smart grid gotland
TRANSCRIPT
2
• Cost efficiently increase the hosting capacity for wind power
• Improvement of the power quality
• Enable demand side participation in the electricity market
Smart Grid Gotland - objectives
• Subprojects within R&D-activities are responsible for the overall project objectives
• Research Platform subprojects are responsible for the physical installations in the grid that constitutes the actual research platform
• Smart Substations and Rural Grid as well as Energy Storage have installations in Smart Grid Gotland Part-2
• In communication outside the project, subprojects Market Test and Market Installations are presented together as Smart Kund Gotland (Smart Customer Gotland)
Smart Kund Gotland Research platform
R&D-Activities
Smart Grid Gotland - scope
2016
2013
- New substation in Källunge
- Self Healing Network operational
- Customer Installation starts
- Funding for Part-2 granted
13/12Project end
Kickoff 1/9
20102011
2012
20142015
Energy Agency grants
funding for Part-1
15/6
Prestudy
finished
23/5
Prestudy
starts
23/11
PV-installation
comissioned
Letter of
Intent signed
6/7
Smart SCADA
installed
Smart Grid Gotland – current situation
System services from wind power• Study how and to which extent wind power
can produce necessary inertia in the system, in order to maintain frequency and voltage levels
Automatic curtailment during critical load situations
• Create a just and efficient way to curtail wind power, which is accepted by a lage diversity of owners and communication solutions.
Studier av olika regler principer
Konstant P -> 0 0 -> P
Increase of the hosting capacity of wind power
Improvement of the power qualityZone concept with centralized intelligence
10kV station, 3 feeders
10kV Feeder
FaultInformationgathererd in
The relayProtection
And sent to SCADA/DMS
Energized
Deenergized
OVR Trip
Fault isolated to smallest possible
grid section
Suggested action:Connect OVR
The operator starts the Restoration and SwitchingAnalysis, RSA, which willinitiate a Load Flow Analysis
Improvement of the power qualitySurveillance on low voltage network
• The low voltage grid is surveyed by customers own meters which traditionally only been used for billing
• The condition of the network is surveyed in real time and disturbances is visualized in the operations centre
• Individual, relevant and understandable outage alerts, based on the information from customers own meter, should be issued automatically
Energy Watch real time visualization of electricity consumption
Price signals and automatic control of
heat and warm water
Customer support Smart Kund web portal
Monthly billEnergy Advice
Enable demand side participation on the electricity market – the customer offer
Water-boilers
Electric heaters
Directelectricheating
Electric floor
heating
Air/water
heat pumps
Air/air heat pumps
(often part of a system with electric radiators thus complex to control)
Enable demand side participation on the electricity market – controllable installations
Installed 260
Participated 400
Invited 700
Interested 1600
Target group 8600
A majority of the participants signed the contract
Two persons per household
NOT INVITED: Summer houses (without supervision), long contracts, certain types of heaters
19% of the target group showed interest
Consumption >8000 kWh/year
Enable demand side participation in the electricity market - Recruitment
Smart Economic Family
Strive to lower cost
Smart Tech family
Like to test technical gadgets
Smart Environment family
Care for the environment
Enable demand side participation on the electricity market – Participants