smart grid – electric vehicle supply equipment (evse’s)
DESCRIPTION
Smart Grid – Electric Vehicle Supply Equipment (EVSE’s). Sustainability Transportation Category San Diego June 2014 Presented by Nathaniel C. Martin, C.E.M. Project Description. The installation of 14 EVSE’s. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/1.jpg)
1
Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)
Sustainability TransportationCategory
San Diego June 2014Presented by
Nathaniel C. Martin, C.E.M
![Page 2: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/2.jpg)
2
Project Description
• The installation of 14 EVSE’s.
• The project was funded through a grant from DOE which was implemented by Sacramento Municipal Utility District (SMUD).
![Page 3: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/3.jpg)
3
Project Description
• The funding requirements were to test the newly commercialized Smart Grid technology.
• Functional requirements: to confirm readiness for direct load control, energy monitoring, and interoperability.
![Page 4: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/4.jpg)
4
Project Information
Project completion date: July 2013Project cost: $236,000
EVSE installation locations:• Parking Lot 1, has 3 units• Parking Structure 1, has 4 units• Parking Structure 2, has 7 units
![Page 5: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/5.jpg)
5
Project Description continued
• Sac State had a requirement to charge a fee for service for each charging event of the EVSE’s.
Prerequisites:• This project required development of a
Demand Response Management System (DRMS) by SMUD.
![Page 6: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/6.jpg)
6
Project Description continued
Prerequisites continued:• Sac State had to install a new Energy
Management Control System (EMCS)• New Electrical Metering equipment with
communication capabilities over the campus Ethernet network
![Page 7: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/7.jpg)
7
EVSE pictures
![Page 8: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/8.jpg)
8
EVSE pictures
![Page 9: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/9.jpg)
9
Energy and the Environment
![Page 10: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/10.jpg)
10
Energy and the Environment
• The total energy usage 6,230 kWh, which equates to 1.93 Metric Tons of CO2e.
• This is equivalent to the 631 gallons, which equates to 5.4 Metric Tons of CO2e.
• The net avoided GHG emissions is 3.47 Metric Tons of CO2e.
![Page 11: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/11.jpg)
11
EMCS AutoDR screen
![Page 12: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/12.jpg)
12
EVSE AutoDr Sequence
![Page 13: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/13.jpg)
13
EVSE charge trend
![Page 14: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/14.jpg)
14
EVSE AutoDr test trend
![Page 15: Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)](https://reader035.vdocuments.us/reader035/viewer/2022081507/56815aac550346895dc84b82/html5/thumbnails/15.jpg)
15
Team
• Linda Hafar, P.E., Sr. Director, Sustainability & Plant Operations-Retired
• Paul Serafimidis, Associate Director, Plant Operations• Nat Martin, C.E.M., Energy Management • SMUD• SAIC Energy, Environment & Infrastructure• The Engineering Enterprise, consulting engineers.• 3DData com• HRGA Architects