small steps big changes - nottingham city council€¦ · small steps big changes client inspired...

47
PROJECT SMALL STEPS BIG CHANGES CLIENT INSPIRED SPACES NOTTINGHAM IN CONSULTATION WITH NOTTINGHAM CITYCARE PARTNERSHIP CIC DOCUMENT ANALYSIS OF BUILDINGS Contacts t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk Partners Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA Architects REDMAK Architecture + Urban Design LLP Address Unit 4 OPM House Haydn Road Nottingham NG5 2LB DATE SIZE JANUARY 2014 A3 page 1 BY REDMAK ARCHITECTURE + URBAN DESIGN LLP BULWELL WARD ASPLEY WARD ARBORETUM WARD ST ANN’S WARD SMALL STEPS BIG CHANGES

Upload: others

Post on 01-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 1

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

S M A L L S T E P S B I G C H A N G E S

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 2

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

C O N T E N T S , I N T R O D U C T I O N A N D S C O P E

1 CONTENTS PAGE

2. INTRODUCTION 2

3. SCOPE 2

4. IDEAL LAYOUT 3

5. BASIS FOR BUDGETARY ANALYSIS 4

6. WARD LOCATIONS 5

7. WARD URBAN / GREENSPACE SPLIT 6

7. BUILDING NAMES AND LOCATIONS 7

8. THE BUILDINGS 8 to 47

2 INTRODUCTION

This study considers the suitability of several existing facilities to host the Small Steps, Big Changes initiative. Each building

identified has been inspected and analysed from the points of view of:

How well the existing spaces and connections between spaces of particular usage can support the proposed uses.

Whether the existing accommodation would support the building being used as the Ward Hub.

What general builder’s work alterations or repairs may be necessary in order to allow the proposed uses to operate.

What budget should be allocated to specific areas or elements of builder’s work.

The financial totals given in this document are transferred to the Capital Spend Plan found elsewhere in the submission.

For photographic information, refer to the appendix.

3 SCOPE

Investigations have not been made into:

The existence of asbestos or other hazardous materials and substances

Condition and / or the efficiency of mechanical and electrical systems

The condition and adaptability of existing computer networks

The site boundaries are assumed and may not indicate the legal ownership.

The plan diagrams given in this document are not based on measured surveys; they are intended to be used to indicate the

general layout, extent and proximity of uses.

The cost estimates provided do not include for:

Heating system modifications or upgrades.

The provision of IT or communications systems.

Loose fixtures and furnishings.

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 3

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

I D E A L L A Y O U T

4 IDEAL LAYOUT

A diagram indicating the ideal juxtaposition of the various rooms required for the delivery of the proposed services.

All proposed buildings should have an appropriate layout for the delivery of the core services.

In addition, one building per Ward is required to host the Ward Administrative Staff.

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 4

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

C O N T E N T S , I N T R O D U C T I O N A N D S C O P E

5 BASIS FOR BUDGETARY ANALYSIS

Each building has a statement regarding the following topics. Where the existing accommodation appears to fall short in the provision of one or more of

these categories, a budgetary allowance is given in order for the inadequacy to be rectified if possible.

FACILITIES: Service Delivery

- Where existing rooms restrict or prevent some aspect of service delivery

FACILITIES: Ward Hub

- Where existing rooms restrict or prevent establishing the 6 to 8 person Ward administrative team

LAYOUT

- Where existing layout restraints prevent the easy movement between spaces

SANITARY

- Where sanitary facilities are distant from the rooms used for service delivery

KITCHEN/ETTE

- Where kitchen facilities appear inadequate for the delivery of some form of healthy eating/cooking classes

CLINICAL ROOM

- Where a clinical room does not exist or is in some way inadequate

NETWORK/WIFI

- Whether there are existing network/Wi-Fi facilities.

CONDITION

- Where surfaces are poor quality or are near the end of their life

SAFETY and ACCESS

- Where access into and around the building is in conflict with the ethos of Part M of the Building Regulations

GENERAL

- Where other aspects of the building interfere with the service delivery

NOTES

- Breast Feeding.

Any multi-purpose room is considered suitable for breast feeding.

Smaller rooms may be more appropriate.

Privacy curtains may be needed.

- Infant Massage

Any multi-purpose room is considered suitable for infant massage.

Larger rooms may need a mobile curtain.

Smaller rooms may be more appropriate.

The addition of soft furnishings may provide a more conducive environment.

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 5

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

W A R D L O C A T I O N S

ARBORETUM

ASPLEY

BULWELL

ST ANN’S

CITY

CENTRE

6 WARD LOCATIONS

The four Wards identified for the delivery of the services and for hosting the hub.

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 6

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

W A R D U R B A N / G R E E N S P A C E S P L I T

ARBORETUM

ASPLEY

BULWELL

ST ANN’S

7 WARD URBAN / GREENSPACE SPLIT

The four Wards identified for the delivery of the services and for hosting the hub showing the extent of built up and green space.

CITY

CENTRE

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 7

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

BUILDING NUMBERS

BULWELL WARD

Snape Wood Community Centre

Bulwell Hall Healthy Living Centre

Crabtree Farm Community Centre

Bulwell Children’s Centre

Bulwell Riverside Joint Service Centre

Ken Martin Leisure Centre

ASPLEY WARD

Bells Lane Community Centre

Aspley Children’s Centre

Aspley Community and Training Centre

Broxtowe Children’s Centre

Sixways Community Centre

ARBORETUM WARD

Hyson Green Youth Club

Mary Potter Health Centre

Tennyson Hall

ST ANN’S WARD

Sycamore Millennium Centre

The Chase Neighbourhood Centre

Blue Bell Hill Children’s Centre

International Community Centre

Valley Joint Services Centre

St Ann’s Children’s Centre

ARBORETUM

ASPLEY

BULWELL

ST

ANN’S

CITY

CENTRE

01

04

06

05

03

02

07

09

11

10

08

13

14

12

16

15

18

20

19

17

02

06

05 04

03

01

10

09 08 11

07

13

12

14

15

17 18

B U I L D I N G N A M E S A N D L O C A T I O N S

20 19

16

8 WARD BUILDING NAMES AND LOCATIONS

The four Wards identified for the delivery of the services with the surveyed buildings located in categories:

WARD HUB

SERVICE DELIVERY

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 8

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

0 1 : S N A P E W O O D C O M M U N I T Y C E N T R E : S N A P E W O O D R O A D

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 9

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ 34,000

Total costs for the upgrade to Ward Hub including extensions: £ 114,000

0 1 : S N A P E W O O D C O M M U N I T Y C E N T R E : S N A P E W O O D R O A D

ANALYSIS

FACILITIES: Service Delivery

- Three varying sized rooms area available including a large hall with sub-dividing wall. £ -

- External play space exists at the site. £ -

- The medium sized multi-purpose room is fitted out as an IT Suite. £ -

FACILITIES: Ward Hub

- This building will not support the Ward Administrative Hub without building an extension. £ 40,000

- Provide office furniture £ 4,000

LAYOUT

- The layout is considered to be similar to the ‘ideal layout’: £ -

SANITARY

- The sanitary accommodation is adjacent the Main Entrance.

Children will need to be supervised when using the toilets. No alterations are prop0sed. £ -

KITCHEN/ETTE

- The kitchen is a domestic type. The cooker does not have an extract hood. Add cooker hood. £ 1,000

- The kitchenette is in the medium meeting room; the IT Suite. £ -

CLINICAL ROOM

- A clinical room does not exist. Construct an extension and fit out: £ 25,000

NETWORK/WIFI

- A network and Wi-Fi are available. Provide new hub and network cabling: £ 8,000

- Provide additional power sockets: £ 3,000

CONDITION

- The decorations and floor finishes in the entrance lobby are near the end of their life. Upgrade £ 4,000

- The Main Hall wall and ceiling decorations are nearing their end of life. Re-paint: £ 5,000

- Upgrade decorations at the front of the building: £ 5,000

- Re-surface the outdoor play space: £ 4,000

SAFETY and ACCESS

- Form opening in the rear of the main hall and install French doors onto the outdoor play space: £ 8,000

GENERAL

- No buggy storage is available. External space exists is available to construct a store: £ 6,000

- Provide play mats: £ 1,000 CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 10

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

0 2 : B U L W E L L H A L L H E A L T H Y L I V I N G C E N T E R : L A W T O N D R I V E

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y A

ND

WA

RD

HU

B

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 11

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ 5,000

Total costs for the upgrade to Ward Hub : £ 20,000

ANALYSIS

FACILITIES: Service Delivery

- Three varying sized rooms available including a large hall with sub-dividing wall. £ -

- The entrance area is an open plan space indicated as a medium sized multi-purpose room. £ -

FACILITIES: Ward Hub

- This building will support the Ward Administrative Hub if the office staff move into service delivery space. £ -

- The ward hub will be tight for space and there is no site available for extensions:

- Provide office furniture: £ 4,000

LAYOUT

- The plan is similar to the ‘ideal layout’. £ -

SANITARY

- No issues. £ -

KITCHEN/ETTE

- The kitchen is a domestic type. £ -

- The kitchen central location suggests further kitchenette space is not necessary. £ -

CLINICAL ROOM

- A clinical room exists. £ -

NETWORK/WI-FI

- Wi-Fi exists. Install a new network hub, and network cabling £ 8,000

- Provide additional power sockets: £ 3,000

CONDITION

- All building areas are in good condition. £ -

- Renovation of the outdoor play wild area: £ 5,000

SAFETY and ACCESS

- No issues. £ -

GENERAL

- An existing nursery operates from the site.

- The outdoor play space will require management to be shared. £ -

- Neither small multi-purpose rooms have external windows; they use borrowed light. £ -

0 2 : B U L W E L L H A L L H E A L T H Y L I V I N G C E N T E R : L A W T O N D R I V E

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y A

ND

WA

RD

HU

B

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 12

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

0 3 : C R A B T R E E F A R M C O M M U N I T Y C E N T R E : S T E A D F O L D C L O S E

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 13

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ 34,000

Total costs for the upgrade to Ward Hub: not possible

ANALYSIS

FACILITIES: Service Delivery

- Three varying sized rooms available including two large halls, one with a sub-dividing wall. £ -

- Two other spaces may become available but are currently hired out: £ -

FACILITIES: Ward Hub

- This building will not support the Ward Administrative Hub. Space is not available to extend. £ -

LAYOUT

- The building layout is contorted in a way that prevents easy supervision of children. £ -

SANITARY

- No issues. £ -

KITCHEN/ETTE

- The kitchen is a domestic type although includes accessible facilities. £ -

- A kitchenette exists in the small devisable part of the main hall. £ -

CLINICAL ROOM

- No clinical room exists. Space is neither available for an extension nor in an existing room: £ -

NETWORK/WI-FI

- Wi-Fi exists. £ -

CONDITION

- All areas are in reasonable condition. £ -

- the second large hall has particularly poor acoustics; add suspended acoustic absorption panelling: £ 6,000

SAFETY and ACCESS

- No other issues. £ -

GENERAL

- Space is neither available inside nor externally for a buggy store. £ -

- Provide play mats for the main hall: £ 1,000

- The outdoor play space indicated is part of a school and access is via a fire escape.

- Create better access from the smaller main hall; French doors and enclosure: £ 12,000

- Add landscaping/play facilities/surfaces and secure enclosure: £ 15,000

0 3 : C R A B T R E E F A R M C O M M U N I T Y C E N T R E : S T E A D F O L D C L O S E

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 14

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

0 4 : B U L W E L L C H I L D R E N ’ S C E N T R E : S T E A D F O L D C L O S E

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 15

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- Two varying sized ground floor spaces are available with two smaller ones on the first floor. £ -

- A large amount of the building has well established use. £ -

- External play space exists at the site but is only accessible via the existing nursery. £ -

- The main multi-purpose space is open to the reception. £ -

- Overall space is limited. £ -

FACILITIES: Ward Hub

- The building will not support the Ward Administrative Hub. Space for extension is not available.£ -

LAYOUT

- The relationship between the available spaces is adequate. £ -

SANITARY

- No issues. £ -

KITCHEN/ETTE

- The kitchen is a domestic type and is open to the reception area. £ -

- The kitchenette is available to the first floor small multi-purpose rooms. £ -

CLINICAL ROOM

- A clinical room exists. £ -

NETWORK/WIFI

- A network and Wi-Fi are available. £ -

CONDITION

- All spaces are in good condition. £ -

SAFETY and ACCESS

- No issues. £ -

GENERAL

- Buggy storage is available. £ -

0 4 : B U L W E L L C H I L D R E N ’ S C E N T R E : S T E A D F O L D C L O S E

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ -

Total costs for the upgrade to Ward Hub including extensions: not possible

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 16

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

0 5 : B U L W E L L R I V E R S I D E J O I N T S E R V I C E C E N T R E : C O V E N T R Y R O A D

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 17

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- Three varying sized rooms are available.

- Two are being used as a nursery. The other is open to the entrance lobby. £ -

- External play space exists at the site. £ -

- This building is extensive and our survey has concentrated on the existing nursery area and youth wing: £ -

FACILITIES: Ward Hub

- This building can support the Ward Administrative Hub: £ -

- Provide office furniture: £ 4,000

LAYOUT

- The layout of the existing rooms are considered acceptable in relation to the ‘ideal layout’. £ -

SANITARY

- No issues. £ -

KITCHEN/ETTE

- A teaching commercial kitchen exists. £ -

- A domestic type kitchen with accessible features opens into a large multi-purpose room. £ -

CLINICAL ROOM

- A clinical exists. £ -

NETWORK/WIFI

- Wi-Fi is available. Provide a network hub and network cabling: £ 8,000

- Provide additional power sockets: £ 3,000

CONDITION

- All spaces are in good condition. £ -

SAFETY and ACCESS

- No issues. £ -

GENERAL

- The external play area has health and safety issues [sharp rocks].

- It is understood that the alterations to make a safe environment for younger children is in progress: £ -

0 5 : B U L W E L L R I V E R S I D E J O I N T S E R V I C E C E N T R E : C O V E N T R Y R O A D

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ -

Total costs for the upgrade to Ward Hub including extensions: £ 15,000

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 18

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

0 6 : K E N M A R T I N L E I S U R E C E N T R E : S A N D H U R S T R O A D

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 19

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- One large multi-purpose space is available on the first floor. £ -

- No external play space exists at the site and space for some is not available. £ -

- Little space is available. Service delivery will be severely restricted. £ -

FACILITIES: Ward Hub

- The building cannot support the Ward Administrative Hub. Space for extension is not available: £ -

LAYOUT

- The layout varies substantially from the ‘ideal layout’. £ -

SANITARY

- The sanitary accommodation is distant from the only available multi-purpose space. £ -

KITCHEN/ETTE

- The only kitchenette available is for the Leisure Centre staff sole use. £ -

CLINICAL ROOM

- A clinical room does not exist. Space to extend is not available. £ -

NETWORK/WIFI

- Unknown. : £ -

CONDITION

- The building condition is acceptable £ -

SAFETY and ACCESS

- No issues. £ -

GENERAL

- No buggy storage is available. External space exists is available to construct a store.

- It would be distant from the service delivery space: £ 6,000

0 6 : K E N M A R T I N L E I S U R E C E N T R E : S A N D H U R S T R O A D

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ 6,000

Total costs for the upgrade to Ward Hub: not possible

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 20

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

0 7 : B E L L S L A N E C O M M U N I T Y C E N T R E : A M E S B U R Y C I R C U S

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 21

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- Three varying sized rooms area available, one is being used as a nursery. £ -

- External play space exists at the site. £ -

- The central multi-purpose space is part of the circulation space for the whole building. £ -

FACILITIES: Ward Hub

- This building will not support the Ward Administrative Hub without building an extension. £ 40,000

- Provide office furniture: £ 4,000

LAYOUT

- The layout is a reasonable approximation to the ‘ideal layout’. £ -

SANITARY

- No issues. £ -

KITCHEN/ETTE

- The kitchen is a domestic type. £ -

- The medium sized space being used as a nursery has a kitchenette. £ -

CLINICAL ROOM

- A clinical room does not exist. Construct an extension and fit out: £ 25,000

NETWORK/WIFI

- No network or Wi-Fi are available. Install new hub and network cabling: £ 8,000

- Install additional power sockets: £ 3,000

- If the building is not going to be the Ward Hub, install two new computers, router and a small Wi-Fi network: £ 5,000

CONDITION

- The building decorations are in reasonable condition. £ -

SAFETY and ACCESS

- No issues. £ -

GENERAL

- No buggy storage is available. External space exists is available to construct a store: £ 6,000

- Changing a pair of fire exit doors from the main hall to the outside would benefit the layout:

- New doors: £ 5,000

- Change the outdoor landscaping into additional play space: £ 16,000

- Provide a set of play mats for the hall: £ 1,000

0 7 : B E L L S L A N E C O M M U N I T Y C E N T R E : A M E S B U R Y C I R C U S

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ 33,000

Total costs for the upgrade to Ward Hub including extensions: £ 108,000

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 22

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

0 8 : A S P L E Y C H I L D R E N ’ S C E N T R E : M I N V E R C R E S C E N T

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y A

ND

WA

RD

HU

B

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 23

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- Several spaces are available with some currently being used. £ -

- External play space exists at the site. £ -

- One medium sized multi-purpose space is part of the circulation space for the whole building. £ -

FACILITIES: Ward Hub

- This building may support the Ward Administrative Hub.

- Negotiation would be needed with existing management.. £ -

- Provide office furniture: £ 4,000

LAYOUT

- The layout is a reasonable approximation to the ‘ideal layout’.

- The long corridor has a consequential negative implication for the supervision of children. £ -

SANITARY

- No issues. £ -

KITCHEN/ETTE

- The kitchen is a commercial type and is in full use by the adjacent nursery. £ -

- The large multi-purpose space has a kitchenette. £ -

CLINICAL ROOM

- A clinical room exists. £ -

NETWORK/WIFI

- The building has access to an NHS server. This access is thought to be limited. Upgrade the system: £ 6,000

- Provide additional power sockets: £ 3,000

CONDITION

- The building decorations are in good condition. £ -

SAFETY and ACCESS

- No issues. £ -

GENERAL

- Buggy storage is available. £ -

- At the time of survey, the management were carrying out external play works:

- Replacement of the large multi-purpose / outdoor play access door. £ -

- Replacement of outdoor play surfaces with health and safety issues. £ -

0 8 : A S P L E Y C H I L D R E N ’ S C E N T R E : M I N V E R C R E S C E N T

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ -

Total costs for the upgrade to Ward Hub including extensions: £ 13,000

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y A

ND

WA

RD

HU

B

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 24

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

0 9 : A S P L E Y C O M M U N I T Y + T R A I N I N G C E N T R E : M I N V E R C R E S C E N T

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 25

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- This building is being well used for delivery of services. £ -

- External play space exists at the site. £ -

- A large multi-purpose room is used as a café and forms part of the circulation for the building. £ -

- A medium sized multi-purpose room is used as a nursery. £ -

FACILITIES: Ward Hub

- This building cannot support the Ward Administrative:. £ -

LAYOUT

- The layout is a long drawn out version of the ‘ideal layout’. £ -

SANITARY

- No issues. £ -

KITCHEN/ETTE

- The kitchen is a commercial type supporting a part time café: £ -

- The nursery has kitchenette. £ -

CLINICAL ROOM

- A clinical room does not exist. Alteration of an existing medium to large space would be needed.

- Several areas of established uses may be appropriate for conversion. No proposed work. £ -

NETWORK/WIFI

- A network exists. £ -

CONDITION

- The building condition is average to poor. Re-decorate the main space: £ 10,000

SAFETY and ACCESS

- No issues. £ -

GENERAL

- No buggy storage is available. External space exists under the porch is security was provided: £ 1,000

- Upgrade the furniture in the reception to create an informal group space: £ 5,000

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ 16,000

Total costs for the upgrade to Ward Hub: not possible

0 9 : A S P L E Y C O M M U N I T Y + T R A I N I N G C E N T R E : M I N V E R C R E S C E N T

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 26

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

1 0 : N O R T H W E S T C H I L D R E N ’ S C E N T R E : S T R E L L E Y R O A D

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 27

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- Six varying sized rooms area available including a theatre space. £ -

- External play space exists at the site. £ -

- A medium sized multi-purpose room is fitted out as an IT Suite. £ -

- A medium multi-purpose room is used as a waiting area. £ -

- A medium multi-purpose room is open plan with the reception area. £ -

- Two out of four nursery rooms were in operation. £ -

FACILITIES: Ward Hub

- This building is not suitable to host the Ward Administrative Hub due to space separation and key fob access: £ -

LAYOUT

- The circular corridor may interfere with supervision of children. £ -

SANITARY

- No issues. £ -

KITCHEN/ETTE

- A domestic type kitchen serves an open plan medium sized multi-purpose room. £ -

- The nursery has kitchenette. £ -

CLINICAL ROOM

- A clinical room exists but is very compact. Internal alteration is not considered cost efficient. £ -

NETWORK/WIFI

- A network exists. £ -

CONDITION

- The building condition is good. £ -

SAFETY and ACCESS

- No issues. £ -

GENERAL

- Buggy storage is available in the porch area. £ -

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ -

Total costs for the upgrade to Ward Hub: not possible

1 0 : N O R T H W E S T C H I L D R E N ’ S C E N T R E : S T R E L L E Y R O A D

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 28

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

1 1 : S I X W A Y S C O M M U N I T Y C E N T R E : D E N T O N G R E E N

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 29

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- This building was undergoing extensive refurbishment after flooding: £ -

- No external play space exists at the site although some space is available. £ -

- The inaccessible area may contain rooms suitable for service delivery. £ -

- The medium multi-purpose room is open plan with the reception area and is not suitable for younger children: £ -

FACILITIES: Ward Hub

- This building cannot support the Ward Administrative Hub: £ -

LAYOUT

- The circular corridor may interfere with supervision of children. £ -

SANITARY

- No issues. £ -

KITCHEN/ETTE

- A domestic type kitchen serves an open plan medium sized multi-purpose room. £ -

- The nursery has kitchenette. £ -

CLINICAL ROOM

- A clinical room does not exist. Internal alteration may be possible

- As survey access was limited, space and cost implications cannot be determined. £ -

NETWORK/WIFI

- The existence of any network is unknown.. £ -

CONDITION

- The building condition is anticipated to be good one the refurbishment is complete. £ -

SAFETY and ACCESS

- No issues. £ -

GENERAL

- The rear small room is in need of refurbishment: £ 4,000

- No buggy storage is available but space exists. Construct external store: £ 6,000

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ 10,000

Total costs for the upgrade to Ward Hub: not possible

1 1 : S I X W A Y S C O M M U N I T Y C E N T R E : D E N T O N G R E E N

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 30

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

1 2 : H Y S O N G R E E N Y O U T H C L U B : T E R R A C E S T R E E T

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y A

ND

WA

RD

HU

B

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 31

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- This building has several spaces available to offer although is mainly used for youth services: £ -

- The building once had a nursery with its own outside play space. £ -

- Some of the building is in very poor condition and the hall on the south is derelict. £ -

- The building suffers from a lack of natural light. £ -

FACILITIES: Ward Hub

- This building can support the Ward Administrative Hub: £ -

- Provide office furniture: £ 4,000

LAYOUT

- The layout is rather contorted leading to issues regarding child supervision. £ -

SANITARY

- No issues. £ -

KITCHEN/ETTE

- The kitchen is in use and is commercial type. £ -

- There is a kitchenette in what was once the nursery. £ -

CLINICAL ROOM

- A clinical room does not exist. An appropriate location for a clinical room is difficult to find. £ -

NETWORK/WIFI

- A small network exists. Install a new hub and network cabling: £ 8,000

- Provide additional power sockets: £ 3,000

CONDITION

- The building condition is generally poor but is better on the first floor and on the north.

- Full refurbishment would not be cost effective: £ -

- Renovation of a medium sized room into the Ward Hub: £ 20,000

SAFETY and ACCESS

- No issues. £ -

GENERAL

- No buggy storage is available. No external space exists. The main hall would need to be used. £ -

FINANCIAL SUMMARY: Costs for upgrade for service delivery: not applicable

Total costs for the upgrade to Ward Hub including extensions: £ 35,000

1 2 : H Y S O N G R E E N Y O U T H C L U B : T E R R A C E S T R E E T

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y A

ND

WA

RD

HU

B

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 32

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

1 3 : M A R Y P O T T E R C H I L D R E N ’ S C E N T R E : G R E G O R Y B O U L E V A R D

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 33

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- This building is extensive and our survey concentrated on the existing children’s centre facility: £ -

- The upper two floors of accommodation have not been included in this study: £ -

FACILITIES: Ward Hub

- This building cannot support the Ward Administrative Hub: £ -

LAYOUT

- The layout is very secure and key fob access is required within the childcare facility: £ -

SANITARY

- No issues. £ -

KITCHEN/ETTE

- The domestic type kitchen serves the large multi-purpose space. £ -

- There are several kitchenettes as indicated. £ -

CLINICAL ROOM

- Two clinical rooms exist. £ -

NETWORK/WIFI

- The building has an NHS network. £ -

CONDITION

- The building condition is very good. £ -

SAFETY and ACCESS

- No issues. £ -

GENERAL

- No buggy storage is available. No external space exists.

- The larger multi-purpose rooms would need to be used. £ -

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ -

Total costs for the upgrade to Ward Hub: £ -

1 3 : M A R Y P O T T E R C H I L D R E N ’ S C E N T R E : G R E G O R Y B O U L E V A R D

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 34

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

1 4 : T E N N Y S O N H A L L : F O R E S T R O A D W E S T

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 35

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- Few spaces in the building are available and there is little capacity: £ -

- There is no outdoor play space available and little opportunity to create it exists.

FACILITIES: Ward Hub

- This building cannot support the Ward Administrative Hub. £ -

LAYOUT

- The building offers little of the variety of rooms and outdoor space needed for this initiative.

- Layout or juxtaposition of the few spaces is considered an irrelevant issue. £ -

SANITARY

- No issues. £ -

KITCHEN/ETTE

- The domestic type kitchen is very compact. £ -

CLINICAL ROOM

- No clinical rooms exist and space does not allow for their creation. £ -

NETWORK/WIFI

- The building has a limited network. £ -

CONDITION

- The building condition is good. £ -

SAFETY and ACCESS

- No issues. £ -

GENERAL

- No buggy storage is available. External space is available. Construct and external store: £ 6,000

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ 6,000

Total costs for the upgrade to Ward Hub including extensions: £ -

1 4 : T E N N Y S O N H A L L : F O R E S T R O A D W E S T

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 36

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

1 5 : S Y C A M O R E M I L L E N N I U M C E N T R E : H U N G E R H I L L R O A D

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y A

ND

WA

RD

HU

B

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 37

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- This building has several spaces available to offer: £ -

- The other building shown on the location plan is an associated sports centre. £ -

- No external play space exists at the site although lots of external space is available to landscape. £ 24,000

FACILITIES: Ward Hub

- This building could support the Ward Administrative Hub. Renovate the front medium sized room: £ 5,000

- Provide office furniture: £ 4,000

LAYOUT

- The long corridor may interfere with supervision of children. £ -

- None of the multi-purpose spaces connect well with outside space; add French doors and a ramp: £ 15,000

SANITARY

- No issues. £ -

KITCHEN/ETTE

- The commercial kitchen is poorly equipped. Install new equipment: £ 18,000

- No other rooms have a kitchenette. Provide additional kitchenette. £ 6,000

- The café space can be used as an informal meeting space but is in poor condition: redecorate: £ 9,000

CLINICAL ROOM

- A clinical room does not exist. Internal alterations are possible. Create clinical room: £ 7,000

NETWORK/WIFI

- There is a small network and no Wi-Fi. Install a new hub and network cabling: £ 8,000

- Provide additional power sockets: £ 3,000

CONDITION

- The building condition is generally poor.

- New flooring and new paint to the walls of the main hall and two rear ground floor rooms: £ 40,000

SAFETY and ACCESS

- The ground floor is split level but has a wheelchair stair lift.

- Full accessibility would require a lift and a stair lift. £ 45,000

GENERAL

- No buggy storage is available but space exists. Construct external store: £ 6,000

- Geographically on the edge of the Ward: £ -

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ 139,000

Total costs for the upgrade to Ward Hub including extensions: £ 184,000

1 5 : S Y C A M O R E M I L L E N N I U M C E N T R E : H U N G E R H I L L R O A D

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y A

ND

WA

RD

HU

B

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 38

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

1 6 : C H A S E N E I G H B O U R H O O D C E N T R E : R O B I N H O O D C H A S E

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 39

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- This building has several spaces available to offer. £ -

- The first floor is in use throughout. £ -

- No external play space exists at the site.

- The potential outdoor play space indicated is on public land. £ -

- The central medium sized multi-purpose space is an open plan café/reception/meeting area. £ -

- One medium sized multi-purpose room is being used as an IT Suite.

FACILITIES: Ward Hub

- This building could not support the Ward Administrative Hub. £ -

LAYOUT

- The layout is similar to the ’ideal layout’. £ -

SANITARY

- No issues. £ -

KITCHEN/ETTE

- The commercial kitchen is in use part time: £ -

- Given the central location of the kitchen, an additional kitchenette is not considered necessary. £ -

CLINICAL ROOM

- A clinical room does not exist. Space to create one is not available. £ -

NETWORK/WIFI

- There is a network. £ -

CONDITION

- The building condition is generally in good. £ -

SAFETY and ACCESS

- No issues. £ -

GENERAL

- No buggy storage is available. No external space exists. The entrance lobby could be used. £ -

- Provide play mats for the main hall: £ 1,000

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ 1,000

Total costs for the upgrade to Ward Hub: not possible

1 6 : C H A S E N E I G H B O U R H O O D C E N T R E : R O B I N H O O D C H A S E

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 40

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

1 7 : B L U E B E L L H I L L C O M M U N I T Y C E N T R E : D E N N E T T C L O S E

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 41

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- This building has several spaces available to offer. £ -

- The building contains an established nursery. £ -

- Two external play spaces exist. The potential one is dedicated for the nursery. £ -

FACILITIES: Ward Hub

- This building could not support the Ward Administrative Hub.

- There is no suitable space for an extension to house it. £ -

LAYOUT

- The layout is similar to the ’ideal layout’; however, the number of rooms available are limited. £ -

SANITARY

- No issues. £ -

KITCHEN/ETTE

- The kitchen is domestic type but the space very generous. £ -

- An additional kitchenette is not considered appropriate. £ -

CLINICAL ROOM

- A clinical room does not exist. Space to create one is not available. £ -

NETWORK/WIFI

- The existence of a network is unknown. £ -

CONDITION

- The building condition is generally in good. £ -

SAFETY and ACCESS

- No issues. £ -

GENERAL

- No buggy storage is available. No external space exists. The main hall would need to be used. £ -

- Provide play mats for the main hall: £ 1,000

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ 1,000

Total costs for the upgrade to Ward Hub including extensions: £ -

1 7 : B L U E B E L L H I L L C O M M U N I T Y C E N T R E : D E N N E T T C L O S E

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 42

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

1 8 : I N T E R N A T I O N A L C O M M U N I T Y C E N T R E : M A N S F I E L D R O A D

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 43

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

ANALYSIS

FACILITIES: Service Delivery

- A comprehensive suite of rooms is available in this building. £ -

- There is an outdoor space including a lawn.

- The hard surfacing is rough. Add outdoor play surfacing: £ 10,000

- The enclosure is not secure. Add fencing: £ 4,000

- The management are interested in applying for match funding to support the project. £ -

FACILITIES: Ward Hub

- This building could support the Ward Administrative Hub: Re-decorate the two upper floor rooms for the Hub: £ 3,000

- Provide office furniture: £ 4,000

LAYOUT

- The building layout is a little contorted. This may give rise to child supervision issues. £ -

SANITARY

- The sanitary accommodation is away from the cluster of multi-purpose rooms being offered. £ -

KITCHEN/ETTE

- The domestic type kitchen is very compact and in poor condition. Re-fit: £ 5,000

- The management intend creating a kitchen where a kitchenette is indicated. £ -

CLINICAL ROOM

- No clinical rooms exist. Locating a room or space suitable to create one is difficult. £ -

NETWORK/WIFI

- The building has a limited Wi-Fi connectivity. Install a new hub and network cabling: £ 8,000

- Provide additional power sockets: £ 3,000

CONDITION

- The building decorations are average to poor. Replace floor finishes and re-paint the ground floor walls etc. £ 30,000

- The large multi-purpose roof near the outdoor play space is in poor condition. Renovate: £ 80,000

SAFETY and ACCESS

- No issues. £ -

GENERAL

- No buggy storage is available.

- The management have suggested using part of the outside play area. Construct a shelter: £ 6,000

- The building is on the edge of one Ward and just outside of another: £ -

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ 135,000

Total costs for the upgrade to Ward Hub including extensions: £ 153,000

1 8 : I N T E R N A T I O N A L C O M M U N I T Y C E N T R E : M A N S F I E L D R O A D

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 44

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

1 9 : V A L L E Y J O I N T S E R V I C E C E N T R E : S T A N N ’ S W E L L R O A D

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 45

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

1 9 : V A L L E Y J O I N T S E R V I C E C E N T R E : S T A N N ’ S W E L L R O A D

ANALYSIS

FACILITIES: Service Delivery

- This building has 5 rooms to offer including the largest one shown that is open plan the city library: £ -

- The rooms being offered are at different ends of the building: £ -

- There is a small outdoor space: £ -

- The management are interested in applying for match funding to support the project. £ -

FACILITIES: Ward Hub

- This building could support the Ward Administrative Hub: £ -

- Provide office furniture: £ 4,000

LAYOUT

- If used for service delivery as well as the Ward Hub, the areas used by the project are separated by the library: £ -

SANITARY

- No issues: £ -

KITCHEN/ETTE

- The building has two kitchenettes, both domestic in scale: £ -

CLINICAL ROOM

- This building has several clinical rooms and has a dedicated breast feeding room: £ -

NETWORK/WIFI

- The building has connectivity to an NHS server. Allow for additional network cabling to the rooms offered: £ 3,000

- Provide additional power sockets: £ 2,000

CONDITION

- The building condition is very good: £ -

SAFETY and ACCESS

- No issues. £ -

GENERAL

- No buggy storage is available. Construct a shelter: £ 6,000

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ 6,000

Total costs for the upgrade to Ward Hub: £ 15,000

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 46

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

2 0 : S T A N N ’ S C H I L D R E N ’ S C E N T R E : o f f P A L M E R S T O N G A R D E N S

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y

PROJECT

SMALL STEPS

BIG CHANGES

CLIENT

INSPIRED SPACES

NOTTINGHAM

IN CONSULTATION WITH

NOTTINGHAM

CITYCARE

PARTNERSHIP CIC

DOCUMENT

ANALYSIS OF BUILDINGS

Contacts

t: 0115 9 60 60 16 e: [email protected] w: www.redmak.co.uk

Partners

Farida Makki MScDP DipArch DipUD RIBA + Mike Reade DipArch DipUD RIBA

Architects

REDMAK Architecture + Urban Design LLP

Address

Unit 4 OPM House Haydn Road Nottingham NG5 2LB

DATE SIZE

JANUARY 2014 A3

page 47

BY

REDMAK ARCHITECTURE

+

URBAN DESIGN LLP

BULWELL WARD

ASPLEY WARD

ARBORETUM WARD

ST ANN’S WARD

2 0 : S T A N N ’ S C H I L D R E N ’ S C E N T R E : o f f P A L M E R S T O N G A R D E N S

ANALYSIS

FACILITIES: Service Delivery

- This building has 2 rooms to offer including one decorated as a children's nursery: £ -

- Service delivery would be limited due to the small number of rooms available: £ -

FACILITIES: Ward Hub

- This building could not support the Ward Administrative Hub and space is not available for an extension: £ -

LAYOUT

- The building layout is adequate: £ -

SANITARY

- No issues: £ -

KITCHEN/ETTE

- The building has a small kitchenette in good condition: £ -

CLINICAL ROOM

- This building has a clinical room: £ -

NETWORK/WIFI

- The building has a small network.: £ -

CONDITION

- The building condition is good: £ -

SAFETY and ACCESS

- The location plan shows that Palmerston Gardens ends some distance from the building: £ -

GENERAL

- There is a shelter in the outdoor play area that could be used for buggies: £ -

FINANCIAL SUMMARY: Costs for upgrade for service delivery: £ -

Total costs for the upgrade to Ward Hub: not possible

CH

OSE

N FO

R

SER

VIC

E

DELIV

ER

Y