Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
Small is beautiful – MiniLNGTM conceptA very small LNG production plant
for the potential use of bio-energy for future energy supply
Presented by Sebastian KunertBusiness Development Engineer, Onshore
Hamworthy Gas Systems AS, Norway
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
PUBLIC PRESENTATION CAUTIONARY STATEMENT:ESTIMATES, EXPECTATIONS, AND BUSINESS PLANS IN THIS PRESENTATION ARE FORWARD-LOOKING STATEMENTS. ACTUAL FUTURE RESULTS, INCLUDING PROJECT PLANS, SCHEDULES, COSTS, AND CAPACITIES AS WELL AS COMMERCIAL ARRANGEMENTS COULD DIFFER MATERIALLY DUE TO CHANGES IN LONG-TERM OIL AND GAS PRICE LEVELS OR OTHER MARKET CONDITIONS AFFECTING THE OIL AND GAS INDUSTRY; POLITICAL OR REGULATORY DEVELOPMENTS; TECHNICAL OR OPERATING FACTORS; THE OUTCOME OF COMMERCIAL NEGOTIATIONS; AND OTHER FACTORS.
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
bio methane conversionis or will be mandatory
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
In this case, we can do something
......
together!
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
Hamworthy Gas Systems
Hamworthy is a supplier of gas processing and liquefaction technologies
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
Small scale LNG plants
21 000 tons/yr plant at Snurrevarden, Norway
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
Small scale LNG plants
84 000 tons/yr plant at Kollsnes, Norway
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
Now Hamworthy can revolutionizeflare gas recovery,coal mine and coal bed methaneand bio gas liquefaction
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
Introducing.....
The MiniLNGTM liquefier
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
A very small LNG production plant
An LNG plant in a standard 40” ISO container optimized for low pressure gases with high contaminants content.SINTEF liquefaction process technology
6000 tons per year Refrigeration cycle withmixed refrigerant for low energy demand.
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
A very small LNG production plant
The plant uses standard equipment for low investment cost and fast manufactureof the liquefaction unit.
The plant is manufacturedat an assembly site, then easily shipped and installed at the chosen location.
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
How small is MiniLNG?
MiniLNG
Snurrevarden
Kollsnes II
8 000 000 m3/yr
30 000 000 m3/yr150 000 000 m3/yr
750 000 000 m3/yr
6000 20 000 100 000 500 000
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
SINTEF Laboratory prototype
Fully instrumentedLiquefaction of methane in a closed circuitProduction: 1 ton LNG/dayIn operation since October2003Long term test during autumn2004 successful with 2 monthsof continuous 24-7 fullyautomated operation
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
The efficiency challenge
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
The efficiency challenge
< 0.6 kWh/kg of LNG produced< 0.5 kWh/kg of LNG produces, if using
CO2 pre-cooling provided byDGE’s BCM-technology
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
The engineering challenge
Oil-flooded screw compressor, after-cooler, off-the-shelf heat exchangers, and expansion valves to the liquefaction system
Creation of multiple phase-changes within the heat exchangers; descending the temperature of the mixture to produce LNG
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
The engineering challenge
For a non-disruptive production of LNG the MiniLNGTM plants will be powered by a gas engine with feed gas or regeneration gas, or both.
”Plug and play” design philosophyRelocation possible
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
The cooling down process
OPTIMIZED VERSIO
N
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
Invitation
Joint industry project Pilot plant
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
The MiniLNGTM biogas-LNG pilot plant
Full scale demonstration of the SINTEF MCR liquefaction technologyi.e. 6 or 15 tons/day – 2400 or 6000 tons/year
An LNG liquefier cannot be used without credible solutions for:Pre-treatmentTail-gas handlingPower supply
The pilot should ideally be representative with respect to:Capacity (6, or 15 tons/day)Feed gas compositionFeed gas impuritiesFeed gas pressurePre-treatment systemTail gas handlingPower generation
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
The MiniLNGTM biogas-LNG pilot plant
MCR pre-cooling
liquefier
pre-treatment
power supply
storage tank
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
The MiniLNGTM biogas-LNG pilot plant
MCR pre-cooling
liquefierpre-treatment
power supply
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
The MiniLNGTM biogas-LNG pilot plant
MCR pre-coolingliquefier
pre-treatment
power supply
storage tank
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
The MiniLNGTM biogas-LNG pilot plant
Proposal for fulfillment of representativeness criteria:Capacity (6 or 15 tons/day).
Paramount, impacts of scale are important
Feed gas composition.Bio gas
Feed gas impurities/Pre-treatment systemRemoval of CO2, water and traces of H2S using DGE’s BCM technology.Excessive H2S and CO2 in feed will require expensive pre-treatment.Within certain narrow limits, pre-treatment can be made fairly simple.
Feed gas pressureAll other sources than pipeline gas needs pre-compression. It is not considered necessary to
demonstrate compression, but pilot will not be built for taking advantage of cold from throttling.
Tail gas handlingA MiniLNG plant in the field should be capable of island-mode operation. All tail-gas should therefore
be treated properly by the pilot plant.
Power generationIsland-mode is required in the field. Pilot must therefore be capable of operation without being
connected to the grid. Requires UPS for control system and small auxiliary manually activated (gasoline) generator. (2,2 kW).
Small is beautiful – The MiniLNG conceptConference ”The potential of bio-energy for future energy supply”, 5. June, 2008, Leipzig, Germany
The MiniLNGTM biogas-LNG pilot plant
Please come and join us !
Thank you for your attention !