sm energy eagleford overview
TRANSCRIPT
European Marketing Bank of America/Merrill Lynch
June 6-10, 2011
1
Consolidated Company
70
34
148
85
64
1Q11 Net Production (MMCFE/d)
Asset Overview
9
985 Bcfe
401 MMCFE/d
Mid Continent Rocky Mountains STX / GC ArkLaTex Permian
Headquarters: Denver, CO
Tulsa, OK
Regional Office
Houston, TX
Regional Office
Billings, MT
Regional Office
Shreveport, LA
Regional Office Midland, TX
Regional Office
2010 Proved Reserves (BCFE) 232
1Q11 Net Production (MMCFE/d) 70
Plays:
Bakken/Three Forks
Niobrara
Rocky Mountains
2010 Proved Reserves (BCFE) 114
1Q11 Net Production (MMCFE/d) 34
Plays:
Wolfberry Oil
Permian
2010 Proved Reserves (BCFE) 207
1Q11 Net Production (MMCFE/d) 148
Plays:
Operated Eagle Ford Shale
Anadarko JV Eagle Ford Shale
South Texas & Gulf Coast
2010 Proved Reserves (BCFE) 294
1Q11 Net Production (MMCFE/d) 85
Plays:
Granite Wash
Woodford Shale
Mid Continent
2010 Proved Reserves (BCFE) 138
1Q11 Net Production (MMCFE/d) 64
Plays:
Haynesville Shale
ArkLaTex
232
114
207
294
138
2010 YE Proved Reserves (BCFE)
Z A V A L AF R I O
L A S A L L E
L I V E O A K
A T A S C O S A
D I M M I T
W E B B
MC MULLEN
MAVERICK
TX SOUTH CENTRAL REG - Regional project in Texas South Central projection
FEET
0 105,526
PETRA 1/19/2011 11:22:07 AM
Total Eagle Ford Shale Position
SM Energy has a 250,000 net acre position in the Eagle Ford shale
~165,000 net operated acres located almost entirely in rich- gas window
~85,000 net acres operated by Anadarko located in oil and rich-gas windows
SM/APC Acreage SM Acreage
12
13
Operated Eagle Ford Shale Overview
• Ramp up from 2 to 6 rigs through the year
• Expecting to drill ~80 gross (70 net) wells, with focus on oilier and higher BTU gas areas
• Well costs currently approximately $6.5 to $7.5 MM
• Increasing contracted takeaway capacity from current 100 Mmcf/d to approximately 230 Mmcf/d by 2H11; total long-term commitment of approximately 470 Mmcf/d by 2H14
• ~165,000 net acres
• 1Q11 Net Production: 91.6 MMCFE/d
• Largely 100% working interest
• 3 operated drilling rigs running in play currently
2011 Plan
Operating Highlights
Net Production
0
10
20
30
40
50
60
70
80
90
100
1Q10 2Q10 3Q10 4Q10 1Q11
MM
CFE
/d
Oil Gas NGL
19.1 26.5
38.8
60.3
91.6 A
A Please see footnote on slide 11
14
Non-operated Eagle Ford Shale Overview
• APC gross rigs to stay at 10 for the remainder of the year
• Participating in approximately 50 net wells
• Roughly 25% WI partner in Anadarko (“APC”) operated JV
• ~310,000 gross / ~85,000 net acres
• 1Q11 Production: 43.5 MMCFE/d
• 10 rigs currently running
• SM participates pro rata in the midstream and downstream arrangements
2011 Plan
Operating Highlights
Net Production
0
5
10
15
20
25
30
35
40
45
50
1Q10 2Q10 3Q10 4Q10 1Q11
MM
CFE
/d
NGL
Gas
Oil
2.2 5.7
13.8
26.1
43.5 A
A Please see footnote on slide 11
15
Proposed Eagle Ford Sell Down
• ~15% of entire gross acre position, or approximately 72,000 net acres marketed
• Disproportionately sells down the non-operated portion of our position to allow for more control over operated capital program
• Allows Company to lock in some return and provides capital to fund development of program
• Company received multiple bids and is currently negotiating a transaction or combination of transactions