Tel.: (P) 26477000 Extn. 2231, Fax: (022) 26478544 Email: [email protected] S'~ MJ\HJ\ VITARAN MnNlrtJ.ntrll Slota Eloctridty Oialribull(Vl Co. lid. (A Govt. of Maharashtra Undertaking) CIN= U40109MH2005SGC15364 Office of the Chief Engineer (Special Project Department) Maharashtra State Electricity Distribution Co. Ltd. "Prakashgad", 5th Floor, Station Road, Bandra(E), Mumbai-400 051. No. CE(SPC)/Feeder Separation/2018-19/T-01 to T-11/ '4' 39 Dtd. 08·01. 'VfJ 19 ADDENDUM - 03 To, AllProspective Bidders, Registered on Mahavitaran E-tender portal Name of Contract: Tender for Feeder Separation works in various Circles. Tender No: CE/SPC/Feeder Separation/ T- 01 to T-11 dtd. 14.06.2019. In Pursuant to subject Tenders for Feeder Separation works in various Circles viz: Buldhana, Nagpur Rural, Chandrapur, Gondia, Bhandara, Ahrnednagar, Ialgaon, Baramati, Satara, Kolhapur and Sangli, the following modifications are made and shall form part of bidding document for this tender: Section / Clause No. Revised Clause Existing Clause Clause 3.5 of Section-1 (Instructions to Bidders) Clause 23.1.2 of Section-1 The bidder shall submit, in a The bidder shall submit, in a (Instructions to Bidders) separate envelop, following separate envelop, following documents in hard copies documents in hard copies prior prior to the dead line for to 17.30 hrs. of last date of bid MSEDCL reserves the right to MSEDCL reserves the right to assess the performance of the assess the performance of the bidder based on the work bidder based on the work carried out by them against carried out by them against MSEDCLtenders. MSEDCLtenders. In case of poor performance, In case of poor performance, MSEDCL reserves right to including but not limited to non- disqualify the bidder. completion of project in time, termination, partial termination, etc, MSEDCL reserves right to disqualify the bidder.

Upload: others

Post on 06-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MnNlrtJ.ntrll Slota Eloctridty Oialribull(Vl Co. (A Govt ... · MJ\HJ\VITARAN MnNlrtJ.ntrll Slota Eloctridty Oialribull(VlCo.lid. (A Govt. of Maharashtra Undertaking) CIN=U40109MH2005SGC15364

Tel.: (P) 26477000Extn. 2231, Fax: (022) 26478544Email: [email protected]

S'~MJ\HJ\VITARANMnNlrtJ.ntrll Slota Eloctridty Oialribull(Vl Co. lid.

(A Govt. of Maharashtra Undertaking)CIN= U40109MH2005SGC15364

Office of the Chief Engineer (Special Project Department)Maharashtra State Electricity Distribution Co. Ltd."Prakashgad", 5th Floor, Station Road, Bandra(E),

Mumbai-400 051.

No. CE(SPC)/Feeder Separation/2018-19/T-01 to T-11/ '4' 39 Dtd. 08·01. 'VfJ 19

ADDENDUM - 03To,All Prospective Bidders,Registered on Mahavitaran E-tender portal

Name of Contract: Tender for Feeder Separation works in various Circles.

Tender No: CE/SPC/Feeder Separation/ T- 01 to T-11 dtd. 14.06.2019.

In Pursuant to subject Tenders for Feeder Separation works in various Circles viz: Buldhana,Nagpur Rural, Chandrapur, Gondia, Bhandara, Ahrnednagar, Ialgaon, Baramati, Satara, Kolhapurand Sangli, the following modifications are made and shall form part of bidding document for thistender:

Section / Clause No. Revised ClauseExisting ClauseClause 3.5 of Section-1(Instructions to Bidders)

Clause 23.1.2 of Section-1 The bidder shall submit, in a The bidder shall submit, in a(Instructions to Bidders) separate envelop, following separate envelop, following

documents in hard copies documents in hard copies priorprior to the dead line for to 17.30 hrs. of last date of bid

MSEDCL reserves the right to MSEDCL reserves the right toassess the performance of the assess the performance of thebidder based on the work bidder based on the workcarried out by them against carried out by them againstMSEDCL tenders. MSEDCL tenders.

In case of poor performance, In case of poor performance,MSEDCL reserves right to including but not limited to non­disqualify the bidder. completion of project in time,

termination, partialtermination, etc, MSEDCLreserves right to disqualify thebidder.

Page 2: MnNlrtJ.ntrll Slota Eloctridty Oialribull(Vl Co. (A Govt ... · MJ\HJ\VITARAN MnNlrtJ.ntrll Slota Eloctridty Oialribull(VlCo.lid. (A Govt. of Maharashtra Undertaking) CIN=U40109MH2005SGC15364

Section / Clause No..~------------~----------------~~~~----------~Revised ClauseExisting Clause

submission of bids: submission:a) Copy of receipt of On- a) Copy of receipt of On­Line Payment made by the Line Payment made by thebidder against the TenderFees and applicable GST.b) Bid security separate

bidder against the Tender Feesand applicable GST.b) Bid security separate for

for each tender quoted for. each tender quoted for.c) Power of attorney in c) Power of attorney in thethe name of the person name of the person authorizedauthorized to sign tender to sign tender documents.documents.

d) Copy of technical proposal.

Clause No. 1.6 All certificates, notices or All certificates, notices or(Communications) (c) of written orders to be given to written orders to be given to theSection-2 (contract the Contractor by the Contractor by the Employer orconditions) Employer or the Employer's the Employer's Representative,

Representative, and all notices and all notices to be given to theto be given to the Employer or Employer or to the Employer'sto the Employer's Representative by theRepresentative by the Contractor, shall either beContractor, shall either be delivered by hand againstdelivered by hand against written acknowledgement ofwritten acknowledgement of receipt, or be sent by email orreceipt, or be sent by email or one of the agreed systems ofone of the agreed systems of electronic transmission. Theelectronic transmission. The address of Employer for theaddresses for the receipt of receipt of suchsuch communications shall be communications is as below:only as stated in the Appendixto Tender. Communication The Chief Engineer (SPD)done at any other address will MSEDCL, 5th Floor,not be considered for anyaction during the execution ofthe project or during theDefect Liability Period.

d)deleted.

PrakashgadBandra (East) - Pin-400051Telephone: (022) 26478252Extn.: 2231Email:[email protected]

Communication done at anyother address will not beconsidered for any action during

Page 3: MnNlrtJ.ntrll Slota Eloctridty Oialribull(Vl Co. (A Govt ... · MJ\HJ\VITARAN MnNlrtJ.ntrll Slota Eloctridty Oialribull(VlCo.lid. (A Govt. of Maharashtra Undertaking) CIN=U40109MH2005SGC15364

conditions) monthly milestones for aperiod of 3 consecutivemonths,

monthly milestones for aperiod of 2 consecutivemonths,

Section / Clause No. Existing Clausethe execution of the project orduring the Defect Liability

Period.

Clause No. 15.1 (Notice to If the Contractor fails to carry If the Contractor fails to carrycorrect) of Section-2 out any of his obligations, or if out any of his obligations, or if(contract conditions) the Contractor is not the Contractor is not executing

executing the Works in the Works in accordance withaccordance with the Contract, the Contract, the Employer'sthe Employer's Representative may give noticeRepresentative may give to the Contractor requiring himnotice to the Contractor to make good such failure andrequiring him to make good remedy the same within asuch failure and remedy the specified reasonable time.same within a specified MSEDCL shall issue Notice toreasonable time. MSEDCL Correct in case the progress isshall issue Notice to Correct not. as per agreed milestonein case the progress is not as for two consecutive months. Inagreed. In case there is no case there is no markedmarked improvement after improvement after one Notice totwo Notice to correct, the correct, the employer may issueemployer may issue termination / partial

Revised Clause

termination / partial termination notice as the casetermination notice. may be.

Clause No. 15.2 (h) of If the Contractor: If the Contractor:Section-2 (contract h) fails to achieve the agreed h) fails to achieve the agreed

Clause No. 15.2 NIL(Termination/PartialTermination) of Section-2(contract conditions)

If the Contractor:i) fails to start the workexecution within 3 months fromdate of LoA,"

Page 4: MnNlrtJ.ntrll Slota Eloctridty Oialribull(Vl Co. (A Govt ... · MJ\HJ\VITARAN MnNlrtJ.ntrll Slota Eloctridty Oialribull(VlCo.lid. (A Govt. of Maharashtra Undertaking) CIN=U40109MH2005SGC15364

Existing Clause Revised ClauseSection I Clause No.a) General: The amount a) General: The amount

payable to the Contractor payable to the Contractorand valued at base prices and valued at base prices inin accordance with the accordance with thepayment Schedule shall payment Schedule shall be

Clause No. 13.2 (PriceVariation Applicable) (a)of Section-2 (contractconditions)

adjusted for rises or falls inthe cost of Labor, Equipment,Plant, Materials and otherinputs to the Works by theaddition or deduction of theamounts for the Major Plantand Equipment determinedby the formulae prescribedin Section 7 "PriceVariation Formulae". To

be adjusted for rises orfalls in the cost of Labor,

Plant,Equipment,Materials and otherinputs to the Works bythe addition or deductionof the amounts for theMajor Plant andEquipment determinedby the formulaeprescribed in Section 7 II

Price VariationFormulae". To the extentthat full compensation forany rise or fall in costs tothe Contractor is notcovered by the provisionsof this or any other clausein the contract, thecontract price shall be

that fullthe extentcompensation for any rise orfall in costs to the Contractoris not covered by theprovisions of this or anyother clause in the contract,the contract price shall bedeemed to include amountsto cover the cost of any suchother rise or fall in costs. ThePrice Variation isapplicable to DistributionTransformer, HTIL TCables, Conductors, RSJPoles, Steel Structure(fabrication), FeederBreaker, Special DesignTransformer, ABSwitch.

deemed includetoamounts to cover the costof any such other rise orfall in costs.

Section-S, 1st paragraph of WHEREAS," FORMOFBIDSECURITY

WHEREAS, ________ [Name of [Name of Bidder] (hereinafterBidder] (hereinafter called called "the Bidder") has"the Bidder") has submitted submitted his bid datedhis bid dated 2019, for

2019, for supply, test, transport,

"

supply, transport, construction, erection, testingtest,

Page 5: MnNlrtJ.ntrll Slota Eloctridty Oialribull(Vl Co. (A Govt ... · MJ\HJ\VITARAN MnNlrtJ.ntrll Slota Eloctridty Oialribull(VlCo.lid. (A Govt. of Maharashtra Undertaking) CIN=U40109MH2005SGC15364

Existing Clause Revised ClauseSection / Clause No.construction, erection, testing and commissioning ofand commissioning of llkV /22kV lines, distributionllkV /22kV lines, distribution transformer centers of varyingtransformer centers of varying capacities, Providing of ABcapacities, Providing of AB switches, HT line , providingswitches, HT line ,providing meters & service connectionsmeters & service connections works and other allied works,works and other allied works, including a two year guaranteeincluding a two year under the FEEDERguarantee (defects liability) SEPARATION on a single pointperiod, for works except responsibility "indivisible fulltransformers & meters and Turnkey" basis under bidfive years guarantee (defect package number Bid No:liability) for transformers & CE/SPC/Feeder Separation /meters under the FEEDER T- _/2019-20 for works in ----SEPARATION on a single Circle (hereinafter called "the

point responsibility Bid")"indivisible full Turnkey"basis under bid packagenumber Bid No:CE/SPC/FeederSeparatiorr/T -_/2019-20for works in --- Circle(hereinafter called "the Bid").

Clause 4 (Contract The commencement date of The commencement date of theCommencement and the Contract shall be the date Contract shall be the date of LOACompletion ) of "Draft of LOA issued by Chief issued by Chief EngineerContract Agreement" of Engineer MSEDCL Special MSEDCL Special Project.TheSection-6 in respect of Project.The time stipulated for time stipulated for completion ofTender No. T-01. T-02. completion of works shall be works shall be the essence of theT-03. T-04. T-05. T-06. T- the essence of the contract. contract. The contract period of07. T-08 and T-09 The contract period of Works Works of " FEEDER

of " FEEDER SEPERATION SEPERATION and other alliedand other allied works" shall works" shall be 18 (Ei2hteen)be 12 (Twelve) months from months from thethe Commencement Date. And Commencement Date. Andfurther contract period for further contract period for otherother allied works, including allied works, includingguarantee/defects liability guarantee/defects liability shallshall be 2 (two) years from the be 2 (two) years from the date ofdate of commissioning of commissioning of useful section

Page 6: MnNlrtJ.ntrll Slota Eloctridty Oialribull(Vl Co. (A Govt ... · MJ\HJ\VITARAN MnNlrtJ.ntrll Slota Eloctridty Oialribull(VlCo.lid. (A Govt. of Maharashtra Undertaking) CIN=U40109MH2005SGC15364

Section / Clause No. Existing Clause Revised Clause

Clause 8.8 (LimitInterimPenalty /LiquidatedDamages (IP /LD)Delay) ofSection-2

useful section for works & for works &materials.materials. The contractor shall so organizeThe contractor shall so his resources and perform andorganize his resources and complete the works within theperform and complete the aforesaid period.works within the aforesaidperiod.

for The limit for Interim The limit for Interim Penalty /Penalty/liquidated liquidated Damages, for delayDamages, for delay shall be shall be 5.00% (Five percent)

for 5.00% (Ten percent) for for executed work and 10% forexecuted work and 10% for Non-executed work excludingNon-executed work excluding GST and Provisional sum (ifGST and Provisional sum (if any). The total IP/LD will beany). The total IP/LD will be limited upto 5% of thelimited upto 5% of the contract value for executedcontract value for executed work and 10% of contractwork and 10% of contract value for non-executed work.value for non-executedwork.

Further, Section-4 (Activity Schedule) is amended as below:

1) In Section-4 (Activity Schedule), Cost data of following Activities are corrected.:

i. 6723 : 11 kVAS: Switch 400 Amp with DPstructure

ii. 6723 R : 11 kVAB. Switch 400 Ampwith 4Pole structure

iii. 6724 : 22 kVAB. Switch with RS]pole 110 X 116, 9 mtr DPwith alliedfabrications.

iv. 830

v. 0908

vi. 1218

: Pin type, 22 KV,AAAC55 mm2. conductor on 116 X100 mm,9 mtrlong RS]Poles

: Cost data forl1 KVSingle circuit Pin type with 55sq.mm AAAClineson 100x116 mm 9 mtr PSCpoles

: 11/0.4 KV,25 KVADist. Transformer centers on RS], 100 X116 mrn, 9 mtrwith Kitkat Dist box

Page 7: MnNlrtJ.ntrll Slota Eloctridty Oialribull(Vl Co. (A Govt ... · MJ\HJ\VITARAN MnNlrtJ.ntrll Slota Eloctridty Oialribull(VlCo.lid. (A Govt. of Maharashtra Undertaking) CIN=U40109MH2005SGC15364

· .

vii. 913 R : Laying of 11 kV3 C300 mm 2 XLPEUG Cable 100m

viii. 0813 R : Laying of 22 kV3 C300 mm 2 XLPEUG Cable 100m

ix. 6723 Rl : Major River Crossing 2no 4pole structure

2) In Section-4, Price Schedules are revised. The revised total tender cost of 11 Circles willbe Rs. 458.16 Cr. against present 459.14 Cr. Further, Clarifications to pre-bid queries isenclosed herewith as Annexure-I.

PLeasenote that this 'ADDENDUM-03' forms a part of the bidding document and a confirmationof its acceptance is to be submitted by signing copy of this Addendum as a part of Bidder's

Technical Proposal.

~

Chief Engineer,Special Project Department

MSEDCL,Mumbai

Page 8: MnNlrtJ.ntrll Slota Eloctridty Oialribull(Vl Co. (A Govt ... · MJ\HJ\VITARAN MnNlrtJ.ntrll Slota Eloctridty Oialribull(VlCo.lid. (A Govt. of Maharashtra Undertaking) CIN=U40109MH2005SGC15364

Pre-Bid Queries of Tender T-Ol to T-U under Feeder Seperation Scheme''''''tt-l ~

Sr.No. Subject Query MSEDCLClariftcation

1 Testing PIconfirm. Transformer will be Inspected and tested at manufacturing works or 100% 10% Transformer will be inspected at factory & 100% TransformerPaKe63 of 1253 testing at site also will be carried out will be Ing>ected at site.

2 Price Variation Price variation shall be applicable on 1) Structural Material (Fabrication) 2) RSJpoles. 3)Please refer addenda - 3CT' PIconfirm and provide IEEMAformula for the same.

Activity Schedule Loading on Tender estimate Amount is mentioned 26.525% instead of37.025%. As per cost data for FY2019-20 of MSEDCL.the centages (loading)3 0602.0603. 1230. (Erection cost on material considered 5% instead of 15%); for the activities within substation is 26.525%; however. centages

1018 PIconfirm. Request to change accordingly. (loading) for the activities out of Substation is 37.025%

4 Activity SchedulePIconfirm. Total mentioned in Schedule-2. Request to change accordingly. Activity Schedule / SORin respect of 0813 R is revised. Please refer

0813 R Addendum-03.5 Activity Schedule PIconfirm. Total Cost of Material mentioned in detailed SOR.Request to change Activity Schedule / SORin respect of 6723 R1 is revised. Please refer

6723 Rl accordingly. Addendum-03.Activity 6723. 6724.

6 6723 R.6723 ai, 6724 PIconfirm. Aluminum Paint & Red Oxide Paint Some of the activity paint is missing. Aluminum Paint & Red Oxide Paint is Included in sundries.R

• 7 Activity No 603 Equipment Support Structure shall be MS. As mentioned in Activity schedule

8 Activity No 603 Foundation Concreting shall be 1:4:8. Foundation concreting ratio is 1:3:6

Concreting ratio under sr.no 18 mentioned 1:3:6 and under assumption it is mentioned Concreting ratio is 1:3:6. Billingwill be done on the basis of actual9 Activity No090B 1:4:8. PIconfirm. Concreting 18 CMTshall be used for 18 Nosof Poles and 8 Nos of Stay executed quantity of item in rio said item specified in actvity as per

set. Section-l, clause no. 16.6.

Billingwill be done on the basis of actual executed quantity of item10 Activity No 1219 Concreting and ratio not mentioned. in rio said item specified in actvity as per Section-I, clause no. 16.6.

Concreting ration is 1:3:6Billingwill be done on the basis of actual executed quantity of item

11 Activity No 1220 Concreting and ratio not mentioned. in rio said item specified in actvity as per Section-l, clause no. 16.6.Concreting ration is 1:3:6

12 Concreting ratio mentioned 1:3:6 Concreting ratio is 1:3:6r--13 Qtymentioned 2 CMTto be used for 2 Nosof RSJPoles and 4 Stay Sets.f.-14 Earthing Set is not mentioned. Billingwill be done on the basis of actual executed quantity of itemf.-

in rio said item speclfled in actvity as per Section-t, clause no. 16.6.15 Activity No6723 GIWire for Earthing is not mentioned.f.-

16 Stay Wire is Not mentioned.f.-

17 Fabrication Material to be used in this activity shall be Painted or Nott-- Red Oxide and Aluminum Paint is included in sundries.18 PIadd rate and qty of Red Oxide and Aluminum Paint in the Activity schedule.

19 Concreting ratio mentioned 1:3:6 and it is in LSnot in CMT. Concreting ratio is 1:3:6 and its unit is to be considered as CMT.Please refer Addendum-03.f.-

20 Activity No 6724 Qty mentioned 2 CMTto be used for 2 Nosof RSjPoles and 4 Stay Sets. Billingwill be done on the basis of actual executed quantity of itemin rIo said item specified in acrvity as per Section' I. clause no. 16.6.r--

21 Fabrication Material to be used In this activity shall be Painted or NotRed Oxide and Aluminum Paint is included in sundries.r-u- PIadd rate and qty of RedOxide and Aluminum Paint in the Activity schedule.

Billingwill be done on the basis of actual executed quantity of item23 AllActivity Schedules CI~!l1rsfor Danger Board and Barbed wire not considered. in rio said item specified in actvity as per Section-I, clause no. 16.6.Clamps for Danger Board are considered in sundries

24 AllActivitySchedules Provision for Hard rock pit excavation not considered. cohsiderlng expenses towardsThe bidder shall take all considerations before offering quote.drilling for hard rock excavation. we request to kindly keep provision for the same.

2S Price Adjustment PVis applicable OnInstallation (Erection Portion) or not? PVis not applicable on Installation (Erection Portion ). Applicableonly on material. Refer addenda - 03.

26 Payment Schedule Balance 10% shall be released after completion of 100% work and closure of project & Yes. 10% shall be released after completion of100% work andafter receipt of Work Completion Certificate. closure of project & after receipt ofWork Completion Certificate.

We are interested to participate in your E-tender notice for feeder separation work invarious circles. We have already purchased tender CE/SPC/Feeder separationjT-

27 02/Nagpur rural circle by making necessary payment in online portal. Now we requiredThe details are available in tender documentqualifying data of Chandra pur circle for CE/SPC/Feeder Separation/T -03/Chandrapur

circle to check our eligibility. Kindly mail us the detail scope/BOQ along with qualifyingcriteria.

In this reference please note that our bankers have refused to issue the Bank Guaranteeto be submitted towards EMDin absence of details of your bank and IFSCcode. Sincethese details have not been given in the NITwe request you to provide these details as

28 without these details it is not possible to get the Bank Guarantee issued from our Please refer Addendum-02bankers. We therefore request you to please provide the above details so that we mayalso participate in the same .

Page 9: MnNlrtJ.ntrll Slota Eloctridty Oialribull(Vl Co. (A Govt ... · MJ\HJ\VITARAN MnNlrtJ.ntrll Slota Eloctridty Oialribull(VlCo.lid. (A Govt. of Maharashtra Undertaking) CIN=U40109MH2005SGC15364

Sr.NQ. Subject Query MSEDCLClarillcation

We understand that Supply, Erection, Testing and Commissioning ofNew lauemeutatioll and renovation 22 KVor 11 KV& LTLines, New/11/0.4 KVor

. 22/0.4 KVDistribution Transformer centers & allied works .

(i) In a single turnkey contract/work orders, at least 25% of the Transformer Capacityconsidered In proposed bid (i.e. Sum of KVAratings of transformers proposed in thepresent bid) and 2S% of length of lines considered in proposed bid(i.e. sum of33/ 22 /

Section 1 11 KV& I.T lines proposed in the bid),

Instructions to OR

Bidders (ii) InTWOturnkey contracts/work orders together equivalent to at least 30% of the

29 5. Qualification of the Transformer Capacity considered in proposed bid and 30% of length of lines considered As per tender clause only.Bidder - For in proposed bid (i.e. sum of33/ 22/11 KV& I.T lines proposed in the bid),

individual Bidder OR

(Q.R) (iii) In THREEturnkey contracts/work orders together equivalent to at least 35% of theTransformer Capacity considered in proposed bid and 35% of length of lines consideredin proposed bid (i.e. sum of33/ 22 / 11 KV& I.T lines proposed inthe bid),In Other Words We Wish to Confirm From your good self that in order to qualify for thetender the quantum of work executed shall also include New/ augmentation andrenovation of sum of33/ 22 /11 KV& I.T lines Work instead of sum of33/ 22 /11 KVlines.

Section 1 Kindlyamend the terms & procedure of payment as 60% cost of all materials shall beInstructions to paid on receipt of material at site. Thepayment made to the contractor shall be

30 Bidders considered as a progressive payment against supply of material and that shall not be Payment Procedure as per tender documents.16.6 Payment considered as an advance paymentSchedule

11". DIUcecur-uy lr.MUJ.19.2 The bid security shall, at the bidder's option, be in the form of a demand draft or anunconditional, irrevocable BankGuarantee from any Nationalized / Scheduled Bank infavour of the Employer, payable at MUMBAI,as stated in the Bidding Data.The format ofthe Bank guarantee shall be in accordance with the sample form of bid security includedin Section 3; other formats may be permitted, subject to the prior approval of theEmployer.

19. BidSecurity 16.4 Mobili7.ationadvance.The BankGuarantee should be from Nationalized bank or Scheduled31 (EMD) & 16.4 a) Contractors will be eligible for mobilization advance equal or less than 10% of the

Mobilization advance. contract value. MSEDCI.shall release such advance against irrevocable valid bank bank (as per RBIguidelines) and should be payable at Mumbai

guarantee of any Nationalized / Scheduled Commercial bank of equal amountWe have our banker as Abhyudaya Co-Operative bank which is scheduled bank andhaving business of20,OOOcrore. Sowill it be acceptable that shall we submit the bidsecurity and mobilization advance in the form of bank guarantee of Abhyudaya Co opbank.We request you to clarify the same whether the bank guarantee (for bid security & BGagainst mobilization advance) of scheduled bank is acceptable to you.

As per Section·IITB/ Clause No.23.1.2, The envelope shall providethe name and address of the bidder, and shall be addressed to theEmployer at the address designated in the Bidding Data.The Address is:

32 Hard Copysubmtsslon Kindly provide the address where to submit hard copies as per clause no. 23.1.2 The Chief Engineer [SPC)MSEDCI.,5th Floor, PrakashgadBandra (East) . Pin-400051Telephone: (022) 26478252 Extn. : 2231Email:[email protected]

33 Activity No.913 R We presume that excavation for UGcable laying is in client scope. Separate item not No, the BOQis for complete scope of work including excavation,iven. Please clarify.laying. backfilling etc asper standard practice.

34 Activity No.913 R,sr. Kindlyconfirm the unit and rate of Sand, as per tender sand rate is Rs.300.81/CmtNo.6 Sand incJudil]gerection. As per tender cost data, Sand rate is Rs. 222/· per CmtActivity No.908, sr.:

Kindlyprovide the PSCpole/RSJ Pole& HTStay set concreting ratio. In activity schedule Concreting ratio is 1:3:6, Billingwill be done on the basis of actual35 No.BConcretingr;.tion 1:3:6 separate item is not given for PSCpole / RSJPole& HTStay set concreting. executed quantity of item in rio said item specified in actvity as per

Secnon-l, clause no. 16.6.

36 Wepresume that concreting for RSJPole and HTStay set are in client scope. Separate 100% work is in bidder's scope including concreting. Billingwill beitem not given. Please clarify. done on the basis of actual executed quantity of item in rio said item

specified in actvity as per Section-I, clause no. 16.6.37 813R Sumof Cost of material of this activity is not match, please clarify. ActivitySchedule / SORin respect of 0813 Rwill be revised.38 In Some activity schedules nut and bolt item is missing. please clarify. Nut and bolts are considered in sundries.39 For above subject tenders three different tender Nos.are showing in tender documents;

'---- [please confirm that which one will be consider,40 Tender No. In tender doc. page no. 1 of 1251· CE/SPC/Feeder Separation/ T- 09/ Satara Circle

f-- Version-2, Read as "CE/SPC/Feeder Separation/ T· 09/Satara Circle"~ Also page No. 142 of 1251- CE/SPC/Feeder Seoaration/T-09/2019-20 and

42 On E'portal- CE/SPC/Feeder Separation/ T- 09/ Satara Circle.

43 Please provide the list of Banks to prepare the BankGuarantee The Bank Guarantee should be from Nationalized bank or Scheduledbank (as per RBIguidelines) and should be payable at Mumbai

44 Please provide the guidelines for online bid submission. Please refer "Vendor E-tendering Process Manual" on following link"L11 ~.~O "V dUVVC 'UUJeLl III ." "'" ,""U""U ",., ute naru copy or 'U"UWHlIl

https://etender.mahadiscom.in/eatApp/download .documents are mendetary1) Copyof receipt of online payment made by bidder2) Bidsecurity: Earnest Money Deposited (EMD)

Hard copy of follOWingdocuments is to be submitted (Please refer3) Power of Attorney45 clause no-23.1.2 Page 4) Copyof Technical Proposals Addendum·03)

No·29 In abov~ ,,:e are ready to submit first 3 points. But We feel that 4th one is already 1) Copy of receipt of online payment made by biddersubrnittlngonline and for hard copy ,paper quantity required will be more and it is not a 2) Bid security: Original copy Earnest MoneyDeposited (EMD)enviement friendly act So kindly through your guidelines on this matter 3) Original copy of Power of AttorneyIt will be great ifyou to either remove this 4th condition in clause no-23.1.2 or grant usto reliie on only online submission.

Page 10: MnNlrtJ.ntrll Slota Eloctridty Oialribull(Vl Co. (A Govt ... · MJ\HJ\VITARAN MnNlrtJ.ntrll Slota Eloctridty Oialribull(VlCo.lid. (A Govt. of Maharashtra Undertaking) CIN=U40109MH2005SGC15364

Sr. No. Subject Query I14SEDCLClarllication

46nme Period 18

Considering quantum of work time period for completion should be at least 2 years. Time period will be as per tender documents only.months

47' Payment terms90% payment against commissiong. Please consider 60% payment against delivery of Payment procedure will be as per tender documents only.material at site. Which is applicable for IPDS & DDUGIYscheme.50% of estimated cost Please consider 30% average turn over for the esimated cost Required Average Turnover will be as per tender documents only.48 Turn Over Which is aoolicable for IPDS& DDUGIYscheme.

'·Useful Section" means the complete separated and commissionedfeeder along with transformers and l..T. lines. The feeder should be

Useful section for Please clarify the meaning of useful section to be consider for raising the invoices.charged from the separate breaker in Sub-station. Partial useful

49 billing section means the partially separated and commissioned feederalong with transformers and l..T. lines starting from the sub-stationsource.

Please clarify wheather labour cess will be applicable extra on services. Yes, Labour cess will be deducted from bill. Extra payment will not50 Labour Cess be made.51 Feeder list Please provide list of Feeders if possible.

1) SPCPConsidered on 9 mtr. PSCpole. The Electrical Inspector does not allowed SPCP

52 Activity 908 11KV line on PSCpole, RSjpole is required.SPCPon PSCpole Is alluwed2)Considering the quantity of 11KV line. Quantity of transformers to be installed is very

less.

Activity 603 Feeder The rates consider for equipments foundations are of PCCas per site conditions &53 technical specifications the RCCfoundations are required. Please consider the details As per Tender conditionBay

measurements as per Civiltables & relese the payments accordingly.

54 Activity 1401A LTline AAAC55 sqmm conductor considered for phase & ACSRweasel is considered for neutral The item rate for all is same. To be used as per site requirementhowever wedge connector are consider as ANTto ANT& GNATto GNAT.Please clarify.

Activity 6723 ABStay sets & Stay wire are missing, Billingwill be done on the basis of actual executed quantity of item55 Switch & DPstructure in r/0 said item specified in actvity as per Section-I, clause no. 16.6.

Activity913R UKV Total amount for cable is taken for 100 mtrs only & all other associated material is Billingwill be done Onthe basis of actual executed quantity of item56 in rio said item specified in actvity as per Section-I, clause no. 16.6.Cable consider for 1 KM& also quantity is in no. instaed of KM.

Please see addenda 03Acivity0923 R SPCP

Billingwill be done on the basis of actual executed quantity of item57 with 2 no. Pin type Activity to be clarify. RSjpole considered 3 nos, V cross 2 no.& SPCP2stes.in rio said item specified in actvity as per Sectlon-l, clause no. 16.6.line

'The interest rate for Mobilisation advance is given as 12% p.a. which is to be given

58 Mobilization Advance against 100% Bank Gurantee. The B.G.expenditure is aroung 3% p.a.As per Tender conditionSo the net advance cost comes to 12% + 3% = 15% per annum.

It is requested to revise the interest rate to SBIbase rate so that it is a viable costIt is mentioned that the mobilisation advance is to be fully recovered in 9 months fromLOA.It should be noted that It takes around 2-3 months to complete all formalities forthe advance payment releas.[PBG submission, contract agreement, Advance BGsubmission & confirmation, payment processing time, etc.). 50 the net available period

59 Mobilization Advance for mobilasition advance is 6 months. Asper Tender conditionThis does not help the agency for speeding up the projectIt is requested to ament the clause to deduct the mobilisation advance on pro rata basisi.e. 10% recovery for each bill.As advance BGis available with MSEDCL,it is requestedto not keep any time limit for full recovery.

A feeder seperation work involves HTline, DTC& LTline. The HTline length is around15·20 KMper feeder. Due to large length of HTline, many crossings (i.e. Highway,railway, forest. river, etc.) will be required. Due to this it is very difficult to totallycomplete the feeder in short period.Also there will be many ROWissues as the line is mostly passing through Gaothan areas.As per our experince, the seperation work gets completed in partial stages. Even in

60 90% payment oDUGjYfeeder seperation works there are guidelines to partially commission theAs per Tender conditionfeeders.

Also the LTbifurcation works take a lot of time as the correct LTnetwork map is notavailable at feild offices.Due to the above reasons, the direct 90% billing procedure for complete feeder is notpractically helpful for maintaining the cash flow of agency.It is requested to provide interim relief to the agency by allowing 70% payment againstcompleted portion of works. The balance 20% may be released after comissioning.

As per Ourexperince the average bill amount of a complete feeder is Rs. 30 to 50 lacswhich gets completed in 2-3 stages.The works will be divided in 4-5 divisions.

61 Running account bills It will not be possible to have a single RAbill of Rs. 1crore. As per Tender conditionIt is requested to remove the limits on no. ofRA bills per month & the minimum RAbillamountThese limits will affect the cash flowof the project & will lead to slow work progress.

The retention amout available with MSEDCLwill be 10%. The BGavailable for theproject will be 5%.In the event of default by contractor the security available with M5EDCLwill be 10% +

62 10% Retention 5% = 15%.As per Tender conditionAllthe deductions required (i.e. IP, LD,negative PV,etc.) will be recovered from the

agency at the time of90% bill itself. The retention amount witheld is on a higher side.It is requested to reduce the 10% retention amount to 5%. This will improve thecashflow of the project & help in fast progress of works.

10% LDfor Non- Pewactivities & quantity considerd in tender may not be required as per fieldLiquidated Damages is levied on delayed works or unexecuted63 conditions. They will remain non-executed due to reasons not attributable to agency.executed work

In that case the LUmay not be appttcable. Please clarify. works which is attributable to agency

The total IPfLD will The wording 'executed work' needs to be defined. LDshould not be recovered for worksbe limited upto 50f0of completed within stipulated time.

64 the contract value for The clause may please be modified to following: Asper Tender conditionexecuted work. 'The totallP/LD will be limited upto 5% of the contract value for particular feeder

billing unit .'

Page 11: MnNlrtJ.ntrll Slota Eloctridty Oialribull(Vl Co. (A Govt ... · MJ\HJ\VITARAN MnNlrtJ.ntrll Slota Eloctridty Oialribull(VlCo.lid. (A Govt. of Maharashtra Undertaking) CIN=U40109MH2005SGC15364

Sr. No. Subject Query MSEOCl Clarification

65Appendix-2: PRICE Is PV for MC & MAC Conductor. I,.T & HTCables. Switchgears. RS)poles applicable? Please refer Addendum·03.. ADJUSTMENT. This is a very scatterd work. The line lengths are also very large. The time required for

66Contractual Period completing of the works will be large. As per Tender condition(Time for Completion) The completion period may please be revised to 24 months from 1Bmonths.

While preparing milestone chart after. receipt of LOAit is understood from earlierproject that there are stringent terms was given in tender document because of which

Milestone is prepared in consultation with agency but as perwe could not execute the work as per our own planning. Whereas we would like to67 MILESTONECHART; request you that give us right to prepare milestone by assessing the scope of work MSEDCLnorms

particularly activity. area ofwork. statutory permissions etc., in the monitoring ofMSEDCL'scompetent authority,

6B GURANTEEPERIOD:Guarantee period of the transformers and other major materials should be 2 years and It As per Tender conditionis to be considered from the date of commissioning of individual.

As, it is Feeder separation works, the retention should be released after completion of69 RETENTION: feeder means irrespective of completion of project because it provoke us or help us As per Tender condition

financially for completing rest of the feeders in time,

As per bid specification base date for PVcalculation is one month prior to technical bidBASEDATEFOR opening. Whereas in most of the cases due to some unavoidable reasons bid submission

70 PRICEVARIATION date get extending for longer span and it will affect our internal working so Weare As per Tender conditionCALCULATION; requesting to your good offices for considering the base date for Price Variation

Calculation is one month prior to LOA.

As per bid specification there is a provision of payment of excess quantity with 10%

PAYMENTOFEXCESSbilling but in most of the cases it was found that the quantity of excess materials and71 amount thereof is found huge so for smooth financial operations it should be released As per Tender conditionQUANTITY;

along with 90% payment and for the same quantity freezing to be done at the initialstage of contract

lt is came to know from our earlier experience that even after becoming L1 bidder thereis a formalities in your office for further negotiations of quoted price with L1bidder. Inthis connection we reiterate that every one quote their best competitive prices for

MSEDCLdoesn't do any negotiation. In case the L1bidder offers72 NEGOTIATIONS: winning the particular project so as per central vigilance committee guidelines thererevised rate same will be considered.shall be no any negotiations with L1 bidder if quoted price will be below 20% in comfort

zone area. It means it will not applicable for any naxal I terrorist affected areas andhighly terrain areas where there is scarcity of any mode of communication,

Asper bid documents there is a provision for 10% LDon non executed works but there

73 PENALTYILO: may be many constraints which cause delay in execution of works like ROWI ExcessAsper Tender conditionScope than acruat/ Statutory Clearances hence the LD/Penaity should be maximum 5%

instead of10% in any case.

There is a provision of Incentive maximum 3% on awarded value Iworks. Whereas itshould be as per survey quantity or freezed scope and should be applicable for those

74 INCENTIVE: who have completed entire works except ROWlocations. Apart from that those agenciesAs per Tender conditionwhich are completed 75% of the works in stipulated time limit for them also if you will

be able to offer incentive for some proportionate then it will be definitely provoke all forcompletion of project under stipulated time period.

There no any provision (or advance in supply of male rials, whereas in earlier tender

MATERIAL there was a provision of 60% advance against material on producing equivalent amount75 ADVANCE: of Bank Guarantee so we are requesting your good offices (or implementation of the As per Tender condition

same so that financial cycle of agency will not be disturbed and it willprovoke us forcompleting of project in time.

There is a provision of Interest on mobilization advance after 6 months of LOAbut in

INTERESTON this connection we request your good 'offices that there is a chance of delay in raising bill

76 MOBILIZATION because of ROWand discrepancy of tit bit works hence to interest will be imposed afterAs per Tender condition

ADVANCE; 50% of contract period and shall be as per SBI rates. For example ifcontract period is1Bmonths then imposing of interest over the Mobilization Advance shall start from of10th Month in case of non-receipt of bill on or before 9th month.

RESPONSIBILITYOF Due to ROWissues I delay In receipt of statutory permission from various Government77 STATUTORY entities shall not be contributed to agency because it is nowhere concerned with agency

As per Tender conditionPERMISSIONS: and concerned government bodies also not entertaining us in the case of statutory

permission and ROW.Definitely we will assist MSEOCLfor expediting the procedure.

78 TIMEEXTENSION: In case of delay attributable to MSEDCLtime extension may be given with applicabilityAsper Tender conditionof PVand without levying LDfor the extended time period.

Due to any reason ifpayment get delayed like constraints of ERP,non-availability of

79 ASSRUEDPAYMENT:competent authority for Signing. non availability of fund etc., for which agency is notresponsible and it definitely affect the progress of balance works hence there should be NotApplicablethe provision of assurance for payment i.e., payment should be paid to the account ofagency within 30 days after raising of bill at initial level i.e.,at Asst Engineer, Infra.

It is understood that project get delayed due to non-receipt of bills even after completion

80of particular activity in all respects because of non-completion of rectification of tit-bit

ADHOCPAYMENT: minor points. In this case we would like to suggest you that release the payment by As per Tender conditionholding appropriate amount on adhoc basis against undertaking letter from concernedagency for rectification of discrepancies for concerned work which is to be billed.

As per bid document one can participate in each and every bid but LOAwill be issued to~aximum 3nos of works . In this case please clarify thar if someone quoting for 4 to 5

81 ABOUTBAGGINGOF bids mdependently and rest of bids participated through consornurny Joint Venture withPARTICULARBID: other bidder in which concerned agency is not a leading agency In such case of Not Permitted

combination, is it possible to treat as a different entity and Ifboth agencies got morethan 6 No.of tenders cumulatively then is it possible to award 3 Nosof tenders to each itmeans for individual bidder 3Nos and for Consortium IJoint Venture bidder 3 Nos.

Page 12: MnNlrtJ.ntrll Slota Eloctridty Oialribull(Vl Co. (A Govt ... · MJ\HJ\VITARAN MnNlrtJ.ntrll Slota Eloctridty Oialribull(VlCo.lid. (A Govt. of Maharashtra Undertaking) CIN=U40109MH2005SGC15364

Sr. N6, Subject Query - MSEDCLOarlncallon,In specification of distribution transformers, details are provided of all energy efficiency

112Transformer Ener.gy levels i.e., star I, star 2, star 3 etc. But in activity schedule of distribution transformer, no

BEE Level-2.". Efficiency level specific energy efficiency level mentioned, It means there is no specific requirement. Therequirement of energy efficiency level may kindly be informed.