Slope Stability ReportPublic Works CommissionCITY OF BURLINGTON, DEPARTMENT OF PUBLIC WORKS (DPW)3/17/2021PHILLIP PETERSON, ASSOCIATE ENGINEER
Purpose and Goals
There are serval steep slopes in the City of Burlington’s public Right-of-Way
Consequence of failure could be high DPW Staff are launching a slope stability program which will
Inspect
Monitor
Identify prioritized projects
Initial Slope InspectionEfforts
Northshore Natural Area
Manhattan Drive at Route 127 Beltline, Manhattan Drive at North Champlain Street Riverside Avenue
Future Efforts Work with property owners on Riverside Avenue
Manhattan Drive Outfall Stabilization Construction 2021 www.burlingtonvt.gov/DPW/water/manhattanoutfall
Stormwater Outfall Inspections 2021
Slope Stability Asset Management (GIS)
Questions?
Contact:Phillip Peterson E.I., Associate EngineerDesk: 802.598.8356Email: [email protected]