Slope Stability ReportPublic Works CommissionCITY OF BURLINGTON, DEPARTMENT OF PUBLIC WORKS (DPW)3/17/2021PHILLIP PETERSON, ASSOCIATE ENGINEER

Purpose and Goals

There are serval steep slopes in the City of Burlington’s public Right-of-Way

Consequence of failure could be high DPW Staff are launching a slope stability program which will

Inspect

Monitor

Identify prioritized projects

Initial Slope InspectionEfforts

Northshore Natural Area

Manhattan Drive at Route 127 Beltline, Manhattan Drive at North Champlain Street Riverside Avenue

Northshore Natural Area

Condition: Stable

Future inspection: Fall 2024

Manhattan Drive at Route 127

Condition: Stable

Future inspection: Fall 2023

Manhattan Drive at Champlain Street

Condition: Stable

Future inspection: Fall 2023

Riverside Avenue

4A

4B

4C

Riverside Avenue 4A Recommendations

Riverside Avenue 4B Recommendations

Riverside Avenue 4C Recommendations

Future Efforts Work with property owners on Riverside Avenue

Manhattan Drive Outfall Stabilization Construction 2021 www.burlingtonvt.gov/DPW/water/manhattanoutfall

Stormwater Outfall Inspections 2021

Slope Stability Asset Management (GIS)

Questions?

Contact:Phillip Peterson E.I., Associate EngineerDesk: 802.598.8356Email: [email protected]