Slide Title
• Use this slide style primarily for text
Title
Subtitle goes hereAmes Post Construction Ordinance
Eric Cowles, PECity of Ames
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Iowa DNR Storm Water Permit
“An ordinance shall be adopted or amended as needed and enforced which will address the control of runoff from building activities after construction has been completed. The ordinance shall require water
quality and quantity components be considered in the design of new construction and implemented when practical. The statement shall promote the use of storm water detention and retention, grass swales,
bioretention swales, riparian buffers and proper operation and maintenance of these facilities.”
MS4 Permit
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Public Input• Storm Water Advisory Committee
Tom Sauer, USDA Soil Scientist
Charlie Kuester, Planner, Ames
Steve Mayberry, ISU MS4 Leanne Harter, Planner, Story Co.
Chuck Winkleblack, Developer
Kurt Friedrich, Developer
Scott Renaud, FOX Engineering
Nathan Easter, Bolton & Menk
Jim Colbert, ISU Biologist
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Past Requirements
“Storm water management design shall include grading, facilities, improvements, or some combination thereof, which results in no
increase in the rate of runoff when compared to the undeveloped condition in the area to be
developed.”
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Past Requirements
“The rainfall frequencies that shall be incorporated in the design of the stormwater management system shall include the 5 year, 10 year, 50 year, and 100 year design storm
events.”
Did not address storm water quality and stream channel protection
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Post Construction Ordinance
Goals:• Utilize a combination of BMPs, aka treatment train• Minimize increases in storm water runoff, • Minimize non-point source pollution, and• Minimize mass grading
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Post Construction Ordinance
Applies to:
New development and redevelopment disturbing 1 acre or more of land and to any development disturbing < 1 acre if impervious cover >10,000 square feet
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Post Construction Ordinance
Exemptions:
Any Ag Activity
Additions/Modification to Single Family Lots
Anything within 1,000 ft of Ames Well Fields
DNR Requirements?
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Procedures/Requirements
• A storm water management plan prepared by PE or LA with site plan or preliminary plat
• Graphic inventory of existing natural resources• Including hydric soils (wetland soils) and
landscape features to be protected
• Adopts Iowa SWM Manual as Design Guide
• Requires Unified Sizing Criteria• WQv, CPv, Overbank/Flood Protection
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Procedures/Requirements
• Topographic watershed map• LiDAR or City aerial topo
• Design calculations for proposed BMPs
• Post Construction Design runoff to meet “meadow in good condition”• No Credit for existing impervious
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Procedures/Requirements
• Use Low Impact Development (LID) features: • Preserve open space and natural areas, • Re-establish prairies • Minimize impervious cover• Capture, store, reuse runoff.
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Procedures/RequirementsSoil Management Plan
• General soils information (NRCS website) • Borings as Needed • Identifies Ground Water• Identify “Soil Health”/Needs for
Amendments• Soils Scientist?• Guides placement of BMPs
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Procedures/Requirements
Stream Buffers
• > 3rd Order – Requires Assesment
• 1st and 2nd Order – 100’ Each Side
• Intermittent Streams – 50’ Each Side
• Waterways with Drainage Area > 50 Acres• 30’ Each Side
• Waterways with Drainage Area > 50 Acres• 20’ Each Side
• Maintained with Natives
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Procedures/Requirements
Maintenance, Repair and Landscaping Plan• Addresses routine and long-term maintenance of:
• BMP’s• Vegetation• Responsibilities• Review Schedule of the Plan
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Procedures/Requirements
Proof of Recorded Maintenance Easements for Access to Storm Water BMPs Recorded with the SWM Final Plan
Dedicate Drainage Easements to City
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Procedures/Requirements
All Water Quality Maintenance• Responsibility of Property Owners
Exception:• City Responsible for Large (Flood) Water Quality
Features (i.e. detention basins)• Dredging, Outlet Structures
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
For Lots Impacted by Storm Water BMPs
Builder to Provide Elevation Certificate• Lowest Opening/Foundations 3’ Above 100 Year
• Certified by LS, PE, LA
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Waivers
Granted by Municipal Engineer• Written Request
• Doesn’t Impair Ordinance Objectives
• Establish Alternative On-Site SWM
• Establish Alternative Off-Site SWM• Equal or Better than On-Site
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Waivers
• Also Establish No Downstream…• Deterioration of Structures
• Degradation of Bio Functions or Habitat
• Accelerated Erosion or Siltation
• Increase Threat of Flood Damage to Public Health, Life or Property
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Performance Bond
Financial Security with Final Plat or Site PlanIn the amount of the total estimated cost for the construction of the BMPs
Receive as-built plans from owner, City conduct final inspection of site, and then release financial security
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Maintenance
• Inspections 1/Year by Owner or Rep• Keep Inspection Records for at Least 3 Years• Make Inspection Records Available to City
Upon Request
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Outreach
• Technical Assistance Documents• Guide Through Ordinance• Check List
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Today
• Timing of Submittals• Redevelopment• Existing Regional Detention• New Construction
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Challenges
• New Apartment Complex• Next to creek• In flood plain/flood way
• Meeting with Developer’s Engineer
• Waivers
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Slide Title
• Use this slide style primarily for text
Title
Subtitle goes here
Challenges
• Redevelopment Site• Next to City Well
• No Perforated/Open Joint Pipe Allowed• Meeting with Development Engineer and Owner
• Waivers