CERC DISCUSSION PAPER
RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL
STATIONS AND TRANSMISSION SYSTEM.
APERC
![Page 2: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/2.jpg)
AUXILIARY POWER CONSUMPTION
Slide 2Slide 2
![Page 3: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/3.jpg)
DescriptionSuggested by
CERCRecommendation
With cooling towers 200 MW 9.5 % * 8.5 %
Without cooling towers 200 MW 9.0 % 8.0 %
With cooling towers 500 MW (Steam driven pumps)
8.0 % 7.5 %
With cooling towers 500 MW (Electrical driven pumps)
9.5 % 9.0 %
Without cooling towers 500 MW(Steam driven pumps)
7.5 % 7.0 %
Without cooling towers 500 MW (Electrical driven pumps)
9.0 % 8.5 %
for units less than 200 MW CEA / CERC to evolve norms
Auxiliary Power Consumption (Coal Plants)
* Actually obtained in respect of two projects (i) M/s BPL Power Project (ii) M/s APGENCO - RTPP II.Colony consumption and construction power shall not be included Slide 3Slide 3
![Page 4: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/4.jpg)
Suggested by CERC
Recommendation
Stabilization period:a) Open Cycleb) Combined Cycle
1.53.5
1.53.5
Subsequent period:a) Open Cycleb) Combined Cycle
1.03.0
1.03.0
Auxiliary Power Consumption (Gas Plants)
Colony consumption and construction power shall not be included
Slide 4Slide 4
![Page 5: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/5.jpg)
Suggested by CERC
Recommendation
(a) with rotating exciters mounted on shaft.
0.2 % of energy generated
(b) With static excitaton system
0.5 % of energy generated
(a) with rotating exliters mounted on the shaft. 0.4 %(b) with static exciters. 0.7 %(iii) Transformation losses. 0.5 %
Details:
(i) Surface Hydro Stations.
(ii) Under ground hydro stations
This can be accepted as it is. However Colony consumption and construction power shall not to be included.
Slide 5Slide 5
![Page 6: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/6.jpg)
STATION HEAT RATE
Slide 6Slide 6
![Page 7: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/7.jpg)
Suggested by CERC
Recommendation
Stabilization period
---
Subsequent period
2500 (*)2350 #
Super critical units
(*)2050
Stabilization period
2900
Subsequent period
2000 (*) 1850
Whether the heat rate be related to Manufacturer's guarneeted rate.
(a) Manufacturer's guarneeted rate with 5 % degradation or figures indicated at (*) which ever is less(b) For despatch Instructions for 60% of the installed capacity
** Station Heat Rate (kcal / kWh) (Coal Plants)
Station Heat Rate (kcal / kWh) (Gas Plants)
** In respect of units of 500 MW and above where the BFP is electrically operated the heat rate of 40 kcal / kWh shall be reduced from SHR. # Actually obtained in respect of RTPP. Slide 7Slide 7
![Page 8: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/8.jpg)
SPECIFIC OIL CONSUMPTION
Slide 8Slide 8
![Page 9: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/9.jpg)
Suggested by CERC
Recommendation
Stabilization period 5.0 (existing)
Subsequent period 3.5 (existing) * 2.0
Associated Despatch instructions
50% (existing) 60%
Whether the norm can be
reduced from 3.5 to 2 ml / kWh
Yes
Specific Oil Consumption (Coal Plants) in ml / kWh
*As approved in case of RTPP.
Slide 9Slide 9
![Page 10: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/10.jpg)
INCENTIVES
Slide 10Slide 10
![Page 11: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/11.jpg)
Suggested by CERC Recommendation
Incentives Coal / Gas: As at present :-(A) Level80 % availability for fixed cost recovery and incentives to start from 77 % PLF taking backing down into accountIncentives at avoided cost and not as a percentage of equityIncentives, therefore to be as a percentage of fixed cost per kWh and the avoided cost to be shared between utility and beneficiary
(A) Level :Coal Plants: above 80% PLF (*)
Gas / Naptha Plants: above 85% PLF (**).
(*) Actually obtained in respect of M/s BPL Power Project in AP.
(**) Actually obtained in respect of 5 gas based projects (i) M/s BSES Andhra Power Limited (ii) M/s Vemagiri Power Generation Ltd (iii) M/s Konaseema EPS Oakwell Ltd (iv) M/s Gautami Power Project Ltd (v) M/s GVK Industries Ltd. Slide 11Slide 11
![Page 12: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/12.jpg)
Suggested by CERC Recommendation
(B) Rate:Revenue neutrality to the existing NTPC stations incentive beyond 77% is fixed at 50% of the fixed cost per kWh with a cap rate of 21.5 paise per kWh. The above reduced by 50 % above 90% PLF to avoid flogging of machines.
(B) Rate:(i) The present incentives allowed by APERC are not uniform (ii) The incentive range from a maximum of 105 paise to 14 paise in AP.(iii) The lowest incentive obtained for gas is 14 paise at 90% PLF and 21.5 paise for Thermal stations.
Proposal: Whether to delink Incentive totally from fixed cost and Incentive for generation above target PLF at a flat rate (ps/kWh) can be adopted.
Incentives can be at a fixed flat rate (ps/kWh) to ensure uniformity. A maximum of 21 ps/kwh and 14 ps / kWh can be prescribed and for coal and gas plants respectively.
Slide 12Slide 12
![Page 13: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/13.jpg)
Suggested by CERC Recommendation
Incentive Hydel:Suggested formula (by NHPC): Incentive = Actual peak time generation * Incentive in Rs / kWh
As at present, in AP Genco & AP Transco PPA the fixed cost based Incentive as per CERC order dated 08-12-2000 is adopted. The new proposal of CERC can be accepted.(CI A – CI N)
100
WhereCI A = Average of daily capacity indexes over one year (CERC notification dated 26-03-2001.CI N = Normative capacity Index = 85%.
Daily Capacity Index = Declared capacity in MW
Maximum available capacity in MWx 100
Declared capacity : capacity available from the plant over peaking hrs in a day shall not be less than 3 hrs in any day. Slide 13Slide 13
![Page 14: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/14.jpg)
Advantages:
i) Incentive not related to capital cost.
ii) Incentive relates to peak time generation as well as capacity index.
iii) There will be higher incentive for storage / pondage type of Hydro stations compared to run of the river schemes.
iv) Incentive does not decrease for older plants.
Slide 14Slide 14
![Page 15: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/15.jpg)
Suggested by CERC Recommendation
Incentives - Transmissiona) Existing1% of the equity for every 0.5% raise in availability above 98% (However in the range of 99.51% to 99.75% incentive is 1% of equity)Alternative Proposalsa) Target availability shall be reduced to 95% (PGCL)b) For Transmission loss above a level disincentive shall apply. c) No incentive
Existing pattern can be continued.
Not acceptable. It shall be enhanced to 98.5 %.
Not required
Not accepted
Slide 15Slide 15
![Page 16: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/16.jpg)
Suggested by CERC Recommendation
Regional TariffProposalAggregating the fixed charges of more than one power station in a region followed by a common variable charge
RecommendedStation wise tariff is always preferable except prices obtained through competitive bidding.
Slide 16Slide 16
![Page 17: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/17.jpg)
O & M EXPENDITURE
Slide 17Slide 17
![Page 18: Slide 1 CERC DISCUSSION PAPER RECOMMENDATIONS ON OPERATING NORMS FOR THERMAL / GAS / HYDEL STATIONS AND TRANSMISSION SYSTEM. APERC](https://reader036.vdocuments.us/reader036/viewer/2022082506/5697bf701a28abf838c7d415/html5/thumbnails/18.jpg)
Suggested by CERC Recommendation
O & M Expenditure(Generation)
2.5% with annual escalaton based on economic parameter WPI & CPI
A Cap of 2.5% with annual escalaton based on economic parameter WPI & CPI
O & M Expenditure(Transmission)
1.50% 1.25%
At an availability98% 98.50%
Slide 18Slide 18