Downtown Connector TrailSlavic Village Development / City of Cleveland
Washington Reservation Metropark to East 9th Street
December 27, 2010Updated January 10, 2012
1
I-490
I-77Morgana Run
New Broadway / 9th Street Downtown Connection
East 34th RTA Station
Job Ready Development Parcel
Steel Warehouse
Washington Reservation
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 1500 3000
SCALE: 1”=1500’-0”N
Route Overview
2
Sheet 1
Cleveland Metroparks Washington Reservation
CROSSWALKENHANCEMENT
ALT. ROUTE
CROSSWALKENHANCEMENT
EX. SIGNED BIKE ROUTE
EX. MULTIPURPOSE PATH
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
3
Sheet 2
GRADE PATH @ ODOT ROW
PERSPECTIVE #1
EX. SIGNED BIKE ROUTE
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
Existing Conditions
Perspective #1 - East 48th North of Fleet
MAINTAIN 7’ CLEAR FROM TRACKS WHERE
SIDING IS IN USE
4
Sheet 3
Steel Warehouse
CROSSING GATES AND
TRAFFIC MATS AT SIDING-TRAIL
INTERSECTION
FENCE IMPROVEMENTS @ INTERSTATE
REMOVE RETAINING WALL.
ADD GATE IN FENCE
EX. PED BRIDGE
PERSPECTIVE #2
FENCE BETWEEN DRIVE
AND TRAIL EX. SIGNED BIKE ROUTE
SECTION AA
0 8 16
SCALE: 1/8”=1’-0”
SECTION AA
TRUCK DRIVE
6’ SECURITY FENCES BOTH SIDES OF 10’ WIDE TRAIL
EXIST. I-77
FENCEEXIST.
RR SPURSTEEL
WAREHOUSE
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
PERSPECTIVE #2
5
Sheet 4
Job Ready Site
UNDERPASS IMPROVEMENTS. ADD LIGHTING & CONNECT TO MORGANA RUN TRAIL
PERSPECTIVE #3 Perspective #2 - West of I-77 / North of Chard*Similar Condition @ Job Ready Site
Perspective #3 - Morgana Trail Connection below East 49th
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
Existing Conditions
Existing Conditions
6
Sheet 5
GRADE & PAVE PATH
Job Ready Site
EXTEND BRIDGE CULVERT TO ACCOMODATE TRAIL
ABOVE UNDERPASS
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
Section BB - Job Ready Site
Future Industrial Building
Future Vehicular
Circulation
Landscaped Slope
I-77
20’
10’ Paved Path ODOT Fence
7
Sheet 6
Job Ready Site
GRADE &
PAVE PATH SECTION BB
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
8
Sheet 7
GRADE & PAVE PATH
ALT. ROUTE TO VALLEY OVERLOOK
ALT. ROUTE @ FUTURE MARGINAL ROAD
CROSSWALKENHANCEMENT
Job Ready Site
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
9
Sheet 8
OVERLOOK REST STOP
ALT. ROUTE @ FUTURE MARGINAL ROAD
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
10
Sheet 9
Republic Office
Building
ALT. ROUTE @ FUTURE MARGINAL ROAD
ALT. ROUTE @ BROADWAY AVE.
SHARROWS
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
11
Sheet 10
CROSSWALKENHANCEMENT
ALT. ROUTE @ BROADWAY AVE. SHARROWS
PERSPECTIVE #4
Perspective #4 - Broadway Trail North of Dille
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
Existing Conditions
12
Sheet 11
WIDEN SIDEWALK ON BRIDGE TO ACCOMODATE PATH
REDUCE AND SHIFT LANES ON BRIDGE
Slavic Village Downtown LinkSlavic Village Development
City of Cleveland, OhioNovember 10, 2010
A @ I-77
B @ I-490
C @ Kingsbury RR Spur
D @ RTA Tracks
Broadway Bridge Sections
4’-6”1’-6”
48’4 LANES
-Standard Configuration-
4’-6”1’-6”
6’-0” 65’5 LANES
6’-0”
Widen Bike Trail to 10’-0”
4’-0” 42’4 LANES
-Sub-standard Configuration-
4’-0”
6’-6”1’-6”
47’4 LANES
-Standard Configuration-
6’-6”1’-6”
PERSPECTIVE #5
SECTION CC
Section CC - Broadway Bridge
Perspective #5 - Broadway Bridge over I-490
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
Existing Conditions
13
ALT. ROUTE SHARROWS
I-490 RAMPS
CROSSWALKENHANCEMENT
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
Sheet 12
14
Sheet 13
RAIL CROSSING IMPROVEMENTS
ALT. ROUTE SHARROWS
REMOVE RUBBLE BELOW BRIDGE
GRADE AND PAVE PATH
IMPROVE UNUSED RAIL BRIDGE FOR PATH USE. ADD FENCING AND PROTECTION BARRIER
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
15
Sheet 14
ALT. ROUTE SHARROWS
GRADE PATH @ SLOPE & ADD
SEGMENTED RETAINING WALL
PAVE PATH AND ADD 6’ FENCING TO PROTECT
FROM ACTIVE RAIL. PROVIDE ACCESS GATES
FOR MAINTENANCE
E. 34TH RAPID TRANSIT STATION
PAVE PATH AND ADD 6’ FENCING TO PROTECT FROM ACTIVE RAIL. PROVIDE ACCESS GATES FOR MAINTENANCE
GCRTA R.O.W. Naturalized Vegetation
Ex. Service Drive
6’ Fence 6’ Fence
Norfolk & Southern Rail
10’ Bike Trail
View to River Valley
SECTION DD
Section DD - E 34th Rapid Station
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
16
Sheet 15
ALT. ROUTE @ POST OFFICE FRONTAGE
GRADE & ADD RETAINING WALLS
US Post Office
ALT. ROUTE @ FRONTAGE
10’ PAVED PATH W/ 6’ FENCING
NORFOLK & SOUTHERN RAIL
CROSSWALK ENHANCEMENT
NE Pre-Release
CROSSWALK ENHANCEMENTS
Intermodal Container Storage
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
17
Sheet 16
US Post Office
IMPROVE RAIL BRIDGE OVER GCRTA TRACKS VIEW TO RIVER
VIEW TO RIVER
UTILITY BRIDGE
NORFOLK & SOUTHERN RAIL
GCRTA RAIL
MAINTAIN 12’ MIN. CLEAR BELOW
UTILITY BRIDGE
PERSPECTIVE #6
VIEW TO TERMINAL
TOWER
Perspective #6 - Utilize Abandoned Railway Corridor
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
Existing Conditions
18
Rail Corridor Ownership and Easements
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
SCALE: NOT TO SCALEN
Section EE - Broadway Realignment
Future Development
ParcelParking
Street Trees BROADWAY(Realigned)10’
Paved Path
Existing Retaining Wall
Compacted Fill Material
View to River Valley
RTA Tracks1
2
19
Sheet 17
US Post Office
Cuyahoga River
NORFOLK & SOUTHERN RAIL
GCRTA RAIL
VIEW TO RIVER
CAMPUS CONNECTOR
CROSSWALKENHANCEMENT
REALIGNMENT OF EAST 14TH STREET
VIEW TO TERMINAL
TOWER
10’ PATH AT FRONTAGE OF DEVELOPMENT PARCEL
REALIGNED BROADWAY
REAL
IGNE
D E
. 9TH
SECTION EE
MULTI-PURPOSE TRAILS BY ODOT
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Downtown Connector TrailWashington Reservation Metropark to East 9th Street
Slavic Village Development / City of ClevelandFebruary, 2013
0 100 200
SCALE: 1”=100’-0”N
KEY10’ OFF-ROAD PATH
ON-STREET ROUTE - BIKE LANE / SHARROWS
ALTERNATE ROUTE
20
McKnight Associates LTD..L A N D S C A P E
A R C H I T E C T U R E
812 Huron Road, # 421Cleveland, Ohio 44115-1126
f: 216 771-1801p: 216 771-1800
www.mcknightla.com
Sheet 3a & 3bDowntown Connector Trail
Washington Reservation Metropark to East 9th Street Slavic Village Development / City of Cleveland
February, 2013
December 16, 2010
Slavic Village Development - Downtown Connector Trail Preliminary Estimate of Probable Construction Costs - Conceptual Design Phase
Section - Item Quantity Unit Unit Cost Subtotal Section Total
Metropark Washington Reservation to Pershing AvenuePublic Right-of-way Improvements 1,000 lf $25.00 $25,000.00Off-Road Grade / Pave 10' Path 3,300 lf $90.00 $297,000.00Remove Rail / Pave 10' Path 1,600 lf $120.00 $192,000.00Improve Fence along I-77 700 lf $50.00 $35,000.00
6' Fence at Job Ready Site 3,300 lf $35.00 $115,500.00Rework Concrete Retaining Wall ls $50,000.00 $50,000.00Crosswalk Enhancements 2 each $25,000.00 $50,000.00Underpass Improvements @ I-77 E49 ls $250,000.00 $250,000.00Landscape Restoration ls $25,000.00 $25,000.00 $1,039,500.00
Pershing Avenue to East 37th Rail CrossingPublic Right-of-way Improvements 3,300 lf $25.00 $82,500.00Off-Road Trail-Grade / Pave 10' Path 1,100 lf $90.00 $99,000.00Rail Crossing at E37th ls $250,000.00 $250,000.00Czar Avenue Mill Overlook ls $150,000.00 $150,000.00Crosswalk Enhancements 3 each $25,000.00 $75,000.00Broadway Bridge Improvements @ I-490 ls $350,000.00 $350,000.00Landscape Improvements at Broadway ls $35,000.00 $35,000.00 $1,041,500.00
East 37th to East Ninth StreetOff-Road Grade / Pave 10' Path 200 lf $90.00 $18,000.00
Remove Rubble / Grade / Pave 1,000 lf $150.00 $150,000.00Pave 10' Path 6,000 lf $75.00 $450,000.00
Grade / Pave 6' Connector Path 500 lf $75.00 $37,500.00Rail Bridge Improvements 650 lf $500.00 $325,000.006' Protection Fence at Active Rail 9,100 lf $40.00 $364,000.00Segmented Retaining Wall 100 lf $250.00 $25,000.00Crosswalk Enhancements 3 each $25,000.00 $75,000.00Landscape Improvements ls $150,000.00 $150,000.00 $1,594,500.00
Downtown Connector Trail Total $3,675,500.00Contingency (10%) $367,550.00
Design and Engineering (10%) $367,550.00Total Budget including Engineering $4,410,600.00