Water Department
2009
Service Level Report
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 2/19
2
ss on a emen
safe, reliable, and
adequate supply of r n ng water or our
customers at the lowestpractical cost.
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 3/19
a er epar men rgan za ona ar
WaterSuperintendent
Grade 28
Engineering TechSupervisor
Grade 20
Admin. Support 5 Administrative Asst.
Grade 15
Engineering Tech IIGrade 18 (2)
Craftsman 3BEquip. Mechanic
Grade 17
Craftsman 3B WelderGrade 17
Craftsman 3B Warehouseman
Grade 17
Admin. Support 4Secretary/Dispatcher
Grade 13
MainlineSupervisor
Grade 22
Craftsman 3BDay Service Worker
Grade 17 (2)
Craftsman Lead 4Night Service Worker
Grade 18 (2)
PlumbingSupervisor
Grade 22
Water OperationsSupervisor
Grade 22
Craftsman Lead A Plumber/Pipefitter
Grade 18
Craftsman Lead BLead Plumber/Pipefitter
Grade 19
Craftsman 3BPump & Purif. Tech
Grade 17 (5)
Craftsman Lead A Plumber/Pipefitter
Grade 18 (2)
Craftsman Lead A CarpenterGrade 18
Heavy EquipmentOperator B
Grade 17 (4)
Heavy EquipmentOperator B
Grade 17
Craftsman Lead A Plumber/Pipefitter
Grade 18 (2)
Equip. Op. Medium CGrade 15
Heavy EquipmentOperator B
Grade 17 (2)
Part Time LaborerGrade PO5
Craftsman 3A Maint. II/Lt. Equip. Op
Grade 16 (3)
Equip. Op. Medium CGrade 15 (3)
Part Time LaborerGrade PO5 (2)
3Part Time LaborerGrade PO5
Equip. Op. Medium BGrade 14 (2)
44 Full Time Positions
4 Part Time Po sitions
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 4/19
Measures of InputsPeople
Water FY05 FY06 FY07 FY08 FY09 FY10
FY05-FY09
Change
Full Time 42 42 43 43 44 44 2
Money
a me 0 0 0 0 0 0 0
FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010
ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL BUDGET
WATER DEPARTMENT
Labor 2,586,842 2,599,285 2,777,991 2,965,323 3,017,786 3,195,512, , , , , , , , , , , ,
Capital 838,198 607,359 1,198,131 678,966 1,899,846 7,351,945Total 6,730,792 6,256,669 7,487,152 8,018,115 9,277,807 15,320,353
CPI 199.2 201.8 208.9 216.6 216.2Real FY05 $ 6,730,792 6,176,058 7,138,266 7,374,920 8,549,194
% Change in RealFY05 $, FY05-FY09 27.02%
Note: FY09 totals include Water Construction Fund 073 expenses.
4
• Grant funded (south valley water tank): $635,174
• Bond funded: $622,084
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 5/19
Analysis of InputsWater Department
Nominal & Real FY05-FY09
10,700,000
8,549,194
7 700 000
8,700,000
9,700,000
6,730,792
6,176,058
7,138,2667,374,920
5,700,000
6,700,000
2,700,000
3,700,000
4,700,000
Real expense in FY09 is up 27.02% vs. FY05
700,000
1,700,000
ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL
FY 2005 FY 2006 FY 2007 FY 2008 FY 2009
5
Total 6,730,792 6,256,669 7,487,152 8,018,115 9,277,807
CPI 199.2 201.8 208.9 216.6 216.2
Real FY05 $ 6,730,792 6,176,058 7,138,266 7,374,920 8,549,194
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 6/19
Western United States*
Pocatello ranksnear the bottom
third
$30.94
$22.55
$19.07 $26.20
25th 75th50thpercentilepercentile percentile
6* For 7,500 gallon use; source: American Water Works Association, sample size 20, 2006survey data.
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 7/19
Locally*
7
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 8/19
8
Capital Assets
2008 2009 IncreaseMiles of Water Pipe 274 274 0
F re Hy rants 1,921 1,938 17Main Line Valves 4,022 4,047 25
Service Lines 19,646 19,668 22
Storage Tanks 14 14 0Storage Capacity (MG) 21.8 21.8 0
Pressure Reducing Valves 42 42 0
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 9/19
9
Outputs:
Deliver safe, clean and reliable drinking water
Water for Fire protection
24/7 Emergency Response
Minimal service complaints
Consumer and Public education
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 10/19
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 11/19
11
4.6 billion gallons pumped 2236 Service Request
11,140 ft Main line replaced 34 New fire hydrants
293 Service line repairs
222 Service lines replaced
29 Main line leaks repaired
1844 Water Quality Samples
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 12/19
a er s r u on ys em n egr y
oca e o s ea
rate = 35 Leaksp/100 miles
i e
74.412.4 30.0
25th 75th50thpercentilepercentile percentile
12 AWWA 2006 Benchmarking, Cities of 50,000 to 100,000, N=6
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 13/19
13
Capital Improvements
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 14/19
14
Construction of the SouthValley Water Tank
West Whitman & West Clark
Main Line Replacement , ,
Main Area Main Line Replacement
Reactivation of Well #33
Country Club pressure zone
restructuring
eter ut zat on pro ect
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 15/19
15
Water Rights Acquisition Annual Water Week and Environmental Fair
Water Quality Report
City-Wide Projects aca awea ar – ver ow ruc ure
GIS Mapping of Storm System
Ross Park Zoo – Bear Exhibit
Snow Removal
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 16/19
16
No violations of Drinking Water Standards
Ver few interru tions to service
Reasonable Rates
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 17/19
17
Center St. Tank Painting
AfterBefore
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 18/19
18
Park Ave, Jane St., Charles Pl.& Willow Ave Main Line
Replacement Projects
Pressure Zone restructuring for reduced
Johnny Creek Transmission Line
Facility Design for new Water Shop
8/8/2019 Sl09 Water
http://slidepdf.com/reader/full/sl09-water 19/19
19
Water Supply alternatives
Aging Infrastructure