skyline technical document system installation ... · system installation & construction detail...

12
ARCHITECTURAL ‘CAP-LESS’ SOLUTIONS FOR PARAPET WALLS & BALCONY HEADS

Upload: others

Post on 13-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SKYLINE TECHNICAL DOCUMENT SYSTEM INSTALLATION ... · system installation & construction detail manual skyline technical document 13.06.2013 architectural ‘cap-less’ solutions

SYSTEM INSTALLATION & CONSTRUCTION DETAIL MANUAL

SKYLINE TECHNICAL DOCUMENT 13.06.2013

ARCHITECTURAL‘CAP-LESS’ SOLUTIONSFOR PARAPET WALLS & BALCONY HEADS

Page 2: SKYLINE TECHNICAL DOCUMENT SYSTEM INSTALLATION ... · system installation & construction detail manual skyline technical document 13.06.2013 architectural ‘cap-less’ solutions

2 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd. 04.07.20162 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd.

SKYL

INE

OVE

R M

AST

ERW

ALL

SYS

TEM

.

SKYL

INE

MEM

BRA

NE:

Adva

nced

wat

erpr

oof m

embr

ane

to b

eap

plie

d as

per

Sky

line

Syst

em S

peci

�cat

ion.

STU

D F

RAM

E

FIXI

NG

S:75

mm

�xi

ng a

nd 4

0mm

but

ton

set

REN

DER

PRO

CESS

MA

STER

WA

LL B

REAT

HER

WRA

P:A

supe

rior t

rans

luce

nt b

reat

her f

ram

e w

rap

whi

ch

prov

ides

hig

h pe

rform

ance

vap

or p

erm

eabi

lity.

FIB

REG

LASS

REI

NFO

RCIN

G M

ESH

:Em

bedd

ed in

�rs

t lay

er o

f pol

ymer

rend

er.

MES

HED

& P

RIM

ED M

AST

ERW

ALL

PA

NEL

S:

Thic

knes

ses:

50/

75/1

00/1

25m

m R

1.8

/2.5

/3.2

/3.9

.**

Incl

udes

R 0

.5 a

llow

ance

for 9

0mm

fram

e, 1

0mm

pla

ster

boar

d.

Suita

ble

for B

AL 2

9 - s

ee M

aste

rWal

l Spe

ci�c

atio

ns.

ALL

OY

EXTE

RNA

L CO

RNER

S:

With

inte

grat

ed m

esh

retu

rns.

POLY

STYR

ENE

H-G

RAD

E W

EDG

E:(R

efer

to M

aste

rWal

l K-S

erie

s Sy

stem

In

stal

latio

n an

d Co

nstru

ctio

n De

tail

man

ual f

or B

AL40

det

ail).

NOT

E:

For B

ox G

utte

r det

ail,

retu

rn d

own

with

F/C

she

et (R

efer

to C

onst

ruct

ion

Deta

il in

Sky

line

Broc

hure

)

Page 3: SKYLINE TECHNICAL DOCUMENT SYSTEM INSTALLATION ... · system installation & construction detail manual skyline technical document 13.06.2013 architectural ‘cap-less’ solutions

4 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd. 04.07.2016

INTRODUCTION

Description

The Skyline membrane may be installed over substrates that have a smooth surface for a strong bond, such as polystyrene, fibre cement, plywood, MasterWall panel, smooth render, concrete or smooth masonry. The Skyline membrane will adhere to rough surfaces when parged with Skyline compatible adhesive (consult Practica MMC). Adhesion test may be required.

Polystyrene Wedge

H Grade polystyrene wedges are recommended to parapet designs and should have a fall of 7° minimum back into the box gutter to avoid water run off the front edge of the building. Wedges should be screwed to parapet frame at 300mm centres using MasterWall fixings with 40mm red washers. Mitre all external/internal corners and tightly butt all joints together, no adhesive is required to wedge joints. Apply MasterWall Joint Foam between wedge/ MasterWall panel junction to seal joint on vertical face.

Fibre Cement (F/C)

When using F/C sheet as a surface for Skyline to bond to, a minimum of 4.5mm thick material should be used, such as with the drop down component into a box gutter on a parapet. Use only 6mm F/C sheet or greater on all horizontal surfaces such as balcony balustrades or cavity brick parapet when used as a cap. Use ‘cement tile adhesive’ to bond F/C to brick or masonry substrates.

Brick / Masonry

Bonding Skyline membrane to rough brick will require parging with a Skyline compatible adhesive or alternatively the surface can be coated with a smooth render finish which Skyline membrane will bond to as with brick veneer. A test patch should be performed to ensure good adhesion will result. Note: any smooth render should be dry prior to applying Skyline. Cavity brick will require a 6mm minimum F/C cap bonded with tile adhesive, and brick veneer a polystyrene cap to the rear (See details on page 13).

Detail Tape

Skyline compatible detail tape is to be applied to all ‘3 surface junctions’ to ensure complete water-tightness is achieved at the point of junction. (See detail on page 17 Detail tape should be 50x50mm square and pressed firmly onto all adjacent surface planes at the junction point. Avoid touching raw detail tape with hands, by using plastic film backing once removed from tape. (See Skyline installation video for correct technique)

Layout

Skyline membrane is to terminate minimum of 35mm onto all vertical surfaces to form a ‘cap’ for water runoff. All joins in the membrane shall overlap 75mm minimum. Vertical returns onto MasterWall cladding to be rendered shall be 75mm. Vertical returns behind alternative cladding shall be 100mm.

Cutting

Use sharp clean knife only to cut Skyline membrane.

Health and Safety

Skyline membrane poses no issues when coming in contact with skin; however avoid contact with eyes. Dispose all waste off cut material according local refuse regulations.

Method

Ensure all substrates are clean of dirt & dust and free of organic matter and solvents. Peel paper from back of Skyline membrane, smoothing out over applied area while working from one direction to ensure no air pockets exist. Apply strong pressure either by hand or roller to activate the adhesive bond of the butyl to the substrate.

Page 4: SKYLINE TECHNICAL DOCUMENT SYSTEM INSTALLATION ... · system installation & construction detail manual skyline technical document 13.06.2013 architectural ‘cap-less’ solutions

5COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd.

Joint Tape

Lap all membrane joins by 75mm minimum. Apply Skyline compatible adhesive to area to be bonded only, by laying two beads of adhesive, and smearing over entire bonded area with a scraper to a thin film of around 1mm. (See Skyline installation video for correct technique) None of the polyester fibre should be visible once adhesive is spread. Press top layer of Skyline onto the adhesive and apply hand pressure to firmly bond. (Note: avoid spreading adhesive on exposed face of Skyline that is to be rendered)

Adhesive Parging

To parge Skyline to substrate, apply 8mm beads of adhesive to substrate 40mm apart, and smear over entire bonded area with a scraper to a thin film of around 1mm. None of the substrate should be visible. Press Skyline onto the adhesive and apply hand pressure to firmly bond. (Note: avoid spreading adhesive on exposed face of Skyline that is to be rendered)

Penetrations

Ensure that no nails/screws or other fixings penetrate through the final Skyline membrane as it is a total waterproofing solution. This would void all warranties.

Warranty - 7 Years

Practica MMC Pty Ltd warrants that its products are free from defects in materials and workmanship for a period of 7 years from the date of purchase. For a full description of the Warranty refer to the Practica MMC website (http://www.practicammc.com.au).

Render

A minimum thickness of 5mm polymer modified render should be applied in two coats over entire Skyline system. A single layer of alkali resistant mesh (145–160 g/m2) must be embedded into the first coat of render.

Render trims should be pre-meshed alloy and should be either glued or embedded into first coat of render. Do not fix with nails or any fixing methods that entail the piercing of the Skyline membrane.

A texture finish to the coating manufacturer’s specification may be applied. It is highly recommended that in a parapet design the render system be over coated with an acrylic membrane for added protection and long term durability of the system.

Page 5: SKYLINE TECHNICAL DOCUMENT SYSTEM INSTALLATION ... · system installation & construction detail manual skyline technical document 13.06.2013 architectural ‘cap-less’ solutions

6 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd. 04.07.2016

These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the specifications detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.

Box

gu

tter

4.5

mm

F/C

sh

eet

wit

h

50m

m w

idth

ret

urn

ed in

to

box

gu

tter

Min

fall

Poly

styr

ene

H-G

rad

e w

edg

e

Raf

ter

Fib

reg

lass

rei

nfo

rcin

g m

esh

to

cov

er g

ap

bet

wee

n a

lloy

ang

le m

esh

ret

urn

s

Mas

terW

all®

pan

el

Sky

line

mem

bra

ne

(to

be

app

lied

as

per

S

kylin

e S

yste

m S

pec

i�ca

tio

n)

Min

imu

m 5

mm

ap

pro

ved

acr

ylic

re

nd

er s

yste

m

Mas

terW

all B

reat

her

Fra

me

Wra

p

Not

e: D

o no

t pea

rce

Skyl

ine

mem

bran

e w

ith m

echa

nica

l fas

tner

s th

roug

h th

e ho

rizo

ntal

pla

ne

All

exte

rnal

co

rner

s re

info

rced

wit

h a

lloy

ren

der

b

ead

wit

h in

teg

ral �

ber

gla

ss

mes

h r

ein

forc

ing

str

ip

SKYLINE SYSTEM / MASTERWALL® PANEL:

RENDERED PARAPET WALL

These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the speci�cations detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.

SUITABLE FOR BAL 12.5, 19 & 29. FOR BAL 40 SEE PAGES 10 & 11.

Ad

equ

ate

bea

d o

f ex

pan

dab

le f

oam

co

nst

ruct

ion

ure

than

e at

mid

po

int

of

pan

el t

hic

knes

s

Mas

terW

all a

pp

rove

d 7

5mm

xin

g &

40m

m b

utt

on

set

Mas

terW

all a

pp

rove

d �

xin

g

& 4

0mm

bu

tto

n s

et

Page 6: SKYLINE TECHNICAL DOCUMENT SYSTEM INSTALLATION ... · system installation & construction detail manual skyline technical document 13.06.2013 architectural ‘cap-less’ solutions

7COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd.

These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the specifications detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.

SKYLINE SYSTEM / MASTERWALL® PANEL:

RENDERED PARAPET WALL (CLOSE UP DETAIL)

These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the speci�cations detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.

Not

e: D

o no

t pea

rce

Skyl

ine

mem

bran

e w

ith m

echa

nica

l fas

tner

s th

roug

h th

e ho

rizo

ntal

pla

nel

Mas

terW

all B

reat

her

Fra

me

Wra

p

Box

gu

tter

4.5m

m F

/C s

hee

t M

in. 5

0mm

in w

idth

Sky

line

Mem

bra

ne

(to

be

app

lied

as

per

S

kylin

e S

yste

m S

pec

i�ca

tio

n)

Min

imu

m 5

mm

ap

pro

ved

mes

h

rein

forc

ed p

oly

mer

ren

der

sys

tem

Poly

styr

ene

H G

rad

e w

edg

e

Fib

reg

lass

rei

nfo

rcin

g m

esh

to

cov

er g

ap

bet

wee

n a

lloy

ang

le m

esh

ret

urn

s

All

exte

rnal

co

rner

s re

info

rced

wit

h a

lloy

ren

der

b

ead

wit

h in

teg

ral �

ber

gla

ss

mes

h r

ein

forc

ing

str

ip

SUITABLE FOR BAL 12.5, 19 & 29. FOR BAL 40 SEE PAGES 10 & 11.

Mas

terW

all a

pp

rove

d �

xin

g

& 4

0mm

bu

tto

n s

et

Mas

terW

all a

pp

rove

d 7

5mm

�xi

ng

&

40m

m b

utt

on

set

Ad

equ

ate

bea

d o

f ex

pan

dab

le f

oam

co

nst

ruct

ion

ure

than

e at

mid

po

int

of

pan

el t

hic

knes

s

Page 7: SKYLINE TECHNICAL DOCUMENT SYSTEM INSTALLATION ... · system installation & construction detail manual skyline technical document 13.06.2013 architectural ‘cap-less’ solutions

8 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd. 04.07.2016

These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the specifications detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.

Box

gu

tter

F/C

sh

eet

4.5m

m w

ith

50

mm

wid

th r

etu

rned

in

to b

ox g

utt

er

Min

fall

Rafte

r

Poly

styr

ene

H-G

rad

e w

edg

e

Koolt

her

m® p

anel

Not

e: D

o no

t pea

rce

Skyl

ine

mem

bran

e w

ith m

echa

nica

l fas

tner

s th

roug

h th

e ho

rizo

ntal

pla

nel

These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the speci�cations detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.

Sky

line

mem

bra

ne

(to

be

app

lied

as

per

S

kylin

e S

yste

m S

pec

i�ca

tio

n)

Fib

reg

lass

rei

nfo

rcin

g m

esh

ove

r en

tire

Koolt

her

m® p

anel

sys

tem

Min

imu

m 5

mm

ap

pro

ved

mes

h r

ein

forc

ed

po

lym

er r

end

er s

yste

m

Mas

terW

all B

reat

her

Fra

me

Wra

p

All

exte

rnal

co

rner

s re

info

rced

wit

h a

lloy

ren

der

b

ead

wit

h in

teg

ral �

ber

gla

ss

mes

h r

ein

forc

ing

str

ip

SKYLINE SYSTEM / Kooltherm® PANEL:

RENDERED PARAPET WALLSUITABLE FOR BAL 12.5, 19 & 29. FOR BAL 40 SEE PAGES 10 & 11.

Fib

reg

lass

rei

nfo

rcin

g m

esh

to

cov

er g

ap

bet

wee

n a

lloy

ang

le m

esh

ret

urn

s

Ad

equ

ate

bea

d o

f ex

pan

dab

le f

oam

co

nst

ruct

ion

ure

than

e at

mid

po

int

of

pan

el t

hic

knes

s

Mas

terW

all a

pp

rove

d 7

5mm

xin

g &

50m

m b

utt

on

set

Mas

terW

all a

pp

rove

d �

xin

g

& 5

0mm

bu

tto

n s

et

Page 8: SKYLINE TECHNICAL DOCUMENT SYSTEM INSTALLATION ... · system installation & construction detail manual skyline technical document 13.06.2013 architectural ‘cap-less’ solutions

9COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd.

These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the specifications detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.

Not

e: D

o no

t pea

rce

Skyl

ine

mem

bran

e w

ith m

echa

nica

l fas

tner

s th

roug

h th

e ho

rizo

ntal

pla

nel

Mas

terW

all B

reat

her

Fra

me

Wra

p

Box

gu

tter

Mas

terW

all a

pp

rove

d 7

5mm

�xi

ng

&

50m

m b

utt

on

set

4.5m

m F

/C s

hee

t -

50m

m w

idth

Sky

line

Mem

bra

ne

(to

be

app

lied

as

per

S

kylin

e S

yste

m S

pec

i�ca

tio

n)

Fib

reg

lass

rei

nfo

rcin

g m

esh

Min

imu

m 5

mm

ap

pro

ved

mes

h

rein

forc

ed p

oly

mer

ren

der

sys

tem

All

exte

rnal

co

rner

s re

info

rced

wit

h a

lloy

ren

der

b

ead

wit

h in

teg

ral �

ber

gla

ss

mes

h r

ein

forc

ing

str

ip

These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the speci�cations detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.

SKYLINE SYSTEM / Kooltherm® PANEL:

RENDERED PARAPET WALLSUITABLE FOR BAL 12.5, 19 & 29. FOR BAL 40 SEE PAGES 10 & 11.

Poly

styr

ene

H G

rad

e w

edg

e

Fib

reg

lass

rei

nfo

rcin

g m

esh

to

cov

er g

ap

bet

wee

n a

lloy

ang

le m

esh

ret

urn

s

Mas

terW

all a

pp

rove

d 7

5mm

�xi

ng

&

50m

m b

utt

on

set

Ad

equ

ate

bea

d o

f ex

pan

dab

le f

oam

co

nst

ruct

ion

ure

than

e at

mid

po

int

of

pan

el t

hic

knes

s

Page 9: SKYLINE TECHNICAL DOCUMENT SYSTEM INSTALLATION ... · system installation & construction detail manual skyline technical document 13.06.2013 architectural ‘cap-less’ solutions

10 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd. 04.07.2016

These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the specifications detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.

Box

gu

tter

F/C

sh

eet

4.5m

m w

ith

50m

m

wid

th r

etu

rned

into

box

gu

tter

Raf

ter

Min

imu

m 5

mm

ap

pro

ved

mes

h r

ein

forc

ed

po

lym

er m

od

i�ed

ren

der

sys

tem

Koolt

her

m® p

anel

Mas

terW

all B

reat

her

Fra

me

Wra

p

Not

e: D

o no

t pea

rce

Skyl

ine

mem

bran

e w

ith m

echa

nica

l fas

tner

s th

roug

h th

e ho

rizo

ntal

pla

nel

Sky

line

mem

bra

ne

(to

be

app

lied

as

per

S

kylin

e S

yste

m S

pec

i�ca

tio

n)

Mas

terW

all a

pp

rove

d a

dh

esiv

e

F/C

sh

eet

4.5m

m

Min

fall

Poly

styr

ene

H-G

rad

e w

edg

e

These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the speci�cations detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.

All

exte

rnal

co

rner

s re

info

rced

wit

h a

lloy

ren

der

b

ead

wit

h in

teg

ral �

ber

gla

ss

mes

h r

ein

forc

ing

str

ip

SKYLINE SYSTEM / Kooltherm® PANEL:

BAL 40 RENDERED PARAPET WALL

Fib

reg

lass

rei

nfo

rcin

g m

esh

to

cov

er g

ap

bet

wee

n a

lloy

ang

le m

esh

ret

urn

s

Mas

terW

all a

pp

rove

d 7

5mm

xin

g &

50m

m b

utt

on

set

Mas

terW

all a

pp

rove

d �

xin

g

& 5

0mm

bu

tto

n s

et

Page 10: SKYLINE TECHNICAL DOCUMENT SYSTEM INSTALLATION ... · system installation & construction detail manual skyline technical document 13.06.2013 architectural ‘cap-less’ solutions

11COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd.

These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the specifications detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.

Not

e: D

o no

t pea

rce

Skyl

ine

mem

bran

e w

ith

mec

hani

cal f

astn

ers

thro

ugh

the

hori

zont

al p

lane

Mas

terW

all B

reat

her

Fra

me

Wra

p

Koolt

her

m® p

anel

Box

gu

tter

4.5m

m F

/C s

hee

t w

ith

50m

m w

idth

Sky

line

Mem

bra

ne

(to

be

app

lied

as

per

S

kylin

e S

yste

m S

pec

i�ca

tio

n)

Fib

reg

lass

rei

nfo

rcin

g m

esh

Min

imu

m 5

mm

ap

pro

ved

mes

h r

ein

forc

ed

po

lym

er m

od

i�ed

ren

der

sys

tem

Poly

styr

ene

H-G

rad

e w

edg

e

4.5m

m F

/C s

hee

t w

ith

50m

m w

idth

These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the speci�cations detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.

All

exte

rnal

co

rner

s re

info

rced

wit

h a

lloy

ren

der

b

ead

wit

h in

teg

ral �

ber

gla

ss

mes

h r

ein

forc

ing

str

ip

SKYLINE SYSTEM / Kooltherm® PANEL:

BAL 40 RENDERED PARAPET WALL (CLOSE UP)

Fib

reg

lass

rei

nfo

rcin

g m

esh

to

cov

er g

ap

bet

wee

n a

lloy

ang

le m

esh

ret

urn

s

Mas

terW

all a

pp

rove

d 7

5mm

�xi

ng

&

50m

m b

utt

on

set

Mas

terW

all a

pp

rove

d �

xin

g

& 5

0mm

bu

tto

n s

et

Mas

terW

all a

pp

rove

d a

dh

esiv

e

Page 11: SKYLINE TECHNICAL DOCUMENT SYSTEM INSTALLATION ... · system installation & construction detail manual skyline technical document 13.06.2013 architectural ‘cap-less’ solutions

16 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd. 04.07.2016

These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the specifications detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.

Note: Do not pearce Skyline membrane with mechanical fastners through the horizontal planel

Render note: Render system is to be polymer modi�ed render, fully �breglass mesh reinforced with alkali resistant render mesh, completed with desired texture �nish. It is recommended that a durable roll-on membrane / paint be applied to keep the surface clean.

These details are indicative for the purpose of illustrating the typical installation of Skyline system. The system is to be installed strictly in accordance with the speci�cations detailed in the forward section of this manual. Substrate construction to be in accordance with the Building Regulations & Statutory Requirements.

MasterWall® Breather Frame Wrap

MasterWall® Breather Frame Wrap

Timber stud

Skyline membrane (to be applied as per Skyline System speci�cation)

Alternative claddinge.g. weatherboard, �bre cement sheeting, aluminium panel, metal sheeting, plywood etc. (as per manufacturers speci�cations)

Timber stud

Timber stud

Waling plate

F/C sheet 4.5mm

Polystyrene wedge or framed with F/C sheet

MasterWall approved adhesive

SKYLINE SYSTEM:

CONCEALED FLASHING DETAILWATERPROOF LEDGE OR SIMILAR

Min. 35mm Skyline membrane drop down

Page 12: SKYLINE TECHNICAL DOCUMENT SYSTEM INSTALLATION ... · system installation & construction detail manual skyline technical document 13.06.2013 architectural ‘cap-less’ solutions

18 COPYRIGHT 2016. No part of this document is to be copied or reproduced without the express written permission of Practica MMC Pty Ltd. 04.07.2016

SYSTEM CHECKLIST:

NOTES:

PRODUCT

Skyline membrane

MasterWall Panel

MasterWall Fixings

MasterWall Breather Frame Wrap

MasterWall Flashing Tape

Premium Quality Modified Liquid Sealant / Adhesive

Expandable Elastic Foam

Ableflex

DESCRIPTION

Waterproof Renderable Membrane

Precoated Polystyrene Panel (ready to render)

Screw Button Sets 100 p/box

Vapour Permeable Sarking

Self Adhesive Aluminium Tape (flashing windows & doors etc)

Premium Quality Modified Liquid Sealant

Expandable Urethane Flexible Foam (joint sealant)

Foam strip for rebated slab detail & expansion joints

SIZES

Width by request

50mm, 75mm, 100mm & 125mm

75mm

1350mm or 2700mm

75mm width

600ml sausage

700ml can

75mm width

COVERAGE

Job specification

1.2m x 2.4m (2.88m²)

300 Centres

82m² per roll

25m roll

2 per roll of flashing tape

65m² of MasterWall Panel

25m roll