SKKU Lab - Meeting. SKKU Lab-meeting, 19.March.2014 Dong- hyun Kim on behalf of the cern-904 team Department of physics, sungkyunkwan university, korea. Content. 1. Status of Korea-Chambers 2. Plan 3. Status of Data-analysis. Status of Korea-Chambers. Schedule. ( ~ 14.April) - PowerPoint PPT PresentationTRANSCRIPT
1
SKKULab - MeetingSKKU LAB-MEETING, 19.MARCH.2014
DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAM
DEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY, KOREA
2Content
1. Status of Korea-Chambers
2. Plan
3. Status of Data-analysis
31. Status of Korea-Chambers Schedule
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1. KCMS Project Total Schdule
1) Project Ready 2014-02-10 2014-02-19 0
2) START 2014-02-10
3) DEAD LINE 2014-04-14
2. Mechanical Prepare
1) Frame Clean & Insulate 2014-02-10 2014-03-14 32
2) Frame Mylar Paste 2014-02-10 2014-03-14 32
3) Cooler & Electronic Set-up 2014-02-17 2014-03-21 32
4) Signal Strip Prepare 2014-02-20 2014-02-21 1
5) Signal Cable Prepare 2014-02-21 2014-02-21 0
3. Gap Prepare
1) Visual Test 2014-02-24 2014-02-28 4
2) Leak Test 2014-02-25 2014-02-28 3
3) Dark Current Test 2014-03-03 2014-03-28 25
4. Chamber Construction
1) 1st Build 2014-02-10 2014-02-20 10
2) 2nd Build 2014-03-05 2014-03-07 2
3) 3rd Build 2014-03-10 2014-03-11 1
4) 4th Build 2014-03-12 2014-03-13 1
5) 5th Build 2014-03-14 2014-03-17 3
6) 6th Build 2014-03-18 2014-03-19 1
7) 7th Build 2014-03-20 2014-03-21 1
8) 8th Build 2014-03-24 2014-03-25 1
9) 9th Build 2014-03-26 2014-03-27 1
10) 10th Build 2014-03-28 2014-03-31 3
02 Month 03 Month 04 MonthP A R T START END DAYS
Frame Clean & InsulateFrame Mylar Paste
Cooler & Electronic Set- up← Signal Strip Prepare← Signal Cable Prepare
← 1 st← 2 nd
← 3 rd← 4 th
← 5 th← 6 th
← 7 th← 8 th
← 9 th← 10 th
← Visual Test← Leak Test
Dark Current Test
( ~ 14.April) DEAD-LINE
Today( 19.March )
Delay
4 1. Status of Korea-Chambers
Complete Build 2nd & 3rd Chamber ( Cosmic-ray test ongoing )
5 1. Status of Korea-Chambers
Ongoing build to 4th & 5th & 6th Chambers
62. Plan & Backup
Ongoing build to 5th & 6th RE4/2 Chambers
Korea-CMS 1st RE4/2 type Chamber
73. Status of Data-Analysis Compare Pythia 6 MC data with Pythia 8
- MC Data sample
: /WToMuNu_TuneZ2star_13TeV-pythia6/Summer13dr53X-PU25bx25_START53_V19D-v1
: /WToMuNu_Tune4C_13TeV-pythia8/Fall13dr-tsg_PU20bx25_POSTLS162_V2-v1
- Process status
: CMSSW Release version For Pythia 8 : 6_2_5 (Developer version, No recipe)
6_2_4 version has Pat Release Note -> Try use this version.
Problem : compile error while compiling analysis program
Compile error : cc1plus: some warnings being treated as errors
‘Werror’ must be disabled
Request to Hyper-news