THE ATYRAU REFINERY IS THE OLDEST PETROLEUM REFINING PLANT IN KAZAKHSTAN, BUILT MORE THAN 60 YEARS AGO.
THE RECONSTRUCTION OF THE REFINERY STARTED IN MARCH 2003, AS PART OF THE TURNKEY CONTRACT, WHICH WAS
WON TO JGC CORPORATION AS MAIN CONTRACTOR, IN COOPERATION WITH MARUBENI CORPORATION. THE SCOPE OF
THE PROJECT WAS TO PRODUCE OIL PRODUCTS THAT FULFILL MODERN STANDARDS AND ECOLOGICAL REQUIREMENTS.
THE TOTAL PROCESSING CAPACITY OF THE REFINERY IS OF 4.3 MILLION TONS OF OIL PER YEAR.
ATYRAU REFINERY / KAZAKHSTAN ONSHORE
EPC CONTRACTOR: JGC CORPORATION / END USER: KAZMUNAIGAS
KAZAKHSTAN
Caspian Sea
Uzbekistan
Kyrgyzstan
The project proved to be a success thanks both to the expe-
rience acquired by Skema in the Kazakh market since 1998,
which it was able to leverage fully, and to the important
technology transfer program established in Kazakhstan.
The commissioning was carried out by local electri-
cal engineers, under the supervision of Skema’s site
services manager.
SOLUTIONS DELIVERED
SKEMA WAS RESPONSIBLE FOR THE PROVISION OF THE PMCC SWITCHBOARDS FOR THE ATYRAU REFINERY.
INTELLIGENT MOTOR CONTROL CENTERS (57 COLUMNS, 371 DRAWERS)
POWER CENTERS (32 COLUMNS)
EPC CONTRACTOR: JGC CORPORATION / END USER: KAZMUNAIGAS
AWA PALOUKOU PLATFORM / CONGO OFFSHORE
EPC CONTRACTOR: SAIPEM / END USER: ENI CONGO
SAIPEM WAS AWARDED THE CONTRACT FOR THE ENGINEERING, PROCUREMENT, CONSTRUCTION AND INSTALLATION OF
A PLATFORM AND ASSOCIATED PIPELINES FOR THE DEVELOPMENT OF THE AWA PALOUKOU FIELD, LOCATED OFF THE
COAST OF THE REPUBLIC OF CONGO IN 2,730 FEET (832 M) OF WATER. THIS IS THE SECOND DEEPEST WATER DEPTH
FIXED PLATFORM PROJECT IN THE WORLD.
CONGO
Gabon
Angola
Democratic Republic of the Congo
Skema was responsible for the design, engineering, manufac-
turing, testing and commissioning of the MV and LV Switch-
gear, the RTUs and the IPCS System. A dual-redundant Local
Control Unit (LCU), based on redundant PLCs, is installed in
the Normal Electrical Room. This LCU is connected, via a re-
dundant Modbus on multimode fiber optic, to a Remote Con-
trol Unit (RCU) installed in the Emergency Electrical Room. The
LCU communicates, via redundant Ethernet network on mul-
timode fiber optic, with an Industrial PC installed in the Main
Electrical Room.
SOLUTIONS DELIVERED
MV SWITCHGEAR (11 COLUMNS)
INTELLIGENT POWER MOTOR CONTROL CENTERS (28 COLUMNS, 149 DRAWERS)
4 REMOTE TERMINAL UNITS
INTEGRATED PROTECTION AND CONTROL SYSTEM
EPC CONTRACTOR: SAIPEM / END USER: ENI CONGO
BAKU TBILISI CEYHAN PIPELINE / AZERBAIJAN AND GEORGIA ONSHORE
EPC CONTRACTOR: PETROFAC / END USER: BRITISH PETROLEUM
THE BAKU-TBILISI-CEYHAN PIPELINE TRANSPORTS CRUDE 1,760 KM (1,094 MILES) FROM THE AZERI-CHIRAG-GUNESH-
LI OIL FIELD IN THE CASPIAN SEA TO THE MEDITERRANEAN SEA. IT PASSES THROUGH BAKU, THE CAPITAL OF AZERBAI-
JAN; TBILISI, THE CAPITAL OF GEORGIA; AND CEYHAN, A PORT ON THE SOUTH-EASTERN MEDITERRANEAN COAST OF
TURKEY, HENCE ITS NAME. IT IS THE SECOND LONGEST OIL PIPELINE IN THE WORLD AND ONE OF THE BIGGEST ENGI-
NEERING PROJECTS.
GEORGIA
AZERBAIJAN
Caspian SeaBlack Sea
Turkey
IranIraq
Syria
Skema supplied Switchgear for Pump stations PS-G2
and PS-G1 and for the intermediate Pigging IP-A1 of the
Baku Tbilisi Ceyhan pipeline, and was responsible for the
design, engineering, manufacturing, testing and com-
missioning of PMCC type LV Switchgear and Bus Ducts.
SOLUTIONS DELIVERED
INTELLIGENT POWER MOTOR CONTROL CENTERS (139 COLUMNS, 429 DRAWERS)
3 DC PANELS
BUS DUCTS
EPC CONTRACTOR: PETROFAC / END USER: BRITISH PETROLEUM
“All in all the Skema service was very satisfactory.”
Contracts Administrator
CHILEAN LNG / CHILE ONSHORE
THE CHILEAN LNG PROJECT CONSISTS OF A NEW GRASS-ROOTS LNG RECEIVING TERMINAL LOCATED AT QUINTERO BAY, AP-
PROXIMATELY 160 KM NORTHWEST OF SANTIAGO, CHILE. LNG CARRIER SHIPS UNLOAD AT A NEW JETTY BUILT AT QUINTERO,
INTO TWO STORAGE TANKS. PROCESS FACILITIES ARE INSTALLED TO ENABLE THE LNG TO BE PUMPED FROM THE STORAGE
TANKS, VAPORIZED AND EXPORTED INTO THE EXISTING TRANSMISSION SYSTEM VIA A NEW PIPELINE. THE TERMINAL IS EXPECT-
ED TO MEET 40% OF CHILEAN GAS DEMAND, WITH AN OVERALL ANNUAL SUPPLY CAPACITY OF 2.5 MILLION TONNES OF LNG.
EPC CONTRACTOR: CB&I / END USER: GNL QUINTERO / A JV BETWEEN: BRITISH GAS / ENDESA CHILE / ENAP / METROGAS
CHILEArgentina
South Pacific Ocean
Paraguay
Uruguay
Skema’s PMCCs were compliant with the following
seismic loads:
> Peak Horizontal Ground Acceleration: 0.83 g
> Peak Vertical Ground Acceleration: 0.59 g
> Seismic Design Code: ASCE 7/IBC 2000
The robustness of the structures was tested in relation to:
> Resistance and stability for individual modules and
for the various configurations
> Ground anchors
> Links between modules (bolts)
> Internal links to modules (rivets)
In addition, Skema’s Switchgear was successfully tested
for seismic load to IEC 60068-3-3 (1 g).
SOLUTIONS DELIVERED
INTELLIGENT POWER MOTOR CONTROL CENTERS (47 COLUMNS, 205 DRAWERS)
5 INTERFACE PANELS
4 POWER TRANSFORMERS
EPC CONTRACTOR: CB&I / END USER: GNL QUINTERO / A JV BETWEEN: BRITISH GAS / ENDESA CHILE / ENAP / METROGAS
CHINAREVSKOYEFIELD / KAZAKHSTAN ONSHORE
EPC CONTRACTOR: EXTERRAN-BELLELI ENERGY / END USER: ZHAIKHMUNAI
CHINAREVSKOYE FIELD, APPROXIMATELY 324 SQUARE KILOMETERS IN SIZE, IS SITUATED CLOSE TO THE CITY OF URALSK
IN WEST KAZAKHSTAN AND IS ONLY 60 KM FROM THE BORDER WITH THE RUSSIAN FEDERATION. THE FIELD CONSISTS
OF AN OIL PROCESSING FACILITY CAPABLE OF PROCESSING 400,000 TPA OF CRUDE OIL, MULTIPLE OIL GATHERING AND
TRANSPORTATION LINES, A GAS POWERED ELECTRICITY GENERATION SYSTEM, MAJOR WAREHOUSE FACILITIES FOR THE
STORAGE OF OIL, MATERIALS, MACHINERY AND CHEMICALS USED IN CRUDE OIL PRODUCTION, AN EMPLOYEE FIELD CAMP
FOR 180 PEOPLE AS WELL AS 14 EXISTING WELLS AND 4 EXPLORATION WELLS UNDER DRILLING AND TEST OPERATIONS.
KAZAKHSTAN
Caspian SeaUzbekistan
Kyrgyzstan
Skema’s solution included the design, engineering, man-
ufacturing, testing and commissioning of MV and LV
Switchgear, including capacitor panels.
SOLUTIONS DELIVERED
MV 6 KV SWITCHGEAR (31 COLUMNS)
INTELLIGENT POWER MOTOR CONTROL CENTERS (93 COLUMNS, 279 DRAWERS)
CAPACITOR PANELS
EPC CONTRACTOR: EXTERRAN-BELLELI ENERGY / END USER: ZHAIKHMUNAI
CORINTH REFINERY / GREECE ONSHORE
EPC CONTRACTOR: TECHNIP / END USER: MOTOR OIL HELLAS
THE CORINTH REFINERY WITH ITS ANCILLARY PLANTS AND OFFSITE FACILITIES IS CONSIDERED AS ONE OF THE MOST
MODERN REFINERIES IN EUROPE. DUE TO ITS FLEXIBILITY IT CAN PROCESS CRUDE OILS OF VARIOUS CHARACTERISTICS
AND PRODUCE A FULL RANGE OF PETROLEUM PRODUCTS, COMPLYING WITH THE MOST STRINGENT INTERNATIONAL
SPECIFICATIONS, SERVING MAJOR PETROLEUM MARKETING COMPANIES IN GREECE AND ABROAD. THE REFINERY PRO-
DUCTION OPERATIONS ARE LOCATED IN AGII THEODORI, IN THE PROVINCE OF CORINTH, ABOUT 70 KM OUTSIDE ATHENS.
GREECETurkey
Bulgaria
Romania
Albania
Black Sea
Skema was awarded the contract for the design, engi-
neering, manufacturing and installation of LV Switchgear
for the new Crude Distillation Unit Complex of the refinery.
SOLUTIONS DELIVERED
POWER MOTOR CONTROL CENTERS (53 COLUMNS, 188 DRAWERS)
DISTRIBUTION PANELS
BUS DUCTS
POWER FACTOR CORRECTION SYSTEM
EPC CONTRACTOR: TECHNIP / END USER: MOTOR OIL HELLAS
CONGO
Gabon
Angola
Democratic Republic of the Congo
DJENO POWER GENERATION PLANT / CONGO ONSHORE
EPC CONTRACTOR: RENCO / END USER: ENI CONGO
THE THERMOELECTRIC POWER PLANT IN DJENO, NEAR POINT NOIR IN CONGO, HAS A 25 MEGAWATT POWER CAPACITY.
THE POWER PLANT IS FIRED WITH ASSOCIATED GAS FROM THE OFFSHORE PLANTS OF KITINA, DJAMBALA AND FOUKAN-
DA, LOCATED 65 KM FROM THE COAST AND PRODUCING A TOTAL OF 26,000 BARRELS OF OIL PER DAY. GAS IS SEPA-
RATED ONSHORE AT THE DJENO TERMINAL CLOSE TO THE NEW POWER PLANT. THE PROJECT REPRESENTS THE FIRST
EXAMPLE OF USE AND EXPLOITATION OF ASSOCIATED GAS OTHERWISE FLARED. THE PROJECT AIMS AT REDUCING GAS
FLARING AND AT USING IT IN POWER GENERATION WITH SIGNIFICANT SOCIAL, ECONOMIC AND ENVIRONMENTAL BENEFITS.
Skema was responsible for the design, engineering, man-
ufacturing, supply, inspection, testing, export packing and
supervision of onsite commissioning of LV Switchgear
and Intelligent Motor Control Centers.
SOLUTIONS DELIVERED
MOTOR CONTROL CENTERS (12 COLUMNS, 19 DRAWERS)
POWER CENTERS (7 COLUMNS)
AUXILIARY SERVICES SWITCHBOARDS
EPC CONTRACTOR: RENCO / END USER: ENI CONGO
NIGERIA
Camerun
NigerCiad
EBOCHA OIL CENTER / NIGERIA ONSHORE
THE EBOCHA OIL CENTRE (EOC) IS LOCATED IN THE NAOC LAND AREA, APPROXIMATELY 10 KM FROM THE OB/OB GAS
PLANT IN THE OBRIKOM RIVER STATE, NIGERIA. THE EBOCHA OIL CENTRE COLLECTS THE LIQUID PRODUCTION FROM IRRI,
KWALE, AKRI, OB/OB AND ADDAX AND TRANSFERS IT TO THE BRASS TERMINAL.
EPC CONTRACTOR: SUDELETTRA NIGERIA / END USER: NAOC
The Power Motor Control Centers supplied for the project
were equipped with automatic change-over to allow the in-
plant distribution of power supply coming from two main
transformers and two emergency diesel generators. The
capacitor banks were required for automatic regulation of
the electrical network power factor.
EPC CONTRACTOR: SUDELETTRA NIGERIA / END USER: NAOC
SOLUTIONS DELIVERED
POWER CENTER (20 COLUMNS)
MOTOR CONTROL CENTERS (16 COLUMNS)
LV CAPACITOR BANKS (4 COLUMNS)
KAZAKHSTAN
Caspian Sea
Uzbekistan
Kyrgyzstan
ESKENE WEST RAIL / KAZAKHSTAN ONSHORE
EPC CONTRACTOR: WORLEYPARSONS / END USER: NORTH CASPIAN OPERATING COMPANY (NCOC) / A CONSORTIUM OF KAZMUNAIGAZ / ENI / SHELL / EXXONMOBIL / TOTAL / CNPC / INPEX
ESKENE WEST RAIL CONSISTS OF THREE BASIC FACILITIES LINKED BY A COMMON RAIL SYSTEM THAT REQUIRE UPGRAD-
ING WORKS TO ACCOMMODATE THE INCREASED RAIL TRAFFIC FROM THE RAIL LOADING FACILITIES (RLF) AND THE MAR-
SHALLING YARD (MYD). THE ESKENE WEST RAIL SERVES THE KASHAGAN FIELD.
Skema was awarded the contract for the design, engineering,
manufacturing and testing of the whole electrical package
for the Eskene West Rail project, encompassing everything
from the Intelligent LV and MV Switchgear to the Modular
Substations.
SOLUTIONS DELIVERED
2 MODULAR SUBSTATIONS
MV 10 KV SWITCHGEAR (41 COLUMNS)
INTELLIGENT POWER MOTOR CONTROL CENTERS (183 COLUMNS, 428 DRAWERS)
9 REMOTE TERMINAL UNITS
DISTRIBUTION BOARDS (87 COLUMNS)
EPC CONTRACTOR: WORLEYPARSONS / END USER: NORTH CASPIAN OPERATING COMPANY (NCOC) / A CONSORTIUM OF KAZMUNAIGAZ / ENI / SHELL / EXXONMOBIL / TOTAL / CNPC / INPEX
FLARES MODIFICATION DAS ISLAND / UAEONSHORE
EPC CONTRACTOR: TECHNIP / END USER: ADMA-OPCO
ADGAS OFFSHORE ASSOCIATED GAS (OAG) PLANT AND INTEGRATED GAS DEVELOPMENT (IGD) FACILITY ARE ON THE
NORTH WEST SIDE OF DAS ISLAND, WHICH IS ADJACENT TO ADMA-OPCO FLARE AREA. THE FLARES POSE RADIATION
HAZARD AND A HIGH RISK OF TOXIC GAS (H2S) EXPOSURE DURING CONSTRUCTION, OPERATION AND MAINTENANCE
PHASES OF THE PROJECT IN CASE OF FLAME OUT FROM THE FINGER FLARES DUE TO THEIR CLOSE PROXIMITY TO THE
OAG AND IGD FACILITIES. ADMA-OPCO HAS CONDUCTED STUDIES TO IMPLEMENT MODIFICATION AND NEW INSTALLA-
TIONS TO MITIGATE THE ABOVE.
IranIraq
Saudi Arabia
Oman
UAEQatar
Kuwait
EPC CONTRACTOR: TECHNIP / END USER: ADMA-OPCO
The degree of protection of the Switchgear is IP 42,
Form 4b, and the structure is equipped with 400 mm-
wide double doors in the cable compartment to facili-
tate access to and the connection of power and auxil-
iary cables to the dedicated feeder.
Color coded insulating caps are provided for all copper
bars and relevant connections. Solutions are provided
to prevent arc propagation across bus-sections using
fire-retardant materials.
Distribution busbar safety shutters have padlock facil-
ities in their closed position. Local and remote selec-
tor switches are padlockable in either position to avoid
unauthorized operation. All motor starters have oper-
ation counters.
SOLUTIONS DELIVERED
SKEMA WAS AWARDED THE CONTRACT FOR THE DESIGN, ENGINEERING, MANUFACTURING, INSPECTION AND TESTING OF:
POWER MOTOR CONTROL CENTERS (8 COLUMNS, 39 DRAWERS)
KAZAKHSTAN
Caspian Sea
Uzbekistan
Kyrgyzstan
DISCOVERED IN 1979, TENGIZ IS ONE OF THE WORLD’S DEEPEST DEVELOPED SUPER GIANT OILFIELDS. THE FUTURE
GROWTH PROJECT (FGP), INTEGRATED WITH THE WELLHEAD PRESSURE MANAGEMENT PROJECT (WPMP), ARE EXE-
CUTED SIMULTANEOUSLY TO EXPAND TENGIZ PRODUCTION AND MAINTAIN FULL PRODUCTION RATES OF THE EXIST-
ING TENGIZ FACILITIES. THE FGP PLANTS WILL NOT PRODUCE SULFUR. THE NATURAL GAS CONTAINING HYDROGEN
SULPHIDE WILL BE RE-INJECTED INTO THE RESERVOIR TO MAINTAIN RESERVOIR PRESSURE. THE EXPANSION IS DE-
SIGNED AND CONSTRUCTED TO OPERATE WITH THE LATEST TECHNOLOGY TO REDUCE AIR EMISSIONS.
FUTURE GROWTH PROJECT (FGP) / KAZAKHSTAN ONSHORE
“This was a technically challenging order. As a result Skema worked very collaboratively with our engineering and management team to
come to successful solutions.”
Project Manager
EPC CONTRACTOR: KPJV / A JV BETWEEN: FLUOR / WORLEY PARSONS / JSC KING AND LLP KGNTEND USER: TENGIZCHEVROIL / A CONSORTIUM OF: CHEVRON / EXXONMOBIL / KAZMUNAYGAS / LUKARKO
ENGINEERING
The substations supplied for the FGP/
WPMP project are one level steel
structures installed above a concrete
foundation. The main structure con-
sists of transverse frames connected
by floor beams, wall corrugated plates
and floor plates. The main structure is
completed with longitudinal beams
connecting the bottom of the main
columns. The structures and machin-
ery are designed to withstand the
seismic design loads and to meet the
general seismic requirements, in ac-
cordance with the SiD (Safety in De-
sign) requirements. All analyses were
carried out using Semi-probabilistic
method at Limit states (LSD), while all
structures were analyzed using FEM
method bend on the package 3D
model, considering the operation con-
figuration and the lifting phase.
For seismic analysis static analysis
was carried out. The lifting was from
top of the substation.
A 3D separate model was generated
for each module in a right handed or-
thogonal Cartesian coordinate sys-
tem. The structural models of the
modules were representative of the
actual structural components and in-
cluded all primary framing members,
namely columns, f loor beams and
floor plates.
FABRICATION IN ITALY
The modular substations fabricated in
Italy were tested at Skema’s yard fa-
cilities, then disassembled in modules
and transported by road to Tengiz, to
be reassembled locally.
The supply included 10 Container-
ized complete transformer 10/0.4 kV
substations for the Contractors’ Com-
pound / Early Works, equipped with:
> 10 kV Gas Insulated Switchgear
(6 sections)
> 10 kV Ring Main units (24 sections)
> Intelligent PMCCs
(66 sections, 154 drawers)
> Distribution Boards (68 sections)
> 220 VDC system
> 220 VDC Ni-Cd battery rack
> 10/0.4 kV cast resin Transformers
> Lighting and electrical system
> HVAC system
> Fire and gas system
2 Containerized 35/10 kV packaged
substations were fabricated for New
Camp 9/A, and were equipped with:
> 35 kV Gas Insulated Switchgear
(21 sections)
> 10 kV Gas Insulated Switchgear
(26 sections)
> 10 kV Disconnector Switches
(4 sections)
> Distribution Boards (25 sections)
> 220 VDC system
> 220 VDC Ni-Cd battery rack
> 10/0.4 kV – 750 kVA cast resin
Transformers
> On Load Tap Changer (OLTC) panel
> Patch panel
> Badge reader access door
> Lighting and electrical system
> HVAC system
> Fire and gas system
The equipment was pre-assembled
and base plated mounted to the maxi-
mum extent including piping, supports,
instruments, wiring, junction boxes.
FABRICATION IN KAZAKHSTAN
Skema LLP was awarded the local fab-
rication of 1 Containerized 10 kV pack-
aged substation for the Construction
Compound. The substation included:
> 10 kV Gas Insulated Switchgear
(15 sections)
> Distribution Boards (11 sections)
> 220 VDC system
> 220 VDC Ni-Cd battery rack
> Cast resin Transformers 35/0.4 kV
> Lighting and electrical system
> HVAC system
> Fire and gas system
The equipment was pre-assembled
and base plated mounted to the maxi-
mum extent including piping, supports,
instruments, wiring, junction boxes.
The modular substation fabricated
in Atyrau was tested at the fabrica-
tion yard facilities, then disassembled
in modules and transported by road
to Tengiz, to be reassembled locally.
For the modular substations fabricated
for the FGP/WPMP, Skema supplied the
following services: preservation, pro-
tection and storage at the fabrication
yard; disassembly in modules; pack-
aging, preservation and protection for
sea and land transport; winterization
for shipment and storage; load out.
“I would like to thank you and your team for producing a quality product which will serve TCO for many years. I appreciate your effort, patience and understanding in working with us to achieve this significant milestone of
signing off the substations for T9A and Orken Village to the required standard
and to the agreed schedule.”
Lead Project Engineer
Skema was in charge of the sizing, detailed design, engi-
neering, project management, scheduling, procurement,
fabrication, painting, inspection, non-destructive exam-
ination, shop testing, expediting, QA/HSE management,
documentation and preservation of 13 Modular Substa-
tions. The fabrication, multidisciplinary installation ac-
tivities (architectural, mechanical, E&I, HVAC, etc.), test-
ing and pre-commissioning of 12 modular substations
were carried out at Skema’s yard in Ravenna, Italy, while
1 modular substation was fabricated by Skema LLP in
Kazakhstan. Performance was according to IEC/GOST
standards and PUE ROK.
SOLUTIONS DELIVERED
13 MODULAR SUBSTATIONS
MV 10/35 KV SWITCHGEAR (68 COLUMNS)
MV 10 KV RING MAIN UNITS (24 COLUMNS)
INTELLIGENT POWER MOTOR CONTROL CENTERS (66 COLUMNS, 154 DRAWERS)
DISTRIBUTION BOARDS (104 COLUMNS)
EPC CONTRACTOR: KPJV / A JV BETWEEN: FLUOR / WORLEY PARSONS / JSC KING AND LLP KGNTEND USER: TENGIZCHEVROIL / A CONSORTIUM OF: CHEVRON / EXXONMOBIL / KAZMUNAYGAS / LUKARKO
KAZAKHSTAN
Caspian Sea
Uzbekistan
Kyrgyzstan
DISCOVERED IN 1979, TENGIZ IS ONE OF THE WORLD’S DEEPEST PRODUCING SUPER GIANT OILFIELDS AND ONE OF THE
LARGEST DISCOVERIES IN RECENT HISTORY. LOCATED IN A REMOTE AREA OF WESTERN KAZAKHSTAN, THE UNDERGROUND
TENGIZ RESERVOIR MEASURES 20 KILOMETRES BY 21 KILOMETRES. THE ENTIRE TENGIZ OILFIELD AREA IS ESTIMATED TO
CONTAIN 750 MILLION TO 1.1 BILLION METRIC TONNES (6 TO 9 BILLION BARRELS) OF RECOVERABLE OIL.
FUTURE GROWTH PROJECT (FGP) / KAZAKHSTAN ONSHORE
EPC CONTRACTOR: KPJV / A JV BETWEEN: FLUOR / WORLEY PARSONS / JSC KING AND LLP KGNTEND USER: TENGIZCHEVROIL / A CONSORTIUM OF: CHEVRON / EXXONMOBIL / KAZMUNAYGAS / LUKARKO
“I’d like to add my sincere thanks to you and your team for a great job completed on time thanks to all of your efforts, to an excellent quality
and with a good safety record. Thanks again.”
Project Engineer
SKEMA’S LV SWITCHGEAR/MCC’S
FOR CORE AND MAIN SUBSTATIONS
INTERNAL ARC FAULT PROTECTION
in accordance to the IEC TR 61641.
The mechanical protection of the switch-
gear was tested by extending the arc
duration to 0.5 s.
OPTICAL SENSORS for arc fault detection
on busbar systems and functional units.
Fiber optic sensors connected to the con-
trol system were installed along the main
and distribution busbar systems, to detect
arc fault. The system allows the electrical
protection activation in a very quick time,
preventing switchgear damages. Besides,
all the functional units are equipped with
a dedicated optic sensor to interrupt
any possible fault inside the drawers.
INFRARED SENSORS for monitoring
the temperature of the main busburs
of busbar junctions and cable entry
for incomers and power transformers.
The connection of the main busbar sys-
tem of the switchgear, the cable entry
sections of incomers and bus-ties, the
connection to the MV/LV power trans-
formers are monitored through a tem-
perature control infrared sensor sys-
tem. Should the connection between
busbars, or the connection of a power
cable loosen up, the temperature in-
crease detected by the sensor would
activate the alarm reporting system.
The consequent punctual control/
switching prevents the damages that
might arise from continued heating.
COMMUNICATION SYSTEM between
functional units and main control system
through Ethernet or optic fiber. All the
data collected from the functional units
and the monitoring data from the fiber
optic and infrared sensors are trans-
ferred via Ethernet, and then through
an optic fiber connection to the main
control system. This allows the unique
coordination of all the substation sys-
tems and utilities.
SUBSTATION PLC
The PLC is installed in the substations’
HVAC room and it is provided with a
touch screen HMI. The logic control sys-
tem is designed to command and control
the HVAC system, taking inputs from the
field instruments and sending outputs to
the equipment such as isolating damp-
ers, fans, air handling units and electric
heaters, as per the operating philosophy
and cause and effect matrix. The HVAC
PLC is also interfacing with F&G panel
and provides different operating modes
depending on the environmental and
emergency situations that may occur
during the normal system operations.
EPC CONTRACTOR: KPJV / A JV BETWEEN: FLUOR / WORLEY PARSONS / JSC KING AND LLP KGNTEND USER: TENGIZCHEVROIL / A CONSORTIUM OF: CHEVRON / EXXONMOBIL / KAZMUNAYGAS / LUKARKO
SOLUTIONS DELIVERED
LV SWITCHGEAR AND MOTOR CONTROL CENTERS (64 COLUMNS, 102 DRAWERS)
DISTRIBUTION BOARDS (16 COLUMNS)
BUS DUCTS (4 LINES)
DRY TYPE CAST RESIN TRANSFORMERS (5 UNITS)
PLC PANELS (12 COLUMNS)
The LV switchgear solutions for the Core and Main Sub-
stations were designed and manufactured in compliance
with the stringent project requirements.
The project defined distinctive specifications for both the
mechanical structure of the switchgear, and the elec-
tric and electronic equipment of the functional units and
columns.
In particular, the LV switchgear are complete with au-
to-transfer scheme, momentary synchronizing between
incomers, switchgear and transformer protection, con-
trol and metering equipment, temperature monitoring
system and arc flash detection system.
“Great job Skema! Thank you very much for your hard work and dedication to complete this project with quality and collaboration.”
Senior Project Manager
KAZAKHSTAN
Caspian Sea
Uzbekistan
Kyrgyzstan
DISCOVERED IN 1979, TENGIZ IS ONE OF THE WORLD’S DEEPEST DEVELOPED SUPER GIANT OILFIELDS. THE FUTURE
GROWTH PROJECT (FGP), INTEGRATED WITH THE WELLHEAD PRESSURE MANAGEMENT PROJECT (WPMP), ARE EXE-
CUTED SIMULTANEOUSLY TO EXPAND TENGIZ PRODUCTION AND MAINTAIN FULL PRODUCTION RATES OF THE EXIST-
ING TENGIZ FACILITIES. THE FGP PLANTS WILL NOT PRODUCE SULFUR. THE NATURAL GAS CONTAINING HYDROGEN
SULPHIDE WILL BE RE-INJECTED INTO THE RESERVOIR TO MAINTAIN RESERVOIR PRESSURE. THE EXPANSION IS DE-
SIGNED AND CONSTRUCTED TO OPERATE WITH THE LATEST TECHNOLOGY TO REDUCE AIR EMISSIONS.
FUTURE GROWTH PROJECT (FGP) / KAZAKHSTAN ONSHORE
EPC CONTRACTOR: KPJV / A JV BETWEEN: FLUOR / WORLEY PARSONS / JSC KING AND LLP KGNTEND USER: TENGIZCHEVROIL / A CONSORTIUM OF: CHEVRON / EXXONMOBIL / KAZMUNAYGAS / LUKARKO
THE EQUIPMENT
Skema provided the following main
equipment for the 110 kV Core sub-
station:
> LV switchgear and MCCs com-
plete with auto-transfer scheme,
momentary synchronizing be-
tween incomers, switchgear and
transformer protection, control
and metering equipment
> Distribution boards, bus ducts,
distribution transformers and
PLC panel
> Electrical/instruments and F&G
systems
> HVAC system
> Hydrosanitary system
> Bridge crane
GE’s scope of supply included the fol-
lowing main equipment:
> 110 kV Gas Insulated Switchgear
(GIS) with associated protection,
control and metering equipment
> Utility metering for the 110 kV
interconnection with the Client’s
network
> UPS system and batteries
THE CORE SUBSTATION
The Core substation consists of 32
modules, which were prefabricated,
assembled, sand-blasted, painted
and bolted to form a unique structure.
After completion of the structural and
architectural assembly, the internal
equipment was installed and the sub-
station was tested.
The modules were then disassem-
bled and shipped to Kazakhstan.
The Core substation is built over 2 lev-
els, each divided into rooms. More in
detail, the ground floor includes:
110 kV GIS AREA – Steel struc-
ture made by assembled units which
contain the gas insulated switchgear
(GIS). A 1.5 t bridge crane is installed
over the top floor of the GIS area for
switchgear maintenance purposes.
ELECTRICAL ROOM – 2 transformers
feeding the LV switchgear, UPS, bat-
tery box, and the distribution boards
are installed in the electrical room on
the ground floor, which includes also
an office and a restroom.
BATTERY ROOM – Batteries are locat-
ed on specific racks in this room, which
is equipped with an eye wash facility
and a trolley to move the batteries.
The mezzanine floor hosts:
HVAC ROOM – The HVAC LV switch-
gear and PLC panel, the main air
conditioning equipment and the duct
system for the whole substation are
in the HVAC room, which includes
also 2 chemical filters and 2 fans.
INSTRUMENT EQUIPMENT ROOM
This room has been designed for
the control panels supplied by GE.
Access ladders, entrance, emer-
gency and maintenance service
doors complete the substation, and
5 removable panels ensure easy
instal lat ion and maintenance of
the bigger and heavier equipment.
A system of walkways at different
heights serve the electro/instru-
mental paths, starting from the low-
er part beneath the floor beams, all
through the intermediate section, up
to the upper part of the substation,
ensuring the connection among the
main equipment such as GIS, trans-
formers, switchgear, lighting, small
power and sensors from the various
rooms.
ENGINEERING
Skema’s scope of work included all
the design and engineering activities,
which were developed through stud-
ies, calculations, verification and val-
idation, and a series of specific de-
tai led procedures to ensure the
correct sequence of operations to
assemble the modules (e.g. removal
of temporary structural parts; seal-
ing; special tools needed to move the
modules; all that is needed to prepare
the structures for transportation).
3D MODEL
Skema’s supply included a 3D model of
the substation, which gives a 360° view
of the whole substation: structural and
architectural parts, electrical and instru-
mentation, HVAC and control disciplines.
The 3D modeling of the substation and
its equipment enables Skema to ensure
a thorough and consistent monitoring of
the most critical areas, a functional di-
mensional verification of the correct po-
sition of the internal elements in the
various areas, and the removal of any
clashes between the elements of the dis-
ciplines that form the model. It also ena-
bles Skema to interface with its Client
efficiently, giving a unique access key to
the project for the success of both the
engineering and construction phases.
SOLUTIONS DELIVERED
110 KV CORE SUBSTATION
The substation is composed of the following areas: > 110 KV GIS ROOM > ELECTRICAL ROOM > BATTERY ROOM > HVAC ROOM > INSTRUMENT EQUIPMENT ROOM
DIMENSIONS (M) 56 X 14.48 X 7.9 WEIGHT (T) 750
In consortium with GE Grid Solutions, Skema was award-
ed the contract for the sizing, design, engineering, mate-
rials, fabrication, inspection, non-destructive examination,
shop-testing, documentation and preparation for shipment
of the Core 110 kV substation for the TCO FGP project.
The substation was divided into 32 transportable pack-
aged sub-modules complete with integral support struc-
ture, access platforms, stairs, electrical equipment and
building services and including the electrical equipment.
EPC CONTRACTOR: KPJV / A JV BETWEEN: FLUOR / WORLEY PARSONS / JSC KING AND LLP KGNTEND USER: TENGIZCHEVROIL / A CONSORTIUM OF: CHEVRON / EXXONMOBIL / KAZMUNAYGAS / LUKARKO
KAZAKHSTAN
Caspian Sea
Uzbekistan
Kyrgyzstan
DISCOVERED IN 1979, TENGIZ IS ONE OF THE WORLD’S DEEPEST DEVELOPED SUPER GIANT OILFIELDS. THE FUTURE
GROWTH PROJECT (FGP), INTEGRATED WITH THE WELLHEAD PRESSURE MANAGEMENT PROJECT (WPMP), ARE EXE-
CUTED SIMULTANEOUSLY TO EXPAND TENGIZ PRODUCTION AND MAINTAIN FULL PRODUCTION RATES OF THE EXIST-
ING TENGIZ FACILITIES. THE FGP PLANTS WILL NOT PRODUCE SULFUR. THE NATURAL GAS CONTAINING HYDROGEN
SULPHIDE WILL BE RE-INJECTED INTO THE RESERVOIR TO MAINTAIN RESERVOIR PRESSURE. THE EXPANSION IS DE-
SIGNED AND CONSTRUCTED TO OPERATE WITH THE LATEST TECHNOLOGY TO REDUCE AIR EMISSIONS.
FUTURE GROWTH PROJECT (FGP) / KAZAKHSTAN ONSHORE
EPC CONTRACTOR: KPJV / A JV BETWEEN: FLUOR / WORLEY PARSONS / JSC KING AND LLP KGNTEND USER: TENGIZCHEVROIL / A CONSORTIUM OF: CHEVRON / EXXONMOBIL / KAZMUNAYGAS / LUKARKO
THE EQUIPMENT
Skema provided the following main
equipment for the 110 kV Main sub-
station:
> LV switchgear and MCCs com-
plete with auto-transfer scheme,
momentary synchronizing be-
tween incomers, switchgear and
transformer protection, control
and metering equipment
> Distribution boards, bus ducts,
distribution transformers and
PLC panel
> Electrical/instruments and F&G
systems, internal and external
lighting
> HVAC system
> Bridge crane
GE’s scope of supply included 110
kV Gas Insulated Switchgear with
the associated control panels, UPS
system and batteries.
“I really appreciate the whole Skema team, very professional service and delivered on their promises to make
the project a success.”
Project Engineer
LENGTH 81.1 M
HEIGHT 8.6 M
WEIGHT 1,097 T
WIDTH 14.6 M
SHIPPED IN 2 MODULES
“On behalf of our team, I would like to express our deep gratitude to the Skema team involved in Main substation
design, development, fabrication, and testing program. We appreciate your strong capabilities and commitment in establishing effective cooperation and communication
with us and all the specialists from supporting companies. Your professionalism allowed us to achieve our targeted
shipment date with a high quality work product. This large and complex scope has been completed with a total
of 637 days of incident and injury free work. This is a great accomplishment and very important achievement
for the TCO Future Growth Project and for all of us. TCO appreciates Skema for their partnership in this work.”
Senior Project ManagerFGP Control & Power
THE MAIN SUBSTATION
The Main substation is built over
2 levels, each divided into rooms.
More in detail, the Utility module
includes the Battery Room and the
Electrical Room on the ground floor,
and the HVAC Room and Instrument
Equipment Room on the first floor.
The GIS module corresponds to
the GIS area which includes the
110 kV GIS switchgear with the control
panels and a 1.5 t bridge crane for GIS
maintenance.
Access ladders entrance, emergency
and maintenance service doors com-
plete the substation, and 3 remova-
ble panels ensure easy installation
and maintenance of the bigger and
heavier equipment. The substation
is complete with air conditioning,
electro/instrumental and fire and gas
systems. A system of cable trays at
different heights serve the electro/
instrumental paths, starting from
the lower part beneath the floor
beams, all through the intermediate
section, up to the upper part of the
substation, ensuring the connection
among the main equipment such
as GIS, transformers, switchgear,
lighting, small power and sensors from
the various rooms.
110 kV GIS AREA (GIS MODULE)
This module contains the gas insu-
lated switchgear (GIS). A 1.5 t bridge
crane is installed over the top floor
of the GIS area for switchgear mainte-
nance purposes.
ELECTRICAL ROOM (UTILITY
MODULE) – 3 transformers feeding
the LV switchgear, the UPS, and the
distribution boards are installed in the
electrical room, which also includes an
office and a restroom.
BATTERY ROOM (UTILITY MODULE)
The batteries are located on specific
racks in this room, which is equipped
with an eye wash facility and a trolley
to move the batteries.
HVAC ROOM (UTILITY MODULE)
The HVAC LV switchgear and PLC
panel, the main air conditioning
equipment and the duct system for
the whole substation are located in
the HVAC room, which also includes
2 chemical filters and 2 fans.
INSTRUMENT EQUIPMENT ROOM
(UTILITY MODULE) – This room is
designed to host control panels.
ENGINEERING AND SERVICES
A complete 3D computer model of the
structure was developed by Skema us-
ing a dedicated calculation software, to
perform the structural analysis for all
conditions applicable to the substation:
in-service, load out and transportation.
All analyses, which included the struc-
tural verifications of all welded and
bolted joints, were carried out consid-
ering the gravity loads of the structure
and equipment, combined with the
dynamic loads and environmental loads
applicable to each specific condition.
For the Main substation Skema sup-
plied the following services:
> Preservation, protection and
storage at the fabrication yard
> Packaging, preservation and pro-
tection for sea and land transport
> Winterization for shipment and
storage
> Load out.
The substation was prepared for load
out by removing all the external items
which were properly packed and fixed
inside the modules or shipped as loose
items inside standard containers.
EPC CONTRACTOR: KPJV / A JV BETWEEN: FLUOR / WORLEY PARSONS / JSC KING AND LLP KGNTEND USER: TENGIZCHEVROIL / A CONSORTIUM OF: CHEVRON / EXXONMOBIL / KAZMUNAYGAS / LUKARKO
SOLUTIONS DELIVERED
110 KV MAIN SUBSTATION
The substation is composed of the following areas: > 110 KV GIS ROOM > ELECTRICAL ROOM > BATTERY ROOM > HVAC ROOM > INSTRUMENT EQUIPMENT ROOM
DIMENSIONS (M) 81.1 X 14.6 X 8.6 WEIGHT (T) 1,097
In consortium with GE Grid Solutions, Skema was award-
ed the contract for the design, engineering, development,
fabrication, electrical equipment, multidisciplinary instal-
lation activities, inspection, testing program, documen-
tation and preservation for shipment of the 110 kV Main
substation for the TCO FGP project. The Main substa-
tion, which is the largest substation of the overall Future
Growth Project, consists of 2 modules which were pre-
fabricated, assembled, sand-blasted, painted and bolted
to form a unique structure. The modules were then dis-
assembled and shipped to Kazakhstan by barge.
FPSO OSX2 / BRAZIL OFFSHORE
EPC CONTRACTOR: SBM OFFSHORE / END USER: OSX-GRUPO EBX
CAMPOS BASIN IS A PETROLEUM RICH AREA LOCATED OFFSHORE OF RIO DE JANEIRO. IT HAS A TOTAL AREA OF 100,000
SQUARE KILOMETERS. THE FPSO IS USED IN THE CAMPOS BASIN, BRAZIL, ON ONE OF A STRING OF HEAVY OILFIELDS
DISCOVERED BY OGX. THE OSX2 IS ABLE TO PRODUCE UP TO 100,000 BARRELS PER DAY OF OIL, WITH STORAGE CA-
PACITY FOR 1.3 MILLION BARRELS.
BRAZIL
Bolivia
Paraguay
SurinameGuyana French Guiana
The Switchgear supplied by Skema, with a rated current
of 5000 A and a rated short-time withstand current of
100 kA, complies with the most stringent requirements
for offshore marine applications: compact dimensions for
limited space, handles on the front of the Switchgear to
prevent injury to personnel in the event of sudden move-
ments, shock-resistant plinth.
Skema used the Bender system to monitor the electri-
cal network and to reveal defects and problems on the
network that could compromise the functionality of the
Switchgear.
SOLUTIONS DELIVERED
SKEMA WAS AWARDED THE CONTRACT FOR THE DESIGN, ENGINEERING, MANUFACTURING, INSPECTION AND TESTING OF:
POWER MOTOR CONTROL CENTERS (80 COLUMNS, 313 DRAWERS)
EPC CONTRACTOR: SBM OFFSHORE / END USER: OSX-GRUPO EBX
EPC CONTRACTOR: CB&I / END USER: NEXEN PETROLEUM
DISCOVERED IN 2007, THE GOLDEN EAGLE AREA (WHICH IS MADE UP OF RESERVOIRS GOLDEN EAGLE, HOBBY AND PER-
EGRINE), IS LOCATED IN APPROXIMATELY 113 M WATER DEPTH IN THE UK SECTOR OF THE NORTH SEA 70 KM OFFSHORE
(19 KM NORTH OF THE BUZZARD FIELD, 21 KM NORTHWEST OF THE ETTRICK FIELD AND 4 KM SOUTH OF THE ATLANTIC
FIELD). THE FIELD IS DEVELOPED USING TWO PLATFORMS - A WELLHEAD PLATFORM AND A PRODUCTION, UTILITY AND
QUARTERS (PUQ) PLATFORM. THE TWO PLATFORMS ARE CONNECTED BY A 70 M BRIDGE. THE FACILITIES BEING BUILT AT
GOLDEN EAGLE CAN ACT AS A FUTURE HUB FOR TIEBACKS. OPERATOR NEXEN HAS ESTIMATED THE GOLDEN EAGLE AREA
CONTAINS 140-150 MILLION BARRELS OF OIL EQUIVALENT IN GROSS RECOVERABLE CONTINGENT RESOURCES, MAKING IT
ONE OF THE LARGEST OIL DISCOVERIES IN THE UK NORTH SEA IN RECENT YEARS.
GOLDEN EAGLE / NORTH SEA (UK) OFFSHORE
EPC CONTRACTOR: CB&I / END USER: NEXEN PETROLEUM
UNITEDKINGDOM
Ireland
France
Germany
SKEMA MOTOR CONTROL AND
MANAGEMENT SYSTEM (MCMS)
The Motor Control and Manage-
ment System (MCMS) developed for
the platforms integrates the intel-
ligent Motor Control Centers made
by Skema with the Process Control
System (PCS), the Power Manage-
ment System (PMS) and the Distribu-
tion Management System (DMS), and
enables an integrated and safe man-
agement of all the electrical users.
The integration is achieved thanks
to the communication capabil i-
ties of the DCUs which operate as
gateways between the upstream
PCS/PMS/DMS and the IEDs with-
in the downstream switchgear.
The DCUs allow concurrent commu-
nication via redundant Modubus-RTU
and OPC between the different sys-
tems. Such integration completely ex-
ploits the capabilities of the 400 IEDs
(supplied by different manufacturers)
which measure, protect and control
all the users connected to the MCMS.
Importantly, the MCMS not only helps
the operator to control the users, but
is of great significance to the electrical
engineer in verifying the performances
of the electrical networks by means of
continuous monitoring of the param-
eters set in the IEDs with special at-
tention to those which influence the
reliability/maintenance of the plant.
The MCMS records the running hours,
the number of operations of each feed-
er circuit and analyzes the most fre-
quent causes of tripping/alarms, so
that the engineer can plan proac-
tive counter measures to avoid future
plant problems which may cause eco-
nomic losses and, in the worst cas-
es, safety risks to the plant/personnel.
This type of intelligent reporting is
pivotal in ensuring a proactive and
cost effective maintenance regime of
the plant. All the DCUs components
are dual redundant and can survive
any individual component failure. The
serial links communicating with the
downstream IEDs via Modbus-RTU
ring (motor managers, measuring
devices and protection relays) can
survive a fault where the serial ca-
ble is broken between two devices.
System response times are of ut-
most importance, the MCMS is de-
signed for ultimate performance.
A command received from the PCS
is actuated by the IEDs in less than
100 ms and the change of status
is available to the PCS in less than
1 second. These performances are
achieved while the DCUs communi-
cate concurrently with the PCS via
Modbus-TCP, with the PMS via Mod-
bus-RTU and with the DMS via OPC.
The special features of Skema’s intelligent MCC pro-
duction cycle are: the focus on the client’s requirements
during the system design phase; the integrated supply
chain for the switchboard and the control system; the
painstaking attention to detail during the testing phase
(conducted entirely in house), which sees all of the sys-
tem functions being checked meticulously; and the FAT
procedure, which is carried out in partnership with the
client in a fully integrated environment.
All of this helps to guarantee that the system performs
to a very high standard, and that it will require very little
(if any) on-site work in order to commission the full system.
EPC CONTRACTOR: CB&I / END USER: NEXEN PETROLEUM
SOLUTIONS DELIVERED
INTELLIGENT MOTOR CONTROL CENTERS (72 COLUMNS, 341 DRAWERS)
POWER CENTERS (14 COLUMNS)
DISTRIBUTION BOARDS
4 DUAL REDUNDANT DATA CONCENTRATOR UNITS (DCUS)
MOTOR CONTROL AND MANAGEMENT SYSTEM (MCMS)
UNITEDKINGDOM
Ireland
France
Germany
GRAIN LNG RTLF / ISLE OF GRAIN (UK) ONSHORE
EPC CONTRACTOR: CB&I / END USER: NATIONAL GRID
NATIONAL GRID GRAIN LNG, OPERATOR OF THE LARGEST LIQUEFIED NATURAL GAS (LNG) IMPORTATION TERMINAL IN EU-
ROPE, AWARDED CONTRACT FOR THE CONSTRUCTION OF NEW ROAD TANKER LOADING FACILITY. THE FACILITY CATERS
FOR THE COMMERCIAL, INDUSTRIAL AND ROAD FUEL MARKETS - COMPLEMENTING EXISTING SERVICES AT GRAIN LNG
TERMINAL ON THE ISLE OF GRAIN (KENT). THE CONSTRUCTION CONTRACT IS FOR AN INITIAL, TWO-BAY ROAD TANKER
LOADING FACILITY (RTLF), WITH THE OPTION TO EXPAND FURTHER SHOULD MARKET DEMAND REQUIRE IT.
EPC CONTRACTOR: CB&I / END USER: NATIONAL GRID
The Intelligent LV Switchgear supplied for the Grain LNG Pro-
ject complies with the most stringent requirements of the Oil
& Gas industry: internal-arc proof, IP42 external protection,
4b type 5 segregation form, IP4X internal protection, IP20
protection when a drawer has been removed from the as-
sembly, fully segregated busbar system, non-interchangea-
ble interlock system for drawers that are mechanically iden-
tical but electrically different.
SOLUTIONS DELIVERED
SKEMA WAS AWARDED THE CONTRACT FOR THE DESIGN, ENGINEERING, MANUFACTURING AND TESTING OF:
INTELLIGENT MOTOR CONTROL CENTERS (3 COLUMNS, 13 DRAWERS)
DISTRIBUTION BOARD (1 PANEL)
HANNIBAL SOUR GAS / TUNISIAONSHORE
EPC CONTRACTOR: WORLEYPARSONS / END USER: BG TUNISIA
THE HANNIBAL SOUR GAS PLANT LOCATED 20 KILOMETERS SOUTH OF SFAX PROCESSES THE HYDROCARBONS BROUGHT
ONSHORE FROM THE MISKAR GAS FIELD, LOCATED 125 KILOMETERS OFFSHORE IN THE GULF OF GABES, TUNISIA. THIS
FIELD IS 100% OPERATED BY BG TUNISIA. SOUR GAS FROM TEN WELLS IS SENT THROUGH A PIPELINE AND PROCESSED
AT THE HANNIBAL PLANT AND SUPPLIED TO THE SOCIÉTÉ TUNISIENNE DE L’ELECTRICITÉ ET DU GAZ (STEG), TUNISIA’S
STATE ELECTRICITY AND GAS COMPANY. DURING ITS LIFETIME, IT IS ESTIMATED THAT THE MISKAR FIELD WILL PRODUCE
MORE THAN 700 BILLION CUBIC FEET OF GAS.
TUNISIA
LybiaAlgeria
Morocco
EPC CONTRACTOR: WORLEYPARSONS / END USER: BG TUNISIA
The LER is composed of:
> Weather-tight enclosure and supporting structure
> Electrical equipment room
> Instrumentation equipment room
> Small power distribution within the building
> HVAC systems
> PA/GA loudspeaker system facilities
> Fire & Gas detection
> CO2 flood system
> PABX telephone system facilities
> Normal lighting system, including external door lighting
> Escape lighting system on emergency exits and routes
> Cable trays/racks
> Earthing system
> Portable fire extinguishers
SOLUTIONS DELIVERED
SKEMA WAS AWARDED THE CONTRACT FOR THE DETAILED DESIGN, SUPPLY AND INSTALLATION OF A PREFABRICATED METAL LOCAL EQUIPMENT ROOM (LER), FULLY ASSEMBLED, WIRED AND TESTED IN SKEMA’S FACTORY IN CESANO MADERNO, FOR INSTALLATION ON SITE.