sj-20140807141023-005-zxsdr b8200 l200 (hv3.10) routine maintenance guide.pdf

23
ZXSDR B8200 L200 LTE Baseband Unit Routine Maintenance Guide Hardware Version: HV3.10 ZTE CORPORATION No. 55, Hi-tech Road South, ShenZhen, P.R.China Postcode: 518057 Tel: +86-755-26771900 Fax: +86-755-26770801 URL: http://support.zte.com.cn E-mail: [email protected]

Upload: sankarson-bhattacharya

Post on 20-Feb-2016

51 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

ZXSDR B8200 L200LTE Baseband Unit

Routine Maintenance Guide

Hardware Version: HV3.10

ZTE CORPORATIONNo. 55, Hi-tech Road South, ShenZhen, P.R.ChinaPostcode: 518057Tel: +86-755-26771900Fax: +86-755-26770801URL: http://support.zte.com.cnE-mail: [email protected]

Page 2: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

LEGAL INFORMATIONCopyright © 2014 ZTE CORPORATION.

The contents of this document are protected by copyright laws and international treaties. Any reproduction or

distribution of this document or any portion of this document, in any form by any means, without the prior written

consent of ZTE CORPORATION is prohibited. Additionally, the contents of this document are protected by

contractual confidentiality obligations.

All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE

CORPORATION or of their respective owners.

This document is provided “as is”, and all express, implied, or statutory warranties, representations or conditions

are disclaimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose,

title or non-infringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the

use of or reliance on the information contained herein.

ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications

covering the subject matter of this document. Except as expressly provided in any written license between ZTE

CORPORATION and its licensee, the user of this document shall not acquire any license to the subject matter

herein.

ZTE CORPORATION reserves the right to upgrade or make technical change to this product without further notice.

Users may visit the ZTE technical support website http://support.zte.com.cn to inquire for related information.

The ultimate right to interpret this product resides in ZTE CORPORATION.

Revision History

Revision No. Revision Date Revision Reason

R1.1 2014-10-30 Added BPN0A in “2.2 Version Information Collection Table”

R1.0 2014-09-18 First edition

Serial Number: SJ-20140807141023-005

Publishing Date: 2014-10-30 (R1.1)

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 3: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

ContentsAbout This Manual ......................................................................................... I

Chapter 1 Overview.................................................................................... 1-11.1 Maintenance Categories ..................................................................................... 1-1

1.2 Precautions........................................................................................................ 1-1

Chapter 2 Maintenance Information ......................................................... 2-12.1 Basic Maintenance Information Collection Table ................................................... 2-1

2.2 Version Information Collection Table .................................................................... 2-2

Chapter 3 Routine Maintenance................................................................ 3-13.1 Definition of Routine Maintenance ....................................................................... 3-1

3.2 Routine Maintenance Items................................................................................. 3-1

3.3 Daily Maintenance Items..................................................................................... 3-2

3.4 Monthly Maintenance Items ................................................................................ 3-2

3.5 Quarterly Maintenance Items .............................................................................. 3-3

3.6 Semiannual Maintenance Items .......................................................................... 3-3

3.7 Annual Maintenance Items.................................................................................. 3-4

Chapter 4 Maintenance Record Table....................................................... 4-14.1 Daily Maintenance Record .................................................................................. 4-1

4.2 Monthly Maintenance Record.............................................................................. 4-2

4.3 Quarterly Maintenance Record............................................................................ 4-3

4.4 Semiannual Maintenance Record........................................................................ 4-4

4.5 Annual Maintenance Record ............................................................................... 4-4

4.6 Emergency Fault Handling Record ...................................................................... 4-6

4.7 Module Replacement Record .............................................................................. 4-7

4.8 Cable Replacement Record ................................................................................ 4-7

Glossary .......................................................................................................... I

I

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 4: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

This page intentionally left blank.

II

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 5: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

About This ManualPurposeThis manual describes how to maintain the ZXSDR B8200 L200.

Intended AudienceThis manual is intended for:

l Hardware installation engineersl Maintenance engineers

What Is in This ManualThis manual contains the following chapters.

Chapter 1, Overview Describes the routine maintenance principles, categories,

methods, and precautions of the ZXSDR B8200 L200.

Chapter 2, Maintenance

Information

Describes the templates for collecting the maintenance

information of the ZXSDR B8200 L200.

Chapter 3, Routine Maintenance Describes the routine maintenance items of the ZXSDR B8200

L200.

Chapter 4, Maintenance Record

Table

Provides maintenance record tables for your reference.

Related DocumentationThe following documents must be available before maintenance:

l Personal Health and Safety Informationl System Security Information

The following documentation is related to this manual:

l ZXSDR B8200 L200(HV3.10) LTE Baseband Unit Hardware Descriptionl ZXSDR B8200 L200(HV3.10) LTE Baseband Unit Product Descriptionl ZXSDR B8200 L200(HV3.10) LTE Baseband Unit Hardware Installationl ZXSDR B8200 L200(HV3.10) LTE Baseband Unit Alarm and Notification Reference

ConventionsThis manual uses the following conventions.

I

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 6: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

Danger: indicates an imminently hazardous situation. Failure to comply can result in

death or serious injury, equipment damage, or site breakdown.

Warning: indicates a potentially hazardous situation. Failure to comply can result in

serious injury, equipment damage, or interruption of major services.

II

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 7: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

Chapter 1OverviewTable of Contents

Maintenance Categories.............................................................................................1-1Precautions ................................................................................................................1-1

1.1 Maintenance CategoriesMaintenance can be classified into three categories: routine maintenance, notificationhandling, and alarm handling.

Routine MaintenanceRoutine maintenance means periodical maintenance. It involves checking the operationof equipment periodically. Any problems detected during the inspection should be handledimmediately to prevent accidents.

Alarm/Notification HandlingNotification handling involves analyzing the notifications generated during systemoperation, determining whether faults exist, and taking proper measures as required.Alarm handling involves analyzing the alarms generated during equipment operation,determining whether faults exist, and taking proper measures as required. For adescription of notification and alarm handling, refer to the ZXSDR B8200 L200(HV3.10)LTE Baseband Unit Alarm and Notification Reference.

1.2 PrecautionsDuring routine maintenance, follow the precautions below:

l Keep the equipment room dry, clean, and at normal temperature. Keep rats or otheranimals out of the equipment room.

l Ensure that the primary power supply of the system is stable and reliable. Checkthe system grounding and the lightning protection grounding regularly. Ensure thatthe lightning protection system is in good condition especially before a thunderstormseason or after a thunderstorm.

l Formulate complete rules for routine maintenance. Keep a detailed duty log ofthe operations, versions, data changes, upgrade, and faults of the system for faultanalysis and handling. Ensure a shift change record is available denoting clearresponsibility.

1-1

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 8: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

ZXSDR B8200 L200 Routine Maintenance Guide

l Never play games or surf the Internet on the PC. Never install, run, or copy anysoftware not related to the system on the PC. Never use the PC for other purposesnot related to work.

l Set the NetNumen passwords based on user levels and keep them open only tomaintenance personnel. Manage the passwords strictly and change them regularly.

l Receive induction training to learn about the equipment and network. Performmaintenance operations according to the instructions described in related manuals.Wear an antistatic wrist strap before touching the equipment to prevent accidentscaused by human errors.

l Do not reset the equipment, load or modify data without permission, especially theEMS database data. Data must be backed up before it is modified. A record ofthe modification should be made at the time. After data modification, the backupdata cannot be deleted until the system operates properly for a certain period of time(generally one week).

l Prepare the following common instruments and meters: flat head screwdriver, crossscrewdriver, signaling analyzer, network cable pliers, multimeter, AC power supply formaintenance, telephone line, and network cable. Test the meters regularly to ensureaccuracy.

l Inspect spare parts and accessories regularly to keep them in stock and in goodcondition. Protect them against moisture and mould. Separate the spare parts andaccessories from the replaced parts and accessories and label them respectively.Replenish the common spare parts and accessories as they are used up.

l Keep any software and documentation that may be used during maintenance in aspecified handy place for use when required.

l Lighting in the equipment room should meet maintenance requirements. Repair anybroken lights in time.

l Solve any detected problems in time. For any problems that cannot be handled,contact the local ZTE office.

l Place the contact information of the local ZTE office in a handy place and make itknown to all maintenance personnel. Update the contact information regularly.

Danger!

Power supply inspection and adjustment must be performed by professionals. Otherwise,injury, death, and equipment failures may occur.

Warning!

Data cannot be modified or synchronized without permission of the person in charge.Otherwise, major accidents may occur.

1-2

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 9: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

Chapter 2Maintenance InformationTable of Contents

Basic Maintenance Information Collection Table.........................................................2-1Version Information Collection Table...........................................................................2-2

2.1 Basic Maintenance Information Collection TableTable 2-1 lists the equipment information to be collected during maintenance for theZXSDR B8200 L200.

Table 2-1 Basic Maintenance Information Collection

Basic Maintenance Information Collection

ZXSDR B8200

L200 name

North latitude

ZXSDR B8200

L200 type

East longitude

ZXSDR B8200

L200 No.

Altitude

ZXSDR B8200

L200 ID

(configured on

the OMC)

City/County Telephone

number of

the equipment

room

Position of

the equipment

room

Daisy chain

mode adopted

(description

of the link

structure)

2-1

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 10: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

ZXSDR B8200 L200 Routine Maintenance Guide

2.2 Version Information Collection TableVersion information of the ZXSDR B8200 L200 should be collected and recorded formaintenance. Table 2-2 lists the ZXSDR B8200 L200 version information to be collected.

Table 2-2 Version Information Collection

Module Version

CC

CC16B

CCE1

BPL1

BPL1A

BPN0A

BPN0

FS5

CR0

SA

SE

UES

UCI

FA

PM

Remarks:

2-2

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 11: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

Chapter 3Routine MaintenanceTable of ContentsDefinition of Routine Maintenance ..............................................................................3-1Routine Maintenance Items........................................................................................3-1Daily Maintenance Items ............................................................................................3-2Monthly Maintenance Items........................................................................................3-2Quarterly Maintenance Items......................................................................................3-3Semiannual Maintenance Items .................................................................................3-3Annual Maintenance Items .........................................................................................3-4

3.1 Definition of Routine MaintenanceRoutinemaintenancemeans to perform a preventive inspection regularly on the equipmentto ensure the equipment operates properly for a long time.

Routine maintenance mainly covers the following two types:

l Regular inspection and testing

Inspect and test the operation, functions, major performance indicators, and hardwarecondition of the ZXSDR B8200 L200 regularly through OMC operations, or withappropriate instruments and meters according to the technical specifications andrequirements for the equipment parts.

l Regular checking and cleaning

Check the hardware of the ZXSDR B8200 L200 and its auxiliary devices. If anyproblem is detected, adjust, fix, or replace the faulty parts immediately to ensurethat the hardware remains intact. Regularly maintain and clean the parts that arevulnerable or must be dust-free. Regularly clean the major parts of other peripheralequipment for proper operation.

Work out a reasonable maintenance schedule and perform routine maintenance onschedule.

3.2 Routine Maintenance ItemsRoutine maintenance includes various regular checks and maintenance tasks that ensurethe equipment operates in the best condition to meet the service requirements of usersand to prevent potential failures.

Routine maintenance of the equipment includes but is not limited to the following items:

l Inspection of the operating environment of the equipment

3-1

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 12: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

ZXSDR B8200 L200 Routine Maintenance Guide

l Collection of performance statisticsl Alarm system maintenancel Data backupl Spare parts inspectionl Board maintenancel Log inspectionl Inspection of the grounding and lightning protection systemsl Power supply inspectionl Inspection of the antenna feeder systeml Preparation before holidays

3.3 Daily Maintenance ItemsTable 3-1 lists the daily maintenance items of the ZXSDR B8200 L200.

Table 3-1 Daily Maintenance Items

Item Sub-item Action

Handling alarms Check all the alarms that are generated since the

last inspection on the EMS and categorize and

handle the alarms based on alarm levels.

Checking

alarms and

notifications

Handling notifications Analyze the notifications that occur frequently.

Ignore common notifications.

Handling common faults Handle the common faults, such as transmission

failures and board faults.

Troubleshoot-

ing

Handling user complaints Analyze and handle the problems that users

complain about, for example, network quality.

3.4 Monthly Maintenance ItemsTable 3-2 lists the monthly maintenance items of the ZXSDR B8200 L200.

Table 3-2 Monthly Maintenance Items

Item Action

Checking the temperature and

humidity

Check the temperature and humidity of the equipment room.

Check the temperature through the alarm management system of

the OMC and measure the humidity with a hygrometer.

Checking the operation of

modules

Check the operation of modules through the alarm management

system of the OMC. For any faulty modules, diagnose the faults

through the diagnostic test system.

3-2

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 13: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

Chapter 3 Routine Maintenance

Item Action

Checking the voice and data

services

Perform the tests with a terminal on site. Observe and survey the

services in each sector. Check whether there are disconnection,

interruption, or throughput errors.

Checking the operation of the

power module

Check the power supply of the ZXSDR B8200 L200.

Checking the grounding and

lightning protection systems

Inspect the operation of the grounding and lightning protection

systems and check whether the connections are secure.

3.5 Quarterly Maintenance ItemsTable 3-3 lists the quarterly maintenance items of the ZXSDR B8200 L200.

Table 3-3 Quarterly Maintenance Items

Item Action

Checking the Standing Wave

Ratio (SWR) of the antenna

feeder

Check whether or not there are SWR alarms reported on the EMS.

Measure the grounding resistance with a grounding resistance

tester, and check whether or not the resistance value is correct.

Measuring the grounding

resistance value and checking

the grounding cable Check whether or not the connectors of each grounding cable are

loose or aging.

Checking the water resistance

and grounding connection of

the antenna feeder connector

and the lightning protection

grounding kit

Check whether or not the outside surface is in good condition.

If necessary, remove the insulating tape and perform a further

inspection. Seal the connection again with the insulating tape after

the inspection.

Checking whether or not the

antenna is installed securely

and inspecting the pitch angle

and azimuth of the directional

antenna

Check whether or not the antenna is beyond the scope specified

by network planning due to wind blowing. Adjust the antenna with

such tools as spanners and angle gauges. Note that screw nuts

with a proper force.

Checking the lightning

protection

Check whether or not the connection of the lightning protection

grounding cable is secure, and check the rust resistance of the

connection.

3.6 Semiannual Maintenance ItemsTable 3-4 lists the semiannual maintenance items of the ZXSDR B8200 L200.

3-3

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 14: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

ZXSDR B8200 L200 Routine Maintenance Guide

Table 3-4 Semiannual Maintenance Items

Item Action Remark

Lightning protection

and grounding

Check the working ground of the

equipment.

Check the protective ground of the

equipment room.

Check the grounding trunk line of

the eNodeB.

Check the lightning protection

ground of the building.

Test all the grounding resistances.

Perform an additional check before

and after nature disasters such as

typhoons and thunderstorms.

3.7 Annual Maintenance ItemsTable 3-5 lists the annual maintenance items of the ZXSDR B8200 L200.

Table 3-5 Annual Maintenance Items

Item Action

Checking the cleanness and

airtightness of the cabinet

Clean the outside surface of the cabinet with a vacuum cleaner or

towel. Pay special attention to the switch or power supply and do

not touch them by mistake during cleaning. Open the cabinet and

check whether or not there is water in it and whether or not the joint

between the top and the bottom covers of the cabinet are airtight.

3-4

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 15: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

Chapter 4Maintenance Record TableTable of ContentsDaily Maintenance Record .........................................................................................4-1Monthly Maintenance Record .....................................................................................4-2Quarterly Maintenance Record...................................................................................4-3Semiannual Maintenance Record...............................................................................4-4Annual Maintenance Record ......................................................................................4-4Emergency Fault Handling Record .............................................................................4-6Module Replacement Record .....................................................................................4-7Cable Replacement Record........................................................................................4-7

4.1 Daily Maintenance RecordTable 4-1 Daily Maintenance Record

Date: Year Month Day

Duty hour: From to Handover from: Handover to:

Active alarm handling record of the eNodeB

eNodeB No. Alarm content Alarm start

time

Alarm end

time

Remark

Abnormal history alarm record of the eNodeB

eNodeB No. Abnormal alarm content and handling Remark

Abnormal history notification record of the eNodeB

eNodeB No. Abnormal notification content and handling Remark

4-1

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 16: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

ZXSDR B8200 L200 Routine Maintenance Guide

User complaint handling

eNodeB No. Complaint content and handling Remark

Handover information:

Team leader verification:

4.2 Monthly Maintenance RecordTable 4-2 Monthly Maintenance Record

Time: Year Month Day Hour Maintained by:

Item Description Action Remark

Are the location

parameters configured

for the eNodeB the

same as the actual

parameters?

Is the rack of the

equipment clean?

Is the cable rack

secure?

Are the fiber connectors

and other cable

connectors in good

contact?

Are the indicators of the

equipment operating

properly?

Are the temperature

and humidity correct?

4-2

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 17: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

Chapter 4 Maintenance Record Table

Are the voice and

data services in good

condition?

Are the grounding and

lightning protection

systems in good

condition?

Are the spare parts and

accessories in stock

and in good condition?

□ Yes □ No

Team leader verification:

4.3 Quarterly Maintenance RecordTable 4-3 Quarterly Maintenance Record

ZXSDR B8200 L200 Name: Time: Year Month Day

Maintained by:

Item Result Remark

Is the ZXSDR B8200 L200

module operating properly?

□ Yes □ No

Are the data services in good

condition?

□ Yes □ No

Is the power module operating

properly?

□ Yes □ No

Are the grounding and lightning

protection systems in good

condition?

□ Yes □ No

Is the grounding resistance

value correct and the grounding

cable in good condition?

□ Yes □ No

4-3

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 18: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

ZXSDR B8200 L200 Routine Maintenance Guide

Are the water resistance and

grounding connection of the

antenna feeder connector

and the lightning protection

grounding kit in good condition?

□ Yes □ No

Is the dust-proof assembly of

the fan module cleaned?

□ Yes □ No

Fault description and

troubleshooting:

Unsolved problems:

Team leader verification:

4.4 Semiannual Maintenance RecordTable 4-4 Semiannual Maintenance Record

Time: Year Month Day Hour Maintained by:

Item Result Remark

Is the working ground of the

equipment connected securely?

□ Yes □ No

Is the protective ground of the

equipment room connected

securely?

□ Yes □ No

Is the grounding trunk line of the

eNodeB connected securely?

□ Yes □ No

Measure the grounding resistance. Value:

4.5 Annual Maintenance RecordTable 4-5 Annual Maintenance Record

Equipment name: Time: Year Month Day

Maintained by:

4-4

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 19: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

Chapter 4 Maintenance Record Table

Equipment name: Time: Year Month Day

Item Result Remark

Is the cabinet clean? □ Yes □ No

Are the temperature and humidity correct? □ Yes □ No

Is the module operating properly? □ Yes □ No

Are the voice and data services in good con-

dition? □ Yes □ No

Is the power module operating properly? □ Yes □ No

Are the grounding and lightning protection

systems in good condition? □ Yes □ No

Is the SWR of the antenna feeder correct? □ Yes □ No

Is the grounding resistance value correct and

the grounding cable in good condition? □ Yes □ No

Are the water resistance and grounding con-

nection of the antenna feeder connector and

the lightning protection grounding kit in good

condition? □ Yes □ No

Is the antenna installed securely and are the

pitch angle and azimuth of the directional an-

tenna correct? □ Yes □ No

Is the lightning protection system for the an-

tenna feeder in good condition? □ Yes □ No

Fault description and troubleshooting:

Unsolved problems:

Team leader verification:

4-5

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 20: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

ZXSDR B8200 L200 Routine Maintenance Guide

4.6 Emergency Fault Handling RecordTable 4-6 Emergency Fault Handling Record

Emergency Fault Handling Record

Site name: Handled by:

Occurrence time: Handling time:

Fault source:

□ Customer complaint □ Alarm system reporting □ Found during routine maintenance □ Other

Fault type:

Fault description:

Action:

Result:

Comment of the person in charge:

4-6

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 21: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

Chapter 4 Maintenance Record Table

4.7 Module Replacement RecordTable 4-7 Module Replacement Record

Module Replacement Record

eNodeB No.: Maintained by:

Module

Name

Slot Number Failure Time Replace-

ment Time

SN of the Faulty

Module

SN of the

Replacement

Module

4.8 Cable Replacement RecordTable 4-8 Cable Replacement Record

Cable Replacement Record

eNodeB No.: Maintained by:

Cable Name Cable

Connection

Position

Failure

Time

Replace-

ment Time

SN of the Faulty

Cable

SN of the

Replacement

Cable

4-7

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 22: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

ZXSDR B8200 L200 Routine Maintenance Guide

4-8

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential

Page 23: SJ-20140807141023-005-ZXSDR B8200 L200 (HV3.10) Routine Maintenance Guide.pdf

GlossaryBPL- Baseband Processing for LTE

CC- Control and Clock Module

CCE- Control Channel Element

FA- Fan Array

FS- Fabric Switch Module

OMC- Operation & Maintenance Center

PM- Power Module

SA- Site Alarm

SE- Site Alarm Extender

UCI- Universal Clock Interface

UES- Universal Ethernet Switch Board

I

SJ-20140807141023-005|2014-10-30 (R1.1) ZTE Proprietary and Confidential