six sigma3

Upload: saoloan-naiborhu

Post on 04-Apr-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 six sigma3

    1/8

    1

    Preparation 1 Decide X which is measured.

    Investigate all of source X Process Map

    Narrowing X with technology discussion or Cause & Effect diagram

    or Quality matrix

    Predict potential failure before MP FMEA

    Preparation 2 Investigation of the reliability of the data which is measured.

    Pass / Fail data Attribute Gage R&R

    Quantitative data Variable Gage R&R

    Define Measure Analyze Improve Control

    Measure data which shows the relation of Y and source X.Yfx

    Narrowing X with discussion

  • 7/30/2019 six sigma3

    2/8

    2

    Process Map

    Objective Investigate X (failure sources) effecting to process

    as many as possible.

    Operators have information. Please ask them.There are many examples which give big hint of solution.

    Observe operation carefully. And acquire your knowledge

    more than other persons.

  • 7/30/2019 six sigma3

    3/8

    3

    It is the diagram which shows divided process and processing machine into some working

    step. And it shows the relation offactor (X) and output (y and Y). It equivalent to Cause

    and effect diagram (Fish bone diagram) which is one of the QC 7 tools.

    What is Process Map?

    Working step A

    Factor XX

    etc

    Output

    Working step N Final Output Y

    Factor (X) Material, setting value, operator, environment, etc.

    Output (y) The result of each working step or the status of products at each working step

    Output (Y) Products status (size, location, weight, strength, vibration, voltage, S/N,

    scratch, etc.)

    Factor XX

    etc

    Output

    X has variation y has variation Y has variation Product sometime

    become failure.)

  • 7/30/2019 six sigma3

    4/8

    4

    If champions indication scope (activity scope) is too wide, the improvement efficiency is bad.

    Narrowing project scope to be better efficiency. (it is sometime impossible.)

    Total process improvement Equipment improvement ( one or some)

    Before making Process Map

    Equipment

    Failure rate 0.1%Sub

    AssemblyProducts

    Equipment

    Failure rate 0.5%

    Equipment

    Failure rate 0.2%Test

    ReworkTheme Theme

    Process flow chart

    Test process is lozenge.

    Write failure rate of each equipment, if you know.

    Make several process maps as many as the number of themes.

  • 7/30/2019 six sigma3

    5/8

    5

    : Divide process and processing machine which is improved into some

    working step.

    Too many steps lower the efficiency. So, divide into about 5 steps.

    Write down working operations.

    How to make Process Map

    NVA VA

    VA

    : Show each operation as VA: value-added or NVA: non-value-added.Example for NVA: transportation, storage, test, rework

    Below shows a part of lens assemble process.

  • 7/30/2019 six sigma3

    6/8

    6

    : Write down output y and Y (operation result, product status, failure contents)

    : write down factor X (environment, setting value, material)

    What is the cause of variation (failure)?

    What will we change for improving variation (failure)?

    How to make Process Map

    Lens breaking by chuck part hit

    Transform of chuck part

    Falling of lens

    Putting lens into frame with opposite way

    Offset of the frame location on tray

    mis-grasp frame by machine

    Offset of the frame location on pallet

    Hit mark, transformation of frame

    Contamination of frame

    Environment of the room

    Size accuracy of frame fitting

    Size accuracy of lens fitting

    Change of chuck air pressure

    Chuck part abrasion

    Chuck location accuracy

    Pallet stopper location accuracy

    Contamination of adsorption pipe

    Air-cleaning frame and

    Apply ion to frame

    NVA VA

    Put lens into frame

    VA

    Environment of the room

    Contamination of air

    Shape of air blow mouth

    Direction of air blow

    Air blow time

    Distance of ion applying

    Time of ion applying

    Environment of the room

    Contamination of frame tray

    Fixing method of frame tray

    Vibration of belt conveyor

    Shock of belt conveyors stopper

    Shock of lifter, moving

    Shock of locking tray

    Move lens frame

    from tray to pallet

  • 7/30/2019 six sigma3

    7/8

    7

    : Classify factor X as C/N/S. (Not need strict classification. Not think too much)

    C (can control) X which is easy to adjust or change.

    Example: Speed, quantity temperature, pressure,

    N (noise): X which is difficult to adjust or change (high cost, low

    accuracy)

    Example: atmosphere temperature, humidity, operator,

    But Is it easy to improve less-educated operator?

    Can champion do change of high cost?

    SStandard operation procedure: Items in the procedure and commonsense.

    Example: cleaning, setting value,

    Note) Procedure also made by person. It has many mistake.

    How to make Process Map

    : Write down other itemsFailure rate, working time (CT: cycle time)

    Issue date, person in charge of process, customer (next process is customer, too)

    Narrowing factor X into 10-20 with open technology discussion.

  • 7/30/2019 six sigma3

    8/8

    8

    Completion of Process Map

    Y =

    Situation of set lens

    to frame

    CT = 27 secFailure rate = 9.5%

    (Falling of lens)

    Lens breaking by chuck part hit

    Transform of chuck part

    Falling of lens

    Putting lens into frame with opposite way

    Offset of the frame location on tray

    mis-grasp frame by machine

    Offset of the frame location on pallet

    Hit mark, transformation of frame

    Contamination of frame

    N Environment of the room

    N Size accuracy of frame fitting

    N Size accuracy of lens fitting

    N Change of chuck air pressure

    C Chuck part abrasion

    C Chuck location accuracy

    C Pallet stopper location accuracy

    N Contamination of adsorption pipeN Down location accuracy of adsorption pipe

    C Size accuracy of lens tray

    (Y-axis, Z-axis)

    C Lens direction is opposite way on lens tray

    C Setting direction of tray is opposite way

    Air-cleaning frame and

    Apply ion to frame

    NVA VA

    Put lens into frame

    VA

    N Environment of the room

    C Contamination of air

    C Shape of air blow mouth

    C Direction of air blow

    S Air blow time

    C Distance of ion applying

    S Time of ion applying

    N Location accuracy of pallet stopper

    N Environment of the room

    N Contamination of frame tray

    N Fixing method of frame tray

    C Vibration of belt conveyor

    C Shock of belt conveyors stopper

    C Shock of lifter, moving

    C Shock of locking tray

    C Size accuracy of frame trayC Location accuracy of chuck

    C Chuck part abrasion

    C Abrasion of frame supporting part of pallet

    N Size accuracy of frame

    C Size accuracy of pallet

    N Change of chuck air pressure

    C Location accuracy of frame supporting part of pallet

    C Holding force of chuck

    C Location accuracy of pallet stopper

    S Stacking number of frame tray

    Move lens frame

    from tray to pallet