six recommendations for dock c project… dock c public workshop may 16, 2013

30
Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Upload: kenneth-beecroft

Post on 31-Mar-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Six Recommendationsfor Dock C Project…

Dock C Public WorkshopMay 16, 2013

Page 2: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

1. Carefully Consider All Viewpoints

Page 3: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Viewpoints Include:

1. Current Slipholders

2. Coronado Taxpayers

3. San Diego Boating Community

4. Promenade Park Users

5. Glorietta Bay Users

6. Unified Port of San Diego

Page 4: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

2. Review Moffatt and Nichol Report

• Complete dock replacement not required.

Page 5: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Engineering Assessment

Page 6: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Moffatt and Nichol Report says:

• Structure, pilings, gangway, platform, hardware, electrical—all good condition.

• Deck boards—worn, but easily replaced.

Page 7: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

3. Consider Structural Refit

• as recommended in Moffatt and Nichol Report

Page 8: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Moffatt & Nichol Recommendation

• Structural Refit $200,000 - $300,000– Tighten bolted connections– Recondition brackets– Replace decking– Consider IPE wood– 20 year+ service life…

Page 9: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

IPE Deck Boards – Very Attractive

Page 10: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

IPE Deck Board Properties

• Beautiful

• Strong

• Smooth

• Long-lasting

• Insect-resistant

Page 11: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Structural Refit Benefits

• $300,000 instead of $3,000,000

• No loss of “rentable linear feet”

• Minimal regulatory approvals necessary

• Beautiful IPE wood instead of concrete

• Indefinite lifespan with proper maintenance– (Coronado Yacht Club has always had wood

docks)

Page 12: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

4. Preserve Open Water

• Important to active Glorietta Bay users

Page 13: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013
Page 14: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

City of Coronado slide. Area in purple is reportedly designated as

“Developable Water Area” in Coronado’s “Local Coastal Plan.”

Page 15: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Coronado LCP should match Port Plan.

However, the same area is designated “Open Bay” in the Port of San Diego “Precise Plan” for

Glorietta Bay.

Page 16: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

5. Do Not Obstruct Promenade Park View

• Open Water views of Glorietta Bay are obstructed from the yacht club to the swimming pool, except at Promenade Park…

Page 17: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

The ONLY remaining Open Water view is from Promenade Park…

Page 18: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

6. Include a Public Dock

• Glorietta Bay is an ideal location

Page 19: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Public Dock Uses

• Access to the water for individuals– From Promenade Park

• Small boats– kayaks, rowboats, Sabots, etc– dinghies from A5 anchorage boats

• Visiting yachts – Passenger drop-off and pick-up– access to Coronado / business district– “dock and dine” etc– Overnight stays - for a reasonable fee

Page 20: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Public Dock Location?

At this “indentation” in the Promenade Park seawall?

Page 21: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Newport Beach has 11 public docks…

Page 22: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Public Access to the water is a good thing!

Page 23: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Burton Chace Park, Marina del Rey

Page 24: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

A Public Dock can be attractive!

Page 25: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Summary

• Structural Refit

• IPE wood

• Public Dock

Page 26: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Good From All Viewpoints?

1. Current Slipholders• Might appreciate structural refit with IPE

decking?

2. Coronado Taxpayers• Already have $7 million in marina assuming

State does not repay CDA loan• Another $3 million for Dock C is a lot of

money• Structural Refit with proper maintenance

1/10th the cost with much better ROI

Page 27: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

3. San Diego Boating Community• Will appreciate a Public Dock, paid for by

Port District?

4. Promenade Park Users• Will appreciate preservation of the park

“View Corridor”

Good From All Viewpoints?

Page 28: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

5. Glorietta Bay Users• Will appreciate preservation of open water• Will appreciate a public dock

6. Unified Port of San Diego• Public Dock consistent with Port charter.

Good From All Viewpoints?

Page 29: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013

Thank You!

Page 30: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013