Sitka Airport IC ProjectLessons-Learn

ByAmanda GillilandKnik Construction

Presented ByDr. George ChangTranstec Group

Page 2: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

Sitka-Rocky Gutierrez Airport Runway Overlay

Alaska, May 2013

Page 3: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

IC Specification• Provide one IC roller per paver • Provide on-site training for contractor and agency • Provide manufacturer representative for IC support• IC test section• Provide Veda files to agency • Operations Criteria – 95% meet optimum passes– 70% meet target ICMV values (HMV)

• 10% deduction from item 401 when IC is not functioning properly

Page 4: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

Night Paving

Page 5: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

Hamm HCQ System

Accelerometer

GPS Receiver

HCQ GPS Navigator

Temperature Sensors Control Panel

Page 6: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

Hamm IC Roller Operation

• Front drum vibratory

• Rear drum oscillatory

• Two amplitude settings

• Two frequency settings

Page 7: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

IC Training

• QC Manager– Setup, software/

analysis (data management), trouble shooting

• Roller Operator– Use on-board display,

setup • Owner Representatives– Basic training

40

10

4Hours of Training

QC ManagerOperatorOwner

Page 8: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

Hamm HCQ Software

Page 9: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

On HAMM HCQ Software

• Limitations– Passes are not

viewed individually– Limited analysis– Base maps are time

consuming to import

Page 10: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

Veda Software

Page 11: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

Veda Temperature Map

Page 12: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

Veda Analysis

Page 13: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

Veda Point Tests

Page 14: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

Veda HMV Map

Page 15: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

Veda Software HMV Comparison

Property “End” “Middle”

Frequency - vpm 3000 2400, 3000

Amplitude - in 0.034 0.019

Speed - mph 2.8-3.8 2.2-3.6

Temperature – degrees F

190-230 190-230

HMV 60-80 60-115

Average Mat Density - %

96 96

Page 16: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

Veda Software vs. Thermal Camera

Page 17: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

Veda Recap

• Base maps• View individual

passes• View roller

settings• Extensive analysis

Page 18: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group

Strengths and Limitations

• Strength– Real time data useful

– particularly for night paving

– Records everything for troubleshooting (if required)

– Helps with density consistency

– Verifies 100% coverage

• Limitation– Does not predict

density – ICMV and density do not correlate at this project

– Room for error in data analysis