Site visit to IMI Brno IMI Precision Engineering Mark Selway, IMI Group CEO 9 June 2015

Page 2: Site visit to IMI Brno

Site visit to IMI Brno

Fix and focus strategy

Addressable Market = £14bn

Our goal for the division is to improve our competitiveness and build a strong platform for future growth

Industrial Automation Commercial Vehicles Oil & Gas

Capitalise on significant potential for accelerated growth

Food & Beverage

Page 3: Site visit to IMI Brno

Site visit to IMI Brno

UK Customer IMI Factory European Distribution Centre

IMI Marketing Company

Step 1

Step 2

Step 3

Step 4

Step 5

Step 6

UK customer sends order to EDC via UK marketing company

EDC places same order to UK factory

UK factory makes product and ships to EDC

EDC ships product to UK customer

EDC invoices UK company at transfer price

UK company invoices UK customer at external selling price

Supply chain complexity

Page 4: Site visit to IMI Brno

Site visit to IMI Brno

Standard costing

▸  Standard costing is most suited to organisations with repetitive assembly work

Standard costs are calculated for each product based on material, labour and overhead costs

Commercial

Vehicle

Life

Sciences

Industrial

Automation

Labour Costs

Material Costs

▸  Precision Engineering is introducing standard costing to understand which sectors and products incur what overhead recoveries and returns.

How are factory overheads allocated ?

Direct Costs

Indirect Costs

Labour Costs

Material Costs

Labour Costs

Material Costs

? ? ?

Page 5: Site visit to IMI Brno

Site visit to IMI Brno

“TOGETHER, we will improve

our competitiveness and

build a strong platform for

future growth.” Mark Selway Group CEO and Precision Divisional Managing Director

Target Introduce business-specific growth plans for every IMI Precision business Optimise Establish accurate and reliable sales and financial forecast planning Generate Introduce more new products and a responsive Application Engineering function Evolve Build a more dynamic and Lean organisation to better compete and respond to market potential Transform Implement Quality process and Lean best practise to improve customer responsiveness Highlight Realign IMI Norgren position in its regional markets to reflect new dynamism and focus Enhance Develop a new IT strategy to build competitive advantage and support future growth Rationalise Reduce and standardise our product portfolio from 450,000 to 50,000 SKUs

FIX8 “Fix & Focus Strategy” Fix the basics in two years

Page 6: Site visit to IMI Brno

Site visit to IMI Brno

Norgren Industrial Automation

= Industrial Automation Product Plans

Norgren Americas Industrial Automation

Norgren Asia Industrial Automation

Norgren Europe Industrial Automation

“Introduce business-specific growth plans

for every IMI Precision business”

FIX8 “Fix & Focus Strategy” Fix the basics in two years

Page 7: Site visit to IMI Brno

Site visit to IMI Brno

“Reduce and standardise our product

portfolio from 450,000 to 50,000 SKUs”

FIX8 “Fix & Focus Strategy” Fix the basics in two years

Page 8: Site visit to IMI Brno

Site visit to IMI Brno

“Implement Quality process and Lean best

practise to improve customer responsiveness”

FIX8 “Fix & Focus Strategy” Fix the basics in two years

Page 9: Site visit to IMI Brno

Site visit to IMI Brno

‣  New ‘out of the box’ JD Edwards system was successfully installed in Brazil and will be added to five sites in the United States in 2015.

“Develop a new IT strategy to build competitive

advantage and support future growth”

FIX8 “Fix & Focus Strategy” Fix the basics in two years

Page 10: Site visit to IMI Brno

Site visit to IMI Brno

“Establish accurate and reliable sales and financial

forecast planning”

”Introduce more new products and a responsive

Application Engineering function”

”Build a more dynamic and Lean organisation to better

compete and respond to market potential”

“Realign IMI Norgren position in its regional markets to

reflect new dynamism and focus”

FIX8 “Fix & Focus Strategy” Fix the basics in two years

Page 11: Site visit to IMI Brno

Site visit to IMI Brno

Lean Assessments

0

10

20

30

40

50

60

70

80

% S

core

1st improvement target % 62 58 52 52 54 52 48 44 44 42 43 52 46 46 48 46 48 51 47 40 42 43 40 37 36 44 50 23

2nd assessment score % 62 61 52 52 53 53 52 49 50 48 44 50 42 50 45 50 40 33 34 50 39 44 39 33 36 39 38 24

‣  All major sites 2nd assessments complete

‣  First assessment average score 32%

‣  Second assessment average score 46%

‣  6 month improvement target score 54%

‣  World-class by 2018

1st assessment score 1st improvement target 2nd assessment score Next improvement target

Page 12: Site visit to IMI Brno

Site visit to IMI Brno

Increase plant utilisation

New simplified organisational structure implemented in Europe Analysis of industrial automation market progressing well New system of standard costing implemented worldwide Early phases of ERP implementation progressing to plan in Americas

Average lean score increased to 46% New Divisional Managing Director appointed (due to take up role in June 2015)

Strategic Checklist