site visit report - epa.ie · site visit report - sv10474 ... abb ao2020-uras26 stack thermocouple...

54
Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not been reported, this should not be construed to mean that there is full compliance with that condition of the licence. Instructions and actions arising from the visit shall be addressed, or where applicable noted, by the licensee in order to ensure compliance, to improve the environmental performance of the installation and to provide clarification on certain issues. The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Licensee Name of Installation Abbott Ireland (Cootehill) Licensee Abbott Ireland Licence Register No. P0687-02 CRO Number 902453 Site Address Dromore West, Cootehill, Cavan Site Visit Reference No. SV10474 Report Detail Issue Date 03/11/2017 Prepared By David Matthews Site Visit Detail Date Of Inspection 27/09/2017 Announced No Time In 09:30 Time Out 17:00 Visited by on behalf of the EPA Exova Catalyst Ireland Licensee Personnel and Role See report. Photo Taken No Samples Taken Yes Video Taken No Odour Assessment No Site Visit Report - SV10474 - Abbott Ireland Page 1 of 54

Upload: vuongdien

Post on 24-Apr-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Site Visit Report

The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions.  Where non-compliance against a particular condition has not been reported, this should not be construed to mean that there is full compliance with that condition of the licence.

Instructions and actions arising from the visit shall be addressed, or where applicable noted, by the licensee in order to ensure compliance, to improve the environmental performance of the installation and to provide clarification on certain issues.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

Licensee

Name of Installation Abbott Ireland (Cootehill)

Licensee Abbott Ireland

Licence Register No. P0687-02

CRO Number 902453

Site Address Dromore West, Cootehill, Cavan

Site Visit Reference No. SV10474

Report Detail

Issue Date 03/11/2017

Prepared By David Matthews

Site Visit Detail

Date Of Inspection 27/09/2017 Announced No

Time In 09:30 Time Out 17:00

Visited by on behalf of the EPA Exova Catalyst Ireland

Licensee Personnel and Role See report.

Photo Taken No Samples Taken Yes Video Taken No

Odour Assessment No

Site Visit Report - SV10474 - Abbott Ireland Page 1 of 54

Scope

This is a report on monitoring of emissions to atmosphere at this site. Please find the detailed technical report attached.

Media

Air.

Site Areas Inspected

See report.

Documents Inspected

See report.

Site Visit Report - SV10474 - Abbott Ireland Page 2 of 54

Site Visit Report - SV10474 - Abbott Ireland Page 3 of 54

ISO/IEC 17025 Accredited Legal Entity, UKAS Accredited Testing Laboratory No. 4279Exova (UK) Ltd trading as Exova Catalyst & Exova Catalyst Ireland

Unit C5, Emery Court, The Embankment Business Park, Stockport, SK4 3GL

EMISSIONS REPORTEPA AIR EMISSIONS COMPLIANCE MONITORING

Your Exova Catalyst Ireland Contact: Nick Kenny (+353 86 853 8247)

CootehillDromore WestAbbott Ireland

Co. Cavan

EPA Office of Environmental Enforcement

(Prepared on behalf of the EPA by Exova Catalyst - EPA Contract No. OEE-DS-14)-

-

Exova Catalyst Ireland, Unit D8 North City Business Park, North Road, Finglas, Dublin 11E: [email protected]

Industrial Emissions Licence: PO687-02

Stack Emissions Testing Report Commissioned by

Installation Name & Address

A1-4 Boiler A

DELETE & COVER ME

MM 10 1074MCERTS Level 2

Stack Reference

Signature of Report Approver

Version 1

Team Leader

Deputy Regional Manager

TE1 TE2 TE3 TE4MM 08 922

MCERTS Level 2

Patrick O'BrienReport Approved by

27th September 2017

Job Reference NumberPO687-02 -CAR17-01

Dates of the Monitoring Campaign

Report Written byJohn Glennon

18th October 2017Report Date

TE1 TE2 TE3 TE4

Version

Site Visit Report - SV10474 - Abbott Ireland Page 4 of 54

TITLE PAGE

CONTENTS

Summary of Sampling Deviations

EXECUTIVE SUMMARY

Monitoring Objectives

Monitoring Results

Monitoring Dates & Times

Process Details

Monitoring & Analytical Methods

Sampling Location

Plant Photos / Sample Points

APPENDIX 1 - Monitoring Personnel & List of Equipment

APPENDIX 2 - Raw Data, Sampling Equations & Charts

9

3

5

6

8

CONTENTS

4

2

7

The testing performed fully meets the technical requirements in Irish EPA Guidance Note, AG2.

Opinions and interpretations expressed herein are outside the scope of Exova Catalyst Ireland's ISO 17025 accreditation.

This test report shall not be reproduced, except in full, without the written approval of Exova Catalyst Ireland.

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 2 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 5 of 54

Overall Aim of the Monitoring Campaign

Special Requirements

Target Parameters

Exova Catalyst Ireland were commissioned by the EPA Office of Environmental Enforcement to carry out stack emissions testing at Abbott Ireland on the A1-4 Boiler A at Cootehill.

The aim of the monitoring campaign was to demonstrate compliance with a set of emission limit values (ELVs) as specified in the Site's Permit.

There were no special requirements.

Oxides of Nitrogen (as NO₂)

MONITORING OBJECTIVES

Executive Summary(Page 1 of 7)

Abbott Ireland, CootehillA1-4 Boiler A

27th September 2017

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 3 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 6 of 54

where MU = Measurement Uncertainty associated with the Result

Parameter

Oxides of Nitrogen (as NO₂) ¹ - -Oxygen Dry

Water Vapour Stack Gas TemperatureStack Gas Velocity

¹

- -NOTE: VOLUMETRIC FLOW RATE & VELOCITY DATA TAKEN FROM THE PRELIMINARY VELOCITY TRAVERSE.

¹ Reference Conditions (REF) are: 273K, 101.3kPa, dry gas, 3% oxygen.

Limit30598

-

Abbott Ireland, Cootehill

27th September 2017

+/-Units Result

Concentration

MULimit+/-

4.18

629

mg/m³ 66.42

Executive Summary

Mass Emission

MONITORING RESULTS

A1-4 Boiler A

Result LimitUnitsMU

0.21

% v/v

3.8m/s

0.8100.4

5.24 200 580.6 62.0

m³/hr 15493m³/hr

°C

(Page 2 of 7)

Volumetric Flow Rate (ACTUAL) 1114

% v/v18.0

8742

0.28g/hr

Volumetric Flow Rate (REF)

-

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 4 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 7 of 54

Parameter

R1 - -R1 -R1R1

All results are expressed at the respective reference conditions.

Date(s)Mass Emission

12:35 - 13:04% v/v 18.0 27/09/2017 30Water Vapour27/09/2017 10:46 - 10:56

Units

Abbott Ireland, Cootehill

MONITORING DATE(S) & TIMES

A1-4 Boiler A27th September 2017

30Oxides of Nitrogen (as NO₂)

(Page 3 of 7)Executive Summary

SamplingTimes mins

% v/v

Velocity & Volumetric Flow Rate

Units DurationConcentration Sampling

27/09/20174.1866.4

27/09/2017g/hr

12:35 - 13:04mg/m³

Oxygen580.6 12:35 - 13:04 30

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 5 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 8 of 54

Standard Operating Conditions

Abbott Ireland, Cootehill

Feedstock (if applicable)

Value

Process Status

A1-4 Boiler A27th September 2017

Abatement SystemAbatement System Running Status

Plume Appearance

N/A

Parameter

Capacity (of 100%) and Tonnes / HourContinuous or Batch Process

Natural GasN/A

Continuous

Gas Boiler

Natural Gas

Fuel

(Page 4 of 7)Executive Summary

PROCESS DETAILS

N/A

80% capacity

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 6 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 9 of 54

CAT-TP-21CATCAT Yes

Dry Zirconia Cell by Horiba PG-250CATOxygen

(with short name reference as appears in the table above)

Exova Catalyst (CAT)

0.41 mg/m³YesEN 14789 CAT-TP-21 Yes 0.1 %

SUMMARY OF SAMPLING DEVIATIONS

Yes 1.2 m/s

ISO 17025 Accreditation Number: 4279

Oxides of Nitrogen (as NO₂)Yes

Yes

Yes CATYes

ANALYSIS LABORATORIES

TechniqueProcedure Lab Lab

Velocity & Vol. Flow Rate

GravimetricWater Vapour

EN 16911-1 (MID) CAT-TP-41 CAT

Chemiluminescence by Horiba PG-250EN 14792CAT-TP-05 CAT-TP-05 0.1 % v/vYesEN 14790

Standard

Abbott Ireland, Cootehill

ISO

Executive Summary

Monitoring

ParameterProcedure

Technical MCERTS17025

TestingTesting

Analytical Analysis17025

Analysis

LOD(Average)

Analytical

A1-4 Boiler A

(Page 5 of 7)

Testing ISO

Analysis

MONITORING & ANALYTICAL METHODS

27th September 2017

Pitot Tube and Thermocouple

Parameter Deviation

All 1 There are no deviations associated with the sampling employed.

Run

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 7 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 10 of 54

Duct Characteristics Location of Sampling Platform

Platform Details

Number of Ports - 1

Platform has 2 levels of handrails (approx. 0.5m & 1.0m high)

-

Sufficient working area to manipulate probe and operate the measuring instruments

Type1.20

Value

Executive Summary

cm

Yes

-

(Page 6 of 7)

Units

-

Permanent

Parameter

Yes

Horizontal

YesThere are no obstructions present which hamper insertion of sampling equipmentSafe Access Available

Width

Yes

-

m²m

Sample Port Size

Circular

Value General Platform Information

Permanent / Temporary PlatformInside / Outside

Platform has chains / self closing gates at top of laddersPlatform has vertical base boards (approx. 0.25m high)

YesYes

SUITABILITY OF SAMPLING LOCATION

Inside

Yes

10

Irish EPA Technical Guidance Note AG1 / EN 15259 Platform Requirements

Port Depth

m

1.13

Orientation of Duct

Easy Access Available

Depth

Area

2" BSP

Value

Sampling Location / Platform Improvement Recommendations

EN 15259 Homogeneity Test Requirements

Sampling Plane Validation Criteria (from EN 15259)

Where NM = Not Measured as no Isokinetic sampling was performed.

--

Yes

Pa

-

NM

-

-

-

--m/s

Maximum Angle of Swirl

> 5 Pa Yes

Units

-

NM0.00

-

NM

-

-

3.85

-

-Lowest Gas Velocity

m/s-

3.71-

-

Required

The sampling location meets all the requirements specified in Irish EPA Guidance Note AG1 and EN 15259, and therefore there are no improvement recommendations.

No Local Negative Flow

-

NM

Mean Velocity--

-

-

Yes

Traverse 1

m/s-

Criteria in EN 15259

-

There is no requirement to perform a EN 15259 Homogeneity Test on this Stack.

9.0

- Compliant

--3.80

1.04

°-

NM-

Easy Access Available

Highest Gas Velocity< 3 : 1Ratio of Above 0.00

-NM0.00

Yes

: 1 YesNM

0.00

--

Lowest Differential Pressure

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 8 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 11 of 54

(Page 7 of 7)

Executive Summary

SAMPLE POINTS

= isokinetic point not sampled atLine A

where = isokinetic point sampled at

= combustion gases sample point= non-isokinetic sample point

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 9 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 12 of 54

APPENDIX 1 - Stack Emissions Monitoring Personnel, List of Equipment & Methods and Technical Procedures Used

APPENDIX 2 - Summaries, Calculations, Raw Data and Charts

APPENDIX CONTENTS

APPENDICES

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 10 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 13 of 54

Stopwatch

-

CAT 9.19

CAT 3.97-

-

CAT 21S.42

SELECT FTIR

SELECT Horiba Model (2)

MM 10 1074 TE1 TE2 TE3 TE4Trainee Luke Cregan MCERTS Trainee MM17 1413 None

ABB AO2020-URAS26

Stack Thermocouple (2)

SELECT Servomex Model-

-

-

MCERTS Number

-

Eco Physics CLD 822Mh

Miscellaneous Items

CAT 12.66

-

Equipment I.D.

STACK EMISSIONS MONITORING PERSONNEL

APPENDIX 1

15m Heated Line (1)

CAT 17.24

-

Heated Probe (1)Bernath 3006 FID -

Mass Flow Controller (2) CAT 6.1

- 1m Heated Line (2)Heated Probe (2)

Equipment Type

Control Box DGM (2)

-

John Glennon MCERTS Level 2

CAT 4.491

-

Umbilical (2) Testo 350 XL

5m Heated Line (1)

Instrumental Analysers

1m Heated Line (3)

Control Box DGM (1)Equipment I.D.

CAT 6.21

CAT 25.35

-

JCT JCC P1 Cooler

CAT 13.27

Mass Flow Controller (1)

Stack Thermocouple (3)

Technical Endorsements

S-Pitot (1)

L-Pitot

Barometer

Digital Manometer (2)

Umbilical (1)Box Thermocouples (2)Box Thermocouples (1)

M&C PSS

- 20m Heated Line (1)20m Heated Line (2)

-

Stack Thermocouple (1)

Gasmet Sampling System-

Extractive Sampling

LIST OF EQUIPMENT

MCERTS Accreditation

-

-

CAT 14.65

-

-

Position

Team Leader

S-Pitot (2) -

-

-

-

-Equipment Type

CAT 20.71

Equipment Type

CAT 4.705

Mass View (1)

--

Mass View (2)

1m Heated Line (1)

Name

Site Balance

Digital Temperature Meter

Heated Probe (3) -

CAT 3.97

Oven Box (1)

-Oven Box (2)

-

Equipment I.D.Digital Manometer (1)Horiba PG-250

Bioaerosols Temperature Logger -Electronic Refrigerator -

-

Oxides of Nitrogen (as NO₂)Oxygen

CAT-TP-21Water Vapour

EN 14789

EN 14790

EN 16911-1 (MID) CAT-TP-41Velocity & Vol. Flow RateCAT-TP-21

CAT 17.24

Technical ProcedureStandard

Single Channel Heater Controller

Parameter

-SELECT Logger 2 -

Dual Channel Heater Controller

Tubes Kit Thermocouple -

20m Heated Line (2)-500g / 1Kg Check Weights CAT 17.24

Last Impinger Arm -Callipers

-

METHODS & TECHNICAL PROCEDURES USED

SELECT Logger 1Mass View (2)Site Balance

CAT 20.71Laboratory Balance

CAT-TP-05EN 14792

Tape Measure CAT 16.35-

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 11 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 14 of 54

General Stack Details

Stack Gas Composition & Molecular Weights

CO₂ (Estimated)

O₂

Moisture (H₂O)

Where: p = M / 22.41

Stack Diameter / Depth, D

PRELIMINARY STACK SURVEY: CALCULATIONS

APPENDIX 2

Stack Area, A

0.1000

MassComponent

°C

Average Stack Static Pressure, Pstatic

-

9.5

Molar Conc

Value

1.20

102.1

Average Stack Gas Temperature, Ta

-0.072

Units

Pa

Fraction Density

Dry

0.14481

4.18 32.00

Conc

1.13

-

mStack Width, W

Stack Details (from Traverse)

Average Pitot Tube Calibration Coefficient, Cp

ppm kg/m³

Average Stack Gas Pressure

Conc Conc

MWet

r% v/v

18.0285.82

8.20

kg/m³

100.4

Average Barometric Pressure, Pb

m

0.8582 28.01

1.9635

-

Volume

kPakPa

0.84

-

-1.2498

44.01

-0.0418

18.021.0726370.36N₂

1.4277 0.05967-0.19635

0.1802

3.43

0.8037

10.00

p pi% v/v

Where: p = M / 22.41

pi = r x p

Calculation of Stack Gas Densities

Where: P STD = sum of component concentrations, kg/m³ (not including water vapour)

P STW = sum of all wet concentrations / 100 x density, kg/m³ (including water vapour)

P Actual = P STD x (TSTP / (PSTP)) x ((Pstatic + Pb) / Ta)

P ActualW (at each sampling point) = P STW x (Ts / Ps) x (Pa / Ta)

Calculation of Stack Gas Volumetric Flowrate, Q

Dry Density (STP), P STD

8742

kg/m³

m³/hrGas Volumetric Flowrate (Actual)

ResultGas Volumetric Flowrate (from Traverse)

18.02

kg/m³

m³/hr

Total Pressure

Average Wet Density (Actual), P ActualW

Units Actual

4.2

kg/m³

101.3

Result

3.0

m³/hr

REF ¹

Oxygen (Dry)

0.909

Dry Density (Actual), P Actual

m³/hrGas Volumetric Flowrate (STP, Dry)

Determinand

1.329

100.4102.0

Gas Volumetric Flowrate REF ¹

Temperature

%

Units

Gas Volumetric Flowrate (STP, Wet)

MoisturekPa%

°C

kg/m³ 1.234

Duct gas flow conditions

1141015493

0.979

Wet Density (STP), P STW

9354

-0.0

0.00

Units

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 12 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 15 of 54

Parameter Parameter

Date of Survey Initial Pitot Leak CheckTime of Survey Final Pitot Leak CheckAtmospheric Pressure Orientation of DuctAverage Stack Static Pressure Pitot Tube, Cp

Result of Pitot Stagnation Test Number of Lines AvailableAre Water Droplets Present? Number of Lines UsedDevice Used

0.909

27/09/2017

ValueUnits

0.84

S-Type Pitot with KIMO MP 200 (500Pa)

102.1

-

Wet Density

Pa

DepthPoint

100.3

Mean

0.30

100.53

100.4

3.83

3.71

-

Traverse

1-

-Swirl

No

Units

APPENDIX 2

kg/m³ -

Pass

PRELIMINARY STACK SURVEY: VELOCITY TRAVERSE TO EN 16911-1 (MID)

Pass

-

-

(1 of 1)

1

Value

∆P --

-72 -

--°-

Horizontal

Pass

m/sPa

0.909

m -°C-72.3

0.08

0.908

Velocity

STATIC (Units: Pa)

4

-0.909

9.02

1.12

100.1

100.50.909.6

10:46 - 10:56

Sampling Line A

kPa

-

-

-

-

-

-

0.9083.85 -9.7

1

-3.83

3.80

-

-

-

9.6

9.5 -

Temp

-

- - -- - -

-

-

-

-

-

-

--

-

-

-

-

- --

- -

-

-

-

-

--

-

--

-

-

-

- -

-

-

-

-

- --

----

-

-

---

-

- --

-

-

--

--------

-

---

--

--

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 13 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 16 of 54

3.426- 8.198

u(φO₂,d) 0.128

u(φCO₂,w) 0.267u(Tc) 1.905

1.063

PRELIMINARY STACK SURVEY: VELOCITY TRAVERSE TO EN 16911-1 (MID) - MEASUREMENT UNCERTAINTY(1 of 1)

APPENDIX 2

Standard uncertainty associated with the local velocities

u(Cf)

u(cal) 0.009

-

u(φCO₂,d) 0.306

- Static PressureStandard uncertainty associated with the density in the duct

Standard uncertainty associated with the stack temperature

-Pa

u(φH₂O) 0.919u(φO₂,w) 0.112

- φCO₂,w- Oxygen, dry- Carbon Dioxide, dry

u(fit) 0.036

Standard Uncertainty associated with the mean local dynamic pressures

- Calibration

u(M) 0.00010

0.214

- Drift- Lack of Fit

- Water Vapour- Oxygen, wet- Carbon Dioxide, wet

-

- Overall corrections to dynamic measurementsStandard uncertainty associated with the molar mass of the gas- φO₂,w

0.130

u(vi)

Ku(pc) 175.695 Pa

u(patm) 175.692u(pstat) 1.063

u(ρ) 0.00489

Standard Uncertainty on the coefficient of the Pitot Tube u(k) 0.005Pa

u(res) 0.00087u(∆pi)

- Resolution

-

Standard uncertainty associated with the absolute pressure in the duct- Atmospheric Pressure

u(drift) 0.083

Performance characteristics (Uncertainty Components) UnitsValueUncertainty

- u²(a)/a²- u²(qV,w)/q²V,w

-1114.2 m³/hr

- u²(qV,w)

Standard uncertainty associated with the local velocities

7.19

%

Pam/sStandard uncertainty associated with the mean velocity

0.00135- 323147- 568.5

Uc,rel(qV,w)

Standard uncertainty associated with the mean velocity (95% Confidence), relative

0.00053-

Uc(qV,w)

0.214u(v) 0.108

Uc(v)Standard uncertainty associated with the mean velocity (95% Confidence)Uc,rel(v) 5.59

0.213

u(vi)

m/s

- u(qV,w)Standard uncertainty associated with the volume flow rate (95% Confidence), relative %

Standard uncertainty associated with the volume flow rate (95% Confidence)

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 14 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 17 of 54

Sample Runs

General Sampling Information

Sample Runs

0.77

Concentration

MeanRun 1

±% v/v

A1-4 Boiler A

% v/v

Parameter

WATER VAPOUR: RESULTS SUMMARY

0.77

APPENDIX 2

Value

Parameter

Abbott Ireland, Cootehill

EN 14790

Uncertainty

Technical ProcedureStandard

Units

WATER VAPOUR: SAMPLING DETAILS

18.02

CAT-TP-05

18.02

Sample Runs

Where: MFC stands for Mass Flow Controller, MV stands for Mass View Flowmeter

18.02

Run 1

- MFC / MV

Sample Flow Rate0.1936

% v/v

1425.128.0Total Mass Of Water Vapour

Liquid Trap End MassLiquid Trap Start Mass

Sampling Device

0.1587

gg

Sampling Dates

5.12

12:35 - 13:04

Volume Sampled (STP, Wet)

g

1422.3

4178.8l/min

4204.0

Sampling Times

Duration

Parameter

m³mins

-

30Volume Sampled (STP, Dry)

- 27/09/2017

Units

gCalculated Water Vapour

Silica Trap End Mass

gSilica Trap Start Mass

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 15 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 18 of 54

Sample Runs

Ambient Temperature Recorded?

Test Conditions

No

Yes

Units Run 1

Run 1

Units Run 1

-

Units

20.0

Water Droplets

Yes-

MU Acceptable % Yes

Less than 50% Faded %

Measurement Uncertainty

Silica Gel

l/min5.1

Measurement Uncertainty (MU) %

Run 1

Mean Sampling Rate

l/min 0.05

Are Water Droplets Present

Leak Test Results Units

Units Run 1

APPENDIX 2

WATER VAPOUR: QUALITY ASSURANCE

4.2

Leak Test Acceptable

-

%

Allowable Leak Rate

l/min

l/min

Pre-Sampling Leak Rate 0.05

0.10Yes

Post-Sampling Leak Rate

Allowable MU

Method Deviations

1

x

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Ambient Temperature Recorded?

There are no deviations associated with the sampling employed.

Nature of Deviation

Yes-

Run Number(x = deviation applies to the associated run)

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 16 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 19 of 54

Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak

Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak

Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak

Sensitivity Coefficient

Vm

Measured Quantities

Run 1

Rw

Rb

L 0.10

Units

0.14

Measured Quantities

%

Units

Run 1

≤2%

uRw

uRb

0.10Rw

Symbol

Requirement of Standard

Uncertainty in Measurement Units

APPENDIX 2

Rb

0.0032

Run 1

0.36No RequirementNo Requirement

0.50

2.00

28.00

0.98

Run 1

Units

uVm

Symbol

≤2%

0.98

Run 1Standard uncertainty

L

%

g

%

-

% v/vg

Uncertainty in Result

0.6428.00

Vm

0.64

Symbol

WATER VAPOUR: MEASUREMENT UNCERTAINTY CALCULATIONS

ValueMeasured Quantities

113.50

0.1587

28.00

g

1.00

Uncertainty as a Percentage

%

28.00 g%

0.1587

Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak

Combined uncertainty

Expanded uncertainty (95% confidence)Expanded uncertainty (95% confidence), estimated with Method DeviationsUncertainty if Water Droplets are presentReported Uncertainty

Expanded uncertainty (95% confidence)Expanded uncertainty (95% confidence), estimated with Method DeviationsUncertainty if Water Droplets are presentReported Uncertainty 4.2%

N/A

% v/v 0.77

Units Run 1

4.2

Parameter

% v/v

% v/v% v/v 0.064

Run 1

0.090

0.360

Uncertainty in ResultMeasured Quantities

Units

% v/v 0.102

0.77

% v/v 0.39

%%

% v/v

% v/v% v/v N/A

0.77

%

4.2

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 17 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 20 of 54

Sample Runs

- -

- -

- -

- -

- -

General Sampling Information

OXIDES OF NITROGEN (as NO₂): RESULTS SUMMARY

Value

APPENDIX 2

Run 1

EN 14792

0.1µm Glass Fibre

Uncertainty

Heated Head Filter UsedFiltration Type / Size

CAT-TP-21

g/hr 580.6

66.42

Uncertainty ±mg/m³

Concentration mg/m³

Abbott Ireland, Cootehill

Yes

A1-4 Boiler A

Parameter Units Mean

62.062.0±g/hr

Parameter

580.6

66.42

Stainless Steel

Mass Emission

5.24

Probe Material

180°C

Technical Procedure

Heated Line Temperature

5.24

Standard

NOTE: Dilution performed to achieve correct span value

FORMAT: Number Used / Number Required

FORMAT: Number Used / Number Required

Reference Conditions

Reference Conditions are: 273K, 101.3kPa, dry gas, 3% oxygen.

Span Gas Type Nitrogen Monoxide

13/07/2019

04/04/2017 - 96.2%

400.3

Number of Sampling Lines Used 1 / 1Number of Sampling Points Used

Span Gas Start Pressure (bar) 160Gas Cylinder Concentration (ppm)Span Gas Uncertainty (%)

Sample Point I.D.'s

1 / 1

2

A1

Span Gas Reference Number CYL 12.0092Span Gas Expiry Date

180°C

Zero Gas Type Nitrogen (5 Grade)

Heated Line TemperatureDate & Result of Last Converter Check

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 18 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 21 of 54

Graphical Trend of Data

APPENDIX 2

OXIDES OF NITROGEN (as NO₂): DATA TREND

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

12:3

5

12:3

6

12:3

7

12:3

8

12:3

9

12:4

0

12:4

1

12:4

2

12:4

3

12:4

4

12:4

5

12:4

6

12:4

7

12:4

8

12:4

9

12:5

0

12:5

1

12:5

2

12:5

3

12:5

4

12:5

5

12:5

6

12:5

7

12:5

8

12:5

9

13:0

0

13:0

1

13:0

2

13:0

3

13:0

4

Conc

entr

atio

n (m

g/m

³)

Oxides of Nitrogen (as NO₂) At Reference Conditions

- Run 1

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 19 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 22 of 54

Sampling Details

Quality Assurance

Zero Drift 0 0 0

Zero Drift 0 0 0

Zero Drift 0 0 0

Instrument Range

Zero Down Sampling Line (Pre) ppm

ppm

Average Temperature °C 1.3

Sampling Times - 12:35 - 13:04

Units

APPENDIX 2

OXIDES OF NITROGEN (as NO₂): SAMPLING DETAILS & QUALITY ASSURANCE

Parameter

100.0

Run 1

Zero Down Sampling Line (Post)Zero Down Sampling Line (Pre)

Span Gas Value ppm

Run 1

4.0< °C

ppm 0.80

ppm

- 27/09/2017Sampling Dates250

- YesTemperature Acceptable

ppm 0.50

Allowable Temperature

0.30

Zero Drift Units

CAL

3CA

L 1

CAL

2

ppm

Run 1

Zero Down Sampling Line (Post) ppm

Zero Down Sampling Line (Post)

ppm

Units

Zero Down Sampling Line (Pre)ppm

ppm

Conditioning Unit Temperature

Zero Drift 0 0 0

Span Drift 0 0 0

Span Drift 0 0 0

Span Drift 0 0 0

Method Deviations

1

x

- - -

- - -

- - -

°C

ppm5.00

Span Drift Acceptable - Yes

Span Down Sampling Line (Post)

ppm

Span Down Sampling Line (Pre) ppm

(x = deviation applies to the associated run)

There are no deviations associated with the sampling employed.

14

Allowable Zero Drift

Units Run 1

CAL

1

± ppm 5.00

Run Ambient Temperature Range

Span Down Sampling Line (Pre) ppm 99.70

ppm

ppm

-

Span Drift

Allowable Span Drift

Test Conditions

Units

CAL

3CA

L 2

Span Down Sampling Line (Post)

Span Down Sampling Line (Post) ppm 102.80ppm 3.10

ppm

Nature of Deviation

ppm

Yes

Span Down Sampling Line (Pre)

Run 1

± ppm

Zero Drift Acceptable

Run Number

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 20 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 23 of 54

0.40

% of full scale

0.60

Performance characteristics RUN 1

Range Used

Lower of [A] or [B]

Converter efficiency

Number of readings in measurement 30 -Repeatability at zero 0.40 % full scale

Ration NO / NO₂Measured concentrationTGN M2 Allowable MULimit value

Cal gas conc. 100.0 ppmConversion 2.05 ppm to mg/m³MCERTS Range [B] 125.0 mg/m³

seconds

%62.07

mg/m³250.0

UnitsResponse time 60

mg/m³ (REF)10.0

200.0

mg/m³

OXIDES OF NITROGEN (as NO₂): MEASUREMENT UNCERTAINTY CALCULATIONS

mg/m³ (STP, dry)5 %

125.0

ppmRange Used [A] 513.1

% full scaleDeviation from linearity 0.34

Span drift 0.00

% full scale/10V96.2 %

% range

Losses in the line (leak)

% full scale

Atmospheric pressure dependence 0.30 % of value/kPaAmbient temperature dependence 0.18 % full scale/10K

% full scaleVolume or pressure flow dependence 0.40

Dependence on voltage

% of value0.30

mg/m³Cal gas conc. 205.2

Performance characteristics RUN 1

% of valueZero drift 0.50

Repeatability at span level

Combined interference

0.40

APPENDIX 2

Units

k =

Expanded uncertainty (no O₂) - at 95% Confidence 3.98

% at ELVResult of Compliance with Uncertainty Requirement in M2 N/A -

RUN 1

use rep at span

% of value

mg/m³ (REF)

mg/m³0.07

mg/m³

Uncertainty corrected to std conds. (O₂) 2.64

0.25 mg/m³Drift

10.0

mg/m³

UnitsExpanded uncertainty (with O₂) - at 95% Confidence 7.89

0.72

mg/m³Dependence on voltage

mg/m³

Result of Compliance with Uncertainty Requirement in M2

mg/m³

RUN 1

% of Value

Expanded uncertainty (with O₂) - at 95% Confidence

0.59

Losses in the line (leak)

UnitsStandard deviation of repeatability at zero

Expanded uncertainty (no O₂) - at 95% Confidence 1.24

% at ELV

Overall Allowable uncertainty (with O₂) - at 95% Confidence 12.1 % at ELV

0.07

RUN 1

2.47

Uncertainty of calibration gas

Units% of Value

mg/m³Standard deviation of repeatability at span level

UnitsMeasurement uncertainty Result 62.07

% at ELV

Overall Allowable uncertainty (no O₂) - at 95% Confidence

mg/m³

% of value% of value

0.30

mg/m³Combined uncertainty 1.26

mg/m³Atmospheric pressure dependence 0.11 mg/m³

mg/m³Lack of fit

Uncertainty of calibration gas 2.00

Performance characteristic RUN 1

0.03 mg/m³Combined interference (from MCERTS Certificate) 0.43

Requirement for SRM is that Uncertainty should be <10% of the value at the ELV, on a dry gas basis, or if O₂ correction is applied less than 10% + the uncertainty associated with the O₂ correction (using sqrt of sum squares to add uncertainty components). Ref EA TGN M2.

Ambient temperature dependence

mg/m³Converter efficiencyLosses in the line (leak) 0.11

COMPLIANT -

mg/m³

Volume or pressure flow dependence 0.00

Expanded uncertainty 1.96

Uncertainty of calibration gas blending 0.50

0.05

6.94

Uncertainty of calibration gas blending 1.40

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 21 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 24 of 54

Sample Runs

- -

- -

- -

General Sampling Information

Span Gas Type Synthetic Air (5 Grade)Span Gas Reference Number

Units Run 1

Value

Standard

Mean

180°C

Parameter

Heated Head Filter Used YesHeated Line Temperature

CYL 11.0268

EN 14789Technical Procedure CAT-TP-21

Probe Material Stainless Steel

Uncertainty ±% v/v 0.28 0.28

A1-4 Boiler AAbbott Ireland, Cootehill

Filtration Type / Size

Parameter

Span Gas Expiry Date 07/12/2021

OXYGEN: RESULTS SUMMARY

APPENDIX 2

Concentration % v/v 4.18 4.18

0.1µm Glass Fibre

NOTE: Dilution performed to achieve correct span value

FORMAT: Number Used / Number Required

FORMAT: Number Used / Number RequiredNumber of Sampling Points Used 1 / 1

Sample Point I.D.'s

Nitrogen (5 Grade)

A1

Span Gas Uncertainty (%) 2

Span Gas Expiry Date 07/12/2021Span Gas Start Pressure (bar) 80Gas Cylinder Concentration (% v/v) 20.49

Number of Sampling Lines Used 1 / 1

Zero Gas Type

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 22 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 25 of 54

Graphical Trend of Data

OXYGEN: DATA TREND

APPENDIX 2

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

12:3

5

12:3

6

12:3

7

12:3

8

12:3

9

12:4

0

12:4

1

12:4

2

12:4

3

12:4

4

12:4

5

12:4

6

12:4

7

12:4

8

12:4

9

12:5

0

12:5

1

12:5

2

12:5

3

12:5

4

12:5

5

12:5

6

12:5

7

12:5

8

12:5

9

13:0

0

13:0

1

13:0

2

13:0

3

13:0

4

Conc

entr

atio

n (%

v/v

)

Oxygen Oxygen

- Run 1

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 23 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 26 of 54

Sampling Details

Quality Assurance

Zero Drift 0 0 0

Zero Drift 0 0 0

Zero Drift 0 0 0

Zero Down Sampling Line (Pre) % v/v

Span Gas Value

Sampling Times

Average Temperature

Zero Down Sampling Line (Post)

% v/v

Allowable Temperature < °C

0.06Zero Down Sampling Line (Post) % v/v 0.09

12:35 - 13:04

Parameter Units Run 1

Instrument Range

CAL

3

4.0

0.03

Zero Down Sampling Line (Pre) % v/v

CAL

1 Zero Down Sampling Line (Pre) % v/v

% v/v

Zero Down Sampling Line (Post)

% v/v

Units Run 1

% v/v

Sampling Dates - 27/09/2017-

Conditioning Unit Temperature Units Run 1

°C

% v/v 5.00

APPENDIX 2

OXYGEN: SAMPLING DETAILS & QUALITY ASSURANCE

1.3

Temperature Acceptable - Yes

CAL

2

% v/v

% v/v 25

Zero Drift

Zero Drift 0 0 0

Span Drift 0 0 0

Span Drift 0 0 0

Span Drift 0 0 0

Method Deviations

1

x

- - -

- - -

- - -

Span Drift Acceptable - Yes

% v/v

% v/v

Zero Drift Acceptable

Run 1

Run 1

Run Ambient Temperature Range °C 14

Span Down Sampling Line (Post) % v/v

Allowable Span Drift ± % v/v 0.25

CAL

3

% v/v

Yes

Run Number

(x = deviation applies to the associated run)

There are no deviations associated with the sampling employed.

% v/v

CAL

3

-

Nature of Deviation

Span Drift Units

Span Down Sampling Line (Pre) % v/vSpan Down Sampling Line (Post) % v/v

5.02

Test Conditions Units

% v/v -0.13

Allowable Zero Drift ± % v/v

% v/v4.89

Span Down Sampling Line (Pre)

0.25

CAL

2 Span Down Sampling Line (Pre) % v/vSpan Down Sampling Line (Post)

CAL

1

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 24 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 27 of 54

% rangeDependence on voltage 0.02 % full scale/10VLosses in the line (leak) 0.00

-0.07 % full scale/10KAtmospheric pressure dependence 0.30 % of value/kPaAmbient temperature dependence

Volume or pressure flow dependence 0.20 % of full scale

Standard deviation of repeatability at zero use rep at span %volStandard deviation of repeatability at span level 0.01 %volLack of fit 0.01 %volDrift 0.07

% of valueUncertainty of calibration gas 2.00

Combined interference 0.56

%vol

Performance characteristics RUN 1 UnitsResponse time 60 seconds

N/A

-Repeatability at zero 0.04

%vol6.0 %

%volVolume or pressure flow dependence 0.00 %vol

0.00 % full scale

4.18 %volRange Used 25.0 %volCal gas conc. 20.5

% of value

Performance characteristic RUN 1 Units

0.05 % of valueZero drift 0.60

Number of readings in measurement 30

RUN 1 Units

Measured concentrationTGN M2 Allowable MULimit value

Span drift

Performance characteristics

% full scaleRepeatability at span level 0.04 % full scaleDeviation from linearity

% full scale

APPENDIX 2

OXYGEN: MEASUREMENT UNCERTAINTY CALCULATIONS

k =

Units

0.02Ambient temperature dependence -0.01 %vol

UnitsMeasurement uncertainty Result 4.18 %volCombined uncertainty 0.15 %vol

Result of Compliance with Uncertainty Requirement in M2Expanded uncertainty (no O₂) - at 95% Confidence 6.81 % of Value

Expanded uncertainty 1.96 0.28 %vol

RUN 1

%volLosses in the line (leak) 0.00

Volume or pressure flow dependence 0.00 %volAtmospheric pressure dependence %vol

COMPLIANT -

Requirement for SRM is that Uncertainty should be 0.5%vol absolute or 6% relative whichever is the lower, on a dry gas basis. Ref EA TGN M2.

Combined interference (from MCERTS Certificate) 0.08 %volDependence on voltage 0.00

%volUncertainty of calibration gas 0.05 %vol

RUN 1

Abbott IrelandCootehillA1-4 Boiler A

CAT-RT (Version BR)Page 25 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 28 of 54

ISO/IEC 17025 Accredited Legal Entity, UKAS Accredited Testing Laboratory No. 4279Exova (UK) Ltd trading as Exova Catalyst & Exova Catalyst Ireland

Unit C5, Emery Court, The Embankment Business Park, Stockport, SK4 3GL

EMISSIONS REPORTEPA AIR EMISSIONS COMPLIANCE MONITORING

Your Exova Catalyst Ireland Contact: Nick Kenny (+353 86 853 8247)

CootehillDromore WestAbbott Ireland

Co. Cavan

EPA Office of Environmental Enforcement

(Prepared on behalf of the EPA by Exova Catalyst - EPA Contract No. OEE-DS-14)-

-

Exova Catalyst Ireland, Unit D8 North City Business Park, North Road, Finglas, Dublin 11E: [email protected]

Industrial Emissions Licence: PO687-02

Stack Emissions Testing Report Commissioned by

Installation Name & Address

A1-4 Boiler B

DELETE & COVER ME

MM 10 1074MCERTS Level 2

Stack Reference

Signature of Report Approver

Version 1

Team Leader

Deputy Regional Manager

TE1 TE2 TE3 TE4MM 08 922

MCERTS Level 2

Patrick O'BrienReport Approved by

27th September 2017

Job Reference NumberPO687-02 -CAR17-01

Dates of the Monitoring Campaign

Report Written byJohn Glennon

12th October 2017Report Date

TE1 TE2 TE3 TE4

Version

Site Visit Report - SV10474 - Abbott Ireland Page 29 of 54

TITLE PAGE

CONTENTS

Summary of Sampling Deviations

EXECUTIVE SUMMARY

Monitoring Objectives

Monitoring Results

Monitoring Dates & Times

Process Details

Monitoring & Analytical Methods

Sampling Location

Plant Photos / Sample Points

APPENDIX 1 - Monitoring Personnel & List of Equipment

APPENDIX 2 - Raw Data, Sampling Equations & Charts

9

3

5

6

8

CONTENTS

4

2

7

The testing performed fully meets the technical requirements in Irish EPA Guidance Note, AG2.

Opinions and interpretations expressed herein are outside the scope of Exova Catalyst Ireland's ISO 17025 accreditation.

This test report shall not be reproduced, except in full, without the written approval of Exova Catalyst Ireland.

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 2 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 30 of 54

Overall Aim of the Monitoring Campaign

Special Requirements

Target Parameters

Exova Catalyst Ireland were commissioned by the EPA Office of Environmental Enforcement to carry out stack emissions testing at Abbott Ireland on the A1-4 Boiler B at Cootehill.

The aim of the monitoring campaign was to demonstrate compliance with a set of emission limit values (ELVs) as specified in the Site's Permit.

There were no special requirements.

Oxides of Nitrogen (as NO₂)

MONITORING OBJECTIVES

Executive Summary(Page 1 of 7)

Abbott Ireland, CootehillA1-4 Boiler B

27th September 2017

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 3 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 31 of 54

where MU = Measurement Uncertainty associated with the Result

Parameter

Oxides of Nitrogen (as NO₂) ¹ - -Oxygen Dry

Water Vapour Stack Gas TemperatureStack Gas Velocity

¹

- -NOTE: VOLUMETRIC FLOW RATE & VELOCITY DATA TAKEN FROM THE PRELIMINARY VELOCITY TRAVERSE.

¹ Reference Conditions (REF) are: 273K, 101.3kPa, dry gas, 3% oxygen.

Limit30598

-

Abbott Ireland, Cootehill

27th September 2017

+/-Units Result

Concentration

MULimit+/-

2.77

719

mg/m³ 67.9

Executive Summary

Mass Emission

MONITORING RESULTS

A1-4 Boiler B

Result LimitUnitsMU

0.24

% v/v

3.3m/s

0.7100.2

7.24 200 573.8 78.3

m³/hr 13504m³/hr

°C

(Page 2 of 7)

Volumetric Flow Rate (ACTUAL) 1149

% v/v16.2

8448

0.28g/hr

Volumetric Flow Rate (REF)

-

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 4 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 32 of 54

Parameter

R1 - -R1 -R1R1

All results are expressed at the respective reference conditions.

Date(s)Mass Emission

13:12 - 13:41% v/v 16.2 27/09/2017 30Water Vapour27/09/2017 11:30 - 11:40

Units

Abbott Ireland, Cootehill

MONITORING DATE(S) & TIMES

A1-4 Boiler B27th September 2017

30Oxides of Nitrogen (as NO₂)

(Page 3 of 7)Executive Summary

SamplingTimes mins

% v/v

Velocity & Volumetric Flow Rate

Units DurationConcentration Sampling

27/09/20172.7767.9

27/09/2017g/hr

13:12 - 13:41mg/m³

Oxygen573.8 13:12 - 13:41 30

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 5 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 33 of 54

Standard Operating Conditions

Abbott Ireland, Cootehill

Feedstock (if applicable)

Value

Process Status

A1-4 Boiler B27th September 2017

Abatement SystemAbatement System Running Status

Plume Appearance

N/A

Parameter

Capacity (of 100%) and Tonnes / HourContinuous or Batch Process

Natural GasN/A

Continuous

Gas Boiler

Natural Gas

Fuel

(Page 4 of 7)Executive Summary

PROCESS DETAILS

N/A

80% of capacity

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 6 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 34 of 54

CAT-TP-21CATCAT Yes

Dry Zirconia Cell by Horiba PG-250CATOxygen

(with short name reference as appears in the table above)

Exova Catalyst (CAT)

0.41 mg/m³YesEN 14789 CAT-TP-21 Yes 0.1 %

SUMMARY OF SAMPLING DEVIATIONS

Yes 1.2 m/s

ISO 17025 Accreditation Number: 4279

Oxides of Nitrogen (as NO₂)Yes

Yes

Yes CATYes

ANALYSIS LABORATORIES

TechniqueProcedure Lab Lab

Velocity & Vol. Flow Rate

GravimetricWater Vapour

EN 16911-1 (MID) CAT-TP-41 CAT

Chemiluminescence by Horiba PG-250EN 14792CAT-TP-05 CAT-TP-05 0.1 % v/vYesEN 14790

Standard

Abbott Ireland, Cootehill

ISO

Executive Summary

Monitoring

ParameterProcedure

Technical MCERTS17025

TestingTesting

Analytical Analysis17025

Analysis

LOD(Average)

Analytical

A1-4 Boiler B

(Page 5 of 7)

Testing ISO

Analysis

MONITORING & ANALYTICAL METHODS

27th September 2017

Pitot Tube and Thermocouple

Parameter Deviation

All 1 There are no deviations associated with the sampling employed.

Run

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 7 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 35 of 54

Duct Characteristics Location of Sampling Platform

Platform Details

Number of Ports - 1

Platform has 2 levels of handrails (approx. 0.5m & 1.0m high)

-

Sufficient working area to manipulate probe and operate the measuring instruments

Type1.20

Value

Executive Summary

cm

Yes

-

(Page 6 of 7)

Units

-

Permanent

Parameter

Yes

Horizontal

YesThere are no obstructions present which hamper insertion of sampling equipmentSafe Access Available

Width

Yes

-

m²m

Sample Port Size

Circular

Value General Platform Information

Permanent / Temporary PlatformInside / Outside

Platform has chains / self closing gates at top of laddersPlatform has vertical base boards (approx. 0.25m high)

YesYes

SUITABILITY OF SAMPLING LOCATION

Inside

Yes

100

Irish EPA Technical Guidance Note AG1 / EN 15259 Platform Requirements

Port Depth

m

1.13

Orientation of Duct

Easy Access Available

Depth

Area

2" BSP

Value

Sampling Location / Platform Improvement Recommendations

EN 15259 Homogeneity Test Requirements

Sampling Plane Validation Criteria (from EN 15259)

Where NM = Not Measured as no Isokinetic sampling was performed.

--

Yes

Pa

-

NM

-

-

-

--m/s

Maximum Angle of Swirl

> 5 Pa Yes

Units

-

NM0.00

-

NM

-

-

3.46

-

-Lowest Gas Velocity

m/s-

3.21-

-

Required

The sampling location meets all the requirements specified in Irish EPA Guidance Note AG1 and EN 15259, and therefore there are no improvement recommendations.

No Local Negative Flow

-

NM

Mean Velocity--

-

-

Yes

Traverse 1

m/s-

Criteria in EN 15259

-

There is no requirement to perform a EN 15259 Homogeneity Test on this Stack.

6.8

- Compliant

--3.32

1.08

°-

NM-

Easy Access Available

Highest Gas Velocity< 3 : 1Ratio of Above 0.00

-NM0.00

Yes

: 1 YesNM

0.00

--

Lowest Differential Pressure

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 8 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 36 of 54

(Page 7 of 7)

Executive Summary

SAMPLE POINTS

= isokinetic point not sampled atLine A

where = isokinetic point sampled at

= combustion gases sample point= non-isokinetic sample point

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 9 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 37 of 54

APPENDIX 1 - Stack Emissions Monitoring Personnel, List of Equipment & Methods and Technical Procedures Used

APPENDIX 2 - Summaries, Calculations, Raw Data and Charts

APPENDIX CONTENTS

APPENDICES

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 10 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 38 of 54

Stopwatch

-

CAT 9.19

CAT 3.97-

-

CAT 21S.42

SELECT FTIR

SELECT Horiba Model (2)

MM 10 1074 TE1 TE2 TE3 TE4Trainee Luke Cregan MCERTS Trainee MM17 1413 None

ABB AO2020-URAS26

Stack Thermocouple (2)

SELECT Servomex Model-

-

-

MCERTS Number

-

Eco Physics CLD 822Mh

Miscellaneous Items

CAT 12.66

-

Equipment I.D.

STACK EMISSIONS MONITORING PERSONNEL

APPENDIX 1

15m Heated Line (1)

CAT 17.24

-

Heated Probe (1)Bernath 3006 FID -

Mass Flow Controller (2) CAT 6.1

- 1m Heated Line (2)Heated Probe (2)

Equipment Type

Control Box DGM (2)

-

John Glennon MCERTS Level 2

CAT 4.491

-

Umbilical (2) Testo 350 XL

5m Heated Line (1)

Instrumental Analysers

1m Heated Line (3)

Control Box DGM (1)Equipment I.D.

CAT 6.21

CAT 25.35

-

JCT JCC P1 Cooler

CAT 13.27

Mass Flow Controller (1)

Stack Thermocouple (3)

Technical Endorsements

S-Pitot (1)

L-Pitot

Barometer

Digital Manometer (2)

Umbilical (1)Box Thermocouples (2)Box Thermocouples (1)

M&C PSS

- 20m Heated Line (1)20m Heated Line (2)

-

Stack Thermocouple (1)

Gasmet Sampling System-

Extractive Sampling

LIST OF EQUIPMENT

MCERTS Accreditation

-

-

CAT 14.65

-

-

Position

Team Leader

S-Pitot (2) -

-

-

-

-Equipment Type

CAT 20.71

Equipment Type

CAT 4.705

Mass View (1)

--

Mass View (2)

1m Heated Line (1)

Name

Site Balance

Digital Temperature Meter

Heated Probe (3) -

CAT 3.97

Oven Box (1)

-Oven Box (2)

-

Equipment I.D.Digital Manometer (1)Horiba PG-250

Bioaerosols Temperature Logger -Electronic Refrigerator -

-

Oxides of Nitrogen (as NO₂)Oxygen

CAT-TP-21Water Vapour

EN 14789

EN 14790

EN 16911-1 (MID) CAT-TP-41Velocity & Vol. Flow RateCAT-TP-21

CAT 17.24

Technical ProcedureStandard

Single Channel Heater Controller

Parameter

-SELECT Logger 2 -

Dual Channel Heater Controller

Tubes Kit Thermocouple -

20m Heated Line (2)-500g / 1Kg Check Weights CAT 17.24

Last Impinger Arm -Callipers

-

METHODS & TECHNICAL PROCEDURES USED

SELECT Logger 1Mass View (2)Site Balance

CAT 20.71Laboratory Balance

CAT-TP-05EN 14792

Tape Measure CAT 16.35-

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 11 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 39 of 54

General Stack Details

Stack Gas Composition & Molecular Weights

CO₂ (Estimated)

O₂

Moisture (H₂O)

Where: p = M / 22.41

Stack Diameter / Depth, D

PRELIMINARY STACK SURVEY: CALCULATIONS

APPENDIX 2

Stack Area, A

0.1000

MassComponent

°C

Average Stack Static Pressure, Pstatic

-

7.3

Molar Conc

Value

1.20

102.1

Average Stack Gas Temperature, Ta

-0.069

Units

Pa

Fraction Density

Dry

0.13007

2.77 32.00

Conc

1.13

-

mStack Width, W

Stack Details (from Traverse)

Average Pitot Tube Calibration Coefficient, Cp

ppm kg/m³

Average Stack Gas Pressure

Conc Conc

MWet

r% v/v

16.1887.23

8.38

kg/m³

100.2

Average Barometric Pressure, Pb

m

0.8723 28.01

1.9635

-

Volume

kPakPa

0.84

-

-1.2498

44.01

-0.0277

18.021.0903073.12N₂

1.4277 0.03948-0.19635

0.1618

2.32

0.8037

10.00

p pi% v/v

Where: p = M / 22.41

pi = r x p

Calculation of Stack Gas Densities

Where: P STD = sum of component concentrations, kg/m³ (not including water vapour)

P STW = sum of all wet concentrations / 100 x density, kg/m³ (including water vapour)

P Actual = P STD x (TSTP / (PSTP)) x ((Pstatic + Pb) / Ta)

P ActualW (at each sampling point) = P STW x (Ts / Ps) x (Pa / Ta)

Calculation of Stack Gas Volumetric Flowrate, Q

Dry Density (STP), P STD

8448

kg/m³

m³/hrGas Volumetric Flowrate (Actual)

ResultGas Volumetric Flowrate (from Traverse)

16.18

kg/m³

m³/hr

Total Pressure

Average Wet Density (Actual), P ActualW

Units Actual

2.8

kg/m³

101.3

Result

3.0

m³/hr

REF ¹

Oxygen (Dry)

0.915

Dry Density (Actual), P Actual

m³/hrGas Volumetric Flowrate (STP, Dry)

Determinand

1.326

100.2102.0

Gas Volumetric Flowrate REF ¹

Temperature

%

Units

Gas Volumetric Flowrate (STP, Wet)

MoisturekPa%

°C

kg/m³ 1.242

Duct gas flow conditions

994913504

0.977

Wet Density (STP), P STW

8339

-0.0

0.00

Units

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 12 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 40 of 54

Parameter Parameter

Date of Survey Initial Pitot Leak CheckTime of Survey Final Pitot Leak CheckAtmospheric Pressure Orientation of DuctAverage Stack Static Pressure Pitot Tube, Cp

Result of Pitot Stagnation Test Number of Lines AvailableAre Water Droplets Present? Number of Lines UsedDevice Used

0.915

27/09/2017

ValueUnits

0.84

S-Type Pitot with KIMO MP 200 (500Pa)

102.1

-

Wet Density

Pa

DepthPoint

100.2

Mean

0.30

100.23

100.2

3.24

3.46

-

Traverse

1-

-Swirl

No

Units

APPENDIX 2

kg/m³ -

Pass

PRELIMINARY STACK SURVEY: VELOCITY TRAVERSE TO EN 16911-1 (MID)

Pass

-

-

(1 of 1)

1

Value

∆P --

-69 -

--°-

Horizontal

Pass

m/sPa

0.915

m -°C-68.9

0.08

0.915

Velocity

STATIC (Units: Pa)

4

-0.915

7.92

1.12

100.2

100.20.906.8

11:30 - 11:40

Sampling Line A

kPa

-

-

-

-

-

-

0.9153.35 -7.4

1

-3.21

3.32

-

-

-

6.9

7.3 -

Temp

-

- - -- - -

-

-

-

-

-

-

--

-

-

-

-

- --

- -

-

-

-

-

--

-

--

-

-

-

- -

-

-

-

-

- --

----

-

-

---

-

- --

-

-

--

--------

-

---

--

--

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 13 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 41 of 54

2.318- 8.382

u(φO₂,d) 0.085

u(φCO₂,w) 0.270u(Tc) 1.904

1.054

PRELIMINARY STACK SURVEY: VELOCITY TRAVERSE TO EN 16911-1 (MID) - MEASUREMENT UNCERTAINTY(1 of 1)

APPENDIX 2

Standard uncertainty associated with the local velocities

u(Cf)

u(cal) 0.005

-

u(φCO₂,d) 0.306

- Static PressureStandard uncertainty associated with the density in the duct

Standard uncertainty associated with the stack temperature

-Pa

u(φH₂O) 0.826u(φO₂,w) 0.075

- φCO₂,w- Oxygen, dry- Carbon Dioxide, dry

u(fit) 0.021

Standard Uncertainty associated with the mean local dynamic pressures

- Calibration

u(M) 0.00009

0.242

- Drift- Lack of Fit

- Water Vapour- Oxygen, wet- Carbon Dioxide, wet

-

- Overall corrections to dynamic measurementsStandard uncertainty associated with the molar mass of the gas- φO₂,w

0.111

u(vi)

Ku(pc) 175.695 Pa

u(patm) 175.692u(pstat) 1.054

u(ρ) 0.00493

Standard Uncertainty on the coefficient of the Pitot Tube u(k) 0.005Pa

u(res) 0.00087u(∆pi)

- Resolution

-

Standard uncertainty associated with the absolute pressure in the duct- Atmospheric Pressure

u(drift) 0.083

Performance characteristics (Uncertainty Components) UnitsValueUncertainty

- u²(a)/a²- u²(qV,w)/q²V,w

-1149.3 m³/hr

- u²(qV,w)

Standard uncertainty associated with the local velocities

8.51

%

Pam/sStandard uncertainty associated with the mean velocity

0.00189- 343859- 586.4

Uc,rel(qV,w)

Standard uncertainty associated with the mean velocity (95% Confidence), relative

0.00053-

Uc(qV,w)

0.242u(v) 0.122

Uc(v)Standard uncertainty associated with the mean velocity (95% Confidence)Uc,rel(v) 7.21

0.239

u(vi)

m/s

- u(qV,w)Standard uncertainty associated with the volume flow rate (95% Confidence), relative %

Standard uncertainty associated with the volume flow rate (95% Confidence)

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 14 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 42 of 54

Sample Runs

General Sampling Information

Sample Runs

0.69

Concentration

MeanRun 1

±% v/v

A1-4 Boiler B

% v/v

Parameter

WATER VAPOUR: RESULTS SUMMARY

0.69

APPENDIX 2

Value

Parameter

Abbott Ireland, Cootehill

EN 14790

Uncertainty

Technical ProcedureStandard

Units

WATER VAPOUR: SAMPLING DETAILS

16.18

CAT-TP-05

16.18

Sample Runs

Where: MFC stands for Mass Flow Controller, MV stands for Mass View Flowmeter

16.18

Run 1

- MFC / MV

Sample Flow Rate0.1894

% v/v

1427.624.6Total Mass Of Water Vapour

Liquid Trap End MassLiquid Trap Start Mass

Sampling Device

0.1587

gg

Sampling Dates

5.12

13:12 - 13:41

Volume Sampled (STP, Wet)

g

1425.1

4204.0l/min

4226.1

Sampling Times

Duration

Parameter

m³mins

-

30Volume Sampled (STP, Dry)

- 27/09/2017

Units

gCalculated Water Vapour

Silica Trap End Mass

gSilica Trap Start Mass

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 15 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 43 of 54

Sample Runs

Ambient Temperature Recorded?

Test Conditions

No

Yes

Units Run 1

Run 1

Units Run 1

-

Units

20.0

Water Droplets

Yes-

MU Acceptable % Yes

Less than 50% Faded %

Measurement Uncertainty

Silica Gel

l/min5.1

Measurement Uncertainty (MU) %

Run 1

Mean Sampling Rate

l/min 0.05

Are Water Droplets Present

Leak Test Results Units

Units Run 1

APPENDIX 2

WATER VAPOUR: QUALITY ASSURANCE

4.3

Leak Test Acceptable

-

%

Allowable Leak Rate

l/min

l/min

Pre-Sampling Leak Rate 0.05

0.10Yes

Post-Sampling Leak Rate

Allowable MU

Method Deviations

1

x

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

Ambient Temperature Recorded?

There are no deviations associated with the sampling employed.

Nature of Deviation

Yes-

Run Number(x = deviation applies to the associated run)

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 16 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 44 of 54

Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak

Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak

Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak

Sensitivity Coefficient

Vm

Measured Quantities

Run 1

Rw

Rb

L 0.09

Units

0.12

Measured Quantities

%

Units

Run 1

≤2%

uRw

uRb

0.10Rw

Symbol

Requirement of Standard

Uncertainty in Measurement Units

APPENDIX 2

Rb

0.0032

Run 1

0.41No RequirementNo Requirement

0.50

2.00

24.60

0.98

Run 1

Units

uVm

Symbol

≤2%

0.98

Run 1Standard uncertainty

L

%

g

%

-

% v/vg

Uncertainty in Result

0.6624.60

Vm

0.66

Symbol

WATER VAPOUR: MEASUREMENT UNCERTAINTY CALCULATIONS

ValueMeasured Quantities

101.95

0.1587

24.60

g

1.00

Uncertainty as a Percentage

%

24.60 g%

0.1587

Sampled Volume (STP)Repeatability of WeighingReading of BalanceLeak

Combined uncertainty

Expanded uncertainty (95% confidence)Expanded uncertainty (95% confidence), estimated with Method DeviationsUncertainty if Water Droplets are presentReported Uncertainty

Expanded uncertainty (95% confidence)Expanded uncertainty (95% confidence), estimated with Method DeviationsUncertainty if Water Droplets are presentReported Uncertainty 4.3%

N/A

% v/v 0.69

Units Run 1

4.3

Parameter

% v/v

% v/v% v/v 0.066

Run 1

0.081

0.324

Uncertainty in ResultMeasured Quantities

Units

% v/v 0.091

0.69

% v/v 0.35

%%

% v/v

% v/v% v/v N/A

0.69

%

4.3

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 17 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 45 of 54

Sample Runs

- -

- -

- -

- -

- -

General Sampling Information

OXIDES OF NITROGEN (as NO₂): RESULTS SUMMARY

Value

APPENDIX 2

Run 1

EN 14792

0.1µm Glass Fibre

Uncertainty

Heated Head Filter UsedFiltration Type / Size

CAT-TP-21

g/hr 573.8

67.91

Uncertainty ±mg/m³

Concentration mg/m³

Abbott Ireland, Cootehill

Yes

A1-4 Boiler B

Parameter Units Mean

78.378.3±g/hr

Parameter

573.8

67.91

Stainless Steel

Mass Emission

7.24

Probe Material

180°C

Technical Procedure

Heated Line Temperature

7.24

Standard

NOTE: Dilution performed to achieve correct span value

FORMAT: Number Used / Number Required

FORMAT: Number Used / Number Required

Reference Conditions

Reference Conditions are: 273K, 101.3kPa, dry gas, 3% oxygen.

Span Gas Type Nitrogen Monoxide

13/07/2019

04/04/2017 - 96.2%

400.3

Number of Sampling Lines Used 1 / 1Number of Sampling Points Used

Span Gas Start Pressure (bar) 160Gas Cylinder Concentration (ppm)Span Gas Uncertainty (%)

Sample Point I.D.'s

1 / 1

2

A1

Span Gas Reference Number CYL 12.0092Span Gas Expiry Date

180°C

Zero Gas Type Nitrogen (5 Grade)

Heated Line TemperatureDate & Result of Last Converter Check

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 18 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 46 of 54

Graphical Trend of Data

APPENDIX 2

OXIDES OF NITROGEN (as NO₂): DATA TREND

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

13:1

2

13:1

3

13:1

4

13:1

5

13:1

6

13:1

7

13:1

8

13:1

9

13:2

0

13:2

1

13:2

2

13:2

3

13:2

4

13:2

5

13:2

6

13:2

7

13:2

8

13:2

9

13:3

0

13:3

1

13:3

2

13:3

3

13:3

4

13:3

5

13:3

6

13:3

7

13:3

8

13:3

9

13:4

0

13:4

1

Conc

entr

atio

n (m

g/m

³)

Oxides of Nitrogen (as NO₂) At Reference Conditions

- Run 1

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 19 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 47 of 54

Sampling Details

Quality Assurance

Zero Drift 0 0 0

Zero Drift 0 0 0

Zero Drift 0 0 0

Instrument Range

Zero Down Sampling Line (Pre) ppm

ppm

Average Temperature °C 1.3

Sampling Times - 13:12 - 13:41

Units

APPENDIX 2

OXIDES OF NITROGEN (as NO₂): SAMPLING DETAILS & QUALITY ASSURANCE

Parameter

100.0

Run 1

Zero Down Sampling Line (Post)Zero Down Sampling Line (Pre)

Span Gas Value ppm

Run 1

4.0< °C

ppm 0.80

ppm

- 27/09/2017Sampling Dates250

- YesTemperature Acceptable

ppm 0.50

Allowable Temperature

0.30

Zero Drift Units

CAL

3CA

L 1

CAL

2

ppm

Run 1

Zero Down Sampling Line (Post) ppm

Zero Down Sampling Line (Post)

ppm

Units

Zero Down Sampling Line (Pre)ppm

ppm

Conditioning Unit Temperature

Zero Drift 0 0 0

Span Drift 0 0 0

Span Drift 0 0 0

Span Drift 0 0 0

Method Deviations

1

x

- - -

- - -

- - -

°C

ppm5.00

Span Drift Acceptable - Yes

Span Down Sampling Line (Post)

ppm

Span Down Sampling Line (Pre) ppm

(x = deviation applies to the associated run)

There are no deviations associated with the sampling employed.

15

Allowable Zero Drift

Units Run 1

CAL

1

± ppm 5.00

Run Ambient Temperature Range

Span Down Sampling Line (Pre) ppm 99.70

ppm

ppm

-

Span Drift

Allowable Span Drift

Test Conditions

Units

CAL

3CA

L 2

Span Down Sampling Line (Post)

Span Down Sampling Line (Post) ppm 102.80ppm 3.10

ppm

Nature of Deviation

ppm

Yes

Span Down Sampling Line (Pre)

Run 1

± ppm

Zero Drift Acceptable

Run Number

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 20 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 48 of 54

0.40

% of full scale

0.60

Performance characteristics RUN 1

Range Used

Lower of [A] or [B]

Converter efficiency

Number of readings in measurement 30 -Repeatability at zero 0.40 % full scale

Ration NO / NO₂Measured concentrationTGN M2 Allowable MULimit value

Cal gas conc. 100.0 ppmConversion 2.05 ppm to mg/m³MCERTS Range [B] 125.0 mg/m³

seconds

%68.80

mg/m³250.0

UnitsResponse time 60

mg/m³ (REF)10.0

200.0

mg/m³

OXIDES OF NITROGEN (as NO₂): MEASUREMENT UNCERTAINTY CALCULATIONS

mg/m³ (STP, dry)5 %

125.0

ppmRange Used [A] 513.1

% full scaleDeviation from linearity 0.34

Span drift 0.00

% full scale/10V96.2 %

% range

Losses in the line (leak)

% full scale

Atmospheric pressure dependence 0.30 % of value/kPaAmbient temperature dependence 0.18 % full scale/10K

% full scaleVolume or pressure flow dependence 0.40

Dependence on voltage

% of value0.30

mg/m³Cal gas conc. 205.2

Performance characteristics RUN 1

% of valueZero drift 0.50

Repeatability at span level

Combined interference

0.40

APPENDIX 2

Units

k =

Expanded uncertainty (no O₂) - at 95% Confidence 3.79

% at ELVResult of Compliance with Uncertainty Requirement in M2 N/A -

RUN 1

use rep at span

% of value

mg/m³ (REF)

mg/m³0.08

mg/m³

Uncertainty corrected to std conds. (O₂) 2.57

0.25 mg/m³Drift

10.0

mg/m³

UnitsExpanded uncertainty (with O₂) - at 95% Confidence 10.66

0.79

mg/m³Dependence on voltage

mg/m³

Result of Compliance with Uncertainty Requirement in M2

mg/m³

RUN 1

% of Value

Expanded uncertainty (with O₂) - at 95% Confidence

0.59

Losses in the line (leak)

UnitsStandard deviation of repeatability at zero

Expanded uncertainty (no O₂) - at 95% Confidence 1.30

% at ELV

Overall Allowable uncertainty (with O₂) - at 95% Confidence 14.1 % at ELV

0.07

RUN 1

2.61

Uncertainty of calibration gas

Units% of Value

mg/m³Standard deviation of repeatability at span level

UnitsMeasurement uncertainty Result 68.80

% at ELV

Overall Allowable uncertainty (no O₂) - at 95% Confidence

mg/m³

% of value% of value

0.30

mg/m³Combined uncertainty 1.33

mg/m³Atmospheric pressure dependence 0.11 mg/m³

mg/m³Lack of fit

Uncertainty of calibration gas 2.00

Performance characteristic RUN 1

0.03 mg/m³Combined interference (from MCERTS Certificate) 0.43

Requirement for SRM is that Uncertainty should be <10% of the value at the ELV, on a dry gas basis, or if O₂ correction is applied less than 10% + the uncertainty associated with the O₂ correction (using sqrt of sum squares to add uncertainty components). Ref EA TGN M2.

Ambient temperature dependence

mg/m³Converter efficiencyLosses in the line (leak) 0.12

COMPLIANT -

mg/m³

Volume or pressure flow dependence 0.00

Expanded uncertainty 1.96

Uncertainty of calibration gas blending 0.56

0.05

10.05

Uncertainty of calibration gas blending 1.40

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 21 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 49 of 54

Sample Runs

- -

- -

- -

General Sampling Information

Span Gas Type Synthetic Air (5 Grade)Span Gas Reference Number

Units Run 1

Value

Standard

Mean

180°C

Parameter

Heated Head Filter Used YesHeated Line Temperature

CYL 11.0268

EN 14789Technical Procedure CAT-TP-21

Probe Material Stainless Steel

Uncertainty ±% v/v 0.28 0.28

A1-4 Boiler BAbbott Ireland, Cootehill

Filtration Type / Size

Parameter

Span Gas Expiry Date 07/12/2021

OXYGEN: RESULTS SUMMARY

APPENDIX 2

Concentration % v/v 2.77 2.77

0.1µm Glass Fibre

NOTE: Dilution performed to achieve correct span value

FORMAT: Number Used / Number Required

FORMAT: Number Used / Number RequiredNumber of Sampling Points Used 1 / 1

Sample Point I.D.'s

Nitrogen (5 Grade)

A1

Span Gas Uncertainty (%) 2

Span Gas Expiry Date 07/12/2021Span Gas Start Pressure (bar) 80Gas Cylinder Concentration (% v/v) 20.49

Number of Sampling Lines Used 1 / 1

Zero Gas Type

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 22 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 50 of 54

Graphical Trend of Data

OXYGEN: DATA TREND

APPENDIX 2

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

13:1

2

13:1

3

13:1

4

13:1

5

13:1

6

13:1

7

13:1

8

13:1

9

13:2

0

13:2

1

13:2

2

13:2

3

13:2

4

13:2

5

13:2

6

13:2

7

13:2

8

13:2

9

13:3

0

13:3

1

13:3

2

13:3

3

13:3

4

13:3

5

13:3

6

13:3

7

13:3

8

13:3

9

13:4

0

13:4

1

Conc

entr

atio

n (%

v/v

)

Oxygen Oxygen

- Run 1

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 23 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 51 of 54

Sampling Details

Quality Assurance

Zero Drift 0 0 0

Zero Drift 0 0 0

Zero Drift 0 0 0

Zero Down Sampling Line (Pre) % v/v

Span Gas Value

Sampling Times

Average Temperature

Zero Down Sampling Line (Post)

% v/v

Allowable Temperature < °C

0.06Zero Down Sampling Line (Post) % v/v 0.09

13:12 - 13:41

Parameter Units Run 1

Instrument Range

CAL

3

4.0

0.03

Zero Down Sampling Line (Pre) % v/v

CAL

1 Zero Down Sampling Line (Pre) % v/v

% v/v

Zero Down Sampling Line (Post)

% v/v

Units Run 1

% v/v

Sampling Dates - 27/09/2017-

Conditioning Unit Temperature Units Run 1

°C

% v/v 5.00

APPENDIX 2

OXYGEN: SAMPLING DETAILS & QUALITY ASSURANCE

1.3

Temperature Acceptable - Yes

CAL

2

% v/v

% v/v 25

Zero Drift

Zero Drift 0 0 0

Span Drift 0 0 0

Span Drift 0 0 0

Span Drift 0 0 0

Method Deviations

1

x

- - -

- - -

- - -

Span Drift Acceptable - Yes

% v/v

% v/v

Zero Drift Acceptable

Run 1

Run 1

Run Ambient Temperature Range °C 15

Span Down Sampling Line (Post) % v/v

Allowable Span Drift ± % v/v 0.25

CAL

3

% v/v

Yes

Run Number

(x = deviation applies to the associated run)

There are no deviations associated with the sampling employed.

% v/v

CAL

3

-

Nature of Deviation

Span Drift Units

Span Down Sampling Line (Pre) % v/vSpan Down Sampling Line (Post) % v/v

5.02

Test Conditions Units

% v/v -0.13

Allowable Zero Drift ± % v/v

% v/v4.89

Span Down Sampling Line (Pre)

0.25

CAL

2 Span Down Sampling Line (Pre) % v/vSpan Down Sampling Line (Post)

CAL

1

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 24 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 52 of 54

% rangeDependence on voltage 0.02 % full scale/10VLosses in the line (leak) 0.00

-0.07 % full scale/10KAtmospheric pressure dependence 0.30 % of value/kPaAmbient temperature dependence

Volume or pressure flow dependence 0.20 % of full scale

Standard deviation of repeatability at zero use rep at span %volStandard deviation of repeatability at span level 0.01 %volLack of fit 0.01 %volDrift 0.07

% of valueUncertainty of calibration gas 2.00

Combined interference 0.56

%vol

Performance characteristics RUN 1 UnitsResponse time 60 seconds

N/A

-Repeatability at zero 0.04

%vol6.0 %

%volVolume or pressure flow dependence 0.00 %vol

0.00 % full scale

2.77 %volRange Used 25.0 %volCal gas conc. 20.5

% of value

Performance characteristic RUN 1 Units

0.05 % of valueZero drift 0.60

Number of readings in measurement 30

RUN 1 Units

Measured concentrationTGN M2 Allowable MULimit value

Span drift

Performance characteristics

% full scaleRepeatability at span level 0.04 % full scaleDeviation from linearity

% full scale

APPENDIX 2

OXYGEN: MEASUREMENT UNCERTAINTY CALCULATIONS

k =

Units

0.02Ambient temperature dependence -0.01 %vol

UnitsMeasurement uncertainty Result 2.77 %volCombined uncertainty 0.14 %vol

Result of Compliance with Uncertainty Requirement in M2Expanded uncertainty (no O₂) - at 95% Confidence 9.97 % of Value

Expanded uncertainty 1.96 0.28 %vol

RUN 1

%volLosses in the line (leak) 0.00

Volume or pressure flow dependence 0.00 %volAtmospheric pressure dependence %vol

COMPLIANT -

Requirement for SRM is that Uncertainty should be 0.5%vol absolute or 6% relative whichever is the lower, on a dry gas basis. Ref EA TGN M2.

Combined interference (from MCERTS Certificate) 0.08 %volDependence on voltage 0.00

%volUncertainty of calibration gas 0.03 %vol

RUN 1

Abbott IrelandCootehillA1-4 Boiler B

CAT-RT (Version BR)Page 25 of 25

Job Number: CDU-0903, Version 1Sample Date/s: 27th September 2017

Industrial Emissions Licence: PO687-02

Site Visit Report - SV10474 - Abbott Ireland Page 53 of 54

Summary

See report.

FOLLOW-UP ACTIONS

You are required to complete the instructions and actions, as outlined in this report, within the specified timeframe.  Where required, you shall respond to actions specified in Compliance Investigations within the required timeframe.The licensee shall maintain documentary evidence, for review by the EPA, that the prescribed corrective actions were completed within the required timeframe.

(i)            Compliance Investigations

You are not required to respond directly to items contained in this EPA site visit report; where an issue requires a direct response, the EPA will generate a Compliance Investigation through the EDEN system. You will receive notification when a Compliance Investigation instruction or action is generated. 

(ii)           Publication of reports and licensee response.

Please note that this Site Visit Report will be made available for public viewing via the EPA’s Licence Enforcement Access Portal within one day of the issue date and will be published on the Licence Details Page of the EPA’s website, www.epa.ie, that relates to your licence 60 calendar days after the issue date.

You may if you choose submit, within 45 calendar days of the issue date of this Site Visit Report, a Licensee Public Response that will be published alongside the Site Visit Report. This Response, should you wish to avail of it, provides you with an opportunity to inform the public about how you are implementing the actions set out in the report, activities underway, timescales and target completion dates. Please be aware that the content of your Licensee Public Response must be factual and should not breach the EPAs stated online publication standards.

If you wish to submit a Licensee Public Response to an EPA Site Visit Report, you should do this by clicking on the ‘Make a Response’ link on the Site Visits page in EDEN. A .pdf document containing your response can be attached and submitted from here. 

(iii)          Response to Site visit report

Where you do wish to respond directly to a site visit report, you should do this by generating a ‘Licensee Return’ of the type ‘Site Updates/Notifications’ and the sub-type ‘Response to EPA Report’ in EDEN. 

Please note that you are required to comply with the conditions of your licence at all times, and where noncompliance occurs you must restore compliance within the shortest possible time. These actions will be verified during subsequent EPA visits.

Please quote the above Inspection Reference Number in any future correspondence in relation to this Report.

Site Visit Report - SV10474 - Abbott Ireland Page 54 of 54