Site Restoration Ron Gilius. Well Site Restoration Report. Filed within 60 days after Site Restoration OG-00075. Section A – Operator and Well Information. Section B – Land Application of Tophole Water. Date of Application Volume Discharged pH and Specific Conductance. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Site Restoration Ron Gilius](https://reader035.vdocuments.us/reader035/viewer/2022062521/56816802550346895ddd8148/html5/thumbnails/1.jpg)
Site Restoration
Ron Gilius
![Page 2: Site Restoration Ron Gilius](https://reader035.vdocuments.us/reader035/viewer/2022062521/56816802550346895ddd8148/html5/thumbnails/2.jpg)
Well Site Restoration Report
Filed within 60 daysafter
Site Restoration
OG-00075
![Page 3: Site Restoration Ron Gilius](https://reader035.vdocuments.us/reader035/viewer/2022062521/56816802550346895ddd8148/html5/thumbnails/3.jpg)
Section A – Operator and Well Information
Section B – Land Application of Tophole Water
• Date of Application• Volume Discharged• pH and Specific Conductance
![Page 4: Site Restoration Ron Gilius](https://reader035.vdocuments.us/reader035/viewer/2022062521/56816802550346895ddd8148/html5/thumbnails/4.jpg)
• Residual Waste – Off-Site Disposal• Type of waste • Amount of Waste• Receiving Facility
NamePermit #
• Name and Address of Hauler
Section C – Off-Site Waste Disposal
![Page 5: Site Restoration Ron Gilius](https://reader035.vdocuments.us/reader035/viewer/2022062521/56816802550346895ddd8148/html5/thumbnails/5.jpg)
Section D – On-Site Disposal – Drill Cuttings or Waste
• Locate the Center in degrees and the distance from the well head• Type of materials
Drill Cuttings above the casing seatDrill Cuttings below the casing seatCement ReturnsDrilling mudsFrac sandsOther
![Page 6: Site Restoration Ron Gilius](https://reader035.vdocuments.us/reader035/viewer/2022062521/56816802550346895ddd8148/html5/thumbnails/6.jpg)
Section E - Site Restoration
• Earth Disturbance Activities Complete- Site Restoration Complete- Stormwater BMPS- Permanent Stabilization
![Page 7: Site Restoration Ron Gilius](https://reader035.vdocuments.us/reader035/viewer/2022062521/56816802550346895ddd8148/html5/thumbnails/7.jpg)
Section F - Pit Disposal
• Pit Dimensions• Procedures to Close Pit• Material and Thickness of subbase and Pit liner• Liner Manufacturer
![Page 8: Site Restoration Ron Gilius](https://reader035.vdocuments.us/reader035/viewer/2022062521/56816802550346895ddd8148/html5/thumbnails/8.jpg)
Section G – Land Application
• Length and Width of Application Area• Ratio of Waste to Soil (not to exceed 1:1)• Chemical Analysis If Requested
(Oil and Gas Operator’s Manual)
![Page 9: Site Restoration Ron Gilius](https://reader035.vdocuments.us/reader035/viewer/2022062521/56816802550346895ddd8148/html5/thumbnails/9.jpg)
Skidding the Rig??
Joe Umholtz, Chief,Division of Resource Management & Well DevelopmentDepartment of Environmental ProtectionRachel Carson State Office Building400 Market Street | Harrisburg, PA 17101Phone: 717.772.2199 | Fax: 717.772.2291www.depweb.state.pa.us