site plans - somerset, massachusetts

12
SITE Feet 0 1000 2000 \\VHB\GBL\PROJ\BOSTON\14483.00 BRAYTON PT\CAD\LD\PLANSET\14483.00 COV 25 August 2020 Owner VHB Project : vhb.com Site Plans Issued for Date Issued Latest Issue Issued for : Brayton Point, LLC 1515 Des Peres Road Suite 300 St. Louis, MO 63131 Applicant Brayton Point, LLC 1515 Des Peres Road Suite 300 St. Louis, MO 63131 Assessor's Map: A2 Parcel ID: 273002A000000020 1 Cedar Street Suite 400 Providence, RI 02903 401.272.8100 Brayton Point Commerce Center Brayton Point Road Somerset, Massachusetts Local Approval August 21, 2020 August 21, 2020 14483.00 Brayton Point Commerce Center Local Approval 08/21/2020 Sheet Index No. Drawing Title Latest Issue C1.01 Legend and General Notes August 21, 2020 C2.01 Key Plan August 21, 2020 C3.01 Site Plan - Area 3A August 21, 2020 C3.02 Site Plan - Area 4 August 21, 2020 C3.03 Site Plan - Area 9A August 21, 2020 C3.04 Erosion and Sediment Control Site Plan - Area 9A August 21, 2020 C3.05 Site Plan - Area 11 August 21, 2020 C3.06 Site Plan - Area 12 August 21, 2020 C4.01 Site Details 1 August 21, 2020 C4.02 Site Details 2 August 21, 2020 C4.03 Site Details 3 August 21, 2020 Reference Drawings (Under Separate Cover) No. Drawing Title Latest Issue C-1 Existing Conditions Plan November 12, 2018 1 to 9 Brayton Point, LLC Site Plans by Sitec, Inc. February 21, 2020 Assessor's Map: A14 Parcel ID: 273014A000000240, 273014A000000260, 273014A000000250

Upload: others

Post on 19-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

SITE

Feet0 1000 2000

\\V

HB

\G

BL\P

RO

J\B

OSTO

N\14483.00 B

RA

YTO

N P

T\C

AD

\LD

\P

LA

NSET\14483.00 C

OV

25 A

ug

ust 2020

Owner

VH

B P

ro

ject :

vh

b.co

m

Site Plans

Issued for

Date Issued

Latest Issue

Issu

ed

fo

r :

Brayton Point, LLC

1515 Des Peres Road

Suite 300

St. Louis, MO 63131

Applicant

Brayton Point, LLC

1515 Des Peres Road

Suite 300

St. Louis, MO 63131

Assessor's Map: A2

Parcel ID: 273002A000000020

1 Cedar Street

Suite 400

Providence, RI 02903

401.272.8100

Brayton Point

Commerce Center

Brayton Point Road

Somerset, Massachusetts

Local Approval

August 21, 2020

August 21, 2020

14

48

3.0

0 B

rayto

n P

oin

t C

om

merce C

en

ter

Lo

cal A

pp

ro

val 0

8/2

1/2

02

0

Sheet Index

No.Drawing Title

Latest Issue

C1.01Legend and General Notes August 21, 2020

C2.01Key Plan August 21, 2020

C3.01 Site Plan - Area 3AAugust 21, 2020

C3.02 Site Plan - Area 4August 21, 2020

C3.03 Site Plan - Area 9AAugust 21, 2020

C3.04 Erosion and Sediment Control Site Plan -

Area 9A

August 21, 2020

C3.05 Site Plan - Area 11August 21, 2020

C3.06 Site Plan - Area 12August 21, 2020

C4.01 Site Details 1August 21, 2020

C4.02 Site Details 2August 21, 2020

C4.03 Site Details 3August 21, 2020

Reference Drawings (Under Separate Cover)

No.Drawing Title

Latest Issue

C-1Existing Conditions Plan November 12, 2018

1 to 9

Brayton Point, LLC

Site Plans by Sitec, Inc.

February 21, 2020

Assessor's Map: A14

Parcel ID: 273014A000000240,

273014A000000260,

273014A000000250

wstvincent
Snapshot

SIAMESE CONNECTION

ACCESSIBLE CURB RAMP

ACCESSIBLE PARKING

VAN-ACCESSIBLE PARKING

COMPACT PARKING STALLS

DOUBLE YELLOW LINE

STOP LINE

CROSSWALK

PARKING COUNT

MAJOR CONTOUR

MINOR CONTOUR

STREAM / POND / WATER COURSE

HAY BALES

SILT FENCE

DETENTION BASIN

RETAINING WALL

STOCKADE FENCE

STONE WALL

FENCE

TREE LINE

WIRE FENCE

PATH

WOOD GUARDRAIL

STEEL GUARDRAIL

GUY WIRE & ANCHOR

MATCHLINE

GUY POLE

HAND HOLE

PULL BOX

ELECTRIC MANHOLE

POST INDICATOR VALVE

TRANSFORMER PAD

TELEPHONE MANHOLE

UTILITY POLE

LIGHT POLE

ELECTRIC METER

WATER WELL

GAS GATE

GAS METER

FIRE HYDRANT

WATER METER

EXTRUDED CONCRETE CURB

BUILDING ENTRANCE

BOLLARD

DOUBLE SIGN

DUMPSTER PAD

SIGN

BUILDING

LOADING DOCK

MONOLITHIC CONCRETE CURB

PRECAST CONC. CURB

LIMIT OF CURB TYPE

SLOPED GRAN. EDGING

SAWCUT

VERT. GRAN. CURB

EDGE OF PAVEMENT

BITUMINOUS CURB

CURB AND GUTTER

CONCRETE CURB

GRAVEL ROAD

BITUMINOUS BERM

WETLAND LINE WITH FLAG

MEAN HIGH WATER

STORM FLOWAGE

LIMIT OF DISTURBANCE

WETLAND BUFFER ZONE

NO DISTURB ZONE

FLOODPLAIN

Prop.

RIGHT-OF-WAY/PROPERTY LINE

CONSTRUCTION LAYOUT

TOWN LINE

ZONING LINE

BASELINE

BUILDING SETBACK

EASEMENT

PROJECT LIMIT LINE

PROPERTY LINE

DOUBLE CATCH BASIN CONCENTRIC

SEWER MANHOLE CONCENTRIC

FLARED END SECTION

CURB STOP & BOX

TAPPING SLEEVE, VALVE & BOX

WATER VALVE & BOX

HEADWALL

DRAIN MANHOLE CONCENTRIC

PLUG OR CAP

TRENCH DRAIN

CLEANOUT

CATCH BASIN CONCENTRIC

GUTTER INLET

MONITORING WELL

DOMESTIC WATER

FIRE PROTECTION

ELECTRIC

CABLE TV

FIRE ALARM

TELEPHONE

GAS

ROOF DRAIN

SEWER

OVERHEAD WIRE

WATER

DRAIN

UNDERDRAIN

CONSTRUCTION EXIT

HEAVY DUTY PAVEMENT

CONCRETE

TOP & BOTTOM OF WALL ELEVATION

TOP OF CURB ELEVATION

BORING LOCATION

TEST PIT LOCATION

BOTTOM OF CURB ELEVATION

SPOT ELEVATION

Prop.

RIPRAP

STEAM

FORCE MAIN

ABAN ABANDON

ACR ACCESSIBLE CURB RAMP

ADJ ADJUST

APPROX APPROXIMATE

BIT BITUMINOUS

BS BOTTOM OF SLOPE

BWLL BROKEN WHITE LANE LINE

CONC CONCRETE

DYCL DOUBLE YELLOW CENTER LINE

EL ELEVATION

ELEV ELEVATION

EX EXISTING

FDN FOUNDATION

FFE FIRST FLOOR ELEVATION

GRAN GRANITE

GTD GRADE TO DRAIN

LA LANDSCAPE AREA

LOD LIMIT OF DISTURBANCE

MAX MAXIMUM

MIN MINIMUM

NIC NOT IN CONTRACT

NTS NOT TO SCALE

PERF PERFORATED

PROP PROPOSED

REM REMOVE

RET RETAIN

R&D REMOVE AND DISPOSE

R&R REMOVE AND RESET

SWEL SOLID WHITE EDGE LINE

SWLL SOLID WHITE LANE LINE

TS TOP OF SLOPE

TYP TYPICAL

CB CATCH BASIN

CMP CORRUGATED METAL PIPE

CO CLEANOUT

DCB DOUBLE CATCH BASIN

DMH DRAIN MANHOLE

CIP CAST IRON PIPE

COND CONDUIT

DIP DUCTILE IRON PIPE

FES FLARED END SECTION

FM FORCE MAIN

F&G FRAME AND GRATE

F&C FRAME AND COVER

GI GUTTER INLET

GT GREASE TRAP

HDPE HIGH DENSITY POLYETHYLENE PIPE

HH HANDHOLE

HW HEADWALL

HYD HYDRANT

INV INVERT ELEVATION

I= INVERT ELEVATION

LP LIGHT POLE

MES METAL END SECTION

PIV POST INDICATOR VALVE

PWW PAVED WATER WAY

PVC POLYVINYLCHLORIDE PIPE

RCP REINFORCED CONCRETE PIPE

R= RIM ELEVATION

RIM= RIM ELEVATION

SMH SEWER MANHOLE

TSV TAPPING SLEEVE, VALVE AND BOX

UG UNDERGROUND

UP UTILITY POLE

WQU WATER QUALITY UNIT

PARKING SETBACK

SILT SOCK / STRAW WATTLE

LegendAbbreviations

General

Utility

LAND SUBJECT TO COASTAL

BUILDINGS

DRAIN MANHOLE ECCENTRIC

SEWER MANHOLE ECCENTRIC

DOUBLE CATCH BASIN ECCENTRIC

CATCH BASIN ECCENTRIC

General

1. CONTRACTOR SHALL NOTIFY "DIG-SAFE" (1-888-344-7233) AT LEAST 72 HOURS BEFORE EXCAVATING.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES

SHALL BE IN ACCORDANCE WITH OSHA STANDARDS AND LOCAL REQUIREMENTS.

3. ACCESSIBLE ROUTES, PARKING SPACES, RAMPS, SIDEWALKS AND WALKWAYS SHALL BE CONSTRUCTED

IN CONFORMANCE WITH THE FEDERAL AMERICANS WITH DISABILITIES ACT AND WITH STATE AND

LOCAL LAWS AND REGULATIONS (WHICHEVER ARE MORE STRINGENT).

4. AREAS DISTURBED DURING CONSTRUCTION AND NOT RESTORED WITH IMPERVIOUS SURFACES

(BUILDINGS, PAVEMENTS, WALKS, ETC.) SHALL RECEIVE 4 INCHES LOAM AND SEED.

5. UPON AWARD OF CONTRACT, CONTRACTOR SHALL MAKE NECESSARY CONSTRUCTION NOTIFICATIONS

AND APPLY FOR AND OBTAIN NECESSARY PERMITS, PAY FEES, AND POST BONDS ASSOCIATED WITH

THE WORK INDICATED ON THE DRAWINGS, IN THE SPECIFICATIONS, AND IN THE CONTRACT

DOCUMENTS. DO NOT CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS, AND FIRE HYDRANTS, WITHOUT

APPROPRIATE PERMITS.

6. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS

SHALL BE RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S

EXPENSE.

7. IN THE EVENT THAT SUSPECTED CONTAMINATED SOIL, GROUNDWATER, AND OTHER MEDIA ARE

ENCOUNTERED DURING EXCAVATION AND CONSTRUCTION ACTIVITIES BASED ON VISUAL, OLFACTORY,

OR OTHER EVIDENCE, THE CONTRACTOR SHALL STOP WORK IN THE VICINITY OF THE SUSPECT

MATERIAL TO AVOID FURTHER SPREADING OF THE MATERIAL, AND SHALL NOTIFY THE OWNER

IMMEDIATELY SO THAT THE APPROPRIATE TESTING AND SUBSEQUENT ACTION CAN BE TAKEN.

8. CONTRACTOR SHALL PREVENT DUST, SEDIMENT, AND DEBRIS FROM EXITING THE SITE AND SHALL BE

RESPONSIBLE FOR CLEANUP, REPAIRS AND CORRECTIVE ACTION IF SUCH OCCURS.

9. DAMAGE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE CONTRACTOR AT NO

ADDITIONAL COST TO OWNER.

10. CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE

IMPACTS TO OFF SITE AREAS, AND SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, IF ANY, AT

NO COST TO OWNER.

11. THIS PROJECT DISTURBS MORE THAN ONE ACRE OF LAND AND FALLS WITHIN THE NPDES

CONSTRUCTION GENERAL PERMIT (CGP) PROGRAM AND EPA JURISDICTION. PRIOR TO THE START OF

CONSTRUCTION CONTRACTOR IS TO FILE A CGP NOTICE OF INTENT WITH THE EPA AND PREPARE A

STORMWATER POLLUTION PREVENTION PLAN IN ACCORDANCE WITH THE NPDES REGULATIONS.

CONTRACTOR SHALL CONFIRM THE OWNER HAS ALSO FILED A NOTICE OF INTENT WITH THE EPA.

Utilities

1. THE LOCATIONS, SIZES, AND TYPES OF EXISTING UTILITIES ARE SHOWN AS AN APPROXIMATE

REPRESENTATION ONLY. THE OWNER OR ITS REPRESENTATIVE(S) HAVE NOT INDEPENDENTLY VERIFIED

THIS INFORMATION AS SHOWN ON THE PLANS. THE UTILITY INFORMATION SHOWN DOES NOT

GUARANTEE THE ACTUAL EXISTENCE, SERVICEABILITY, OR OTHER DATA CONCERNING THE UTILITIES,

NOR DOES IT GUARANTEE AGAINST THE POSSIBILITY THAT ADDITIONAL UTILITIES MAY BE PRESENT

THAT ARE NOT SHOWN ON THE PLANS. PRIOR TO ORDERING MATERIALS AND BEGINNING

CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND DETERMINE THE EXACT LOCATIONS, SIZES, AND

ELEVATIONS OF THE POINTS OF CONNECTIONS TO EXISTING UTILITIES AND, SHALL CONFIRM THAT

THERE ARE NO INTERFERENCES WITH EXISTING UTILITIES AND THE PROPOSED UTILITY ROUTES,

INCLUDING ROUTES WITHIN THE PUBLIC RIGHTS OF WAY.

2. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, OR EXISTING

CONDITIONS DIFFER FROM THOSE SHOWN SUCH THAT THE WORK CANNOT BE COMPLETED AS

INTENDED, THE LOCATION, ELEVATION, AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED

WITHOUT DELAY BY THE CONTRACTOR, AND THE INFORMATION FURNISHED IN WRITING TO THE

OWNER'S REPRESENTATIVE FOR THE RESOLUTION OF THE CONFLICT AND CONTRACTOR'S FAILURE TO

NOTIFY PRIOR TO PERFORMING ADDITIONAL WORK RELEASES OWNER FROM OBLIGATIONS FOR

ADDITIONAL PAYMENTS WHICH OTHERWISE MAY BE WARRANTED TO RESOLVE THE CONFLICT.

3. SET CATCH BASIN RIMS, AND INVERTS OF SEWERS, DRAINS, AND DITCHES IN ACCORDANCE WITH

ELEVATIONS ON THE GRADING AND UTILITY PLANS.

4. RIM ELEVATIONS FOR DRAIN AND SEWER MANHOLES, WATER VALVE COVERS, GAS GATES, ELECTRIC

AND TELEPHONE PULL BOXES, AND MANHOLES, AND OTHER SUCH ITEMS, ARE APPROXIMATE AND

SHALL BE SET/RESET AS FOLLOWS:

A. PAVEMENTS AND CONCRETE SURFACES: FLUSH

B. ALL SURFACES ALONG ACCESSIBLE ROUTES: FLUSH

C. LANDSCAPE, LOAM AND SEED, AND OTHER EARTH SURFACE AREAS: ONE INCH ABOVE

SURROUNDING AREA AND TAPER EARTH TO THE RIM ELEVATION.

5. CONTRACTOR SHALL MAKE ARRANGEMENTS FOR AND SHALL BE RESPONSIBLE FOR PAYING FEES FOR

POLE RELOCATION AND FOR THE ALTERATION AND ADJUSTMENT OF GAS, ELECTRIC, TELEPHONE, FIRE

ALARM, AND ANY OTHER PRIVATE UTILITIES, WHETHER WORK IS PERFORMED BY CONTRACTOR OR BY

THE UTILITIES COMPANY.

6. UTILITY PIPE MATERIALS SHALL BE AS FOLLOWS, UNLESS OTHERWISE NOTED ON THE PLAN:

A. STORM DRAINAGE PIPES SHALL BE HIGH DENSITY POLYETHYLENE (HDPE)

8. ALL DRAINAGE STRUCTURE INTERIOR DIAMETERS (4' MIN.) SHALL BE DETERMINED BY THE

MANUFACTURER BASED ON THE PIPE CONFIGURATIONS SHOWN ON THESE PLANS AND LOCAL

MUNICIPAL STANDARDS. FOR MANHOLES THAT ARE 20 FEET IN DEPTH AND GREATER, THE MINIMUM

DIAMETER SHALL BE 5 FEET.

Layout and Materials

1. DIMENSIONS ARE FROM THE EDGE OF PAVEMENT, FACE OF CURB, FACE OF BUILDING, FACE OF WALL,

AND CENTER LINE OF PAVEMENT MARKINGS, UNLESS OTHERWISE NOTED.

2. PROPOSED BOUNDS AND ANY EXISTING PROPERTY LINE MONUMENTATION DISTURBED DURING

CONSTRUCTION SHALL BE SET OR RESET BY A PROFESSIONAL LAND SURVEYOR.

3. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY EXISTING PAVEMENT ELEVATIONS AT

INTERFACE WITH PROPOSED PAVEMENTS, AND EXISTING GROUND ELEVATIONS ADJACENT TO

DRAINAGE OUTLETS TO ASSURE PROPER TRANSITIONS BETWEEN EXISTING AND PROPOSED FACILITIES.

Demolition

1. CONTRACTOR SHALL REMOVE AND DISPOSE OF EXISTING MANMADE SURFACE FEATURES WITHIN THE

LIMIT OF WORK INCLUDING BUILDINGS, STRUCTURES, PAVEMENTS, SLABS, CURBING, FENCES, UTILITY

POLES, SIGNS, ETC. UNLESS INDICATED OTHERWISE ON THE DRAWINGS. REMOVE AND DISPOSE OF

EXISTING UTILITIES, FOUNDATIONS AND UNSUITABLE MATERIAL BENEATH AND FOR A DISTANCE OF 10

FEET BEYOND THE PROPOSED BUILDING FOOTPRINT INCLUDING EXTERIOR COLUMNS.

2. EXISTING UTILITIES SHALL BE TERMINATED, UNLESS OTHERWISE NOTED, IN CONFORMANCE WITH

LOCAL, STATE AND INDIVIDUAL UTILITY COMPANY STANDARD SPECIFICATIONS AND DETAILS. THE

CONTRACTOR SHALL COORDINATE UTILITY SERVICE DISCONNECTS WITH THE UTILITY

REPRESENTATIVES.

3. CONTRACTOR SHALL DISPOSE OF DEMOLITION DEBRIS IN ACCORDANCE WITH APPLICABLE FEDERAL,

STATE AND LOCAL REGULATIONS, ORDINANCES AND STATUTES.

4 THE DEMOLITION LIMITS DEPICTED IN THE PLANS IS INTENDED TO AID THE CONTRACTOR DURING THE

BIDDING AND CONSTRUCTION PROCESS AND IS NOT INTENDED TO DEPICT EACH AND EVERY ELEMENT

OF DEMOLITION. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING THE DETAILED SCOPE OF

DEMOLITION BEFORE SUBMITTING ITS BID/PROPOSAL TO PERFORM THE WORK AND SHALL MAKE NO

CLAIMS AND SEEK NO ADDITIONAL COMPENSATION FOR CHANGED CONDITIONS OR UNFORESEEN OR

LATENT SITE CONDITIONS RELATED TO ANY CONDITIONS DISCOVERED DURING EXECUTION OF THE

WORK.

5. UNLESS OTHERWISE SPECIFICALLY PROVIDED ON THE PLANS OR IN THE SPECIFICATIONS, THE ENGINEER

HAS NOT PREPARED DESIGNS FOR AND SHALL HAVE NO RESPONSIBILITY FOR THE PRESENCE,

DISCOVERY, REMOVAL, ABATEMENT OR DISPOSAL OF HAZARDOUS MATERIALS, TOXIC WASTES OR

POLLUTANTS AT THE PROJECT SITE. THE ENGINEER SHALL NOT BE RESPONSIBLE FOR ANY CLAIMS OF

LOSS, DAMAGE, EXPENSE, DELAY, INJURY OR DEATH ARISING FROM THE PRESENCE OF HAZARDOUS

MATERIAL AND CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS THE ENGINEER FROM ANY

CLAIMS MADE IN CONNECTION THEREWITH. MOREOVER, THE ENGINEER SHALL HAVE NO

ADMINISTRATIVE OBLIGATIONS OF ANY TYPE WITH REGARD TO ANY CONTRACTOR AMENDMENT

INVOLVING THE ISSUES OF PRESENCE, DISCOVERY, REMOVAL, ABATEMENT OR DISPOSAL OF ASBESTOS

OR OTHER HAZARDOUS MATERIALS.

Erosion Control

1. PRIOR TO STARTING ANY OTHER WORK ON THE SITE, THE CONTRACTOR SHALL NOTIFY APPROPRIATE

AGENCIES AND SHALL INSTALL EROSION CONTROL MEASURES AS SHOWN ON THE PLANS AND AS

IDENTIFIED IN FEDERAL, STATE, AND LOCAL APPROVAL DOCUMENTS PERTAINING TO THIS PROJECT.

2. CONTRACTOR SHALL INSPECT AND MAINTAIN EROSION CONTROL MEASURES ON A WEEKLY BASIS

(MINIMUM) OR AS REQUIRED PER THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP). THE

CONTRACTOR SHALL ADDRESS DEFICIENCIES AND MAINTENANCE ITEMS WITHIN TWENTY-FOUR HOURS

OF INSPECTION. CONTRACTOR SHALL PROPERLY DISPOSE OF SEDIMENT SUCH THAT IT DOES NOT

ENCUMBER OTHER DRAINAGE STRUCTURES AND PROTECTED AREAS.

3. CONTRACTOR SHALL BE FULLY RESPONSIBLE TO CONTROL CONSTRUCTION SUCH THAT

SEDIMENTATION SHALL NOT AFFECT REGULATORY PROTECTED AREAS, WHETHER SUCH

SEDIMENTATION IS CAUSED BY WATER, WIND, OR DIRECT DEPOSIT.

4. CONTRACTOR SHALL PERFORM CONSTRUCTION SEQUENCING SUCH THAT EARTH MATERIALS ARE

EXPOSED FOR A MINIMUM OF TIME BEFORE THEY ARE COVERED, SEEDED, OR OTHERWISE STABILIZED

TO PREVENT EROSION.

5. UPON COMPLETION OF CONSTRUCTION AND ESTABLISHMENT OF PERMANENT GROUND COVER,

CONTRACTOR SHALL REMOVE AND DISPOSE OF EROSION CONTROL MEASURES AND CLEAN SEDIMENT

AND DEBRIS FROM ENTIRE DRAINAGE AND SEWER SYSTEMS.

Existing Conditions Information

1. BASE PLAN: THE PROPERTY LINES SHOWN ARE APPROXIMATE ONLY, AND ARE BASED ON

INFORMATION PROVIDED BY MASSGIS. THE TOPOGRAPHY AND PHYSICAL FEATURES ARE BASED ON AN

ACTUAL FIELD SURVEY PERFORMED ON THE GROUND BY CIVILVIEW, INC., DURING AUGUST-OCTOBER

OF 2018.

A. WETLAND AREAS SHOWN ARE APPROXIMATE ONLY, BASED ON INFORMATION PROVIDED BY

MASSGIS.

2. TOPOGRAPHY: ELEVATIONS ARE BASED ON NAVD88.

3. LAND SUBJECT TO COAST STORM FLOWAGE (LSCSF) IS APPROXIMATE AND DRAWN FROM A AERIAL

SURVEY DATA AND FEMA FLOOD MAPS.

4. ALL WETLAND LINES INCLUDING, BUT NOT LIMITED TO, SALT MARSH, SWAMP, BARRIER BEACH, AND

COASTAL BEACH ARE APPROXIMATE AND TAKEN FROM MASSGIS DATA. EXACT BOUNDARIES TO BE

FIELD VERIFIED.

5. SHORELINE AND ALL BUFFERS ARE APPROXIMATE AND TAKEN FROM MASSGIS DATA. TOP OF COASTAL

BANK TO BE FIELD VERIFIED.

Document Use

1. THESE PLANS AND CORRESPONDING CADD DOCUMENTS ARE INSTRUMENTS OF PROFESSIONAL

SERVICE, AND SHALL NOT BE USED, IN WHOLE OR IN PART, FOR ANY PURPOSE OTHER THAN FOR

WHICH IT WAS CREATED WITHOUT THE EXPRESSED, WRITTEN CONSENT OF VHB. ANY UNAUTHORIZED

USE, REUSE, MODIFICATION OR ALTERATION, INCLUDING AUTOMATED CONVERSION OF THIS

DOCUMENT SHALL BE AT THE USER'S SOLE RISK WITHOUT LIABILITY OR LEGAL EXPOSURE TO VHB.

2. CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF PLANS, SPECIFICATIONS, AND

DATA FILES THAT ARE OBTAINED FROM THE DESIGNERS, BUT SHALL VERIFY LOCATION OF PROJECT

FEATURES IN ACCORDANCE WITH THE PAPER COPIES OF THE PLANS AND SPECIFICATIONS THAT ARE

SUPPLIED AS PART OF THE CONTRACT DOCUMENTS.

3. SYMBOLS AND LEGENDS OF PROJECT FEATURES ARE GRAPHIC REPRESENTATIONS AND ARE NOT

NECESSARILY SCALED TO THEIR ACTUAL DIMENSIONS OR LOCATIONS ON THE DRAWINGS. THE

CONTRACTOR SHALL REFER TO THE DETAIL SHEET DIMENSIONS, MANUFACTURERS' LITERATURE, SHOP

DRAWINGS AND FIELD MEASUREMENTS OF SUPPLIED PRODUCTS FOR LAYOUT OF THE PROJECT

FEATURES.

Notes

100' COASTAL BANK BUFFER ZONE

200' RIVERFRONT AREA

of

Project Number

Sheet

Drawing Number

Issued for

Checked byDesigned by

Appvd.DateRevisionNo.

Saved

Tu

esd

ay, A

ug

ust 25, 2020 2:37:01 P

M W

STV

IN

CEN

T P

lo

tted

Tu

esd

ay, A

ug

ust 25, 2020 2:52:07 P

M O

'B

rien

, Eric

\\vhb\gbl\proj\Boston\14483.00 brayton pt\cad\ld\Planset\14483.00 LG.dwg

vh

b.co

m

Date

1 Cedar Street

Suite 400

Providence, RI 02903

401.272.8100

Brayton Point

Commerce Center

Brayton Point Road

Somerset, Massachusetts

Local Approval

Not Approved for Construction

Aug. 21, 2020

11

14483.00

Legend and

General Notes

C-1.01

1

EOB SDL

wstvincent
Snapshot

Area 4

Area 12

Area 3A

Area 9A

Area 11

of

Project Number

Sheet

Drawing Number

Issued for

Checked byDesigned by

Appvd.DateRevisionNo.

Saved

Th

ursd

ay, A

ug

ust 20, 2020 4:31:48 P

M ER

IC

OB

RIEN

P

lo

tted

Tu

esd

ay, A

ug

ust 25, 2020 2:52:33 P

M O

'B

rien

, Eric

\\vhb\gbl\proj\Boston\14483.00 brayton pt\cad\ld\Planset\14483.00 Key.dwg

vh

b.co

m

Date

1 Cedar Street

Suite 400

Providence, RI 02903

401.272.8100

Brayton Point

Commerce Center

Brayton Point Road

Somerset, Massachusetts

Local Approval

Not Approved for Construction

Aug. 21, 2020

11

14483.00

Key Plan

C-2.01

2

EOB SDL

Feet4002000 100

TAUNTON RIVER

MOUNT HOPE BAY

LEE RIVER

wstvincent
Snapshot

12"P

V

C

2

4

"

R

C

P

24"R

CP

24"RCP

2

4

"

R

C

P

12"P

VC

2

4

"

R

C

P

12"H

D

PE

24"R

C

P

24"R

C

P

24"R

C

P

SALT MARSH

SHALLOW MARSH MEADOW

SHRUB SWAMP

BARRIER BEACH

LSCSF

LSCSF

LS

C

S

F

LSC

SF

LSC

SF

SAWCUT /PAVEMENT PATCH / LOW

DMH 3A-1

RIM=22.0

INV.=18.5 (WQU 3A-1)

INV.=10.42 (EX.)

EXISTING DETENTION BASIN D3A-2

EXISTING DETENTION BASIN D3A-1

PLUG 24" RCP INLET

FROM BUILDING

WITHIN MANHOLE

WQU Q3A-2

RIM= 22.75± (EX.)

INV=10.55± (EX.)

WQU Q3A-1

RIM=22.0±

INV.=18.5± (TD 3A-1)

INV.=18.4± (OUT)

TRENCH DRAIN T3A-1

RIM=21.5

INV. (HIGH)=20.5

INV. (OUT)=19.3

6" HDPE

SAWCUT / PAVEMENT PATCH

SILT SACK SEDIMENT TRAP

AR

EA

3A

B

OU

ND

AR

Y

COMPOST FILTER SOCK

LOW

LOW

LA

AREA 3A OUTFALL LOCATION

TO TAUNTON RIVER

24" RCP

CONNECT TO EXISTING CB

INV.=10.4± (EX.)

A

R

E

A

3

A

B

O

U

N

D

A

R

Y

of

Project Number

Sheet

Drawing Number

Issued for

Checked byDesigned by

Appvd.DateRevisionNo.

Saved

Th

ursd

ay, A

ug

ust 20, 2020 7:03:42 P

M A

CU

NH

A P

lo

tted

Tu

esd

ay, A

ug

ust 25, 2020 2:53:34 P

M O

'B

rien

, Eric

\\vhb\gbl\proj\Boston\14483.00 brayton pt\cad\ld\Planset\14483.00 Site Plan.dwg

vh

b.co

m

Date

1 Cedar Street

Suite 400

Providence, RI 02903

401.272.8100

Brayton Point

Commerce Center

Brayton Point Road

Somerset, Massachusetts

Local Approval

Not Approved for Construction

Aug. 21, 2020

11

14483.00

Site Plan - Area 3A

C-3.01

3

EOB SDL

Feet80400 20

AREA 3A

Key

Not To Scale

AREA 4

AREA 12

AREA 9A

AREA 11

wstvincent
Snapshot

10"RCP10"RCP

30"RCP

10"RCP

30"RCP30"RCP

L

S

C

S

F

LSC

SF

LSC

SF

L

S

C

S

F

L

S

C

S

F

LSC

SF

LSC

SF

LSC

SF

LSC

SF

L

S

C

S

F

L

S

C

S

F

AREA 4 BOUNDARY

AREA 4 BOUNDARY

SAWCUT /PAVEMENT PATCH / LOW

WQU Q4-1

RIM=14.0±

INV.= 9.15± (EX 30")

DMH 4-1

RIM=14.0±

INV.= 10.4 (24" HDPE FROM SITEC DETENTION BASIN 3)

INV.=8.95 (EX 30" RCP)

INV.=8.9 (36" HDPE)

CUT AND CAP

EXISTING 30"

RCP PIPE

36"D

SILT SACK SEDIMENT TRAP

SILT SACK SEDIMENT TRAP

PROPOSED OUTLET FROM

SITEC DETENTION BASIN 3

INCREASED TO 36" HDPE

MAINTAIN PROPOSED OUTFALL

FROM SITEC DETENTION BASIN 3

INV = 7.50

SITEC DETENTION BASIN 3

(SEE SITEC PLANS UNDER

SEPARATE COVER)

of

Project Number

Sheet

Drawing Number

Issued for

Checked byDesigned by

Appvd.DateRevisionNo.

Saved

Th

ursd

ay, A

ug

ust 20, 2020 7:03:42 P

M A

CU

NH

A P

lo

tted

Tu

esd

ay, A

ug

ust 25, 2020 2:53:45 P

M O

'B

rien

, Eric

\\vhb\gbl\proj\Boston\14483.00 brayton pt\cad\ld\Planset\14483.00 Site Plan.dwg

vh

b.co

m

Date

1 Cedar Street

Suite 400

Providence, RI 02903

401.272.8100

Brayton Point

Commerce Center

Brayton Point Road

Somerset, Massachusetts

Local Approval

Not Approved for Construction

Aug. 21, 2020

11

14483.00

Site Plan - Area 4

C-3.02

4

EOB SDL

Feet40200 10

AREA 4

AREA 3A

Key

Not To Scale

AREA 12

AREA 9A

AREA 11

wstvincent
Snapshot

1

2

"P

V

C

12"PVC

12"PVC

24"RCP24"RCP24"RCP

24"RCP

1

2

"P

V

C

2

4

"

R

C

P

24"R

CP

AREA 3A BOUNDARY

32.2±

24.75

24.75

CONNECT TO EXISTING

MANHOLE DRAINING TO

LOWER SUPPLY BASIN

CONNECT TO EXISTING

MANHOLE DRAINING TO

LOWER SUPPLY BASIN

CONNECT TO EXISTING

MANHOLE DRAINING TO

LOWER SUPPLY BASIN

STONE SWALE SS 9A1

9A1

RIM=29.50

INV=26.00 OUT

DCB

9A2

RIM=32.00

INV=25.10

INV=25.00

9A1

OUT

DMH

OVERFLOW STONE

WEIR OFW 9A1

OVERFLOW STONE

WEIR OFW 9A2

SAND FILTER SF 9A1

BOTTOM OF BASIN / TOP OF FILTER = EL. 23

9A3

RIM=24.60

INV=22.00 OUT

DCB

6" UD

6" UD

6" UD

6" UD

6" UD

6" UD

6" U

D

6" U

D

CO (TYP.)

I = 20.75 (TYP.)

INV=19.90

INV=21.70

GRASS SWALE GS 9A1

31.5±

3

1

3

0

25

24

23

23

24

HEAVY DUTY

BITUMUNOUS

CONCRETE

PAVEMENT

HEAVY DUTY

BITUMUNOUS

CONCRETE

PAVEMENT

HEAVY DUTY

BITUMUNOUS

CONCRETE

PAVEMENT

E

O

P

EO

P

EOP

EOP

SA

WC

UT / EO

P

E

O

P

/

S

A

W

C

U

T

/

L

O

W

EO

P / SA

WC

UT

STEEL BEAM

GUARDRAIL

6"D

1

8

"

D

2

4

"

D

24"D

30.75±

31

25.25

25.25

25.25

LA

LA

LA

33.7±

EX HP

3:1 STONE SLOPE

LIM

IT O

F A

REA

9A

L

IM

IT

O

F

A

R

E

A

9

A

L

I

M

I

T

O

F

A

R

E

A

9

A

LIMIT OF AREA 9A

S

A

W

C

U

T

/

L

O

W

26

2

6

25

24

23

25

LA

3:1 STONE SLOPE

3:1 STONE SLOPE

3:1 STONE SLOPE

APPROXIMATE LOCATION OF FUTURE

ACCESS DRIVE TO BE INCLUDED WITH

THE DEVELOPMENT OF AREA 9

31.5±

31.25±

28

32

33

34

35

36

37

38

31

28

32

27

26

27.2±

27.2±

27.2±

35

32

3

2

30

30

3

0

32.0±

of

Project Number

Sheet

Drawing Number

Issued for

Checked byDesigned by

Appvd.DateRevisionNo.

Saved

Th

ursd

ay, A

ug

ust 20, 2020 7:03:42 P

M ER

IC

OB

RIEN

P

lo

tted

Tu

esd

ay, A

ug

ust 25, 2020 3:12:48 P

M O

'B

rien

, Eric

\\vhb\gbl\proj\Boston\14483.00 Brayton Pt\cad\ld\Planset\14483.00 Site Plan.dwg

vh

b.co

m

Date

1 Cedar Street

Suite 400

Providence, RI 02903

401.272.8100

Brayton Point

Commerce Center

Brayton Point Road

Somerset, Massachusetts

Local Approval

Not Approved for Construction

Aug. 21, 2020

11

14483.00

Site Plan - Area 9A

C-3.03

5

EOB SDL

Feet80400 20

AREA 4

AREA 3A

Key

Not To Scale

AREA 12

AREA 9A

AREA 11

wstvincent
Snapshot

1

2

"P

V

C

12"PVC

12"PVC

24"RCP24"RCP24"RCP

24"RCP

2

4

"

R

C

P

24"R

CP

AREA 3A BOUNDARY

32.2±

24.75

24.75

STONE SWALE SS 9A1

9A1

RIM=29.50

INV=26.00 OUT

DCB

9A2

RIM=32.00

INV=25.10

INV=25.00

9A1

OUT

DMH

OVERFLOW STONE

WEIR OFW 9A1

OVERFLOW STONE

WEIR OFW 9A2

SAND FILTER SF 9A1

BOTTOM OF BASIN / TOP OF FILTER = EL. 23

9A3

RIM=24.60

INV=22.00 OUT

DCB

GRASS SWALE GS 9A1

31.5±

3

1

3

0

25

24

23

23

24

30.75±

31

25.25

25.25

25.25

33.7±

EX HP

COMPOST FILTER SOCK (TYP)

COMPOST FILTER SOCK (TYP)

STABILIZED CONSTRUCTION EXIT

POTENTIAL CONSTRUCTION

LAYDOWN / STOCKPILE AREA

26

2

6

25

24

23

25

31.5±

31.25±

28

31

32

33

34

35

36

37

3

8

31

28

32

2

8

27

26

27.2±

27.2±

27.2±

35

32

3

2

30

30

3

0

COMPOST FILTER SOCK (TYP)

32.0±

of

Project Number

Sheet

Drawing Number

Issued for

Checked byDesigned by

Appvd.DateRevisionNo.

Saved

Th

ursd

ay, A

ug

ust 20, 2020 7:03:42 P

M A

CU

NH

A P

lo

tted

Tu

esd

ay, A

ug

ust 25, 2020 2:54:05 P

M O

'B

rien

, Eric

\\vhb\gbl\proj\Boston\14483.00 brayton pt\cad\ld\Planset\14483.00 Site Plan.dwg

vh

b.co

m

Date

1 Cedar Street

Suite 400

Providence, RI 02903

401.272.8100

Brayton Point

Commerce Center

Brayton Point Road

Somerset, Massachusetts

Local Approval

Not Approved for Construction

Aug. 21, 2020

11

14483.00

Soil Erosion and Sediment

Control Site Plan

Area 9A

C-3.04

6

EOB SDL

Feet80400 20

General

1. CONTRACTOR SHALL NOTIFY "DIG-SAFE" (1-888-344-7233) AT LEAST 72 HOURS BEFORE EXCAVATING.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES SHALL BE IN

ACCORDANCE WITH OSHA STANDARDS AND LOCAL REQUIREMENTS.

3. THIS PROJECT DISTURBS MORE THAN ONE ACRE OF LAND AND FALLS WITHIN THE NPDES CONSTRUCTION GENERAL PERMIT

(CGP) PROGRAM AND EPA JURISDICTION. PRIOR TO THE START OF CONSTRUCTION CONTRACTOR IS TO FILE A CGP NOTICE OF

INTENT WITH THE EPA AND PREPARE A STORMWATER POLLUTION PREVENTION PLAN IN ACCORDANCE WITH THE NPDES

REGULATIONS. CONTRACTOR SHALL CONFIRM THE OWNER HAS ALSO FILED A NOTICE OF INTENT WITH THE EPA.

4. THIS PLAN ILLUSTRATES THE MINIMUM EROSION AND SEDIMENTATION CONTROLS. THE STORMWATER POLLUTION

PREVENTION PLAN (SWPPP) OPERATOR SHALL UPDATE THIS PLAN THROUGHOUT THE DURATION OF CONSTRUCTION TO

SHOW THE LOCATIONS OF PROPOSED/CONSTRUCTED EROSION AND SEDIMENTATION CONTROLS DEEMED NECESSARY TO

MEET THE REQUIREMENTS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM CONSTRUCTION GENERAL PERMIT

(NPDES CGP). THE CONTRACTOR IS REQUIRED TO PROVIDE ADDITIONAL INTERIM EROSION AND SEDIMENTATION CONTROLS

THAT, INCLUDING BUT NOT LIMITED TO THOSE LISTED BELOW. THE CONTRACTOR SHALL MANAGE EROSION AND

SEDIMENTATION DURING CONSTRUCTION TO PREVENT IMPACTS TO RESOURCE AREAS, ROADWAYS, AND ABUTTING

PROPERTIES AND SHALL BE RESPONSIBLE FOR CLEANUP, REPAIRS AND CORRECTIVE ACTION IF SUCH OCCURS. THE

CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN THE EROSION AND SEDIMENTATION CONTROLS THROUGHOUT THE

DURATION OF CONSTRUCTION.

4.1. CATCH BASIN PROTECTION

4.2. GRAVEL CONSTRUCTION ENTRANCE/EXIT

4.3. VEGETATIVE SLOPE STABILIZATION

4.4. TEMPORARY SEDIMENT BASINS

4.5. STOCKPILE MANAGEMENT

4.6. DUST CONTROL

5. AREAS DISTURBED DURING CONSTRUCTION AND NOT RESTORED WITH IMPERVIOUS SURFACES (BUILDINGS, PAVEMENTS,

WALKS, ETC.) SHALL RECEIVE 4 INCHES LOAM AND SEED.

6. UPON AWARD OF CONTRACT, CONTRACTOR SHALL MAKE NECESSARY CONSTRUCTION NOTIFICATIONS AND APPLY FOR AND

OBTAIN NECESSARY PERMITS, PAY FEES, AND POST BONDS ASSOCIATED WITH THE WORK INDICATED ON THE DRAWINGS, IN

THE SPECIFICATIONS, AND IN THE CONTRACT DOCUMENTS. DO NOT CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS, AND FIRE

HYDRANTS, WITHOUT APPROPRIATE PERMITS.

7. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE

CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

8. IN THE EVENT THAT SUSPECTED CONTAMINATED SOIL, GROUNDWATER, AND OTHER MEDIA ARE ENCOUNTERED DURING

EXCAVATION AND CONSTRUCTION ACTIVITIES BASED ON VISUAL, OLFACTORY, OR OTHER EVIDENCE, THE CONTRACTOR SHALL

STOP WORK IN THE VICINITY OF THE SUSPECT MATERIAL TO AVOID FURTHER SPREADING OF THE MATERIAL, AND SHALL

NOTIFY THE OWNER IMMEDIATELY SO THAT THE APPROPRIATE TESTING AND SUBSEQUENT ACTION CAN BE TAKEN.

9. CONTRACTOR SHALL PREVENT DUST, SEDIMENT, AND DEBRIS FROM EXITING THE SITE AND SHALL BE RESPONSIBLE FOR

CLEANUP, REPAIRS AND CORRECTIVE ACTION IF SUCH OCCURS.

10. STAGING AND STOCKPILE AREAS SHALL NOT BE LOCATED WITHIN ANY WETLAND, ABUTTING RESOURCE AREA, AND THE

100-FOOT BUFFER ZONE, AND SHALL BE LOCATED WITHIN THE LOD.

11. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND INSTALLING THE FOLLOWING ITEMS ON SITE AND REDLINING THE PLAN

FOR RECORD KEEPING PURPOSES AS REQUIRED BY THE NPDES PERMIT:

11.1. BUILDING MATERIALS STAGING AREAS

11.2. STOCKPILE AREAS. EROSION CONTROLS SHALL BE PLACED AT THE BASE OF ALL STOCKPILES

11.3. DESIGNATED WASHOUT AREAS.

11.4. TEMPORARY SEDIMENT BASIN AREAS.

Erosion Control

1. PRIOR TO STARTING ANY OTHER WORK ON THE SITE, THE CONTRACTOR SHALL NOTIFY APPROPRIATE AGENCIES AND SHALL

INSTALL EROSION CONTROL MEASURES AS SHOWN ON THE PLANS AND AS IDENTIFIED IN FEDERAL, STATE, AND LOCAL

APPROVAL DOCUMENTS PERTAINING TO THIS PROJECT.

2. CONTRACTOR SHALL INSPECT AND MAINTAIN EROSION CONTROL MEASURES DAILY, AND REMOVE SEDIMENT THEREFROM ON

A WEEKLY BASIS AND WITHIN TWELVE HOURS AFTER EACH STORM EVENT OR AS IDENTIFIED IN THE ORDER OF CONDITIONS

AND DISPOSE OF SEDIMENTS IN AN UPLAND AREA SUCH THAT THEY DO NOT ENCUMBER OTHER DRAINAGE STRUCTURES

AND PROTECTED AREAS. THE CONTRACTOR SHALL ADDRESS DEFICIENCIES AND MAINTENANCE ITEMS WITHIN TWENTY-FOUR

HOURS OF INSPECTION. RECORDS OF THE INSPECTIONS WILL BE PREPARED AND MAINTAINED ON SITE BY THE CONTRACTOR.

3. CONTRACTOR SHALL BE FULLY RESPONSIBLE TO CONTROL CONSTRUCTION SUCH THAT SEDIMENTATION SHALL NOT AFFECT

REGULATORY PROTECTED AREAS, WHETHER SUCH SEDIMENTATION IS CAUSED BY WATER, WIND, OR DIRECT DEPOSIT.

4. CONTRACTOR SHALL PERFORM CONSTRUCTION SEQUENCING SUCH THAT EARTH MATERIALS ARE EXPOSED FOR A MINIMUM

OF TIME BEFORE THEY ARE COVERED, SEEDED, OR OTHERWISE STABILIZED TO PREVENT EROSION.

5. UPON COMPLETION OF CONSTRUCTION AND ESTABLISHMENT OF PERMANENT GROUND COVER, CONTRACTOR SHALL

REMOVE AND DISPOSE OF EROSION CONTROL MEASURES AND CLEAN SEDIMENT AND DEBRIS FROM ENTIRE DRAINAGE AND

SEWER SYSTEMS.

6. STABILIZED CONSTRUCTION EXIT. A CROSS SLOPE WILL BE PLACED IN THE ENTRANCE TO DIRECT RUNOFF TO A PROTECTED

SETTLING AREA. IF DEEMED NECESSARY AFTER CONSTRUCTION BEGINS, A WASH PAD MAY BE INCLUDED TO WASH OFF

VEHICLE WHEELS BEFORE LEAVING THE PROJECT SITE.

7. SILT SHALL BE REMOVED FROM BEHIND THE EROSION CONTROL BARRIERS IF GREATER THAN 6-INCHES DEEP.

8. THE CONTRACTOR SHALL REPAIR DAMAGED OR DETERIORATED EROSION CONTROL MEASURES IMMEDIATELY AFTER

IDENTIFICATION.

9. SEDIMENT THAT IS COLLECTED IN STRUCTURES SHALL BE DISPOSED OF PROPERLY OR COVERED IF STORED ON SITE.

Sand Filter Protection During Construction

FOR THE LONG-TERM FUNCTION OF THE SAND FILTER, CARE MUST BE TAKEN IN THIS AREA DURING CONSTRUCTION. THE

CONTRACTOR SHALL EMPLOY THE FOLLOWING MINIMUM BEST MANAGEMENT PRACTICES (BMPs):

1. THESE AREAS SHALL NOT BE USED AS CONSTRUCTION SEDIMENTATION SYSTEMS.

2. ALL STORMWATER RUNOFF FROM EXPOSED SURFACES SHALL BE DIRECTED AWAY FROM THESE AREAS.

3. CONSTRUCTION EQUIPMENT, VEHICULAR, AND STOCKPILING OF CONSTRUCTION AND EARTH MATERIALS SHALL BE

OUTSIDE THE LIMITS OF THESE AREAS. THE SUBGRADE BENEATH SHALL NOT BE COMPACTED.

4. EXCAVATION FOR CONSTRUCTION OF THESE SYSTEMS SHALL BE PERFORMED MANUALLY OR BY HYDRAULIC EXCAVATOR

OR SOME OTHER SIMILAR MEANS TO ENSURE THAT THE EQUIPMENT IS NOT IN DIRECT CONTACT WITH THE NATURAL

FILTRATION EARTH MATERIAL AND DOES NOT CAUSE COMPACTION OF THE SUBGRADE.

5. THE CONTRACTOR SHALL INSTALL TEMPORARY CONSTRUCTION FENCING AROUND THE PERIMETER OF THE SYSTEMS TO

PREVENT THE USE OF THESE AREAS FOR ALL ACTIVITIES THAT MIGHT DAMAGE THE INFILTRATION CAPABILITIES. THE

FENCING MAY BE REMOVED FOR BACKFILLING AND FINAL CONSTRUCTION.

6. THE SAND FILTER SHALL BE PROTECTED WITH EROSION CONTROLS IMMEDIATELY UPON INSTALLATION TO PREVENT

CLOGGING OF FILTER MATERIALS. THESE AREAS SHALL NOT BE USED AS SEDIMENTATION OR DEWATERING BASINS.

Swale Protection During Construction

FOR THE LONG-TERM FUNCTION OF THE GRASS SWALES, CARE MUST BE TAKEN IN THIS AREA DURING CONSTRUCTION. THE

CONTRACTOR SHALL EMPLOY THE FOLLOWING MINIMUM BEST MANAGEMENT PRACTICES (BMPs):

1. THESE AREAS SHALL NOT BE USED AS CONSTRUCTION SEDIMENTATION SYSTEMS.

2. ALL STORMWATER RUNOFF FROM EXPOSED SURFACES SHALL BE DIRECTED AWAY FROM THESE AREAS.

3. CONSTRUCTION EQUIPMENT, VEHICULAR, AND STOCKPILING OF CONSTRUCTION AND EARTH MATERIALS SHALL BE

OUTSIDE THE LIMITS OF THESE AREAS. THE SUBGRADE BENEATH SHALL NOT BE COMPACTED.

4. EXCAVATION FOR CONSTRUCTION OF THESE SYSTEMS SHALL BE PERFORMED MANUALLY OR BY HYDRAULIC EXCAVATOR

OR SOME OTHER SIMILAR MEANS TO ENSURE THAT THE EQUIPMENT IS NOT IN DIRECT CONTACT WITH THE NATURAL

FILTRATION EARTH MATERIAL AND DOES NOT CAUSE COMPACT OF THE SUBGRADE.

5. THE CONTRACTOR SHALL INSTALL TEMPORARY CONSTRUCTION FENCING AROUND THE PERIMETER OF THE SYSTEMS TO

PREVENT THE USE OF THESE AREAS FOR ALL ACTIVITIES THAT MIGHT DAMAGE THE INFILTRATION CAPABILITIES. THE

FENCING MAY BE REMOVED FOR BACKFILLING AND FINAL CONSTRUCTION.

6. THE SWALE SHALL BE PROTECTED WITH EROSION CONTROL BLANKETS IMMEDIATELY UPON INSTALLATION TO PREVENT

CLOGGING OF FILTER MATERIALS. THESE AREAS SHALL NOT BE USED AS SEDIMENTATION OR DEWATERING BASINS.

AREA 4

AREA 3A

Key

Not To Scale

AREA 12

AREA 9A

AREA 11

wstvincent
Snapshot

1

2

"P

V

C

1

2

"

P

V

C

36"R

C

P

36"R

C

P

36"R

CP

S

H

R

U

B

S

W

A

M

P

SHALLOW MARSH MEADOW

SHALLOW MARSH MEADOW

L

S

C

S

F

DISCHARGE POINT TO SETTLING

BASIN 3 ULTIMATELY DRAINING

TO LOWER SUPPLY BASIN

WQU Q11-1

RIM=32.0±

INV.= 20.5± (EX)

A

R

E

A

1

1

B

O

U

N

D

A

R

Y

A

R

E

A

1

1

B

O

U

N

D

A

R

Y

REPLACE EXISTING MANHOLE

STRUCTURE WITH WQU

LOW

of

Project Number

Sheet

Drawing Number

Issued for

Checked byDesigned by

Appvd.DateRevisionNo.

Saved

Th

ursd

ay, A

ug

ust 20, 2020 7:03:42 P

M A

CU

NH

A P

lo

tted

Tu

esd

ay, A

ug

ust 25, 2020 2:54:15 P

M O

'B

rien

, Eric

\\vhb\gbl\proj\Boston\14483.00 brayton pt\cad\ld\Planset\14483.00 Site Plan.dwg

vh

b.co

m

Date

1 Cedar Street

Suite 400

Providence, RI 02903

401.272.8100

Brayton Point

Commerce Center

Brayton Point Road

Somerset, Massachusetts

Local Approval

Not Approved for Construction

Aug. 21, 2020

11

14483.00

Site Plan - Area 11

C-3.05

7

EOB SDL

Feet80400 20

AREA 4

AREA 3A

Key

Not To Scale

AREA 12

AREA 9A

AREA 11

wstvincent
Snapshot

12"C

MP

1

2

"C

M

P

1

2

"

C

M

P

1

2

"

C

M

P

1

2

"

C

M

P

12"CM

P

1

2

"

C

M

P

12"HD

PE

1

4

"

C

M

P

1

5

"

H

D

P

E

LSCSF

L

S

C

S

F

L

S

C

S

F

L

S

C

S

F

LSC

SF

L

S

C

S

F

LSC

SF

C

O

A

S

T

A

L

B

A

N

K

SAWCUT /PAVEMENT PATCH / LOW

WQU Q12-1

RIM=14.2±

INV.= 9.5± (EX)

DISCHARGE POINT 009

TO TAUNTON RIVER

EXISTING OIL SEPARATOR 009

AR

EA

12 B

OU

ND

AR

Y

AR

EA

12 B

OU

ND

AR

Y

SILT SACK

SEDIMENT TRAP

of

Project Number

Sheet

Drawing Number

Issued for

Checked byDesigned by

Appvd.DateRevisionNo.

Saved

Th

ursd

ay, A

ug

ust 20, 2020 7:03:42 P

M A

CU

NH

A P

lo

tted

Tu

esd

ay, A

ug

ust 25, 2020 2:54:25 P

M O

'B

rien

, Eric

\\vhb\gbl\proj\Boston\14483.00 brayton pt\cad\ld\Planset\14483.00 Site Plan.dwg

vh

b.co

m

Date

1 Cedar Street

Suite 400

Providence, RI 02903

401.272.8100

Brayton Point

Commerce Center

Brayton Point Road

Somerset, Massachusetts

Local Approval

Not Approved for Construction

Aug. 21, 2020

11

14483.00

Site Plan - Area 12

C-3.06

8

EOB SDL

Feet40200 10

AREA 4

AREA 3A

Key

Not To Scale

AREA 12

AREA 9A

AREA 11

wstvincent
Snapshot

Compost Filter Sock

N.T.S.Source: VHB

LD_658

1/16

WORK

AREA

FLOW

NOTES

1. SILTSOCK SHALL BE FILTREXX SILTSOXX, OR APPROVED EQUAL.

2. SILTSOCKS SHALL OVERLAP A MINIMUM OF 12 INCHES.

3. SILTSOCK SHALL BE INSPECTED PERIODICALLY AND AFTER ALL STORM

EVENTS, AND REPAIR OR REPLACEMENT SHALL BE PERFORMED PROMPTLY

AS NEEDED.

4. COMPOST MATERIAL SHALL BE DISPERSED ON SITE, AS DETERMINED BY THE

ENGINEER.

5. IF NON BIODEGRADABLE NETTING IS USED THE NETTING SHALL BE

COLLECTED AND DISPOSED OF OFFSITE.

12" (M

IN

.)

INSTALL SUPPLEMENTAL

COMPOST MATERIAL

TOP OF

GROUND

BIODEGRADABLE

MESH NETTING

COMPOST FILLED

SILTSOCK (12" TYP.)

2" X 2" WOOD STAKE,

PLACED 10' O.C.

3"-4"

PROTECTED AREA

REV

Stabilized Construction Exit

N.T.S.Source: VHB

LD_682

1/16

3' 5

:1

NOTES

1. EXIT WIDTH SHALL BE A TWENTY-FIVE (25) FOOT MINIMUM, BUT NOT

LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS

OCCURS.

2. THE EXIT SHALL BE MAINTAINED IN A CONDITION WHICH SHALL

PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC

RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH

ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR OR

CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL

SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC

RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY. BERM SHALL BE

PERMITTED. PERIODIC INSPECTION AND MAINTENANCE SHALL BE

PROVIDED AS NEEDED.

3. STABILIZED CONSTRUCTION EXIT SHALL BE REMOVED PRIOR TO FINAL

FINISH MATERIALS BEING INSTALLED.

PLAN VIEW

CROSS-SECTION

1

1

2

" CRUSHED STONE

FILTER

FABRIC

MOUNTABLE BERM

EXISTING

PAVEMENT

50' (MIN.)

SITE

4" (MIN.)

25'

(M

IN

.)

10'

10'

EXISTING

PAVEMENT

10' (MIN.)

50' (MIN.)

SITE

Erosion Control Blanket Swale Installation

N.T.S.Source: VHB

LD_681

1/16

NO. 11 GAUGE WIRE

TYPICAL STAPLES

A.

* INSTALLATION SHALL BE AS PER MANUFACTURER'S RECOMMENDATIONS

BURY THE TOP END OF THE JUTE STRIPS IN A TRENCH 6

INCHES OR MORE IN DEPTH. SECURE WITH ROW OF

STAPLES IN VERTICAL TRENCH WALL, 6 INCH SPACING, 4

INCHES DOWN FROM TOP OF TRENCH

TAMP THE TRENCH FULL OF

SOIL. SECURE WITH ROW OF

STAPLES, 6 INCH SPACING, 4

INCHES DOWN FROM THE

TRENCH.

OVERLAP - BURY UPPER END OF LOWER STRIP AS

IN 'A' AND 'B'. OVERLAP END OF TOP STRIP 4 INCHES

AND STAPLE.

EROSION STOP - FOLD OF JUTE BURIED IN

SLIT TRENCH AND TAMPED; DOUBLE

ROW OF STAPLES.

B.

C.

D.

6"

OVERLAP

WIDTH

VARIES

1-1

1

2

" 1-1

1

2

"

6"

10"

STAPLE OUTSIDE EDGE

2 FEET ON CENTER.

4 INCH OVERLAP OF

JUTE STRIP WHERE

TWO OR MORE STRIP

WIDTHS ARE REQUIRED.

STAPLES ON 18 INCH

ON CENTER.

Erosion Control Blanket Slope Installation

N.T.S.Source: VHB

LD_680

1/16

NO. 11 GAUGE WIRE

TYPICAL STAPLES

NOTES

1. BEGIN AT THE TOP OF BLANKET INSTALLATION AREA BY ANCHORING BLANKET IN A 6"

DEEP TRENCH BACKFILL AND COMPACT TRENCH AFTER STAPLING.

2. ROLL THE BLANKET DOWN THE SWALE IN THE DIRECTION OF THE WATER FLOW.

3. THE EDGES OF BLANKETS MUST BE STAPLED WITH APPROX. 4 INCH OVERLAP WHERE 2

OR MORE STRIP WIDTHS ARE REQUIRED.

4. WHEN BLANKETS MUST BE SPLICED DOWN THE SWALE, PLACE UPPER BLANKET END

OVER LOWER END WITH 6 INCH (MIN.) OVERLAP AND STAPLE BOTH TOGETHER.

5. METHOD OF INSTALLATION SHALL BE AS PER MANUFACTURER'S RECOMMENDATIONS.

6. EROSION CONTROL BLANKETS SHALL BE USED IN ALL AREAS WHERE SLOPES EXCEED 3:1.

6"

1

1

2

" 1

1

2

"

10"

6" LOAM & SEED

STAPLE 12"

ON CENTER

6" O

VER

LA

P

(M

IN

.)

4"

OVERLAP

(MIN.)

6"

STAPLES 12"

ON CENTER

STAPLES 12"

ON CENTER

Dewatering Straw Bale Basin

N.T.S.Source: VHB

LD_690

1/16

FILTER FABRIC

GEOTEXTILE

NON-WOVEN

NOTES

1. NUMBER OF BALES MAY VARY DEPENDING ON SITE CONDITIONS.

2. THE BASIN TO BE SIZED TO PREVENT DISCHARGE WATER FROM

OVERTOPPING BASIN.

CROSS-SECTION

PLAN VIEW

SECURE HOSE

DISCHARGE

FILTER FABRIC (MIRAFI 140N OR APPROVED EQUAL)

DISCHARGE HOSE

DISCHARGE HOSE

WOODEN STAKES,

2 PER BALE

STAKED BALES

FIELD

V

AR

IA

BLE

FIELD VARIABLE

SECURE FABRIC

WITH EROSION

CONTROL

STAPLES

FILTER FABRIC

MIRAFI 140N

(OR APPROVED

EQUAL)

10' (MIN)

1' OVERLAP

Siltsack Sediment Trap

N.T.S.Source: VHB

LD_674

1/16

FLOW FLO

W

NOTES

1. INSTALL SILTSACK IN ALL CATCH BASINS WHERE INDICATED ON THE PLAN

BEFORE COMMENCING WORK OR IN PAVED AREAS AFTER BINDER COURSE IS

PLACED AND HAY BALES HAVE BEEN REMOVED.

2. GRATE TO BE PLACED OVER SILTSACK.

3. SILTSACK SHALL BE INSPECTED PERIODICALLY AND AFTER ALL STORM

EVENTS AND CLEANING OR REPLACEMENT SHALL BE PERFORMED

PROMPTLY AS NEEDED. MAINTAIN UNTIL UPSTREAM AREAS HAVE BEEN

PERMANENTLY STABILIZED

SECTION VIEW

PLAN VIEW

EXPANSION RESTRAINT

SILTSACK

CATCH BASIN GRATE

1" REBAR FOR

BAG REMOVAL

CATCH BASIN GRATE

SILTSACK

of

Project Number

Sheet

Drawing Number

Issued for

Checked byDesigned by

Appvd.DateRevisionNo.

Saved

Tu

esd

ay, A

ug

ust 25, 2020 2:34:03 P

M W

STV

IN

CEN

T P

lo

tted

Tu

esd

ay, A

ug

ust 25, 2020 2:54:41 P

M O

'B

rien

, Eric

\\vhb\gbl\proj\Boston\14483.00 brayton pt\cad\ld\Planset\14483.00 DT.dwg

vh

b.co

m

Date

1 Cedar Street

Suite 400

Providence, RI 02903

401.272.8100

Brayton Point

Commerce Center

Brayton Point Road

Somerset, Massachusetts

Local Approval

Not Approved for Construction

Aug. 21, 2020

11

14483.00

Site Details 1

C-4.01

9

EOB SDL

wstvincent
Snapshot

Trench Drain (Type A)

N.T.S.Source: VHB

LD_190-A

1/16

CB

A

A

S=1% (MIN.)

NOTES

1. TRENCH DRAIN SHALL BE HEAVY DUTY

TYPE DESIGNED FOR HS-20 LOADING.

2. CONCRETE SHALL BE 5000 PSI CEMENT

CONCRETE (TYPE II) 6% (1.5%±) AIR

ENTRAINED.

3. TRENCH DRAIN GRATE SHALL MEET

AMERICANS WITH DISABILITY ACT

(ADA) REGULATIONS.

DIA.

VARIES

10"

20"

CATCHBASIN

SEE DRAINAGE PLANS

TRENCH DRAIN

8"

8"

8"

8"

6" 6"

8"

24"

(M

IN

.)

VA

RIES

COMPACTED

SUBGRADE

COMPACTED

GRAVEL

CAST-IN-PLACE

CONCRETE

BITUMINOUS CONCRETE PAVEMENT

ANGLE FRAME SYSTEM

SEE DRAINAGE PLANS

FOR PIPE SIZE, LOCATION

AND INVERT ELEVATION

STANDARD (20"X10")

CATCH BASIN COMPATIBLE

WITH TRENCH DRAIN

SYSTEM

CAST IRON GRATE

SEE DRAINAGE PLANS

FOR RIM ELEV.

END

CAP

ACO DRAIN SYSTEM

(OR APPROVED EQUAL

PLAN

SECTION A-A

PROFILE

Utility Trench

N.T.S.Source: VHB

LD_300

1/16

1

1

NOTES

1. WHERE UTILITY TRENCHES ARE CONSTRUCTED THROUGH

DETENTION BASIN BERMS OR OTHER SUCH SPECIAL SECTIONS,

PLACE TRENCH BACKFILL WITH MATERIALS SIMILAR TO THE

SPECIAL SECTION REQUIREMENTS.

2. USE METALLIC TRACING/WARNING TAPE OVER ALL PIPES.

DEP

TH

V

AR

IES

COMPACTED BEDDING

HAND TAMPED HAUNCHING

WARNING TAPE

DEPTH AND SURFACE

TREATMENT VARIES

COMPACTED

SUBGRADE

12"

(MIN.)

6"

(M

IN

.)

PIP

E

DIA

.12"

CO

MP

AC

TED

BED

DIN

G

5'-0" M

AX

IM

UM

VA

RIES

SAWCUT

COMPACTED GRANULAR FILL

COMMON FILL/

ORDINARY BORROW

PAVED AREA

SEE APPLICABLE

PAVEMENT SECTION LANDSCAPED AREA

Sand Filter with Underdrain (SF 9A1)

N.T.S.Source: VHB

LD_352

1/16

WATER

PONDING

LEVEL

ASTM C-33

SAND

NOTES

1. INSTALL UNDERDRAINS PER PLAN.

2. SIDE SLOPES SHALL BE 3:1 MAX.

OVERFLOW PIPE

(PER DRAINAGE PLANS)

PVC PERFORATED

UNDERDRAIN PER PLAN

1

1

2

" CRUSHED STONE

FILTER FABRIC

MIRAFI 140N

6"6"

6"

1'-6"

3"

1'-6"

MINIMUM 3' WIDE SOD BORDER

PER LANDSCAPE PLAN

TOPSOIL / GRASS SEED

S

ID

E

S

LO

P

E

EXISTING

UNCOMPACTED

SOIL

OVERFLOW CATCH

BASIN (PER PLANS)

HDPE LINER

HDPE LINER

ANCHOR

Drain Manhole (DMH)

N.T.S.Source: VHB

LD_115

1/16

NOTES

1. ALL SECTIONS SHALL BE DESIGNED FOR

HS-20 LOADING. DIAMETER OF STRUCTURES

SHALL BE COORDINATED WITH PIPE

CONFIGURATIONS.

2. COPOLYMER MANHOLE STEPS SHALL BE

INSTALLED AT 12" O.C. FOR THE FULL DEPTH

OF THE STRUCTURE.

3. PROVIDE OPENINGS FOR PIPES WITH 2" MAX.

CLEARANCE TO OUTSIDE OF PIPE. MORTAR

ALL PIPE CONNECTIONS.

4. JOINT SEALANT BETWEEN PRECAST SECTIONS

SHALL BE PREFORMED BUTYL RUBBER.

5. DRAIN MANHOLE FRAME AND COVER SHALL

BE SET IN FULL MORTAR BED. ADJUST TO

GRADE WITH CLAY BRICK AND MORTAR (2

BRICK COURSES TYPICALLY, 5 BRICK

COURSES MAXIMUM)

D

I

A

.

V

A

R

I

E

S

COMPACTED SUBGRADE

COMPACTED GRAVEL

CEMENT CONCRETE INVERT

SEE NOTE 3.

OUTLET

SHELF TO BE CONCRETE FORMED

AT SLOPE OF 1" PER FOOT.

SEE NOTE 4.

SEE NOTE 5.

FINISH

GRADE

STEPS, SEE

NOTE 2.

12"

(TY

P.)

MO

NO

LITH

IC

BA

SE SEC

TIO

N

RISER

SEC

TIO

N(S)

AS R

EQ

'D

.

EC

CEN

TR

IC

CO

NE SEC

TIO

N

SEE A

LTER

NA

TE

TO

P SLA

B

12"

(TYP.)

8"

24" DIA.

ACCESS 8"

ALTERNATE TOP SLAB

24" DIA.

ACCESS

12"

8"

(M

IN

.)

48" DIA. (MIN.)

DIA

.

VA

RIES

48" DIA. (MIN.)

Grassed Swale

N.T.S.Source: VHB

LD_171

1/16

3

1 1

3

6" BLANKET

EMBEDMENT (TYP.)

COMPACTED

SUBGRADE

EXISTING

GROUND

6" LOAM AND SEED

EROSION CONTROL BLANKET

W

D

2'

(TYP.)

SWALE TABLE

SWALE

DESIGNATION

W D

GS 9A1 6'

VARIES

0.25' - 2'

GS 9A2 6'

VARIES

0.25' - 1'

REV

HDPE Liner and Anchor Detail

N.T.S.Source: VHB

6"

12" 12"HDPE LINER

ANCHOR

Overflow Stone Weir (OFW 9A-1, OFW 9A-2)

N.T.S.Source: VHB

LD_161

1/16

2

3

1

1

FLO

W

BASIN SIDE

FLOW

PCC WITH MORTARED JOINTS

FILTER FABRIC

COMPACTED LOW

PERMEABILITY CORE

DIKE BEYOND

STONE FOR PIPE ENDS

8' (MIN.)

1' - 0" STONE

FOR PIPE ENDS

COMPACTED LOW

PERMEABILITY CORE

PRECAST

CONCRETE CURB (PCC)

FILTER FABRIC

6" LOAM & SEED

5' - 0" W=30' 5' - 0"

D=

6"

TO

P O

F B

ER

M

PCC

CONTINUE CHANNEL SHAPE

TO BOTTOM OF SLOPE

SECTION A-A

SECTION B-B

PLAN VIEW

A

B

A

B

REV

Steel Beam Guardrail with Steel Post

N.T.S.Source: VHB

LD_456

1/16

2%

6

1

4

"

R

GROUND LINE

W 6 X 8.5 POST

2'-3"

29

32

X1

1

8

"SLOTTED HOLES

USE SPLICE BOLTS

1'-4"

6'-3"

CURB

FINISHED

SURFACE

2'-3" ±

1"

1'-9" ±

1"

BACKUP

PLATE

0'-9" 4'-3"

RAIL

6'-3" O.C.

W 6X8.5 POST

W 6X8.5

OFFSET BRACKET

2'-0"

8

1

2

"

3" MIN.

F-3-70 BOLT

WOOD OR PLASTIC BLOCK

W 6X8.5 POST

PLAN VIEW

SECTION VIEW

ELEVATION VIEW

PLAN VIEW

2

1

4

"

OVERFLOW EL.

= 24.75

Bituminous Concrete Pavement Sections

N.T.S.Source: VHB

LD_430

1/16

NOTES

PAVEMENT SECTIONS ARE SUBJECT TO CHANGE AND WILL BE BASED ON THE

RESULTS OF FURTHER GEOTECHNICAL INVESTIGATIONS.

12" C

OM

PA

CTED

GR

AV

EL

1

1

2

" BITUMINOUS DENSE BINDER COURSE

1

1

2

" BITUMINOUS TOP COURSE

12" C

OM

PA

CTED

GR

AV

EL

COMPACTED SUBGRADE

COMPACTED SUBGRADE

STANDARD DUTY FLEXIBLE PAVEMENT

HEAVY DUTY FLEXIBLE PAVEMENT

2

1

2

" BITUMINOUS DENSE BINDER COURSE

1

1

2

" BITUMINOUS TOP COURSE

Catch Basin (CB) With Oil/Debris Trap

N.T.S.Source: VHB

LD_101

1/16

INVERT

NOTES

1. ALL SECTIONS SHALL BE DESIGNED FOR

HS-20 LOADING.

2. PROVIDE OPENINGS FOR PIPES WITH 2"

MAX. CLEARANCE TO OUTSIDE OF PIPE.

MORTAR ALL PIPE CONNECTIONS.

3. JOINT SEALANT BETWEEN PRECAST

SECTIONS SHALL BE PREFORMED BUTYL

RUBBER.

4. CATCH BASIN FRAME AND GRATE SHALL BE

SET IN FULL MORTAR BED. ADJUST TO

GRADE WITH CLAY BRICK AND MORTAR (2

BRICK COURSES TYPICALLY, 5 BRICK

COURSES MAXIMUM).

DIA

.

VA

RIES

12"

(TYP.)

MO

NO

LITH

IC

BA

SE SEC

TIO

N

RISER

SEC

TIO

N(S)

AS R

EQ

D.

CO

NC

EN

TR

IC

CO

NE SEC

TIO

N

SEE A

LTER

NA

TE

TO

P SLA

B

4' (M

IN

.)

48" DIA. (MIN.)

ALTERNATE ECCENTRIC CONE SECTION

ALTERNATE TOP SLAB

COMPACTED

GRAVEL

COMPACTED

SUBGRADE

SEE NOTE

OUTLET

SEE NOTE 3.

OIL/DEBRIS

TRAP

SEE NOTE 4.

FINISH GRADE

48" DIA. (MIN.)

24" SQUARE

OPENING (TYP.)

8"

MIN

.

12"

12"

8" 24" 8"

Double Grate Catch Basin (DCB) with Oil/Debris Trap

N.T.S.Source: VHB

LD_103

1/16

INVERT

NOTES

1. ALL SECTIONS SHALL BE DESIGNED FOR HS-20 LOADING.

2. PROVIDE OPENINGS FOR PIPES WITH 2" MAX. CLEARANCE TO OUTSIDE OF

PIPE. MORTAR ALL PIPE CONNECTIONS.

3. JOINT SEALANT BETWEEN PRECAST SECTIONS SHALL BE BUTYL RUBBER.

4. DOUBLE CATCH BASIN FRAME AND GRATE SHALL BE SET IN FULL MORTAR

BED. ADJUST TO GRADE WITH CLAY BRICK AND MORTAR (2 BRICKS

TYPICALLY, 5 BRICK COURSES MAXIMUM)

COMPACTED SUBGRADE

COMPACTED GRAVEL

OIL/DEBRIS

TRAP

SEE NOTE 2.

OUTLET

SEE NOTE 3.

MORTAR SHELF

DOUBLE CATCH BASIN

FRAME & GRATE

SEE NOTE 4.

FINISH GRADE

12"

12"

(TYP.)

MO

NO

LITH

IC

BA

SE SEC

TIO

N

RISER

SEC

TIO

N(S)

AS R

EQ

'D

.

TO

P

SLA

B

4' (M

IN

.)

48" DIA. (MIN.)

24" X 36"

OPENING

DIA

.

VA

RIES

8"

(M

IN

.)

Stone Swale

N.T.S.Source: VHB

LD_171

1/16

3

1

1

3

EXISTING

PAVEMENT

D1

2'

(TYP.)

SWALE TABLE

SWALE

DESIGNATION

W D1 D2

PS 9A1 4'1' (MIN.)

VARIES

1.5' - 4'

PROPOSED

PAVEMENT

2" CRUSHED

STONE

W

RIPRAP SURFACE

D50 = 6"

COMPACTED

SUBGRADE

D2

ANCHOR TRENCH

6"

6"

FILTER FABRIC

of

Project Number

Sheet

Drawing Number

Issued for

Checked byDesigned by

Appvd.DateRevisionNo.

Saved

Tu

esd

ay, A

ug

ust 25, 2020 2:34:03 P

M W

STV

IN

CEN

T P

lo

tted

Tu

esd

ay, A

ug

ust 25, 2020 2:54:46 P

M O

'B

rien

, Eric

\\vhb\gbl\proj\Boston\14483.00 brayton pt\cad\ld\Planset\14483.00 DT.dwg

vh

b.co

m

Date

1 Cedar Street

Suite 400

Providence, RI 02903

401.272.8100

Brayton Point

Commerce Center

Brayton Point Road

Somerset, Massachusetts

Local Approval

Not Approved for Construction

Aug. 21, 2020

11

14483.00

Site Details 2

C-4.02

10

EOB SDL

wstvincent
Snapshot

PLAN VIEW B-B

N.T.S.

CENTER OF CDS

STRUCTURE, SCREEN

AND SUMP OPENING

PVC HYDRAULIC SHEAR

PLATE

2'-7

" [7

87

]

(2

'-0

" [6

10

])

1'-9" [533]

(5

'-3

" [1

60

0])

ELEVATION A-A

N.T.S.

FIBERGLASS SEPARATION

CYLINDER AND INLET

SOLIDS

STORAGE SUMP

SEPARATION

SCREEN

INLET PIPE

(MULTIPLE INLET PIPES MAY

BE ACCOMMODATED)

OUTLET PIPE

PVC HYDRAULIC SHEAR

PLATE

(4

'-0

" [1

21

9])

FLOW

PERMANENT

POOL ELEV.

OIL BAFFLE SKIRT

A

### [####] I.D. MANHOLE

STRUCTURE

VA

RIE

S

FRAME AND COVER

(DIAMETER VARIES)

N.T.S.

+/-135°

M

A

X

.

+/-65°

M

A

X

.

F

L

O

W

FIBERGLASS SEPARATION

CYLINDER AND INLET

TOP SLAB ACCESS

(SEE FRAME AND COVER

DETAIL)

CONTRACTOR TO GROUT

TO FINISHED GRADE

GRADE

RINGS/RISERS

A

BB

F

O

R

M

A

I

N

T

E

N

A

N

C

E C

A

L

L

1

.

8

0

0

.

3

3

8

.

1

1

2

2

www.contechES.com

TM

C

l

e

a

n

w

a

t

er s

ta

r

t

s

h

e

r

e

®

GENERAL NOTES

1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.

2. FOR SITE SPECIFIC DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHT,

PLEASE CONTACT YOUR CONTECH ENGINEERED SOLUTIONS LLC REPRESENTATIVE.

www.ContechES.com

3. CDS WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA

AND INFORMATION CONTAINED IN THIS DRAWING. CONTRACTOR TO CONFIRM

STRUCTURE MEETS REQUIREMENTS OF PROJECT.

4. STRUCTURE SHALL MEET AASHTO HS20 LOAD RATING, ASSUMING EARTH COVER OF 0' -

2', AND GROUNDWATER ELEVATION AT, OR BELOW, THE OUTLET PIPE INVERT

ELEVATION. ENGINEER OF RECORD TO CONFIRM ACTUAL GROUNDWATER ELEVATION.

CASTINGS SHALL MEET AASHTO M306 AND BE CAST WITH THE CONTECH LOGO..

5. IF REQUIRED, PVC HYDRAULIC SHEAR PLATE IS PLACED ON SHELF AT BOTTOM OF

SCREEN CYLINDER. REMOVE AND REPLACE AS NECESSARY DURING MAINTENANCE

CLEANING.

6. CDS STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C-478 AND

AASHTO LOAD FACTOR DESIGN METHOD.

INSTALLATION NOTES

A. ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS ARE

SITE-SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE SPECIFIED BY ENGINEER OF

RECORD.

B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH

CAPACITY TO LIFT AND SET THE CDS MANHOLE STRUCTURE.

C. CONTRACTOR TO INSTALL JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS AND

ASSEMBLE STRUCTURE.

D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT INLET AND OUTLET PIPE(S). MATCH

PIPE INVERTS WITH ELEVATIONS SHOWN. ALL PIPE CENTERLINES TO MATCH PIPE

OPENING CENTERLINES.

E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT,

HOLDING WATER TO FLOWLINE INVERT MINIMUM. IT IS SUGGESTED THAT ALL JOINTS

BELOW PIPE INVERTS ARE GROUTED.

Water Quality Units (WQU) Q4-1, Q11-1

N.T.S.Source: VHB

LD_171

1/16

Contech CDS 2020-5

FRAME AND COVER

(DIAMETER VARIES)

N.T.S.

PLAN VIEW B-B

N.T.S.

CENTER OF CDS STRUCTURE,

SCREEN AND SUMP OPENING

PVC HYDRAULIC

SHEAR PLATE

2'-1

1" [8

89

]

(2

'-0

" [6

10

])

1'-9" [533]

(5

'-7

" [1

70

2])

ELEVATION A-A

N.T.S.

FIBERGLASS

SEPARATION CYLINDER

AND INLET

SOLIDS STORAGE

SUMP

SEPARATION

SCREEN

INLET PIPE

(MULTIPLE INLET PIPES MAY

BE ACCOMMODATED)

OUTLET PIPE

PVC HYDRAULIC

SHEAR PLATE

(4

'-0

" [1

21

9])

FLOW

PERMANENT

POOL ELEV.

OIL BAFFLE

SKIRT

A

### [####] I.D.

MANHOLE STRUCTURE

VA

RIE

S

+/-135°

M

A

X

.

+/-6

MA

X.

F

L

O

W

FIBERGLASS

SEPARATION CYLINDER

AND INLET

TOP SLAB ACCESS

(SEE FRAME AND

COVER DETAIL)

CONTRACTOR TO GROUT TO

FINISHED GRADE

GRADE

RINGS/RISERS

BB

A

F

O

R

M

A

I

N

T

E

N

A

N

C

E C

A

L

L

1

.

8

0

0

.

3

3

8

.

1

1

2

2

www.contechES.com

TM

C

l

e

a

n

w

a

t

er s

ta

r

t

s

h

e

r

e

®

GENERAL NOTES

1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.

2. FOR SITE SPECIFIC DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS

AND WEIGHT, PLEASE CONTACT YOUR CONTECH ENGINEERED

SOLUTIONS LLC REPRESENTATIVE. www.ContechES.com

3. CDS WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL

DESIGN DATA AND INFORMATION CONTAINED IN THIS DRAWING.

CONTRACTOR TO CONFIRM STRUCTURE MEETS REQUIREMENTS OF

PROJECT.

4. STRUCTURE SHALL MEET AASHTO HS20 LOAD RATING, ASSUMING EARTH

COVER OF 0' - 2', AND GROUNDWATER ELEVATION AT, OR BELOW, THE

OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TO CONFIRM

ACTUAL GROUNDWATER ELEVATION. CASTINGS SHALL MEET AASHTO

M306 AND BE CAST WITH THE CONTECH LOGO..

5. IF REQUIRED, PVC HYDRAULIC SHEAR PLATE IS PLACED ON SHELF AT

BOTTOM OF SCREEN CYLINDER. REMOVE AND REPLACE AS NECESSARY

DURING MAINTENANCE CLEANING.

6. CDS STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM

C-478 AND AASHTO LOAD FACTOR DESIGN METHOD.

INSTALLATION NOTES

A. ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS

ARE SITE-SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE

SPECIFIED BY ENGINEER OF RECORD.

B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND

REACH CAPACITY TO LIFT AND SET THE CDS MANHOLE STRUCTURE.

C. CONTRACTOR TO INSTALL JOINT SEALANT BETWEEN ALL STRUCTURE

SECTIONS AND ASSEMBLE STRUCTURE.

D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT INLET AND OUTLET

PIPE(S). MATCH PIPE INVERTS WITH ELEVATIONS SHOWN. ALL PIPE

CENTERLINES TO MATCH PIPE OPENING CENTERLINES.

E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS

WATER TIGHT, HOLDING WATER TO FLOWLINE INVERT MINIMUM. IT IS

SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED.

Water Quality Unit (WQU) Q12-1

N.T.S.Source: VHB

LD_171

1/16

Contech CDS 2025-5

GENERAL NOTES

1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.

2. FOR SITE SPECIFIC DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND

WEIGHT, PLEASE CONTACT YOUR CONTECH ENGINEERED SOLUTIONS LLC

REPRESENTATIVE. www.ContechES.com

3. CDS WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN

DATA AND INFORMATION CONTAINED IN THIS DRAWING. CONTRACTOR TO CONFIRM

STRUCTURE MEETS REQUIREMENTS OF PROJECT.

4. STRUCTURE SHALL MEET AASHTO HS20 LOAD RATING, ASSUMING EARTH COVER OF

0' - 2', AND GROUNDWATER ELEVATION AT, OR BELOW, THE OUTLET PIPE INVERT

ELEVATION. ENGINEER OF RECORD TO CONFIRM ACTUAL GROUNDWATER

ELEVATION. CASTINGS SHALL MEET AASHTO M306 AND BE CAST WITH THE CONTECH

LOGO..

5. IF REQUIRED, PVC HYDRAULIC SHEAR PLATE IS PLACED ON SHELF AT BOTTOM OF

SCREEN CYLINDER. REMOVE AND REPLACE AS NECESSARY DURING MAINTENANCE

CLEANING.

6. CDS STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C-478 AND

AASHTO LOAD FACTOR DESIGN METHOD.

INSTALLATION NOTES

A. ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS ARE

SITE-SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE SPECIFIED BY ENGINEER

OF RECORD.

B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH

CAPACITY TO LIFT AND SET THE CDS MANHOLE STRUCTURE.

C. CONTRACTOR TO INSTALL JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS

AND ASSEMBLE STRUCTURE.

D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT INLET AND OUTLET PIPE(S).

MATCH PIPE INVERTS WITH ELEVATIONS SHOWN. ALL PIPE CENTERLINES TO

MATCH PIPE OPENING CENTERLINES.

E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER

TIGHT, HOLDING WATER TO FLOWLINE INVERT MINIMUM. IT IS SUGGESTED THAT

ALL JOINTS BELOW PIPE INVERTS ARE GROUTED.

PLAN VIEW B-B

N.T.S.

FIBERGLASS SEPARATION

CYLINDER AND INLET

CENTER OF CDS STRUCTURE, SCREEN AND

SUMP OPENING

PVC HYDRAULIC SHEAR

PLATE

2'-0

" [6

10

]

(2

'-0

" [6

10

])

1'-9" [533]

(4

'-6

" [1

37

2])

ELEVATION A-A

N.T.S.

FIBERGLASS SEPARATION

CYLINDER AND INLET

SOLIDS STORAGE SUMP

SEPARATION

SCREEN

INLET PIPE

(MULTIPLE INLET PIPES

MAY BE ACCOMMODATED)

OUTLET PIPE

PVC HYDRAULIC

SHEAR PLATE

(4

'-0

" [1

21

9])

FLOW

PERMANENT POOL

ELEV.

OIL BAFFLE SKIRT

CONTRACTOR TO GROUT

TO FINISHED GRADE

GRADE

RINGS/RISERS

A

A

48" [1219] I.D. MANHOLE

STRUCTURE

TOP SLAB ACCESS

(SEE FRAME AND COVER

DETAIL)

VA

RIE

S

FRAME AND COVER

(DIAMETER VARIES)

N.T.S.

+/-135°

M

A

X

.

F

L

O

W

+/-6

MA

X.

BB

F

O

R

M

A

I

N

T

E

N

A

N

C

E C

A

L

L

1

.

8

0

0

.

3

3

8

.

1

1

2

2

www.contechES.com

TM

C

l

e

a

n

w

a

t

er s

ta

r

t

s

h

e

r

e

®

Water Quality Unit (WQU) Q3A-1

N.T.S.Source: VHB

LD_171

1/16

Contech CDS 2015-4

GENERAL NOTES

1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE.

2. DIMENSIONS MARKED WITH ( ) ARE REFERENCE DIMENSIONS. ACTUAL

DIMENSIONS MAY VARY.

3. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS

AND WEIGHTS, PLEASE CONTACT YOUR CONTECH ENGINEERED

SOLUTIONS LLC REPRESENTATIVE. www.contechES.com

4. CDS WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL

DESIGN DATA AND INFORMATION CONTAINED IN THIS DRAWING.

5. STRUCTURE SHALL MEET AASHTO HS20 AND CASTINGS SHALL MEET

HS20 (AASHTO M 306) LOAD RATING, ASSUMING GROUNDWATER

ELEVATION AT, OR BELOW, THE OUTLET PIPE INVERT ELEVATION.

ENGINEER OF RECORD TO CONFIRM ACTUAL GROUNDWATER

ELEVATION.

6. PVC HYDRAULIC SHEAR PLATE IS PLACED ON SHELF AT BOTTOM OF

SCREEN CYLINDER. REMOVE AND REPLACE AS NECESSARY DURING

MAINTENANCE CLEANING.

INSTALLATION NOTES

A. ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION

PROVISIONS ARE SITE-SPECIFIC DESIGN CONSIDERATIONS AND SHALL

BE SPECIFIED BY ENGINEER OF RECORD.

B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND

REACH CAPACITY TO LIFT AND SET THE CDS MANHOLE STRUCTURE

(LIFTING CLUTCHES PROVIDED).

C. CONTRACTOR TO ADD JOINT SEALANT BETWEEN ALL STRUCTURE

SECTIONS, AND ASSEMBLE STRUCTURE.

D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH PIPE

INVERTS WITH ELEVATIONS SHOWN.

E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS

WATER TIGHT, HOLDING WATER TO FLOWLINE INVERT MINIMUM. IT IS

SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED.

FRAME AND COVER

(DIAMETER VARIES)

N.T.S.

PLAN VIEW B-B

N.T.S.

FIBERGLASS

SEPARATION CYLINDER

AND INLET

CENTER OF CDS STRUCTURE,

SCREEN AND SUMP OPENING

(2

'-0

" [6

10

])

1'-9" [533]

ELEVATION A-A

N.T.S.

FIBERGLASS

SEPARATION CYLINDER

AND INLET

SOLIDS STORAGE

SUMP

SEPARATION

SCREEN

INLET PIPE

(MULTIPLE INLET PIPES MAY

BE ACCOMMODATED)

OUTLET PIPE

(4

'-0

" [1

21

9])

FLOW

PERMANENT

POOL ELEV.

OIL BAFFLE

SKIRT

A

VA

RIE

S

+/-135°

M

A

X

.

+/-65°

M

A

X

.

F

L

O

W

4'-1

" [1

24

5]

(6

'-9

" [2

05

8])

### [####] I.D.

MANHOLE STRUCTURE

TOP SLAB ACCESS

(SEE FRAME AND

COVER DETAIL)

TOP SLAB ACCESS

CONTRACTOR TO GROUT TO

FINISHED GRADE

GRADE

RINGS/RISERS

BB

A

F

O

R

M

A

I

N

T

E

N

A

N

C

E C

A

L

L

1

.

8

0

0

.

3

3

8

.

1

1

2

2

www.contechES.com

TM

C

l

e

a

n

w

a

t

e

r st

a

r

t

s

h

e

r

e

®

Water Quality Unit (WQU) Q3A-2

N.T.S.Source: VHB

LD_171

1/16

Contech CDS 3035-6

of

Project Number

Sheet

Drawing Number

Issued for

Checked byDesigned by

Appvd.DateRevisionNo.

Saved

Tu

esd

ay, A

ug

ust 25, 2020 2:34:03 P

M W

STV

IN

CEN

T P

lo

tted

Tu

esd

ay, A

ug

ust 25, 2020 2:54:50 P

M O

'B

rien

, Eric

\\vhb\gbl\proj\Boston\14483.00 brayton pt\cad\ld\Planset\14483.00 DT.dwg

vh

b.co

m

Date

1 Cedar Street

Suite 400

Providence, RI 02903

401.272.8100

Brayton Point

Commerce Center

Brayton Point Road

Somerset, Massachusetts

Local Approval

Not Approved for Construction

Aug. 21, 2020

11

14483.00

Site Details 3

C-4.03

11

EOB SDL

wstvincent
Snapshot