SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal Building or By Phone or GoToMeeting: You may dial in by calling United States +1 (571) 317-3122 Access Code: 974-684-669 or you may attend by utilizing the following link: https://global.gotomeeting.com/join/974684669 All public participants’ phones will be muted during the meeting except during the publ ic comment period where applicable. AGENDA: 1. Call to Order 2. Approval of Site Plan Review minutes dated July 27, 2020 3. 1141 Hus Drive Marquardt Village request for an institutional facility 4. Adjournment

Upload: others

Post on 17-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m ... 24, 2020 SPR Packet.pdf · Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal

SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal Building or By Phone or GoToMeeting: You may dial in by calling United States +1 (571) 317-3122 Access Code: 974-684-669 or you may attend by utilizing the following link: https://global.gotomeeting.com/join/974684669 All public participants’ phones will be muted during the meeting except during the public comment period where applicable. AGENDA: 1. Call to Order 2. Approval of Site Plan Review minutes dated July 27, 2020 3. 1141 Hus Drive – Marquardt Village request for an institutional facility 4. Adjournment

Page 2: SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m ... 24, 2020 SPR Packet.pdf · Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal

SITE PLAN REVIEW COMMITTEE July 27, 2020

The Site Plan Review Committee met on the above date at 1:30 P.M. in the Council Chambers of City Hall as well as via GotoMeeting. The following members were present: Emily McFarland, Jacob Maas, Jaynellen Holloway, Tim Gordon, Randy Johnson, Randy Franks, Randy Wojtasiak, Doug Zwieg, Rose Simon-Silva, Joe Lehner, and Andrew Beyer. Also in attendance were Nikki Zimmerman, Robert Stangler, and Matthew Petushek of Morton Buildings.

1. Call to Order The meeting was called to order by Chairperson Jacob Maas.

2. Approval of the Site Plan Review Committee Minutes Dated July 13, 2020

Motion was made by Doug Zwieg and seconded by Randy Johnson to approve the July 13, 2020 Site Plan Review minutes as submitted. Unanimously approved.

3. 792 Milford Street – request for a bus garage and seasonal storage building

Calvary Baptist is requesting a storage building to house their busses and seasonal items. No maintenance will occur in this building. The following was discussed by the various departments:

Engineering: There is an existing sanitary sewer easement. It should be noted that if anything, such as a driveway, is placed over or in an easement, should the city need to complete maintenance or improvements on anything within that easement, the city does not have to replace anything which is disturbed to access the easement. In addition, the storm water plan has been sent to a third party (Ruekert Mielke) for review. Any charges incurred for this will be charged back to the applicant. There is also an existing storm water basin on site. There is currently no maintenance agreement in place for this. An agreement must be submitted to the Engineering Department before construction begins. An erosion control permit must also be submitted to the Engineering Department with the rules and regulations being strictly adhered to throughout the project.

Building Inspector: The plans must be reviewed at the state before being submitted to the Building, Safety, & Zoning Department with the Commercial Building Permit application. Zoning Administrator: This item will be going before the Plan Commission on August 10, 2020 to have three conditional use permits reviewed.

A motion was made by Jaynellen Holloway and seconded by Doug Zwieg to approve this project with the following conditions:

A) The knowledge of the existing sanitary sewer easement and the notation that the city does not need

to replace anything on or in this easement should the area need maintenance or improvements by the city.

B) The storm water review fees from Ruekert Mielke will be charged to the applicant. C) An erosion control permit must be taken out prior to the work being started and all regulations shall be

strictly adhered to during the project. D) A maintenance agreement for the pond must be submitted to the Engineering Department by the

applicant.

Motion unanimously approved.

4. 1225 N. Fourth Street – concept plan review Robert Stangler was present to discuss this item which last appeared before the Site Plan Review Committee on January 13, 2020. The following was discussed by the various departments:

Engineering Department: Sidewalks will be required along Juneau Street but not along N. Fourth Street. They will have to be maintained by the association. The sidewalk must also be in the public right of way and must be 5’ wide. Any storm water review plans will be sent to a third party (Ruekert Mielke) for review. Any charges incurred for this will be charged back to the applicant.

Fire Department: The hydrant now being placed on Juneau Street in the public right of way is okay. The hammer heads also appear to be in compliance in the private drive areas.

Page 3: SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m ... 24, 2020 SPR Packet.pdf · Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal

BS&Z: On behalf of Randy Wojtasiak, Jacob Maas shared that per Chapter 545 this will have to be heard in front of the Park and Rec Commission for fees. The fees will be charged when each single structure is built. In addition, impact fees will be due when the building permits for each structure is paid for as well.

A motion was made by Doug Zwieg and seconded by Tim Gordon to approve this project with the following conditions:

A) The sidewalk currently shown on N. Fourth Street is not required. Sidewalk on Juneau Street will be

required. B) The storm water review fees from Ruekert Mielke will be charged to the applicant.

Motion unanimously passed.

5. Adjournment Motion was made by Jaynellen Holloway, seconded by Emily McFarland to adjourn. Unanimously approved.

Respectfully submitted,

Nikki Zimmerman, Recording Secretary NOTE: These minutes are uncorrected, and any corrections made thereto will be noted in the proceedings at which these minutes are approved.

Page 4: SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m ... 24, 2020 SPR Packet.pdf · Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal

5'-3" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0"

5'-0

"8

'-0

"8

'-0

"5

'-0

"

E

8'-0

"

8'-0" 8'-0" 8'-0"

8'-0

"8

'-0

"

4'-0" 16'-0" 4'-0" 10'-0" 4'-0" 10'-0" 4'-0" 10'-0" 46'-8"3'-4"4'-0"

116'-0"

6" 5'-9" 6"

51

'-0

"

6"

6"

5'-3" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0"

4'-0" 16'-0" 4'-0" 10'-0" 4'-0" 10'-0" 4'-0" 10'-0" 54'-0"

116'-0"

6" 5'-9"

6"

5'-0

"8

'-0

"8

'-0

"5

'-0

"8

'-0

"8

'-0

"8

'-0

"

51

'-0

"

6"

6"

6'-0

"3

'-4

"

E

20'-2"

5

1

2

" 44'-9

1

2

"

48'-0"

5

1

2

"

26'-8"

3

1

2

"

7'-8"

3

1

2

"

12'-6"

16

'-0

"

5

1

2

"

8'-0

"

3

1

2

"

7'-3

"

FE

CATCH

BASIN

CATCH

BASIN

FLOOR

DRAIN

FE

20'-5

1

2

"

16

'-0

"

6'-6"4'-0"4'-0"4'-0"

6'-0

"1

'-0

"1

'-0

"

6'-0

"

1'-0

"1

'-0

"

WASH BAY

100

1

A3.0

10

2

VEHICLE STORAGE

101

STORAGE

102

100A

105A

BREAK ROOM

103

TLT. RM

104

WORKSHOP

105

105B

10

3A

103B

10

4

VW

2

VW

2

VW1VW1

100C

100B

101D

101A

101E

101B

101F

101C

STORAGE

200

SHEET

200370

Marquardt V

illage

Pro

po

se

d M

ain

te

na

nce

S

ho

p

Hu

s D

rive

Wa

te

rto

wn

, W

I

BHA

low

fis7

52

S

. G

ro

ve

S

t.

Rip

on

, W

I 5

49

71

92

0-8

10

-5

56

1

Willia

m F

H

och

, A

IA

B H

rchi

tect

s, llc

A

2020 © BlowfisH Architects, llc

FLOOR PLAN

SCALE: 1/8" = 1'-0"

0'8' 8' 16'

PRELIMINARY

PR

ELIM

IN

AR

Y D

RA

WIN

G - N

OT

F

OR

C

ON

ST

RU

CT

IO

N

A1.1

JULY 15, 2020

AUG. 14, 2020

NORTH

MEZZANINE PLAN

SCALE: 1/8" = 1'-0"

0'8' 8' 16'

NORTH

Page 5: SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m ... 24, 2020 SPR Packet.pdf · Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal

WEST ELEVATION

SCALE: 1/8" = 1'-0"

EAST ELEVATION

SCALE: 1/8" = 1'-0"

SOUTH ELEVATION

SCALE: 1/8" = 1'-0"

NORTH ELEVATION

SCALE: 1/8" = 1'-0"

FIRST FLOOR

EL. = 100'-0"

ROOF BEARING

EL. = 116'-0"

FIRST FLOOR

EL. = 100'-0"

ROOF BEARING

EL. = 116'-0"

FIRST FLOOR

EL. = 100'-0"

ROOF BEARING

EL. = 116'-0"

FIRST FLOOR

EL. = 100'-0"

ROOF BEARING

EL. = 116'-0"

PRE-FIN. 29 ga. METAL

ROOF PANEL (TYP)

PRE-FIN. 29 GA. METAL

WALL PANEL (TYP)

PRE-FIN. METAL

CORNER TRIM (TYP)

PRE-FIN. METAL GUTTER

AND DOWNSPOUT (TYP)

BRICK WAINSCOT

(TYP)

PRE-FIN. METAL WRAPPED

WOOD SILL (TYP)

PRE-FIN. METAL

COVERED FASCIA (TYP)

PRE-FIN. 29 GA. METAL

WALL PANEL (TYP)

PRE-FIN. METAL

CORNER TRIM (TYP)

PRE-FIN. METAL GUTTER

AND DOWNSPOUT (TYP)

BRICK WAINSCOT

(TYP)

PRE-FIN. METAL WRAPPED

WOOD SILL (TYP)

14

'-8

"

INSULATED H.M. DOOR

AND FRAME - PAINTED

INSULATED H.M. DOOR

AND FRAME - PAINTED

INSULATED O.H.

DOOR (TYP)

VINYL HORIZ. SLIDER

WINDOW W/ INSULATED

GLAZING (TYP)

VINYL HORIZ. FIXED

WINDOW W/ INSULATED

GLAZING (TYP)

4

12

4

12

SHEET

200370

Marquardt V

illage

Pro

po

se

d M

ain

te

na

nce

S

ho

p

Hu

s D

rive

Wa

te

rto

wn

, W

I

BHA

low

fis7

52

S

. G

ro

ve

S

t.

Rip

on

, W

I 5

49

71

92

0-8

10

-5

56

1

Willia

m F

H

och

, A

IA

B H

rchi

tect

s, llc

A

2020 © BlowfisH Architects, llc

PRELIMINARY

PR

ELIM

IN

AR

Y D

RA

WIN

G - N

OT

F

OR

C

ON

ST

RU

CT

IO

N

A2.0

AUG 14, 2020

Page 6: SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m ... 24, 2020 SPR Packet.pdf · Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal
Page 7: SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m ... 24, 2020 SPR Packet.pdf · Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal
Page 8: SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m ... 24, 2020 SPR Packet.pdf · Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal
Page 9: SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m ... 24, 2020 SPR Packet.pdf · Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal
Page 10: SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m ... 24, 2020 SPR Packet.pdf · Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal
Page 11: SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m ... 24, 2020 SPR Packet.pdf · Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal
Page 12: SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m ... 24, 2020 SPR Packet.pdf · Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal
Page 13: SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m ... 24, 2020 SPR Packet.pdf · Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal

Mar

quar

dt V

illage

Mai

nten

ance

Bui

ldin

gW

ater

tow

n,W

IAu

gust

4, 2

020

Page 14: SITE PLAN REVIEW Monday, August 24, 2020 at 1:30 p.m ... 24, 2020 SPR Packet.pdf · Monday, August 24, 2020 at 1:30 p.m. Location: Council Chambers, Second Level of the Municipal