site plan - level 1 · skyline senior residence 11330 campo road floor plan - main level a1.0 1504...

11
Assisted Living Common Space Duplex Units Independent Living Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudio architecture. © COPYRIGHT d 2150 West Washington, Suite 303 San Diego, California 92110 s Team a Project No. Drawing No. o mu s tu d i o r c h i t e ctur e Date: July 24, 2019 C:\Temp\1504 Skyline Senior Residence - Arch(2020)[email protected] Skyline Senior Residence 11330 Campo Road Site Plan - Level 1 A0.1 1504 1" = 50'-0" 1 Site Plan SDC PDS RCVD 07-31-19 GPA16-005

Upload: others

Post on 07-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Site Plan - Level 1 · Skyline Senior Residence 11330 Campo Road Floor Plan - Main Level A1.0 1504 Notes 1 Lobby/Reception Desk 3 Administrative Offices 4 Clinic/Senior Services 7

Assisted Living

Common Space

Duplex Units

Independent Living

Pro

pri

eta

ry d

esig

n:

The

se d

raw

ing

s a

nd d

esig

n a

re p

rote

cte

d b

y c

om

mo

n law

co

pyri

gh

t. A

ll pa

tenta

ble

ma

teria

l co

nta

ined

here

in a

nd o

rigin

atin

g w

ith

do

musstu

dio

arc

hitectu

re s

hall

be p

rope

rty o

f d

om

usstu

dio

arc

hitectu

re.

© C

OP

YR

IGH

T

d

2150 West Washington, Suite 303San Diego, California 92110

s

Team

a

Project No.

Drawing No.

omus t udio r c h i tec t ure

Date: July 24, 2019

C:\T

em

p\1

504

Skylin

e S

enio

r R

esid

ence

- A

rch(2

02

0)_

john

.pyja

r@do

mu

sstu

dio

.com

.rvt

Skylin

e S

en

ior

Re

sid

ence

11330 C

am

po R

oad

Site P

lan

-L

evel 1

A0.1

1504

1" = 50'-0"1

Site Plan

SDC PDS RCVD 07-31-19 GPA16-005

Page 2: Site Plan - Level 1 · Skyline Senior Residence 11330 Campo Road Floor Plan - Main Level A1.0 1504 Notes 1 Lobby/Reception Desk 3 Administrative Offices 4 Clinic/Senior Services 7

SD

SD

SD

S

S

S

MH MH

MH

MH

MH

MH

MH

500

510

485

490

495

4904

90

495

495

500

505

510

515

520

500

505

510

515

520

530

485

485

490

495

500

530

535

505

510

515

525

520

490

495

500

485

480

530

540

548

530

520

510

520

515

520

510

500

490

510

520

530

540

550

560

550

540

530

520

520

510

500

510

530

540

550

570

560

540

550

560

570

1

A3.1

28

14

7

24

3

1

14

22

4

1

A2.2

2

A3.1

3

A3.1

25

26

Unit Count

Common Space

Assisted Living

Independent Living

Duplex Units

Level 1 25 Independent Living + 23 Assisted Living = 48 UnitsLevel 2 25 Independent Living + 49 Assisted Living = 74 UnitsLevel 3 25 Independent Living + 49 Assisted Living = 74 UnitsLevel 4 0 Independent Living + 26 Assisted Living = 26 Units

Totals: 75 Independent Living + 147 Assisted Living = 222 Units

(550 s.f. - 1 bedroom Unit) Total: 147 Units. There are no Kitchens in these units.

(1500 s.f. - 2 bedroom Units) Total: 10 duplex Units with Kitchens

Main Building unit breakdown by floor

(550 s.f. - 1 bedroom Unit) Total: 75 units. There are no Kitchens in these units

Pro

pri

eta

ry d

esig

n:

The

se d

raw

ing

s a

nd d

esig

n a

re p

rote

cte

d b

y c

om

mo

n law

co

pyri

gh

t. A

ll pa

tenta

ble

ma

teria

l co

nta

ined

here

in a

nd o

rigin

atin

g w

ith

do

musstu

dio

arc

hitectu

re s

hall

be p

rope

rty o

f d

om

usstu

dio

arc

hitectu

re.

© C

OP

YR

IGH

T

d

2150 West Washington, Suite 303San Diego, California 92110

s

Team

a

Project No.

Drawing No.

omus t udio r c h i tec t ure

Date: July 24, 2019

C:\T

em

p\1

504

Skylin

e S

enio

r R

esid

ence

- A

rch(2

02

0)_

john

.pyja

r@do

mu

sstu

dio

.com

.rvt

Skylin

e S

en

ior

Re

sid

ence

11330 C

am

po R

oad

Flo

or

Pla

n -

Ma

in L

eve

l

A1.0

1504

Notes1 Lobby/Reception Desk

3 Administrative Offices

4 Clinic/Senior Services

7 Nurses Area

14 Patio

22 Dog Run

24 Coffee Shop/Lounge

25 Fitness Room/Yoga Room

26 Craft Room

28 Pool

1" = 50'-0"1

Site - Main Level Colored Plans

Page 3: Site Plan - Level 1 · Skyline Senior Residence 11330 Campo Road Floor Plan - Main Level A1.0 1504 Notes 1 Lobby/Reception Desk 3 Administrative Offices 4 Clinic/Senior Services 7

SD

SD

SD

S

S

S

MHMH

MH

MH

MH

MH

MH

500

510

485

490

495

4904

90

495

495

500

505

510

515

520

500

505

510

515

520

530

485

485

490

495

500

530

535

505

510

515

525

520

490

495

500

485

480

530

540

548

530

520

510

520

515

520

510

500

490

510

520

530

540

550

560

550

540

530

520

520

510

500

510

530

540

550

570

560

540

550

560

570

1

A3.1

13

27

13

12

21

2

1

A2.2

2

A3.1

3

A3.1

Unit Count

Common Space

Assisted Living

Independent Living

Duplex Units

Level 1 25 Independent Living + 23 Assisted Living = 48 UnitsLevel 2 25 Independent Living + 49 Assisted Living = 74 UnitsLevel 3 25 Independent Living + 49 Assisted Living = 74 UnitsLevel 4 0 Independent Living + 26 Assisted Living = 26 Units

Totals: 75 Independent Living + 147 Assisted Living = 222 Units

(550 s.f. - 1 bedroom Unit) Total: 147 Units. There are no Kitchens in these units.

(1500 s.f. - 2 bedroom Units) Total: 10 duplex Units with Kitchens

Main Building unit breakdown by floor

(550 s.f. - 1 bedroom Unit) Total: 75 units. There are no Kitchens in these units

All

win

dow

s to

be 1

hour fir

e rate

d o

r equal

Pro

pri

eta

ry d

esig

n:

The

se d

raw

ing

s a

nd d

esig

n a

re p

rote

cte

d b

y c

om

mo

n law

co

pyri

gh

t. A

ll pa

tenta

ble

ma

teria

l co

nta

ined

here

in a

nd o

rigin

atin

g w

ith

do

musstu

dio

arc

hitectu

re s

hall

be p

rope

rty o

f d

om

usstu

dio

arc

hitectu

re.

© C

OP

YR

IGH

T

d

2150 West Washington, Suite 303San Diego, California 92110

s

Team

a

Project No.

Drawing No.

omus t udio r c h i tec t ure

Date: July 24, 2019

C:\T

em

p\1

504

Skylin

e S

enio

r R

esid

ence

- A

rch(2

02

0)_

john

.pyja

r@do

mu

sstu

dio

.com

.rvt

Skylin

e S

en

ior

Re

sid

ence

11330 C

am

po R

oad

Flo

or

Pla

n -

Seco

nd

Leve

l

A1.1

1504

Notes2 Memory Court

12 Kitchen

13 Dining Room

21 Service Parking and Bridge to Kitchen

27 Terrace Dining

1" = 50'-0"1

Site - Second Level

Page 4: Site Plan - Level 1 · Skyline Senior Residence 11330 Campo Road Floor Plan - Main Level A1.0 1504 Notes 1 Lobby/Reception Desk 3 Administrative Offices 4 Clinic/Senior Services 7

SD

SD

SD

S

S

S

MH MH

MH

MH

MH

MH

MH

500

510

485

490

495

4904

90

495

495

500

505

510

515

520

500

505

510

515

520

530

485

485

490

495

500

530

535

505

510

515

525

520

490

495

500

485

480

530

540

548

530

520

510

520

515

520

510

500

490

510

520

530

540

550

560

550

540

530

520

520

510

500

510

530

540

550

570

560

540

550

560

570

1

A3.1

1

A2.2

2

A3.1

3

A3.1

Unit Count

Common Space

Assisted Living

Independent Living

Duplex Units

Level 1 25 Independent Living + 23 Assisted Living = 48 UnitsLevel 2 25 Independent Living + 49 Assisted Living = 74 UnitsLevel 3 25 Independent Living + 49 Assisted Living = 74 UnitsLevel 4 0 Independent Living + 26 Assisted Living = 26 Units

Totals: 75 Independent Living + 147 Assisted Living = 222 Units

(550 s.f. - 1 bedroom Unit) Total: 147 Units. There are no Kitchens in these units.

(1500 s.f. - 2 bedroom Units) Total: 10 duplex Units with Kitchens

Main Building unit breakdown by floor

(550 s.f. - 1 bedroom Unit) Total: 75 units. There are no Kitchens in these units

All

win

dow

s to

be 1

hour fir

e rate

d o

r equal

Pro

pri

eta

ry d

esig

n:

The

se d

raw

ing

s a

nd d

esig

n a

re p

rote

cte

d b

y c

om

mo

n law

co

pyri

gh

t. A

ll pa

tenta

ble

ma

teria

l co

nta

ined

here

in a

nd o

rigin

atin

g w

ith

do

musstu

dio

arc

hitectu

re s

hall

be p

rope

rty o

f d

om

usstu

dio

arc

hitectu

re.

© C

OP

YR

IGH

T

d

2150 West Washington, Suite 303San Diego, California 92110

s

Team

a

Project No.

Drawing No.

omus t udio r c h i tec t ure

Date: July 24, 2019

C:\T

em

p\1

504

Skylin

e S

enio

r R

esid

ence

- A

rch(2

02

0)_

john

.pyja

r@do

mu

sstu

dio

.com

.rvt

Skylin

e S

en

ior

Re

sid

ence

11330 C

am

po R

oad

Flo

or

Pla

n -

Thir

d L

eve

l

A1.3

1504

Notes

1" = 50'-0"1

Site - Third Level

Page 5: Site Plan - Level 1 · Skyline Senior Residence 11330 Campo Road Floor Plan - Main Level A1.0 1504 Notes 1 Lobby/Reception Desk 3 Administrative Offices 4 Clinic/Senior Services 7

SD

SD

SD

S

S

S

MHMH

MH

MH

MH

MH

MH

500

510

485

490

495

4904

90

495

495

500

505

510

515

520

500

505

510

515

520

530

485

485

490

495

500

530

535

505

510

515

525

520

490

495

500

485

480

530

540

548

530

520

510

520

515

520

510

500

490

510

520

530

540

550

560

550

540

530

520

520

510

500

510

530

540

550

570

560

540

550

560

570

1

A3.1

1

A2.2

2

A3.1

3

A3.1

Unit Count

Common Space

Assisted Living

Independent Living

Duplex Units

Level 1 25 Independent Living + 23 Assisted Living = 48 UnitsLevel 2 25 Independent Living + 49 Assisted Living = 74 UnitsLevel 3 25 Independent Living + 49 Assisted Living = 74 UnitsLevel 4 0 Independent Living + 26 Assisted Living = 26 Units

Totals: 75 Independent Living + 147 Assisted Living = 222 Units

(550 s.f. - 1 bedroom Unit) Total: 147 Units. There are no Kitchens in these units.

(1500 s.f. - 2 bedroom Units) Total: 10 duplex Units with Kitchens

Main Building unit breakdown by floor

(550 s.f. - 1 bedroom Unit) Total: 75 units. There are no Kitchens in these units

Pro

pri

eta

ry d

esig

n:

The

se d

raw

ing

s a

nd d

esig

n a

re p

rote

cte

d b

y c

om

mo

n law

co

pyri

gh

t. A

ll pa

tenta

ble

ma

teria

l co

nta

ined

here

in a

nd o

rigin

atin

g w

ith

do

musstu

dio

arc

hitectu

re s

hall

be p

rope

rty o

f d

om

usstu

dio

arc

hitectu

re.

© C

OP

YR

IGH

T

d

2150 West Washington, Suite 303San Diego, California 92110

s

Team

a

Project No.

Drawing No.

omus t udio r c h i tec t ure

Date: July 24, 2019

C:\T

em

p\1

504

Skylin

e S

enio

r R

esid

ence

- A

rch(2

02

0)_

john

.pyja

r@do

mu

sstu

dio

.com

.rvt

Skylin

e S

en

ior

Re

sid

ence

11330 C

am

po R

oad

Flo

or

Pla

n -

Fo

urt

h L

eve

l

A1.4

1504

Notes

1" = 50'-0"2

Site - Fourth Level

Page 6: Site Plan - Level 1 · Skyline Senior Residence 11330 Campo Road Floor Plan - Main Level A1.0 1504 Notes 1 Lobby/Reception Desk 3 Administrative Offices 4 Clinic/Senior Services 7

SD

SD

SD

S

S

S

MHMH

MH

MH

MH

MH

MH

500

510

485

490

495

4904

90

495

495

500

505

510

515

520

500

505

510

515

520

530

485

485

490

495

500

530

535

505

510

515

525

520

490

495

500

485

480

530

540

548

530

520

510

520

515

520

510

500

490

510

520

530

540

550

560

550

540

530

520

520

510

500

510

530

540

550

570

560

540

550

560

570

1

A3.1

1

A2.2

2

A3.1

3

A3.1

Parking:77 total spaces

1

2

3

45

6

7

8

9

10

11

12

13

14

15

16

17

18

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

4142

43 4445 46 47 4849 50 51 525354

55

56575859606162

Trash room

24' - 0" 21

1920

6364

65

66

6768

69

70

71

72

7374

75

76

Bicycle Parking for (7) Spaces

77

Pro

pri

eta

ry d

esig

n:

The

se d

raw

ing

s a

nd d

esig

n a

re p

rote

cte

d b

y c

om

mo

n law

co

pyri

gh

t. A

ll pa

tenta

ble

ma

teria

l co

nta

ined

here

in a

nd o

rigin

atin

g w

ith

do

musstu

dio

arc

hitectu

re s

hall

be p

rope

rty o

f d

om

usstu

dio

arc

hitectu

re.

© C

OP

YR

IGH

T

d

2150 West Washington, Suite 303San Diego, California 92110

s

Team

a

Project No.

Drawing No.

omus t udio r c h i tec t ure

Date: July 24, 2019

C:\T

em

p\1

504

Skylin

e S

enio

r R

esid

ence

- A

rch(2

02

0)_

john

.pyja

r@do

mu

sstu

dio

.com

.rvt

Skylin

e S

en

ior

Re

sid

ence

11330 C

am

po R

oad

Flo

or

Pla

n -

Pa

rkin

g G

ara

ge

A1.5

1504

Notes

1" = 50'-0"1

Parking Garage Floor Plan

The number of Parking spaces shall be provided to meet the San Diego County Zoning Ordinance.

The number of Bicycle Parking spaces shall be provided to meet the San Diego County Zoning Ordinance.

1.

2.

Page 7: Site Plan - Level 1 · Skyline Senior Residence 11330 Campo Road Floor Plan - Main Level A1.0 1504 Notes 1 Lobby/Reception Desk 3 Administrative Offices 4 Clinic/Senior Services 7

4A2.2

2A2.2

1A2.1

3A2.1

4A2.1

2A2.1

3A2.2

Flat area for Solar Panels

Tile Roof

Trellis

Trellis

Tile Roof

Tile Roof

Pro

pri

eta

ry d

esig

n:

The

se d

raw

ing

s a

nd d

esig

n a

re p

rote

cte

d b

y c

om

mo

n law

co

pyri

gh

t. A

ll pa

tenta

ble

ma

teria

l co

nta

ined

here

in a

nd o

rigin

atin

g w

ith

do

musstu

dio

arc

hitectu

re s

hall

be p

rope

rty o

f d

om

usstu

dio

arc

hitectu

re.

© C

OP

YR

IGH

T

d

2150 West Washington, Suite 303San Diego, California 92110

s

Team

a

Project No.

Drawing No.

omus t udio r c h i tec t ure

Date: July 24, 2019

C:\T

em

p\1

504

Skylin

e S

enio

r R

esid

ence

- A

rch(2

02

0)_

john

.pyja

r@do

mu

sstu

dio

.com

.rvt

Skylin

e S

en

ior

Re

sid

ence

11330 C

am

po R

oad

Roo

f P

lan

A1.6

1504

Notes

1" = 50'-0"2

Roof Plan

Page 8: Site Plan - Level 1 · Skyline Senior Residence 11330 Campo Road Floor Plan - Main Level A1.0 1504 Notes 1 Lobby/Reception Desk 3 Administrative Offices 4 Clinic/Senior Services 7

Main Level505.00

2nd Level519.00

3rd Level530.00

Upper Roof552.00

T.O. Parapet559.00

Parking Garage493.00

4th Level541.00

Dining Roof536.00

51

52

53

54

54

53

56

51

52

54

53

Main Level505.00

2nd Level519.00

3rd Level530.00

Upper Roof552.00

T.O. Parapet559.00

Parking Garage493.00

53

51

52

51

53

Main Level505.00

2nd Level519.00

3rd Level530.00

Upper Roof552.00

T.O. Parapet559.00

Parking Garage493.00

4th Level541.00

Dining Roof536.00

51

5352

5454

53 51

52

Main Level505.00

2nd Level519.00

3rd Level530.00

Upper Roof552.00

T.O. Parapet559.00

Parking Garage493.00

4th Level541.00

Dining Roof536.00

51

52 53

52

51

5454

Pro

pri

eta

ry d

esig

n:

The

se d

raw

ing

s a

nd d

esig

n a

re p

rote

cte

d b

y c

om

mo

n law

co

pyri

gh

t. A

ll pa

tenta

ble

ma

teria

l co

nta

ined

here

in a

nd o

rigin

atin

g w

ith

do

musstu

dio

arc

hitectu

re s

hall

be p

rope

rty o

f d

om

usstu

dio

arc

hitectu

re.

© C

OP

YR

IGH

T

d

2150 West Washington, Suite 303San Diego, California 92110

s

Team

a

Project No.

Drawing No.

omus t udio r c h i tec t ure

Date: July 24, 2019

C:\T

em

p\1

504

Skylin

e S

enio

r R

esid

ence

- A

rch(2

02

0)_

john

.pyja

r@do

mu

sstu

dio

.com

.rvt

Skylin

e S

en

ior

Re

sid

ence

11330 C

am

po R

oad

Ele

vation

s

A2.1

1504

Notes51 Stucco

52 Siding

53 Tile Roof

54 Trellis

56 Window

1" = 20'-0"1

Site Elevation - South (Right)

1" = 20'-0"3

Site Elevation - North (Left)

1" = 20'-0"2

Site Elevation - South (Left)

1" = 20'-0"4

Site Elevation - North (Right)

Page 9: Site Plan - Level 1 · Skyline Senior Residence 11330 Campo Road Floor Plan - Main Level A1.0 1504 Notes 1 Lobby/Reception Desk 3 Administrative Offices 4 Clinic/Senior Services 7

Main Level505.00

2nd Level519.00

3rd Level530.00

Upper Roof552.00

T.O. Parapet559.00

Parking Garage493.00

4th Level541.00

Existing Grade LineExisting Grade Line

Existing Grade Line

52' -

1"

Main Level505.00

2nd Level519.00

3rd Level530.00

Upper Roof552.00

T.O. Parapet559.00

4th Level541.00

53 56 52 5351

Main Level505.00

2nd Level519.00

3rd Level530.00

Upper Roof552.00

Parking Garage493.00

4th Level541.00

Dining Roof536.00

51 52 53 5456

Main Level505.00

2nd Level519.00

3rd Level530.00

Upper Roof552.00

T.O. Parapet559.00

Parking Garage493.00

51 54 53 52 51

Pro

pri

eta

ry d

esig

n:

The

se d

raw

ing

s a

nd d

esig

n a

re p

rote

cte

d b

y c

om

mo

n law

co

pyri

gh

t. A

ll pa

tenta

ble

ma

teria

l co

nta

ined

here

in a

nd o

rigin

atin

g w

ith

do

musstu

dio

arc

hitectu

re s

hall

be p

rope

rty o

f d

om

usstu

dio

arc

hitectu

re.

© C

OP

YR

IGH

T

d

2150 West Washington, Suite 303San Diego, California 92110

s

Team

a

Project No.

Drawing No.

omus t udio r c h i tec t ure

Date: July 24, 2019

C:\T

em

p\1

504

Skylin

e S

enio

r R

esid

ence

- A

rch(2

02

0)_

john

.pyja

r@do

mu

sstu

dio

.com

.rvt

Skylin

e S

en

ior

Re

sid

ence

11330 C

am

po R

oad

Ele

va

tio

ns/S

ection

s

A2.2

1504

Notes51 Stucco

52 Siding

53 Tile Roof

54 Trellis

56 Window

1/32" = 1'-0"1

Site Section - NorthSouth

1" = 20'-0"4

West Elevation

1" = 20'-0"2

Site Elevation - East (left)1" = 20'-0"

3Site Elevation - East (Right)

Page 10: Site Plan - Level 1 · Skyline Senior Residence 11330 Campo Road Floor Plan - Main Level A1.0 1504 Notes 1 Lobby/Reception Desk 3 Administrative Offices 4 Clinic/Senior Services 7

14' -

0"

10' -

0"

2nd Level

1st Level

T.O. Roof

53 5251 56

24' -

0"

14' -

0"

2nd Level

1st Level

T.O. Roof

53 5251

10' -

0"

24' -

0"

14' -

0"

10' -

0"

2nd Level

1st Level

T.O. Roof

535251

24' -

0" 1

4' -

0"

10' -

0"

2nd Level

1st Level

T.O. Roof

5352 51

24' -

0"

Pro

pri

eta

ry d

esig

n:

The

se d

raw

ing

s a

nd d

esig

n a

re p

rote

cte

d b

y c

om

mo

n law

co

pyri

gh

t. A

ll pa

tenta

ble

ma

teria

l co

nta

ined

here

in a

nd o

rigin

atin

g w

ith

do

musstu

dio

arc

hitectu

re s

hall

be p

rope

rty o

f d

om

usstu

dio

arc

hitectu

re.

© C

OP

YR

IGH

T

d

2150 West Washington, Suite 303San Diego, California 92110

s

Team

a

Project No.

Drawing No.

omus t udio r c h i tec t ure

Date: July 24, 2019

C:\T

em

p\1

504

Skylin

e S

enio

r R

esid

ence

- A

rch(2

02

0)_

john

.pyja

r@do

mu

sstu

dio

.com

.rvt

Skylin

e S

en

ior

Re

sid

ence

11330 C

am

po R

oad

Dup

lex E

leva

tion

s

A2.3

1504

1" = 10'-0"1

West Elevation1" = 10'-0"

2North Elevation

1" = 10'-0"3

East Elevation1" = 10'-0"

4South Elevation

Notes51 Stucco

52 Siding

53 Tile Roof

56 Window

Page 11: Site Plan - Level 1 · Skyline Senior Residence 11330 Campo Road Floor Plan - Main Level A1.0 1504 Notes 1 Lobby/Reception Desk 3 Administrative Offices 4 Clinic/Senior Services 7

Main Level505.00

2nd Level519.00

3rd Level530.00

Upper Roof552.00

T.O. Parapet559.00

Parking Garage493.00

53' -

0"

Existing Grade Line

Existing Grade Line

Existing Grade Line

Existing Grade Line

Main Level505.00

2nd Level519.00

3rd Level530.00

Upper Roof552.00

T.O. Parapet559.00

Parking Garage493.00

4th Level541.00

Dining Roof536.00

Existing Grade Line

Existing Grade Line

Existing Grade Line

57' -

0"

Existing Condominiums Beyond

+/- 572

Main Level505.00

2nd Level519.00

3rd Level530.00

Upper Roof552.00

T.O. Parapet559.00

Parking Garage493.00

4th Level541.00

Dining Roof536.00

Existing Grade Line

Existing Grade Line

Existing Grade Line

Existing Grade Line

49' -

0"

Existing Condominiums

+/- 572

Pro

pri

eta

ry d

esig

n:

The

se d

raw

ing

s a

nd d

esig

n a

re p

rote

cte

d b

y c

om

mo

n law

co

pyri

gh

t. A

ll pa

tenta

ble

ma

teria

l co

nta

ined

here

in a

nd o

rigin

atin

g w

ith

do

musstu

dio

arc

hitectu

re s

hall

be p

rope

rty o

f d

om

usstu

dio

arc

hitectu

re.

© C

OP

YR

IGH

T

d

2150 West Washington, Suite 303San Diego, California 92110

s

Team

a

Project No.

Drawing No.

omus t udio r c h i tec t ure

Date: July 24, 2019

C:\T

em

p\1

504

Skylin

e S

enio

r R

esid

ence

- A

rch(2

02

0)_

john

.pyja

r@do

mu

sstu

dio

.com

.rvt

Skylin

e S

en

ior

Re

sid

ence

11330 C

am

po R

oad

Section

s

A3.1

1504

Notes

1" = 20'-0"1

Site Section - EastWest Bottom

1" = 20'-0"2

Site Section - EastWest Middle

1" = 20'-0"3

Site Section - EastWest Top