HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Site ID : 28UPD029.
Site Name : Perumnas Antang.
Drafted by : Marwan Purba.
Region : South Sulawesi.
Brown Field Site Model Indoor photos Album
No Name Company Sign
1
2
3
4
5
This document is Site Model that have been confirmed by Huawei and Indosat.
Below are PIC of each company.
Site ID : 28UPD029.
Site Name : Perumnas Antang.
Site Type : Brown Field Indoor.
Region : South Sulawesi.
Project Name : Indosat MBS Project.
Site Solution Scenario : Reuse U2100 (Cut Feeders + New Jumpers).
Previous System : G900 & U2100.
Current System : G900, DCS1800, U2100, U900.
Pre-assembly : in the warehouse.
Supervised by:
Indosat Team:
1. Rae Lawrance as SME.
2. Zain Aslam as SME.
3. Dave Vipond as Senior QC.
Huawei Team:
1. Ian Raynold as QM HQ.
2. Caoweidong as RPM South Sulawesi.
3. Zhaoyongchao as PMO.
4. Mahardika Dewayana as DQA.
5. Apip Bisri as EHS Expert.
6. Marwan Mulia Purba as QC.
7. Muhammad Fauzan as Project Engineer.
8. Sugiharto as Project Engineer.
9. Maykel as MW Engineer.
10. Zhoujin, Hamdan, Chandra Gunawan and Fahmi as BSS Engineers.
11. Syaiful Nadjar as Power Engineer.
General Information:
All connectors RRU, Filter, Port Antenna have been tightened by Torch Wrench 25Nm.
All hybrid tale and power DC connection in RRU have been checked by QC Huawei.
Pre-assembly
All hybrid tale and power DC connection in Junction Box have been checked by QC
Huawei.
All hybrid tale and power DC connection in Junction Box have been checked by QC
Huawei.
Pre-assembly
Waterproofing done by 3 layers; Insulate tape, rubber then insulate tape.
Waterproofing done by 3 layers; Insulate tape, rubber then insulate tape and finally
fixed by cable tie top and bottom.
Pre-assembly
Connection of Grounding to Junction box have been checked and tightened properly.
Connection of grounding RRU and Filter have been checked properly.
Pre-assembly
View of Pre-Assembly done on Warehouse.
View of Pre-Assembly done on Warehouse.
Pre-assembly
View of Pre-Assembly done on Warehouse
Pre-assembly
Antenna packet ready to delivery to site.
Crane Truck loading packet of antenna.
Packing and delivery
Unpacking materials antenna packet on site.
Unpacking materials antenna packet on site.
Antenna Installation
Anchor bolts have been installed tightly.
Anchor bolts have been installed tightly.
Anchor bolts Installation of Indoor Service Rack
Left view of Indoor Service Cabinet
Right view of Indoor Service Cabinet
Indoor Service Rack Installation
Indoor service cabinet front view.
Over view of ODF, BBU Main, BBU spare, EMUA and DDF.
Indoor cabinet Installation
View of ODF and DCPDU full pull out.
View of ODF and DCPDU from right side.
Optic Installation
View of Cross connection BTS and MW in DDF.
View of Cross connection BTS and MW in DDF.
E1T1 Installation
View of Route cables of Power DC and grounding.
Connection grounding at IGB inside Indoor Service Rack.
Grounding Installation
Grounding Indoor Service Rack Installation
Over view of L-support for Indoor Service Rack.
L-support of Indoor Service Rack Installation
Route AC Power cable from Rectifier to Existing ACPDB.
View AC Power entering ACPDB Existing.
Power system Installation
View of Connection DC Power of BBU, EMUA and RRU at the DCPDU Rectifier.
Power system Installation
View of connection AC Power at Terminal block of Indoor Service Rack.
Back view of Terminal block covered.
Power system Installation
Full view of existing ACPDB.
AC Power connection add 3 pieces New MCB 16A
Power system Installation
AC Power source measure result Phase-R with Phase-S = 371 VAC.
AC Power source measure result Phase-S with Phase-T = 379 VAC.
Power system Installation
Full view of Battery 2 Banks 170Ah.
Back view of Indoor Service Cabinet
Power system Installation
View of Alarm connection in EMUA.
View of Alarm connection in DDF at top of Indoor Service Rack.
Alarm Installation
Left view of cable management Power separate with Alarm and traffic cables.
Right view of cable management.
Cable management
View of route cable from EMUA to DDF.
View of route cable from EMUA to DDF.
Cable management
View of route trunk cable on the indoor tray.
Full view of route trunk cable entering the shelter.
Trunk cable Installation
Route cable of 2 pcs Trunk cable on HCT.
Route cable of 2 pieces Trunk cable on VCT.
Trunk cables Installation
View of connection grounding kit of Trunk cables.
View of grounding kit RFS Trunk cables.
Grounding Installation
View of middle grounding kit of trunk cable upper HCT.
View of top grounding kit of trunk.
Grounding Installation
Grounding RRU GSM, Filter GSM, RRU DCS sector 1.
Grounding RRU GSM, Filter GSM, RRU DCS sector 2.
Grounding Installation
Over view Grounding connection sector 3
Grounding RRU GSM, Filter GSM, RRU DCS sector 3.
Grounding Installation
Route cable of main grounding from Sector 1,2 and 3 going to the main EGB on tower.
Over view connection of main grounding cable sector 1,2 and 3 include 2 grounding
kit of trunk cables at the main EGB.
Grounding Installation
View of top bending trunk cable on tower.
Hoisting grip hang on tower.
Trunk cable Installation
Full view Antenna Triple band sector 1 on tower.
Full view Antenna Triple band sector 2 on tower.
Antenna Triple band Installation
Full view Antenna Triple band sector 3 on tower.
Antenna Triple band Installation
View of connection jumper on port antenna triple band sector 1.
View of connection jumper on port antenna triple band sector 2.
Jumper cables Installation
View of connection jumper on port antenna triple band sector 3.
Jumper cables Installation
View of route Trunk cable to the Junction Box.
View of route Trunk cable to the Junction Box.
Cables management
View of route Trunk cable to the Junction Box.
Cables management
View of connection optic cables in CPRI 0 & CPRI 1 and Power DC connection in RRU.
View of connection Optic and Power DC of RRU inside Junction Box.
Power DC and Optic Installation
Mechanical tilt sector 1.
Mechanical tilt sector 2.
Mechanical Tilt measure
Mechanical tilt sector 3.
Mechanical Tilt measure
Routing trunk cable, grounding and jumper through tower bracing sector 1 & 2.
Routing trunk cable, grounding and jumper through tower bracing sector 3.
Cable management on tower
View of antenna height base on confirmation RNP 38.5 Magl.
View of antenna height base on confirmation RNP 38.5 Magl.
Antenna height base on RNP
View of connection strut antenna on bracing tower.
Antenna strut Installation
Tested Video call on site using Indosat Sim Card.
Function test and alarm test result. (Please click twice at the above icon).
Function test and alarm test result from BSC Indosat KIMA
Site Clean.
Site Clean.
Site clean
Site clean.
Site clean
Full view of antenna triple band on tower.
Thank you www.huawei.com
Copyright©2011 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements
regarding the future financial and operating results, future product portfolio, new technology, etc. There are a
number of factors that could cause actual results and developments to differ materially from those expressed or
implied in the predictive statements. Therefore, such information is provided for reference purpose only and
constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.