site audit report - major projects

125
Site Audit Report

Upload: others

Post on 17-Mar-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Site Audit Report

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  i 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

TABLE OF CONTENTS 

1.0  INTRODUCTION ..................................................................................................................................... 1 

1.1  Background ................................................................................................................................. 1 

1.2  Scope and Structure of Review Report ...................................................................................... 4 

1.3  Limitations and Intellectual Property Matters ........................................................................... 5 

2.0  OVERVIEW OF WORKS COMPLETED AND INVOLVEMENT OF AUDITOR ............................................... 6 

3.0  SITE INFORMATION ............................................................................................................................. 10 

3.1  Site Identification and Location ................................................................................................ 10 

3.2  Site Setting................................................................................................................................ 10 

3.3  Site Layout, Topography and Drainage .................................................................................... 10 

3.3.1  Site Layout ................................................................................................................ 10 

3.3.2  Topography .............................................................................................................. 11 

3.3.3  Drainage ................................................................................................................... 11 

3.4  Geology ..................................................................................................................................... 11 

3.5  Hydrogeology ........................................................................................................................... 11 

3.6  Site History ............................................................................................................................... 11 

3.7  Summary of Identified Contamination Issues .......................................................................... 13 

3.7.1  Groundwater ............................................................................................................ 13 

3.7.2  Asbestos ................................................................................................................... 14 

3.7.3  Ground Gases ........................................................................................................... 14 

3.8  Proposed Development ............................................................................................................ 14 

3.9  Assessment Criteria .................................................................................................................. 15 

3.9.1  Soil ............................................................................................................................ 15 

3.9.2  Soil Vapour/Ground Gas ........................................................................................... 16 

3.9.3  Groundwater ............................................................................................................ 17 

4.0  SUMMARY OF RELEVANT INVESTIGATION WORK .............................................................................. 18 

4.1  Stage 1 Preliminary Investigation (AGEE 1990) ........................................................................ 18 

4.2  Stage 2 Survey (WWC 1996) ..................................................................................................... 18 

4.3  Stage 4 Investigations ............................................................................................................... 19 

4.3.1  Full Scale Reactive Iron Barrier, Data Gaps Report (URS 2004a).............................. 19 

4.3.2  2004 DNAPL Source Area Investigation (URS 2004b) ............................................... 19 

4.4  Preliminary Soil Investigations (HLA 2005) ............................................................................... 19 

4.5  Southern Plumes Source Area Delineation Investigation (URS 2006) ...................................... 20 

4.6  Shallow Contaminated Soil/Fill Delineation and Waste Management (Golder 2012b) ........... 21 

4.7  Review of Risk Issues – Groundwater Discharge to Springvale Drain (EnRiskS 2012) .............. 22 

4.8  Delineation of Remediation Areas (JBS&G 2014b) ................................................................... 23 

4.9  Asbestos and Vapour Assessment (JBS&G 2018b) ................................................................... 24 

4.10  Auditor’s Review of Investigations ........................................................................................... 25 

5.0  SUMMARY OF PREVIOUS REMEDIATION WORK ................................................................................. 26 

5.1  Soil Hotspot Validation (JBS&G 2015d) .................................................................................... 26 

5.1.1  Removal of Vegetation ............................................................................................. 26 

5.1.2  Stripping of Superficial Soils ..................................................................................... 26 

5.1.3  Monitoring and Extraction Well Decommissioning.................................................. 26 

5.1.4  Air and Environmental Monitoring .......................................................................... 26 

5.1.5  Excavation of Hotspots and Stockpiles ..................................................................... 27 

5.1.6  Stockpiled Materials from the Compensatory Flood Basin ...................................... 27 

5.1.7  Waste Materials Disposed Off‐Site or Placed on Block 2 ......................................... 27 

5.1.8  Soil from Block 2 ....................................................................................................... 27 

5.1.9  Validation Results ..................................................................................................... 27 

ii  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

6.0  CONCEPTUAL SITE MODEL AND CONTAMINATION ASSESSMENT ..................................................... 29 

6.1  Topographic Setting ................................................................................................................. 29 

6.2  Geology .................................................................................................................................... 29 

6.2.1  Regional.................................................................................................................... 29 

6.2.2  Local ......................................................................................................................... 30 

6.3  Hydrogeology ........................................................................................................................... 31 

6.3.1  Groundwater Flow Regime ...................................................................................... 31 

6.3.2  Groundwater Levels ................................................................................................. 32 

6.3.3  Hydraulic Characteristics .......................................................................................... 32 

6.4  Groundwater and Surface Water Interaction near the Springvale Drain ................................ 33 

6.5  Site Contamination Issues ........................................................................................................ 33 

6.6  Contaminants of Potential Concern ......................................................................................... 34 

6.7  Updated CSM (Orica 2017) ...................................................................................................... 34 

7.0  HUMAN HEALTH RISK ASSESSMENT ................................................................................................... 36 

7.1  Methodology ............................................................................................................................ 36 

7.2  Risk Issues on Block 1 ............................................................................................................... 37 

7.2.1  Review of Groundwater Data .................................................................................. 37 

7.2.2  Review of Soil Gas and Flux Emissions Data ............................................................ 38 

7.2.3  Exposure Pathways ‐ Specifically Related to Lot 9 ................................................... 38 

7.3  Assessment of Risk – Asbestos ................................................................................................. 39 

7.3.1  Assessment of Risk ‐ Asbestos ‐ Specifically Related to Lot 9 .................................. 40 

7.4  Assessment of Risk – Vapour Intrusion .................................................................................... 40 

7.4.1  Vapour Intrusion from Groundwater ....................................................................... 40 

7.4.2  Vapour Intrusion from Springvale Drain .................................................................. 43 

7.4.3  Assessment of Risk – Ground Gas ............................................................................ 44 

7.5  EnRiskS Conclusions ................................................................................................................. 46 

7.6  Auditor’s Review of EnRiskS (2019) ......................................................................................... 46 

7.7  Auditor’s Review of Potential Impacts on Neighbouring Properties ....................................... 48 

8.0  REMEDIATION ACTION PLAN .............................................................................................................. 49 

8.1  Remediation/Management Approach ..................................................................................... 49 

8.2  Geotechnical and Foundation Issues associated with Deck Construction ............................... 49 

8.3  Regulatory Compliance ............................................................................................................ 50 

8.4  Barrier System (Management of Asbestos in Soil) ................................................................... 50 

8.5  Vapour/Gas Mitigation System ................................................................................................ 51 

8.6  Waste Classification and Off‐Site Disposal of Soils .................................................................. 51 

8.7  Backfilling of Excavations and Physical Separation Layer ........................................................ 52 

8.8  Validation ................................................................................................................................. 52 

8.9  Unexpected Finds ..................................................................................................................... 52 

8.10  Ongoing Monitoring/Management .......................................................................................... 52 

8.11  Auditor’s Review ...................................................................................................................... 53 

9.0  AUDITOR’S ASSESSMENT OF THE SUITABILITY OF THE REMEDIATION ACTION PLAN ....................... 54 

9.1  Risks to Human Health ............................................................................................................. 54 

9.2  Risk to Structures ..................................................................................................................... 55 

9.3  Risk to the Environment ........................................................................................................... 55 

9.4  Regulatory Compliance ............................................................................................................ 55 

9.5  Potential Contaminant Migration ............................................................................................ 55 

9.6  Groundwater Issues ................................................................................................................. 55 

9.7  Aesthetic Issues ........................................................................................................................ 56 

9.8  Chemical Mixtures.................................................................................................................... 56 

9.9  Short‐Term and Long‐Term Management ............................................................................... 56 

9.10  EPA Guideline Requirements ................................................................................................... 56 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  iii 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

10.0  AUDITOR’S CONCLUSIONS AND RECOMMENDATIONS ...................................................................... 58 

10.1  Overview .................................................................................................................................. 58 

10.2  Adequacy of Investigation ........................................................................................................ 58 

10.3  Adequacy of Risk Assessment .................................................................................................. 58 

10.4  Suitability of Remediation Action Plan ..................................................................................... 58 

REFERENCES ................................................................................................................................................... 59 

 Important Information About Your Site Audit 

 

TABLES 

Table 1  Chronological Summary of Significant Events Table 2  Review of Historical Aerial Photography  Table 3  Groundwater Contaminants Table 4  Soil Assessment Criteria  Table 5  Summary of Remediation Work at Hotspots and Stockpiles – Lot 9 Table 6  Site Stratigraphy Table 7  Hydraulic Characteristics Table 8  Summary and Review of Soil Vapour Data ‐ Lot 9 Table 9  Guidance Values for Gas Protection Table 10  Scores for Protection Measures  

FIGURES 

Figure 1  Site Location Figure 2  Site Setting Figure 3  Proposed Development Figure 4  Location of Testpits (JBS&G 2018) Figure 5  Schematic Cross‐Section of the Groundwater Flow System Figure 6  Contours on the Buried Surface of the Hawkesbury Sandstone Figure 7  Location and Nomenclature of Groundwater Contaminant Plumes Figure 8  Barrier Layer Areas  

APPENDICES 

Appendix A  Contaminant Groups Appendix B  Copies  of  the  Associated  Reports  that  the  Auditor  has  Specifically  Relied  Upon 

(provided on CD) Appendix C  Copies of Relevant Letter Reports, Supporting Documentation and Communications Appendix D  Auditor Checklists 

D1  Auditor’s Assessment of  the Consultant’s Use of Data Quality Objectives and Data Quality Indicators, and Review of Quality Assurance/Quality Control Data 

D2  Auditor’s Review of the Human Health Risk Assessment  

ASSOCIATED REPORTS 

Remediation Action Plan, 28 McPherson Street, Banksmeadow NSW, prepared by JBS&G Australia Pty Ltd (ref. 54709/119224 Rev0), dated 15 May 2019 

Southlands Block 1 HHRA Revision: Development of  Flood Detention Basn, prepared by Environmental Risk Sciences Pty Ltd, dated 24 January 2019 

Assessment  of  Potential  for  Accumulation  of  Ground  Gases  Associated  with  Proposed  Warehouse Distribution  and  Office  Development,  Lot  9,  28 McPherson  Street,  Banksmeadow  NSW,  prepared  by JBS&G Australia Pty Ltd (ref. 54709‐119907 rev2), dated 7 February 2019 

Asbestos and Vapour Assessment, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow, prepared by JBS&G Australia Pty Ltd (ref. 54709/114803 Rev A), dated 14 August 2018 

iv  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

Conceptual Site Model, Orica Botany, prepared by Orica Australia Pty Ltd, dated 20 September 2017 

Human  Health  Risk  Assessment,  Southlands  Block  1  Development,  prepared  by  Environmental  Risk Sciences (ref. O/15/SDB1R001‐revB), dated 31 July 2015 

Soil Hotspot Validation Report, Block 1, Southlands, 28 McPherson Street, Banksmeadow NSW, prepared by JBS&G Australia Pty Ltd (ref. 43499/100797 Rev0), dated 31 July 2015 

Delineation  of  Remediation  Areas,  Southlands, McPherson  Street,  Banksmeadow,  NSW,  prepared  by JBS&G Australia Pty Ltd (ref. 43499‐57915), dated 24 July 2014 

Review  of  Groundwater‐Surface Water  Interaction  at  Springvale  Drain,  Southlands  Development  Site, Banksmeadow, NSW, prepared by JBS Environmental Pty Ltd (ref. JBS 42049‐54480), dated 23 May 2013 

Review  of  Risk  Issues  –  Groundwater  Discharge  to  Springvale  Drain,  prepared  by  Environmental  Risk Sciences, dated 1 June 2012 

Shallow Contaminated Soil/Fill Delineation and Waste Management Report, Orica Southlands, prepared by Golder Associates Pty Ltd (ref. 117623028‐002‐Rev1), dated 16 March 2012 

Conceptual Site Model – Botany, prepared by URS Australia Pty Ltd (ref. 43217627, revision 0), dated 23 November 2007 

Southern Plumes Source Area Delineation  Investigation  ‐ February 2006, prepared by URS Australia Pty Ltd (ref. 43346038.07901), dated 19 June 2006 

Factual  Report  on  Preliminary  Soil  Investigation,  Orica  Botany  –  Southlands,  NSW,  prepared  by  HLA‐Envirosciences Pty Limited (ref. S4039401_RPT_25Aug05), dated 25 August 2005 

Orica  Botany  Environmental  Survey  Stage  4  –  Remediation,  2004  DNAPL  Source  Area  Investigation, prepared by URS Australia Pty Ltd, dated August 2004 

Orica Botany Environmental Survey Stage 4 – Remediation, Full Scale Reactive  Iron Barrier ‐ Data Gaps ‐ Module 2a, prepared by URS Australia Pty Ltd (ref. 46160‐005/R010_A), dated 12 May 2004 

Block  2  Southlands DNAPL  Investigation, prepared by AGC Woodward‐Clyde  Pty  Limited  (ref. R004‐A), dated August 1996 

State Pollution Control Commission, ICI Botany Environmental Survey, Stage 1 Preliminary Investigations, prepared by A G Environmental Engineers in association with Woodward‐Clyde Consultants (USA), dated May 1990 

 

  

List of Abbreviations   

Page 1 QaO.31 List of Abbreviations

CMJA

General 

ACM  asbestos‐containing material AF  asbestos fines AFP  Australian Federal Police AGEE  Australian Groundwater Environmental Engineers AHD  Australian Height Datum ASC NEPM  National Environment Protection (Assessment of Site Contamination) Measure 1999 B(a)P  benzo(a)pyrene BGCP  Botany Groundwater Cleanup Program BIP  Botany Industrial Park BTEX  benzene, toluene, ethylbenzene, xylene CEMP  construction environmental management plan CFM  chloroform CHC  chlorinated hydrocarbon CLM Act  Contaminated Land Management Act 1997 CMJA  C. M. Jewell & Associates Pty Ltd COPC  contaminant of potential concern CPT  cone penetrometer test CPWE  carpark waste encapsulation CQA  construction quality assurance CS  characteristic gas situation CSM  conceptual site model CTC  carbon tetrachloride DBL  DBL Property Pty Limited DCE  dichloroethene DNAPL  dense non‐aqueous‐phase liquid DP  deposited plan DPE  Department of Planning and Environment EA  Environmental Assessment EDC  1,2‐dichloroethane ENM  excavated natural material EnRiskS  Environmental Risk Sciences Pty Ltd EPA  Environment Protection Authority EP&A Act  Environmental Planning and Assessment Act 1979 ETP  effluent treatment plant FA  fibrous asbestos FSRIB  full‐scale reactive iron barrier GCP  groundwater cleanup plan Golder  Golder Associates Pty Ltd GTP  groundwater treatment plant HCB  hexachlorobenzene HCBD  hexachlorobutadiene HCE  hexachloroethane HHRA  human health risk assessment HI  hazard index HIL  health investigation level HLA  HLA‐Envirosciences Pty Ltd HSL  health screening level ICI  ICI Australia Limited IL  investigation level JBS&G  JBS&G Australia Pty Ltd LTSEMP  long‐term site environmental management plan LOR  limit of reporting NCUA  Notice of Clean‐up Action 

  

List of Abbreviations   

Page 2 QaO.31 List of Abbreviations

CMJA

Orica  Orica Australia Pty Ltd PAH  polycyclic aromatic hydrocarbons PCA  primary containment area PCE  tetrachloroethene PCL  primary containment line PID  photoionisation detector PRG  Preliminary Remediation Goal PSRIB  pilot scale reactive iron barrier RAP  remediation action plan RSL  Regional Screening Level SAQP  sampling analysis and quality plan SAR  site audit report SAS  site audit statement SCA  secondary containment area SEARs  Secretary’s Environmental Assessment Requirements SLR  SLR Consulting Australia Pty Ltd SRA  State Rail Authority SSD  State Significant Development TASR  temporary aquifer storage and recovery TCA  trichloroethane TCE  trichloroethene TeCA  tetrachloroethane TEQ  toxic equivalents TPH  total polycyclic hydrocarbons TRH  total recoverable hydrocarbon URS  URS Australia Limited USEPA  United States Environment Protection Agency UST  underground storage tank VC  vinyl chloride VENM  virgin excavated natural material VMP  voluntary management proposal VOC  volatile organic compound VRA  voluntary remediation agreement WHO  World Health Organization WWC  AGC Woodward‐Clyde Pty Limited Measurements 

%  per cent µg/m3  micrograms per cubic metre cm  centimetre f/ml  fibres per millilitre km2  square kilometre m  metre m/d  metres per day m/s  metres per second ML/d  megalitres per day mg/kg  milligrams per kilogram mg/L  milligrams per litre mm  millimetre MPa  mega pascals ppm  parts per million v/v  volume per volume w/w  weight per weight 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  1 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

1.0  INTRODUCTION 

1.1  Background 

This Site Audit Report (SAR) relates part of the property located at 28 McPherson Street, Banksmeadow, in New South Wales (the site). The location of the site is shown on Figure 1.  At the date of this SAR, the description of the site is Lot 9 in DP1205673, and the owner is Orica Limited.   This SAR summarises a process of assessment of contamination affecting the site, and the procedures and standards to be followed in order to manage the risks posed by contaminated soil and groundwater and associated vapour/gas, to make the site suitable for the proposed commercial/industrial land use.  Historically, the site that is now Lot 9 was part of the property known as ‘Southlands’ which was located at 26‐28 McPherson Street, Banksmeadow. Southlands was comprised of two blocks of  land, referred to as Block 1  and Block 2. The  site  that  this  SAR describes was originally part of Block 1  Southlands  and sections  of  this  SAR  refer  to  that  nomenclature.  A  history  of  the  investigation  and  remediation work carried out at Southlands is provided below.  Southlands  has  been  the  subject  of  a  number  of  notices,  orders  and  agreements  issued  by  the NSW Environment Protection Authority  (EPA) and  its numerous predecessor organisations, back  to  the State Pollution Control Commission. Current EPA notices relevant to the site are: 

Declaration of Remediation Site  (Section 21 of  the Contaminated  Land Management Act 1997 – CLM Act), Declaration No. 21074, Area No. 3203, dated 9 February 2005 (amended 26 June 2017); 

Notice of Approval of Voluntary Management Proposal  (Section 17 of  the CLM Act), Notice No. 20151711, Area No. 3203, dated 13 August 2015;  

Notice to Amend Approved Voluntary Management Proposal No. 20151711 (Section 44 of the CLM Act), Notice No. 20164428, Area No. 3203, dated 15 December 2016; and 

Notice to Amend Approved Voluntary Management Proposal No. 20151711 (Section 44 of the CLM Act), Notice No. 20174415, Area No. 3203, dated 19 June 2017. 

 In July 2006, Orica Australia Limited (Orica) submitted a development application (06‐0191) under Part 3A (as  then  in  force)  of  the  Environmental  Planning  and  Assessment  Act  1979  (EP&A  Act)  to  the  NSW Department  of  Planning  for  the  Southlands  Remediation  and  Development  Project  (the  Project).  The Project was divided into three stages, Stage 1 of the proposed Project related to the development of Block 2, whilst Stages 2 and 3 were relevant to the development of Block 1.  In  2008,  as  part  of  the  Environmental  Assessment  (EA)  for  the  Project,  URS  Australia  Pty  Ltd  (URS) prepared a Remediation Action Plan (RAP) (URS 2008e) for the entire Southlands property (i.e. Blocks 1 and  2).  The  remediation  strategy  included  remediation  of  a  number  of  identified  soil  ‘hotspots’, installation of a layer of clean fill material to manage asbestos‐impacted soil and mitigation measures for potential  vapour  emissions.  Hotspots  requiring  remediation  were  identified  by  comparison  of  soil contaminant concentrations against  site  specific  risk‐based  soil criteria derived  in a Human Health Risk Assessment (HHRA) (URS 2008d) undertaken for the property.  On 25 November 2008, a Draft Site Audit Statement (SAS) (SA263) and supporting Draft SAR (J1130.10R‐rev0) (CMJA 2008) were  issued by the Auditor, Christopher Jewell. The SAS  indicated that the RAP (URS 2008e) was  suitable  and  appropriate,  and  that  if  followed,  the  property  could  be made  suitable  for commercial use.  Project Approval under Section 75J of the EP&A Act  for the development of Southlands was granted by NSW Minister  for  Planning  on  16  December  2012  (Project  Approval  06_0191)  (since modified  by  the Minister for Planning and Infrastructure on 14 August 2013, 22 April 2015, 17 February 2016 and 10 June 2016).    

2  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

In  January 2014, due  to proposed  substantial  changes  from  the development  approved  in  the original Project Approval, the availability of additional information in relation to the characterisation of risk at the property (EnRiskS 2013) and the release,  in May 2013, of the amended National Environment Protection (Assessment of Site Contamination) Measure 1999 (ASC NEPM), JBS&G Australia Pty Ltd (JBS&G) prepared a Revised RAP for Stage 1 (Block 2) of the Project (JBS&G 2014a).   Although  focussing  on  Block  2,  JBS&G’s  Revised  RAP  also  identified  areas  of  soil  on  Block  1  requiring remediation, not  including asbestos‐impacted  soil,  so  that  they  could be  remediated  concurrently with the Block 2 remediation works.  On 30  January 2014,  a  Statutory  Section B  SAS  (SA263/1)  and  supporting  SAR  (J1130.17R‐rev0)  (CMJA 2014) were  issued  by  the  Auditor,  Christopher  Jewell.  The  statement  indicated  that  the  Revised  RAP (JBS&G  2014a) was  suitable  and  appropriate,  and  that  if  the  requirements of  the RAP were  followed, Block 2 could be made suitable for commercial and industrial use.  In  June  2014,  JBS&G  undertook  sampling  to  delineate  the  lateral  and  vertical  extent  of  the  identified remediation areas (JBS&G 2014b) to guide the extent of excavation required during remediation.  During  2014,  JBS&G  carried  out  remediation  of  the  identified  hotspots  on  Block  1  (concurrently with remediation work on Block 2)  in general accordance with the Revised RAP (JBS&G 2014a).  In June 2015, JBS&G prepared a Soil Hotspot Validation Report  (JBS&G 2015d)  that described  the assessment carried out to demonstrate that impacted soils had been remediated in accordance with the Revised RAP.  In  2015,  a  HHRA  was  prepared  by  Environmental  Risk  Sciences  Pty  Ltd  (EnRiskS  2015)  to  provide  a quantitative assessment of potential risks to human health associated with the presence of contamination remaining on Block 1, based on  the  revised development proposal, and  identify  issues  that  require  risk mitigation  measures  to  be  considered  in  the  proposed  development.  However,  this  HHRA  did  not specifically address the area that is now Lot 9.  The following dot points outline the remediation work carried out on the eastern portion of Block 1 (i.e. this work is not directly related to Lot 9 which is the subject of this SAR): 

On 29 July 2015, following remediation of the identified hotspots, JBS&G issued its RAP for Part of Block 1 Southlands (JBS&G 2015e).  

In September 2016, the eastern portion of property described as Block 1 was acquired by Anderson Street  Developments  Pty  Ltd.  This  property  became  Lot  10  in  DP1205673.  Anderson  Street Developments Pty Ltd further subdivided the property into two portions, known as Lot 100 and Lot 101 in DP1223909), with the intention to: 

- develop the northern portion for use as an Australian Border Force dog accommodation and training facility; and  

- partially remediate and validate the southern portion as suitable for commercial/  industrial use then sell that land. 

Between  September  2016  and  February  2017,  the  south‐eastern  portion  of  Block  1  (fronting McPherson Street and described as Lot 100 in DP1223909) was partially remediated and validated in  accordance  with  the  RAP  (JBS&G  2015e),  i.e.  the  pre‐existing  geotextile  fabric  and  surficial vegetation overlaying the site was removed and disposed off‐site and a marker  layer and physical separation  layer were  installed across the  lot. The remaining requirements of the RAP (relating to the installation of gas mitigation measures) were to be undertaken by the future owners of Lot 100. 

In 2017,  the north‐eastern portion of Block 1, described as Lot 101  in DP1223909  (the proposed Australian Border Force facility), was remediated and validated in accordance with the RAP (JBS&G 2015e) and was considered by the Auditor to be suitable for commercial/ industrial uses subject to the  implementation of  the approved  Long Term Site Environmental Management Plan  (LTSEMP) (JBS&G 2018a). 

 The western portion of Block 1, described as Lot 9 in DP1205673 is the subject of this Site Audit. 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  3 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

In December 2018, Orica submitted an application  to  the NSW Department of Planning & Environment (DPE)  to  issue  Secretary’s Environmental Assessment Requirements  (SEARs)  for  the establishment of  a warehouse estate on Lot 9 comprising a suspended concrete platform above the flood detention basin to support  warehouse  buildings  and  hardstand/parking  areas;  and  the  construction  of  two  warehouse buildings  for  the  storage  and  distribution  of  general merchandise  including  goods  arriving  from  Port Botany.   It  is noted  that Orica does not plan  to  implement  the development,  that will be done by a prospective future purchaser, but instead aims to sell the land with the development approval in place.  On  14 December  2018,  the DPE  granted  its  consent  to  State  Significant Development  (SSD)  9691  and issued its SEARs under Section 4.12(8) of the EP&A Act and Schedule 2 of the Environmental Planning and Assessment Regulation 2000.  The current Site Audit for Block 1 of Southlands was requested on 28 February 2018, by Mr David Johnson of Orica Australia Pty Ltd. Subsequently, Mr Jeffrey Lord of DBL Property Pty Limited (DBL) on behalf of Orica confirmed that a Site Audit Statement (SAS) was required to address the following key issues noted in the SEARs for SSD 9691: 

Contamination ‐ including: 

- Assessment  of  the  extent  and  nature  of  any  contamination  of  the  soil,  groundwater  and  soil vapour  including the potential risks to human health and the environmental receptors near the site 

- A remediation action plan (RAP) detailing the measures that will be undertaken to remediate and manage any contamination identified at the site; 

- The  engagement of  a  Site Auditor  accredited under  the Contaminated  Land Management Act 1997 NSW Site Auditor Scheme 

- A Section B Site Audit Statement and Site Audit Report prepared by a NSW Site Auditor, certifying site suitability for the intended use subject to the implementation of an appropriate RAP. 

 Consequently, this site audit is a Statutory Site Audit as defined by Section 47(c) of the CLM Act.  This audit was  conducted  for  the purpose of determining  the matters  that are  listed below  (using  the terminology and numbering of Section 4 of the CLM Act): 

(v) the suitability and appropriateness of a plan of management, long‐term management plan or a voluntary management proposal. 

 Reflecting the purpose of the audit and the matters to be determined, this Site Audit  is,  in the terms of the site audit statement prescribed by the CLM Act, a Section‐B Site Audit.  The SAR has been prepared in accordance with the EPA’s Guidelines for the NSW Site Auditor Scheme, 3rd edition (EPA 2017). It has been prepared by Christopher Jewell, who is a Site Auditor accredited under the CLM Act.  Southlands  and  the  Botany  Industrial  Park  (BIP)  have  been  the  subject  of  detailed  and  extensive geoenvironmental  investigations and assessments carried out  for Orica and  its predecessor  ICI Australia Limited (ICI) by a number of consultants and extending over the period from 1990 to 2018. This body of work provides the foundation for the Site Audit, and is summarised in this report. However, this Site Audit relates principally to the following documents: 

Remediation Action Plan, 28 McPherson Street, Banksmeadow NSW, prepared by JBS&G Australia Pty Ltd (ref. 54709/119224 Rev0), dated 15 May 2019 

Southlands  Block  1  HHRA  Revision:  Development  of  Flood  Detention  Basn,  prepared  by Environmental Risk Sciences Pty Ltd, dated 24 January 2019 

4  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

Assessment of Potential for Accumulation of Ground Gases Associated with Proposed Warehouse Distribution and Office Development, Lot 9, 28 McPherson Street, Banksmeadow NSW, prepared by JBS&G Australia Pty Ltd (ref. 54709‐119907 rev2), dated 7 February 2019 

Asbestos  and  Vapour  Assessment,  Lot  9  in  DP1205673,  28  McPherson  Street,  Banksmeadow, prepared by JBS&G Australia Pty Ltd (ref. 54709/114803 Rev A), dated 14 August 2018 

Human Health Risk Assessment, Southlands Block 1 Development, prepared by Environmental Risk Sciences (ref. O/15/SDB1R001‐revB), dated 31 July 2015 

Soil Hotspot  Validation  Report,  Block  1,  Southlands,  28 McPherson  Street,  Banksmeadow NSW, prepared by JBS&G Australia Pty Ltd (ref. 43499/100797 Rev0), dated 31 July 2015 

 It should also be noted that: 

Copies of the reports that the Auditor has specifically relied upon are provided as Appendix B of this report (on CD). 

Copies of  the  letter  reports and  supporting documentation  that  the Auditor has  relied upon are provided in Appendix C of this SAR. 

Copies of all other  relevant documents  that were  forwarded  to  the Auditor during  the course of this audit are held on file. 

The Auditor has visited Southlands on at least eight occasions extending over a period of ten years prior  to  the commencement of  the current  site audit, and on a  further  ten occasions  since May 2016 to observe and verify, as far as practicable, the site conditions and the progress of the work being audited. 

Compliance checklists have been completed and are provided as Appendix D of this SAR.  

1.2  Scope and Structure of Review Report 

Section 2 of this SAR presents a chronological summary of events that relate to the site and are significant to this audit, and it outlines the Auditor’s involvement.  Section  3  of  this  SAR  sets  out  basic  identification  and  location  information  concerning  the  site.    An indication  of  the  layout,  topography,  drainage,  geology  and  hydrogeological  setting  of  the  site  is  also provided, together with an overview of its history. Any known or potential contaminant sources are listed; and the associated contaminant groups of concern are also identified. A list of the individual compounds that make up the contaminant groups of concern is provided as Appendix A. This section also outlines the future use of the site, and provides the associated assessment criteria.  For a more detailed description of the layout, topography, drainage, geology, hydrogeology and history of the site,  reference should be made  to Section 6 of  this  report and  the associated  reports.  It should be noted  that  throughout  this  SAR  extensive  use  has  been made  of  the  associated  reports.  Specifically, sections of those reports have been adopted for use in this report.  Section  4  provides  an  overview  of  the  investigation  works  undertaken  on  the  site  by  the  various consultants  up  to  2018,  and  includes  the Auditor’s  evaluation  of  the work’s  adherence  to  EPA  (2017) guidelines. For a more detailed description of the investigations undertaken at the site, reference should be made to the associated reports.  Section 5 provides a summary of previous remediation work and Section 6 a description and discussion of the Conceptual Site Model (CSM) and Contamination Assessment, and the current site status.  Section  7  presents  a  summary  of  the HHRA  for  Block  1  and  the  Revised HHRA  specific  to  Lot  9,  and includes the Auditor’s review of that document.  Section 8 outlines the RAP for the site, and includes the Auditor’s review of that document.  

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  5 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

Section 9 presents an audit of  the completeness and adequacy of  the plan of  remediation described  in Section 8. The audit was carried out against the criteria established by EPA (2017), but also incorporates the  reviewer’s  own  judgement;  reference  has  been  made  to  other  guideline  publications  issued  or endorsed by the EPA,  including Guidelines  for Consultants Reporting on Contaminated Sites  (EPA 2011), Sampling Design Guidelines (EPA 1995) and the ASC NEPM, as appropriate.  Section 10 presents the Auditor’s conclusions and recommendations.  

1.3  Limitations and Intellectual Property Matters 

This report has been prepared by C. M. Jewell & Associates Pty Ltd (CMJA) for the use of the client and government agencies identified in Section 1.1, for the specific purpose described in that section.  The work has been carried out, and this report prepared, utilising the standards of skill and care normally expected of a  site auditor practising  in New South Wales under  the  requirements of  the CLM Act. The level  of  confidence  of  the  conclusions  reached  is  governed,  as  in  all  such work,  by  the  scope  of  the investigation carried out and by the availability and quality of the data. The Auditor has satisfied himself that  the available data are adequate  to  support  the  conclusions he has  reached, and  comply with  the minimum requirements indicated in the guideline documents specified for the NSW Site Auditor Scheme. Where limitations or uncertainties in conclusions are known, they are identified in this report. However, no liability can be accepted for failure to identify conditions or issues which arise in the future and which could  not  reasonably  have  been  assessed  or  predicted  using  the  site  information  and  analytical  data available for review.  Data collected by others have, of necessity, been used  to support  the conclusions of  this  report. Those data have been subjected to reasonable scrutiny but have essentially, and necessarily, been used in good faith. Liability cannot be accepted for errors in data collected by others where such errors could not have been detected by reasonable scrutiny of the data and supporting information supplied to or requested by the Auditor.  This  report,  any  original  data  contained  in  the  report,  and  its  findings  and  conclusions  remain  the intellectual property of CMJA. A licence to use the report for the specific purpose identified in Section 1.1 is granted  to  the persons  identified  in  that  section on  the  condition of  receipt of  full payment  for  the services involved in the preparation of the report.  It is recommended that this report should not be used by other persons or for other purposes than those identified in Section 1.1 without prior reference to the Auditor. The report must not be reproduced except in full and with the permission of CMJA.  

6  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

2.0  OVERVIEW OF WORKS COMPLETED AND INVOLVEMENT OF AUDITOR 

Table 1 sets out a factual summary of work completed on the site, and of the Auditor’s involvement.  

TABLE 1Chronological Summary of Significant Events 

Date  Activity/Task 

May 1990  AG Environmental Engineers (AGEE)  in association with Woodward‐Clyde (WWC) carried out a Stage 1 investigation for ICI that identified the presence of chlorinated hydrocarbons (CHC) on Southlands. 

1993‐1996  ICI  commenced  a  Stage  2  environmental  survey,  in  which  an  investigation  for  CHC  was undertaken and a 3‐year remediation timetable developed.   

Nov 1996  Orica  issued  a  proposed  Remediation  Plan  to  the  EPA  that  included  periodic  reports summarising the findings of monitoring work. 

Mar 1998  Orica  detected  early  signs  of  the  central  plume  on  Block  1  of  Southlands,  and  commenced extensive monitoring and modelling. 

Feb 1999  Orica constructed a Pilot Scale Reactive Iron Barrier (PSRIB). 

May 1999  EPA recommended containment options for the central plume.  In August 1999, Orica  issued a dichloroethane (EDC) plume containment report to the EPA. 

Feb 2000  Orica  entered  into Voluntary  Investigation  and  Remediation Agreements  (19003  and  26004) with the EPA. As per voluntary remediation agreement (VRA) requirements, Orica subsequently issued annual reports to the EPA in February 2001, February 2002 and February 2003. 

Remedial  work  was  undertaken  to  realign  the  Springvale  Drain,  and  Orica  relined  the stormwater pipes. 

Oct 2000  A dense non‐aqueous‐phase  liquid  (DNAPL)  investigation  report  is  issued  to  the EPA and URS undertake investigation of the PSRIB. 

May 2002  Orica entered into a VRA for Stage 4 remediation with the EPA. 

Jun 2002  Dr  Hans  Stroo  undertook  an  independent  peer  review  of Orica’s  remediation  strategy,  and supported the proposed work. 

Aug‐Oct 2002  Orica submitted a Development Application for bioremediation field trials. 

Jun‐Jul 2003  Orica  proposed  an  amendment  of  the  VRA  regarding  issues  and  alternatives  for  Full  Scale Reactive Iron Barrier (FSRIB) installation. The EPA accepted the proposal. 

26 Sep 2003  The EPA  issued Orica with a Notice of Clean Up Action (1030236). On 31 October 2003, Orica submitted a draft Groundwater Clean Up Plan to the EPA. On 17 February 2004, the EPA issued Orica with a variation notice requiring the implementation of the Groundwater Clean Up Plan. 

28 Oct 2004  Orica achieved interim hydraulic containment, as dictated by the Clean Up Action timeframe. 

2 Mar 2005  The Auditor visited the site. 

1 Apr 2005  HLA‐Envirosciences Pty Ltd (HLA) issued a draft Sampling Analysis and Quality Plan (SAQP) for a Limited  Environmental  Investigation.  The  Auditor  reviewed  the  SAQP  and  provided  his comments to Orica in an email dated 5 April 2005. On 6 April 2005, HLA issued a revised SAQP. The Auditor reviewed  it and provided further comments to Orica  in a facsimile dated 24 June 2005. 

6 May 2005  The Auditor visited the site. 

14 Jun 2005  HLA issued a draft Limited Environmental Investigation report. The Auditor reviewed the report and provided comments to Orica in an email dated 24 June 2005. On 26 July 2005, HLA issued a draft Factual Report on Limited Environmental  Investigation. The Auditor reviewed the report and provided further comments to HLA in an email dated 1 August 2005. HLA incorporated the Auditor’s comments and issued a final report on 25 August 2005 (HLA 2005). 

The Auditor  forwarded a  letter  to Orica on 29 August 2005 stating  that he had  reviewed  the SAQP  and  the  Factual Report on  Limited  Environmental  Investigation,  and  that both  reports were satisfactory. 

23 Jun 2005  Chris Jewell was formally appointed as Auditor in a letter from Mr Stephen Corish of Orica. 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  7 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

TABLE 1Chronological Summary of Significant Events 

Date  Activity/Task 

13 Jul 2005  The Auditor received copies of the following reports: 

Stage 1 Preliminary Investigation Report (AGEE 1990); 

Dense Non‐Aqueous Phase Liquid Investigation (WWC 1996); 

Environmental Survey – Stage 4 Remediation, Full Scale Reactive  Iron Barrier Data Gaps report (URS 2004a); and 

Remediation,  Groundwater  Cleanup  Plan,  Quarterly  Groundwater  and  Surface  Water Monitoring Report (URS 2005a). 

27 Sep 2006  URS  issued a draft SAQP – Nant Street Extension,  Limited Stage 2  Investigation. The Auditor reviewed the SAQP and provided comments to Orica in a facsimile dated 4 October 2006. URS issued a revised SAQP on 13 October 2006. The Auditor reviewed the document and forwarded further comments to Orica on 1 November 2006. 

25 Jan 2007  URS issued a final draft Phase 1 and Limited Phase 2 Assessment (URS 2007a). The Auditor read the report. 

Oct 2007‐Nov 2008 

URS issued a draft RAP, dated 11 October 2007, and a draft HHRA, dated 17 October 2007.  The Auditor reviewed the documents and provided his initial comments to Orica in an email dated 29 October 2007. URS  issued revised drafts of the RAP, dated 17 March 2008, and the HHRA, dated 13 March 2008. The Auditor read both revised reports. 

On 11 June 2008 the Auditor attended a meeting with Orica to discuss the draft HHRA and RAP. The Auditor provided Orica with a review of the draft HHRA and RAP in a letter dated 23 June 2008. 

On  2 October  2008, URS  issued  a  final  HHRA  (URS  2008d)  and  final  RAP  (URS  2008e).  The Auditor forwarded his review of both documents to URS in an email dated 5 November 2008. 

Sep‐Oct 2008  The Auditor received copies of the following reports: 

Temporary  Aquifer  Storage  and  Recovery  (TASR)  –  Groundwater  Flow Modelling  and Assessment (JBS 2008); 

Review of TASR – Groundwater Flow Modelling Assessment (Laase 2008); 

Review of Environmental Factors, Temporary Aquifer Storage and Recovery (Orica 2008); 

Environmental Monitoring at Springvale Drain (URS 2008a); 

Infilling of Springvale Drain Re‐alignment Channel (URS 2008b); 

Shallow Groundwater Interception of Springvale Drain (URS 2008c); 

draft Surface Water and Ambient Air Monitoring Program for Springvale Drain, May 2007 to June 2008, dated 19 September 2008; 

Conceptual Site Model (URS 2007b);  

Southern Plumes Source Area Delineation Investigation – February 2006 (URS 2006); and 

Environmental Survey Stage 4 Remediation, Progress Report – Southern Plumes DNAPL Source Area Delineation Investigation, August 2005 (URS 2005b). 

The Auditor read the reports. 

On 19 January 2009, the Auditor received a final version of URS’s Surface Water and Ambient Air Monitoring for Springvale Drain (URS 2008f). 

25 Nov 2008  The Auditor issued a Draft Section B SAS (SA263) and Draft SAR (J1130.10R‐rev0) (CMJA 2008) indicating that the RAP (URS 2008e) was appropriate and that  if followed Block 1 and Block 2 could be made suitable for commercial / industrial uses. Copies of the Draft SAR and Draft SAS were provided  to NSW Department of Planning  for  approval of  conditions  and  enforcement mechanisms. 

25 Feb 2009  The Auditor visited the site. 

19 Aug 2011  Golder Associates Pty Ltd (Golder) issued a Groundwater Well Replacement Plan (Golder 2011). The  Auditor  reviewed  the  plan  and  forwarded  his  comments  to  Golder  in  a  letter  dated  2 September 2011. 

In  September  2012,  JBS  issued  a  Groundwater  Well  Replacement  Plan  (JBS  2012b)  which incorporated the Auditor’s comments made in regard to the Golder Plan. 

16 Apr 2012  Project  Approval  for  the  development  of  Southlands  was  granted  by  NSW  Department  of Planning, under Section 75J of the EP&A Act. 

8  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

TABLE 1Chronological Summary of Significant Events 

Date  Activity/Task 

11 Jul 2012  The Auditor received copies of the following reports: 

Draft Report on Feasibility Study of Potential Vapour Mitigation Options (Golder 2009); 

Geotechnical Investigation (Golder 2012a); 

Shallow  Contaminated  Soil/Fill  Delineation  and  Waste  Management  Report  (Golder 2012b); 

Construction Environmental Management Plan (CEMP) (Golder 2012c); and 

Environmental Management Strategy (Golder 2012d). 

The Auditor read the reports. 

6 Aug 2013  The Auditor received copies of the following reports: 

Draft Revised HHRA (EnRiskS, 16 July 2013), and 

Draft Revised RAP, Block 2, Stage 1, Southlands Development (JBS&G, 5 August 2013). 

The Auditor  read  the documents and provided  initial comments  in an email  to Orica dated 5 September 2013. 

On  1 December  2013,  the Auditor  received  a  revised RAP,  dated  29 November  2013,  and  a revised HHRA, dated 21 November 2013 (EnRiskS 2013).   

The Auditor  reviewed  the  revised RAP and HHRA and approved  them  for  the purpose of his audit  in a  letter dated 9 December 2013. The Auditor  received a  final Revised RAP, dated 30 January 2014 (JBS&G 2014a). 

31 Aug 2013  The Auditor visited the site. 

30 Jan 2014  The Auditor issued a Section B SAS (SA263/1) and SAR (J1130.17R‐rev0) (CMJA 2014) indicating that the Revised RAP for Block 2 (JBS&G 2014a) was appropriate and that  if followed the site could be made suitable for commercial/industrial use.   

9 May 2014  JBS&G issued its SAQP – Delineation of Remediation Areas. The Auditor reviewed the plan and forwarded his comments to Orica in an email dated 20 May 2014. 

7 Jul 2014  JBS&G issued its Preliminary Report on Delineation Sampling. The Auditor reviewed the report and provided his  comments  to Orica  in an email dated 8  July 2014. On 10  July 2014,  JBS&G issued its revised Preliminary Report on Delineation Sampling. The Auditor reviewed the report and provided further comment to Orica in a letter dated 10 July 2014. 

On 22  June 2015,  the Auditor  received a  final version of  JBS&G’s Delineation of Remediation Areas, dated 24 July 2014 (JBS&G 2014b). 

27 Jul 2014  The Auditor’s assistant, Mr Steven Hallam, visited the site to view remedial works. 

12 May 2015  JBS&G issued a LTSEMP for Block 2. 

4 Mar 2015  The Auditor visited the site. 

21 Apr 2015  JBS&G issued its Validation Report for Block 2 (JBS&G 2015b). 

13 May 2015  The  Auditor  issued  a  Section  B  SAS  (SA263/2)  and  SAR  (J1130.22R‐rev0)  (CMJA  2015a) indicating  that  Block  2  was  suitable  for  commercial/industrial  use  subject  to  the implementation of JBS&G’s LTSEMP (dated 12 May 2015). 

10 Jun 2015  JBS&G  issued  its draft  Soil Hotspot Validation Report  for Block 1. A  final of  the  Soil Hotspot Validation Report for Block 1 was issued on 31 July 2015 (JBS&G 2015d). 

15 Jun 2015  JBS&G issued its draft RAP for Part of Block 1, an updated draft was issued on 22 June 2015. The Auditor reviewed JBS&G’s updated draft RAP for Part of Block 1 and EnRiskS draft HHRA (dated 11 June 2015) and forwarded his comments to Orica in an email dated 27 July 2015. 

On 29 July 2015, JBS&G  issued  its final RAP for Part of Block 1 (JBS&G 2015e); and on 31 July 2015, EnRiskS issued its final HHRA (EnRiskS 2015). 

22 Jun 2015  The Auditor received copies of the following JBS&G reports: 

Landfill Gas Monitoring Events and Additional Gas Well Installation Works (JBS&G 2015c); and 

Soil Vapour Sampling and Analysis Report (JBS&G 2015a). 

4 Aug 2015  The  Auditor  issued  a  Section  B  SAS  (SA263/3)  and  SAR  (J1130.23R‐rev0)  (CMJA  2015b) indicating  that  the  RAP  (JBS&G  2015e)  for  the  eastern  portion  of  Block  1  (i.e.  Lot  10  in DP1205673) was  appropriate  and  that  if  followed  the  area  to which  it  referred  to  could  be made suitable for commercial/industrial use. 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  9 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

TABLE 1Chronological Summary of Significant Events 

Date  Activity/Task 

23 Sep 2016  The  eastern  portion  of  Block  1  (Lot  10  in  DP1205673)  was  sold  to  Anderson  Street Developments Pty Ltd. Anderson Street Developments Pty Ltd further subdivided the property into  two  lots:  Lot  100  in DP1223909  (the  southern portion)  and  Lot  101  in DP1223909  (the northern portion). 

2016‐2017  During the subsequent two years, the Auditor visited the site on numerous occasions to assess the progress of remediation and construction. 

27 Feb 2017  The Auditor issued a Section B SAS (SA263/4) and SAR (J1130.29R‐rev0) (CMJA 2017) indicating that  the  remediation  and  validation work described  in  the  Interim Validation Report  (JBS&G 2017a) for Lot 100  in DP1223909 was carried out  in appropriately and  in accordance with the RAP (JBS&G 2015e) and the LTSEMP (JBS&G 2017b) was suitable and appropriate. 

8 Jan 2018  The  Auditor  issued  a  Section  A2  SAS  (SA263/5)  and  SAR  (J1130.33R‐rev0)  (CMJA  2018) indicating that subject to compliance with the LTSEMP (JBS&G 2018a), Lot 101 in DP1223909 is suitable  for  the  following  uses:  Commercial/Industrial  and  Detector  Dog  Training  and Accommodation Facility. 

24 Jan 2019  EnRiskS  issued  a HHRA Revision: Development of  Flood Detention Basin  (EnRiskS 2019).  The Auditor read the HHRA Revision. 

14 Feb 2018  JBS&G provided the Auditor with an initial site concept plan for the construction on Lot 9. The Auditor  reviewed  the plans and provided his comments  to DBL  in a  letter dated 15 February 2018. 

In  response,  on  19  February  2018  JBS&G  provided  the  Auditor  with  an  extract  from  their proposed scope of work for a asbestos and soil gas assessment to be carried out at the site. The Auditor  read  the  scope of work  and provided his  comments  to  JBS&G  in  an email dated 26 February 2018. 

14 Aug 2018  JBS&G  issued  an  Asbestos  and  Vapour  Assessment  (JBS&G  2018b).  The  Auditor  read  the Assessment. 

14 Dec 2018  The DPE granted its consent to SSD 9691 and issued its SEARs. 

14 Dec 2018  The Auditor was informed by DBL on behalf of Orica of the requirement to provide a Section B SAS in respect of Lot 9 in DP1205673. The sections below refer to that Lot. 

7 Feb 2019  JBS&G  issued an Assessment of Potential  for Accumulation of Ground Gases Associated with Proposed  Warehouse  Distribution  and  Office  Development  (JBS&G  2019a).  The  Auditor reviewed  the  assessment  and  provided  his  comments  to Orica  in  a  letter  dated  8 February 2019. 

18 Feb 2019  JBS&G  issued a draft Remediation Action Plan  (RAP)  for Lot 9. The Auditor  read  the RAP and provided his comments to Orica in a letter dated 8 March 2019. 

On  15 May  2019,  JBS&G  issued  a  final  RAP  for  Lot  9  (JBS&G  2019b).  The  RAP  included  a Geotechnical Assessment prepared by Pells Sullivan Meynink (PSM 2019) as Appendix D. 

16 May 2019  The Auditor issued a Section B SAS (SA263/6) and SAR (J1130.39R‐rev0) indicating that the RAP (JBS&G 2019b)  for  Lot 9  in DP1205673 was appropriate and  if  followed  the area  to which  it referred to could be made suitable for commercial/industrial use. 

Note:  Shading indicates work undertaken prior to the Auditor’s involvement with Southlands 

10  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

3.0  SITE INFORMATION 

This section of  the  report provides basic  identification and  location  information concerning  the site. An indication  of  the  layout,  topography,  drainage,  geology  and  hydrogeological  setting  of  the  site  is  also provided, together with an overview of the site’s history.  Any known or potential contaminant sources have been listed, and the associated contaminant groups of concern  identified.  This  section  also  outlines  the  proposed  future  use  of  the  site  and  provides  the associated assessment criteria.  

3.1 Site Identification and Location 

This SAR  relates  to part of  the property  located at 28 McPherson Street, Banksmeadow,  in New South Wales (the site). The location of the site is shown on Figure 1.  At the date of this SAR, the description of the site is Lot 9 in DP1205673, and the owner is Orica Limited.    Map Grid of Australia Zone 56H  co‐ordinates of  the  centre of  the  site are approximately 335680E and 6242175N.  The site lies within Bayside local government area, in the Parish of Botany, County of Cumberland, and is currently zoned SEPP (State Significant Precincts) 2005 under the Botany Local Environment Plan 2013.  

3.2  Site Setting 

The site is located in a predominantly industrial area, as indicated on Figure 2; and is bounded as outlined below. 

To the north  A detector Dog Facility  is  located to the north and north‐east of the site. A Quenos Pty Ltd owned tank farm facility known as the Nant Street Tank Farm is located further north of the site. 

To the east  Beyond the Detector Dog Facility to the north‐east of the site lies a narrow strip of land owned by Orica and is associated with the Botany Groundwater Cleanup Program (BGCP). The Sydenham – Botany Goods Railway Corridor is located further east. 

To the south  McPherson Street forms the southern boundary to the Southlands site, beyond which is a shipping container facility and warehouse/storage facility. 

To the west  The western boundary of the site  is  formed by Nant Street, beyond which  is Springvale Drain  and  warehouses  recently  constructed  on  Block  2  Southlands.  A  chemical manufacturing facility owned by Solvay Interox Pty Ltd is located to the west of Block 2, separated by Floodvale Drain. 

 

3.3  Site Layout, Topography and Drainage 

3.3.1  Site Layout 

The site is irregular in shape with an area of approximately 4.1 hectares. The site  is vacant land which is used as compensatory flood storage. The site surface has a maintained vegetation cover.   Entry to the site  is from Nant Street, which adjoins the western boundary of the site and  is accessed off McPherson Street. Access to Nant Street is via a locked, steel security gate. the site is secured with a 1.8‐metre (m) high chain wire mesh fence.  Underground  infrastructure  (access road, pipeline, extraction and monitoring wells) associated with the BGCP is located in a gravel road at the southern end of the site.  

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  11 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

3.3.2  Topography 

The local topography generally slopes down towards the south‐west and Penrhyn Estuary, from a relative high point of 20 m Australian Height Datum (AHD) at the eastern side of the BIP, down to elevations of less than 4 m AHD at the south of Southlands.  The  area was  formerly  part  of  the  Veterans  Swamp, which  has  now  been  substantially  drained.  The slightly higher land to the north and north‐east (now the BIP) was formerly covered by sand dunes.  

3.3.3  Drainage 

Prior  to  the  recent  construction  of  stormwater  detention  basins  on  the  site,  there  was  no  other engineered drainage on Southlands besides the Springvale and Floodvale drains. Due to the uneven and hummocky site topography the drains were not very effective at  intercepting runoff from the site; most rainfall  onto  the  site  infiltrated  the  sandy  site  surface,  and  was  then  either  utilised  by  the  former vegetation cover or percolated to the shallow water table. Some shallow groundwater discharged to the drains.    The  recent development of  Southlands Block 2  as  a  logistics hub  that  is  substantially paved with  fully engineered drainage  and  the  recent development of  the eastern portion of Block 1 have  substantially changed this regime.  

3.4  Geology 

The  superficial  deposits  beneath  the  site  and  surrounding  area  are  comprised  of  Quaternary‐age interbedded sands, peaty sands, peat and mud, known as the Botany Sands, underlain by the Triassic‐age Hawkesbury Sandstone bedrock.    See Section 6.2 for a more detailed description of the site geology.  

3.5  Hydrogeology 

The Botany Sands beneath  the  site and  the  surrounding area contain a  series of unconfined and  semi‐confined aquifers that together are referred to as the Botany Sands Aquifer. Work by URS on the Orica site,  and by  others  elsewhere  in  the Botany  Sands Aquifer, has made  it  clear  that  this  is not  a  single aquifer,  but  a  multi‐aquifer  system  containing  many  aquifer  and  aquitard  units  varying  in  hydraulic conductivity  and  in  lateral  and  vertical  extent.  The  aquifer  units  attain  a  degree  of  lateral  continuity because  of  the  discontinuous  nature  of  the  aquitards,  and  are  interconnected  vertically  by  leakage through the aquitards.   Groundwater  levels  in  the  shallow  aquifer  beneath  Southlands  fluctuated  with  rainfall  but  prior  to remediation were  typically  from a  few centimetres  (cm)  to 3 m below ground  level  (bgl)  (3.5  to 1.0 m AHD).   See Section 6.3 for a more detailed description of the site hydrogeology.  

3.6  Site History 

Extensive levelling and dewatering were carried out in the East Botany area in the late 19th and early 20th centuries. Ash  from  the nearby Bunnerong Power Station was used as  fill material across much of  the area,  including  the  site.  Based  on  field  observations,  it  is  likely  that  other materials  such  as  building rubble, demolition wastes and paper wastes were also used in the filling process.  The  East Botany  area  has  a  long  industrial  history;  industries  established  in  the  early  part of  the  20th century included tanneries, fellmongeries, wool scourers and a paper mill – in brief, industries that were, even at that time, sufficiently noxious to warrant banishment to the southern edge of the city. Chemical industries  including  ICI,  A.C.  Hatrick  and  Crest  were  established  in  the  1940s  to meet  wartime  and immediate post‐war demand.  ICI began  chemical manufacturing on  the area  immediately north of  the Southlands (now the southern part of BIP) in 1942 and continued development through to the 1980s. ICI 

12  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

manufactured  trichloroethene  (TCE)  from  1948  to  1977,  and  tetrachloroethene  (PCE)  and  carbon tetrachloride (CTC) from 1964 to 1991.  Limited anecdotal and  some aerial photographic evidence  suggest  that  the earliest uses of  Southlands included some form of intensive agriculture, probably market gardening; and the land was subject to sand and peat extraction in the 1960s.    Australian  Paper Manufacturers  owned  Southlands  prior  to  ICI’s  acquisition  in  1980.  It  appears  the property was used for storage of paper waste bales and paper wastes appear to have been placed in the excavations  that  remained  following  earlier  peat  mining  activities  on  Block  1,  resulting  in  shallow, periodically water‐charged depressions known as the Paper Waste Ponds.  Following ICI’s purchase of Southlands in 1980, the property was unfenced for many years and subject to uncontrolled illegal dumping of a wide range of materials.  WWC  (1996)  carried  out  a  review  of  aerial  photographs  of  Southlands,  and  provided  the  following interpretation (Table 2). Post‐1996 information was added by URS (2007a).  

TABLE 2Review of Historical Aerial Photography 

Date  Description 

1951  Bournes Tannery is located on Springvale Drain, north of Block 2 at the present location of the Mobil Botany Terminal. 

Ponds are present west (Block 2) and east (Block 1) of Springvale Drain. 

A possible drain extending from the then ICI plant across Block 1 to Springvale Drain was identified. 

Waste paper storage is present (off‐site), south of McPherson Street. 

1955  Fill (boiler ash) is spread over a large area of Block 1. 

1961  A drain appears to extend from the ICI plant across the northern boundary of Block 1 to Springvale Drain.   

A large pond is present on Block 1. 

1962  The area between the railway embankment and Orica’s Effluent Treatment Plant, formerly located immediately north‐east of Block 1, appear to have been receiving direct discharge of effluent to ground. 

1965  Two tanks are present in the Nant Street tank farm area. 

The drain noted in 1951 is no longer present. 

Numerous excavations and earthworks are clearly visible on Block 1 (assumed to be associated with the sand and peat mining activities). 

1969  Construction of the former Esso tank farm is under way (at the current location of the Mobil Botany Terminal). 

Several ponds are present on Block 1, some of which are bunded. 

1970  A series of ponds are present on Block 1 and a drain leading from the railway line onto Block 1 is also noted. 

Possible placement of paper waste is visible. 

1975  Extensive excavations are clearly visible on Block 1. 

The central pond (currently referred to as the large Paper Waste Pond) is filled. 

Nant Street appears to have been built up to act as a bund wall for paper slurry storage. 

1978  Excavations on the northern boundary of Southlands appear to have been back‐filled with ash. 

Ash materials are stockpiled on the southern portion of Block 1, at the former location of the backfilled ponds. 

Paper waste disposal and land spreading/filling of ash material are evident. 

1979  Numerous ponds and excavations are still present on Block 1. 

The large central pond appears dry and slurried paper waste effluent extends from the pond to Nant Street. 

Pre‐1981 

Fill material, domestic waste (including refrigerators, stoves, cars, rubbish) and industrial demolition rubble (including some asbestos cement sheeting) are dumped on Southlands, particularly on Block 2. 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  13 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

TABLE 2Review of Historical Aerial Photography 

Date  Description

1981  Southlands appears fenced. 

1989  Investigations of the contamination of groundwater, soil, sediments, surface water, biota and air commence. 

2005  Bioremediation field trials are conducted on Block 2. Pump lines and some wells associated with hydraulic containment and ex‐situ groundwater treatment are constructed and operational. 

A number of mostly unsealed roads are constructed. 

A large number of groundwater monitoring wells and bundled piezometers are installed on both blocks. 

Nant Street, running north–south parallel to the eastern embankment of Springvale Drain, continues to provide access to the Nant Street tank farm. 

There are a number of services easements on the Southlands site. 

 More  recent aerial photography viewed by  the Auditor and dated March 2007 and  June 2009, showed little change from 2005.  In October  2011,  the  initial  placement  of  treated  soil  from  the  Car  Park Waste  Encapsulation  (CPWE) remediation can be seen on Block 1 and  in September 2012 the  initial earthworks for remedial work on Block 2 are apparent.  Remediation earthworks on Block 2 and construction of the stormwater detention basins on Block 1 are visible from July 2014 and progress through the first half of 2015. Works on the eastern part of Block 2 are evident from May 2015.  Redevelopment work on Block 1 is visible from June 2015.  A geofabric  cover was placed on  the eastern part of Block 1  in  July 2015;  construction of buildings on Block 2 began in August 2015 and were substantially complete by March 2018.  Remedial earthworks on Block 1 began  in October 2016 and were substantially complete by May 2017. Construction of the kennel  facility on the northern part of Block 1 was evident  in July of that year, and complete by December.  Construction  of  the  southern  part  of  Block  1  can  be  seen  in  the  October  2018  photograph  and  has advanced in the April 2019 photograph.  

3.7  Summary of Identified Contamination Issues 

3.7.1  Groundwater 

Contaminants that may be present  in groundwater beneath Block 1, and therefore Lot 9,  include those that have originated either directly, as products or waste products, from manufacturing processes carried out  on  the  BIP  or  are  degradation  products  of  chemicals  formed  in  those  processes.  The  principal contaminants related to former operations at the BIP are presented in Table 3.    

14  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

 

TABLE 3Groundwater Contaminants 

Name  Alternative Name Abbreviation 

Carbon Tetrachloride  Tetrachloromethane  CTC 

Chloroform  Trichloromethane  CFM 

1,1,2,2‐tetrachloroethane  Sym tet  1,1,2,2‐TeCA 

1,1,1‐trichloroethane  Methyl chloroform  1,1,1‐TCA 

1,1,2‐trichloroethane  β‐tri  1,1,2‐TCA 

1,2‐dichloroethane  Ethylene dichloride  EDC (or 1,2‐DCA) 

Tetrachloroethene  Perchloroethene, Perchloroethylene  

PCE 

Trichloroethene  Trichloroethylene  TCE 

Cis‐1,2‐dichloroethene  ‐  Cis‐1,2‐DCE 

trans‐1,2‐dichloroethene  ‐  Trans‐1,2‐DCE 

Chloroethene  Vinyl chloride  VC 

Hexachlorobenzene  ‐  HCB 

Hexachlorobutadiene  ‐  HCBD 

 

3.7.2  Asbestos 

There is potential for asbestos impacted fill to be present on site. From review of descriptions of asbestos containing materials  (ACM)  encountered  in  a preliminary  investigation  completed  in  2005  (HLA  2005), JBS&G assessed that both friable and non‐friable asbestos were present in the soil at the site (JBS 2012a).  

3.7.3  Ground Gases 

Ground gases were detected  in previous soil vapour and ground gas assessments (JBS&G 2015a, 2015c) undertaken  on  the  eastern  part  of  Block  1.  The monitoring  indicated  the  presence  of  volatile  organic compounds  (VOC),  including  chlorinated  compounds,  and  elevated  methane  and  carbon  dioxide concentrations at some of the monitoring locations.   

3.8  Proposed Development 

On 14 December 2018,  the DPE  issued Secretary’s Environmental Assessment Requirements  (SEARs)  in respect of an application for State Signficant Development Consent (SSD 9691) for the establishment of a warehouse estate on Lot 9 comprising: 

a suspended concrete platform siting 2.5 m above  the  flood detention basin on piers  to support warehouse buildings and hardstand/parking areas; and 

construction of two warehouse buildings  for the storage and distribution of general merchandise including goods arriving from Port Botany. 

 A  10‐m  wide  landscaped  zone  (setback)  will  run  along  the  northern,  north‐western  and  southern perimeter of Lot 9, with the setback reducing to 6 m along the south‐western perimeters and 5 m along the western perimeter.  It is noted that Orica does not plan to implement the development itself; development will be undertaken by  a  prospective  future  purchaser.  Orica  does  instead  intend  to  sell  the  land with  the  development approval in place.  The proposed development is shown on Figure 3.  The Auditor has viewed the concept design for the prposed development. He has also been provided with, and has  read, a geotechnical assessment  report  for  the  site  (PSM 2019). The Auditor understands  that piled foundations will be required to support the deck and proposed buildings. Piling will penetrate to a maximum depth of about 10 metres. This issue is further discussed in Section 8.2 of this SAR. 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  15 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

3.9  Assessment Criteria 

3.9.1  Soil 

Only  soil  remaining  on  the  site  following  completion  of  remediation  has  been  reviewed  against  the following  guidelines.  Additional  considerations  with  respect  to  vapour  intrusion  and  the  presence  of ground gases on Block 1 are presented in Section 7 of this SAR.  Based  on  the  proposed  commercial/industrial  use,  and  in  accordance  with  the  decision  process  for assessment of urban redevelopment sites (EPA 2017), concentrations of contaminants  in the soil will be compared with  health  investigation  levels  (HIL)  for  commercial/industrial  land  use  (HIL  D)  and  other criteria adopted for the site. The HILs (ASC NEPM) were adopted for use in screening site soil data in the HHRA (EnRiskS 2015, 2019) and have been subsequently adopted as soil validation criteria.  Note: The criteria provided for volatile compounds are for outdoor areas only, as adopted in the hotspot validation  report  (JBS&G  2015d)  and  as  outlined  below.  It  is  noted  that  an  assessment  of  risk  due  to potential  intrusion  (into  buildings)  of  vapour  derived  from  both  soil  and  groundwater  sources  was undertaken separately in the HHRA (EnRiskS 2019).   The soil assessment criteria are provided in Table 4.    

16  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

 

TABLE 4Soil Assessment Criteria (mg/kg) 

Analyte Commercial/Industrial Landuse 

HIL‐D (ASC NEPM) Industrial Criteria Relevant to VOC – Outdoor Areas Only 

Metals and Metalloids 

Arsenic  3000N   

Cadmium  900N   

Chromium (VI)  3600N   

Copper  240000N   

Nickel  6000N   

Lead  1500N   

Zinc  400000N   

Mercury (inorganic)  730N   

Total Recoverable Hydrocarbons (TRH) and Benzene, Toluene, Ethylbenzene, Xylene (BTEX) 

TRH C6‐C10  700*   

TRH >C10‐C16  1000*   

TRH >C16‐C34  3500*   

TRH >C34‐C40  1000*   

Benzene    54U (51) 

Ethylbenzene    21000UT (20,000) 

Xylenes    2700UT (2500) 

Polycyclic Aromatic Hydrocarbons (PAH) 

Carcinogenic PAH as B(a)P (TEQ)  40N   

Total PAH  4000N   

Chlorinated Hydrocarbons 

VC    17U (17) 

cis‐1,2‐DCE    2000UT (2300) 

EDC    22U (20) 

TCE    20U (60) 

1,1,2‐TCA    6.8U (50) 

PCE    410UT (390) 

1,1,2,2‐TeCA    28U (27) 

CFM    1100UT (1000) 

HCBD  620UT (1200)   

HCB  80   

Notes:   

mg/kg  milligrams per kilogram 

N  ASC NEPM HIL‐D 

*  ASC NEPM Management Limits – commercial and industrial 

U  United  States  Environmental  Protection  Agency  (USEPA)  Regional  Screening  Level  (RSL)  for  industrial  soil,  based  on  a carcinogenic risk level of 1x10‐5 (consistent with ASC NEPM guidance) 

T  Criteria  adopted  from  the USEPA RSL  based  on  threshold  dose‐response  relationship  as  relevant  to  the  nature  of  the contaminants of potential concern (COPC) evaluated 

B(a)P  benzo(a)pyrene 

TEQ  toxicity equivalence quotient 

 As  is  further discussed  in Section 7 of this SAR, some of the criteria  in Table 4 are derived  from United States Environment Protection Agency (USEPA) Regional Screening Levels (RSL) as were current  in 2012. RSLs are updated regularly and the Auditor has reviewed these criteria against the version current at the time of finalisation of this SAR (November 2017). Current RSLs are shown in brackets in Table 4. Given the conservative  approach  adopted  in  the  HHRA  described  in  Section  7  of  this  SAR,  no  changes  to  the outcome result from the revised RSL.  

3.9.2  Soil Vapour/Ground Gas 

Soil vapour and ground gas criteria are considered on a site‐specific basis in Section 7 of this SAR.  

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  17 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

3.9.3  Groundwater 

Management  of  groundwater  contamination  at  the  site  is  regulated  by  the  EPA  under  the  following notices: 

Declaration of Remediation Site  (Section 21 of  the CLM Act), No. 21074, Area No. 3203, dated 9 February 2005; 

Notice of Approval of Voluntary Management Proposal (Section 17 of the CLM Act), No. 20151711, Area No. 3203, dated 13 August 2015;  

Notice  to  amend  approved  voluntary management  proposal  (Section  44  of  the  CLM  Act),  No. 20164428, Area No. 3203, dated 15 December 2016; and 

Notice  to  amend  approved  voluntary management  proposal  (Section  44  of  the  CLM  Act),  No. 20174415, Area No. 3203, dated 19 June 2017. 

  

   

18  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

4.0  SUMMARY OF RELEVANT INVESTIGATION WORK 

This section provides a summary of the historical investigation work undertaken on Southlands. This work provided the basis for the understanding of site conditions that underpinned the RAP (JBS&G 2019b) and the Auditor’s review of that document. This work has extended over a period of almost 30 years, but it is included in this report because each stage of assessment and remediation has built progressively on the foundation laid by previous work. There is no single definitive site assessment report.  It  should be  recognised  that  the earlier  investigations dealt with Southlands as a whole. Subsequently, Block 1 and Block 2 were addressed separately and, most recently, the individual lots into which Block 1 was subdivided have been the subject of separate reports. Thus, the focus has been narrowed with time to the extent possible. This summary contains the information that is relevant to Lot 9.  Note: The  identification of  impacts  in  this section  is discussed  in  the context of  the  investigation  levels discussed in the previous section.  

4.1  Stage 1 Preliminary Investigation (AGEE 1990) 

AGEE  carried out preliminary  investigations across  ICI’s Botany properties. With  respect  to Southlands, AGEE concluded that the ‘shallow’ groundwater was contaminated, mainly by CHCs. Limited evidence of ‘deep’ groundwater CHC contamination beneath Southlands was also reported. Concentrations of CHC in deep groundwater were markedly higher than in the shallow groundwater.  AGEE also reported that elevated concentrations of CHC had been detected in shallow fill materials. It was inferred  that  these concentrations may have been  related  to discharge of  ICI effluent directly onto  the ground  in  the  vicinity  of  the  former  effluent  treatment  pond  (ETP)  and/or  leaks  from  a  pipeline  that discharged into Springvale Drain.  HCB,  HCBD  and  hexachloroethane  (HCE) were  detected  in  shallow  fill materials, with  concentrations decreasing downwards through the fill profile.  Some of the ponds  in Southlands were reported to be contaminated with CHC. Contaminants,  including CHC and mercury, were also identified in sediments and surface water sampled from the Springvale Drain.  

4.2  Stage 2 Survey (WWC 1996) 

Soil Quality The soil quality investigations undertaken by WWC were targeted on the basis of the Stage 1 investigation (AGEE  1990).  Overall,  the  analytical  results  collected  indicated  that  very  few  volatile  or  semi‐volatile compounds were present in the unsaturated soils.    The soils on Block 1 were found to contain few volatile contaminants with concentrations greater than 1 mg/kg, with  the  exception of one peat  sample  collected  from  a depth  interval of  0.7  to  0.8 m below ground  level  (bgl),  in  the  eastern  portion  of  Block  1.  This  sample  contained  concentrations  of  CHC, including PCE, TCE, 1,1‐DCE, cis‐1,2‐DCE, trans‐1,2‐DCE and VC, ranging between 3.5 and 21 mg/kg.  Low levels of semi‐VOCs were detected in soils collected from across Block 1. The highest concentrations were  generally detected  in  samples  collected  from  a  trench  excavated  immediately  east of  Springvale Drain in the northern portion of Block 1, in particular from a sample collected from a near‐surface sample interval. An elevated concentration of mercury (70.5 mg/kg) was recorded in a sample collected from the same trench.  HCB, HCBD and HCE were the most widely detected semi‐volatile contaminants across Block 1.  Dense Non Aqueous Phase Liquids DNAPL was identified at: 

WG67D,  located on the State Rail Authority  (SRA)  land, adjacent to the  former ETP  to the north‐east of Southlands; 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  19 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

WG82D, located on Block 1; and 

bundle piezometer SB1 on Block 1.  It was  concluded  that  the most  significant  potential  areal  extent  of  DNAPL was  between  the  former Solvents Plant and Springvale Drain.  Groundwater and Surface Water Quality Dissolved phase CHC,  in particular EDC, were detected  in shallow and deep groundwater; and dissolved phase CHC were detected in surface water (Springvale Drain).  Sediment Quality CHC, mercury and chromium were detected  in sediment collected  from Springvale Drain; and CHC and mercury were detected in sediment collected elsewhere on Southlands.  

4.3  Stage 4 Investigations 

4.3.1  Full Scale Reactive Iron Barrier, Data Gaps Report (URS 2004a) 

URS  assessed  alignment  options  for  the  FSRIB.  In  investigating  the  geochemical  and  geotechnical conditions  of  the  north‐eastern  corner  of  Southlands,  the  following  findings  relating  to  groundwater contamination were noted: 

TCE was detected and was inferred to be associated with the Central EDC Plume; 

1,1,2,3‐TeCA concentrations were lower than previously reported; and 

EDC was present at high concentrations (>2000 milligrams per litre – mg/L).  

4.3.2  2004 DNAPL Source Area Investigation (URS 2004b) 

The  investigation  comprised  bore‐drilling  down  gradient  of  the  former  Solvents  and  TCE/PCE  Plants. Report findings in relation to Southlands included: 

the  lateral extent of the DNAPL zone on the north‐western portion of Block 1 was relatively well defined, however, the vertical distribution was complex; and 

DNAPL in Block 1 was present as thin (<0.1 m) accumulations.  URS concluded that containment would be the most effective means of minimising potential migration of contaminants from a DNAPL source area. Additionally, other primary methods of containment  including pumping, and secondary  treatment methods  including  flushing,  thermal and chemical approaches were considered.  

4.4  Preliminary Soil Investigations (HLA 2005) 

HLA’s  scope  of work  included  collection  of  soil/fill  samples  from  approximately  78  test  pits,  a  broad characterisation of the fill stockpiles located across Southlands and a limited program of water leach tests under neutral conditions.  In  general, HLA  concluded  that  the  entire  surface of both Block 1  and Block 2 had been  subjected  to uncontrolled  dumping  of  construction  debris  and  fill materials,  such  as  ash  and  fragments  of  fibrous cement sheeting. In detail, HLA described the findings of the investigation of Block 1 as follows.  Soil Contamination 

Concentrations  of mercury  exceeding  the  adopted  criteria were  identified  in  soil  on  the  south‐western portion of Block 1 and along the eastern side of Nant Street. Limited water  leach testing indicated that the mercury was leachable under neutral conditions. 

Concentrations  of  lead  exceeding  the  adopted  criteria were  detected  in  test‐pit  TP31,  near  the southern boundary of Block 1. 

20  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

Concentrations of total petroleum hydrocarbons (TPH) (C10‐C36) and BTEX were detected in samples collected from the south‐western portion of Block 1. 

TPH (C10‐C36) contamination (possibly related to a former SRA diesel tank spill) was identified in the eastern portion of Block 1. 

Concentrations  of  CHC,  including  HCB,  above  the  adopted  criteria  were  detected  in  samples collected  from  the  south‐western  and  eastern  portions  of  Block  1,  in  the  vicinity  of  the groundwater discharge area. 

Numerous instances of potential ACM were noted in the fill layer during the investigations.  Stockpile Contamination 

CHC were detected above the adopted criteria in two of the stockpiles, located in the north‐eastern (SP28) and southern portion (SP30) of Block 1. 

Asbestos fibres were detected in both a fragment of fibrous cement sheeting and in a soil collected from Stockpile SP15, located in the mid‐northern portion of Block 1. 

 Sediment Concentrations of metals and PAH exceeding the adopted criteria were detected  in a  limited number of pond sediment characterisation samples. Volatiles (CHC) were also detected  in the sediments. However, screening investigation levels for these compounds were not provided in the adopted guidelines.  The Auditor was  satisfied  that  the  scope  of  the  investigation was  adequate  to  address  the  objectives stated  in the report. Where departures were made from guidelines made or endorsed by the EPA these departures were justified by the limited objectives of the investigation.  The Auditor  considered  that  the data  contained  in  the  report may be  relied upon  for  the purposes of making  a  limited  assessment  of  the  condition  of  soils  above  the  water  table  on  the  site,  and  (in conjunction with groundwater investigations and risk assessment work previously carried out by others), developing remedial or management strategies for the site.  

4.5  Southern Plumes Source Area Delineation Investigation (URS 2006) 

This  report described part of a broader  investigation  carried out  to delineate  the extent of  the DNAPL source areas for the Botany southern plumes. These source areas are: 

S1 source area – beneath the northern part of Block 1 and possibly the Botany rail corridor; 

S2  Source  area  –  beneath  the  former  solvents  plant  on  the  BIP,  the  Botany  rail  corridor  and possibly the northern part of Block 1; and 

S3 Source area – beneath the former TCE plant on the BIP, the Botany rail corridor and possibly the northern part of Block 1. 

 The objectives of  the  investigation  included  establishment of  the northern boundary of  the DNAPL  S1 source area  located on Southlands and better characterisation of the S1, S2 and S3 source areas and/or dissolved phase plumes in the north‐east corner of Block 1.  Investigations  included  the  installation  and  sampling  of monitoring wells  BP103  and  BP104  along  the northern bound of Block 1 and the installation and sampling of monitoring wells BP105 and BP106 along the north‐east boundary of Block 1.  DNAPL was observed in BP105 at various depths along with high dissolved‐phase CHC concentrations. The range of CHC present in groundwater and DNAPL at BP105 included: 

volatile CHC: CTC, CFM, EDC, 1,1,2,2‐TeCA, PCE and TCE; and  

semi‐volatile CHC: HCB, HCBD and HCE.  

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  21 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

The DNAPL was predominantly PCE and the DNAPL composition was indicative of contamination from the former Solvent Plant. The exact mechanism under which DNAPL reached the S1 source area is not known.  

4.6  Shallow  Contaminated  Soil/Fill  Delineation  and  Waste  Management  (Golder 2012b) 

Golder undertook a  review of previous  investigations undertaken by HLA  (2005), WWC  (1996) and URS (2008e),  including  a  comparison  of  previously  identified  soil/fill  ‘hot  spots’  against  revised  adopted investigation  levels,  in  particular,  the  USEPA  Region  IX  Preliminary  Remediation  Goals  (PRG)  (2004) included in the RAP (URS 2008e) that were superseded by the USEPA RSLs (2011). Golder noted that URS (2008e)  included recommendations for further delineation of  identified soil/fill contamination as well as further assessment and  classification of anticipated  soil/fill wastes  requiring management, prior  to  the commencement of active remediation.  The objective of  the  investigation was  to  further delineate soil/fill contamination hotspots  identified  in URS (2008e). The hot spots  included areas where the site‐specific risk based soil criteria were exceeded for volatile COPC; and an area in the north‐west portion of Block 1 of mercury impact in soil/fill requiring remediation due  to  the potential  for mercury  to  leach  to groundwater. Golder also  sampled  stockpiles located along the southern and eastern boundaries of Block 1.  Golder’s  delineation  sampling  comprised  soil  sampling  from  hand‐augered,  test  pitted  and  stockpile sampling locations across Southlands. Sampling locations were excavated or hand‐augered to a depth of 2 m bgl or prior practical refusal. A minimum of two samples from each sampling location were submitted for analysis.  Field  screening was  undertaken  on  the  samples  using  a  photoionisation  detector  (PID), with  readings ranging between 0 and 2162 parts per million (ppm).  Golder  adopted  the  soil  validation  criteria  provided  in  URS  (2008e)  to  assess  the  results  of  the  soil delineation  sampling. Golder noted  that  some of  the  validation  criteria provided  in URS  (2008e) were based on the USEPA PRG (2004). The USEPA had subsequently replaced the PRGs with RSLs, which Golder used  to  update  the  validation  criteria  as  necessary. Golder  noted  that  based  on USEPA  RSLs  only  the validation criteria for naphthalene and 1,2,4‐trichlorobenzene changed from the criteria provided in URS (2008e). It is noted that both these compounds are volatile and Golder modified these criteria by dividing by a factor of 100.  Golder  summarised  the  findings  of  the  delineation  sampling  for  each  of  the  areas  investigated  across Block 1 as follows:  Central Southern Portion of Block 1 

TPH (C15‐C36) concentrations exceeded the adopted investigation level (IL) in a near surface sample from one location (GETP23_0.3). The depth of TPH impact was inferred to be limited based on the concentration in the sample collected at 1.0 m bgl. 

Naphthalene  concentrations  exceeded  the  IL  in  a  near  surface  sample  at  one  location (GEHA32_0.5). 

Volatile  CHC  concentrations  exceeded  the  IL  in  samples  collected  at  five  locations  (GETP25, GETP26, GETP31, GEHA33 and GETP60) at surface level and to depths of 2.0 m bgl at GETP31. 

 South‐Western Portion of Block 1 

TPH and BTEX concentrations exceeded the IL in soil samples collected from two locations (GEHA54 and GEHA55) at 1.8 m bgl. 

B(a)P  and  total  PAH  concentrations  exceeded  the  IL  in  a  soil  sample  collected  at  one  location (GEHA52) at a depth of 0.5 m bgl. 

Naphthalene  concentrations exceeded  the  IL at  two  locations  (GEHA54 and GEHA55)  in  samples collected from 0.5 to 1.8 m bgl. 

22  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

CTC and PCE concentrations exceeded the IL at two locations (GEHA18 and GEHA54) from samples collected  from  near  surface  up  to  0.5 m  bgl. Golder  noted  that  the  volatile  CHC  impacts were limited in vertical extent based on samples collected and analysed from greater depths. 

HCB  concentrations  exceeded  the  IL  at  four  locations  (GEHA18, GHEA50, GEHA52, GEHA54  and GEHA55) from samples collected at surface level to a depth of 1.8 m bgl. 

HCBD and HCE concentrations exceeded the  IL  in a surface sample at one  location (GEHA54). The impacts  to  soil were  inferred  to  be  limited  in  vertical  extent  based  on  samples  collected  and analysed from deeper intervals. 

Mercury concentrations exceeded the IL at five locations (GEHA18, GEHA51, GEHA52, GEHA54 and GEHA55) from samples collected at surface level to 1.8 m bgl. 

 East of the Northern Portion of Springvale Drain 

HCB  concentrations  exceeded  the  IL  in  a  surface  sample  from  one  location  (GEHA49).  The HCB impact was inferred to be limited in vertical extent based on analysis of the sample collected at 1.0 m bgl. 

Mercury concentrations exceeded the  IL  in near surface (0 to 0.5 m bgl) samples at two  locations (GEHA48 and GEHA49). 

 Vicinity of TP15 

TPH (C15‐C36) concentrations exceeded the IL at one location (GETP38) at a depth of 1.2 m bgl. 

Naphthalene  concentrations  exceeded  the  IL  at  two  locations  (GETP38  and GEHA40)  at  depths ranging from 0.5 to 1.2 m bgl. 

 Stockpiles 

Concentrations of COPC did not exceed the IL in samples collected from stockpiles located along the southern and eastern boundaries of Block 1. 

 In  addition  to  the COPC  identified  in URS  (2008e)  for each of  the  areas  requiring  remediation, Golder identified further COPC for the remediation areas as follows: 

TPH in the vicinity of GETP23; 

naphthalene in the vicinity of GEHA32; 

TPH and naphthalene in the vicinity of TP15; and  

HCB in the vicinity of GEHA49.  

4.7  Review of Risk Issues – Groundwater Discharge to Springvale Drain (EnRiskS 2012) 

In 2012, EnRiskS undertook a review of risk  issues associated with groundwater discharge to Springvale Drain.  The  review was  prepared  in  response  to  a  letter  from  the  EPA which  commented  on  various aspects of quarterly reports prepared  in 2011 for the groundwater treatment plant (GTP) surface water and groundwater monitoring program. The review incorporated the following data: 

quarterly  water  level  and  surface  water  quality  data  presented  in  the  GTP  surface  water  and groundwater monitoring reports; 

air quality data collected as part of the 15‐month air sampling program; and 

surface water  and  ambient  air data  collected during  a period of elevated  groundwater  levels  in 2011. 

 The  review  identified  several  time periods when water  levels at MWB03S exceeded 2.3 m AHD. These levels have been associated with  ‘high’ ambient air concentrations by URS (2008e) with most of the risk associated  with  EDC  and  CTC.  EnRiskS  (2012)  indicated  that  ‘high’  levels  of  inhalation  exposure  are associated with the following ambient air concentrations: 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  23 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

EDC concentrations exceeding 16 micrograms per cubic metres (µg/m3); and  

CTC concentrations exceeding 4 µg/m3.  Utilising workplace exposure  scenarios and published air quality guidelines EnRiskS  concluded  that  the ambient air concentrations associated with ‘high’ groundwater levels 

…are not associated with unacceptable levels of risk. Hence use of the higher groundwater level of 2.3 m AHD at MWB03S is appropriate for the identification of risk issues that may warrant further evaluation through the collection of surface water data (to determine the concentrations of CHC in the drain), with ambient air data only collected where the surface water concentrations are elevated. 

 Quarterly  surface water monitoring  in  June and September 2011  coincided with elevated groundwater levels and the results of this sampling indicated the presence of CHC in surface water at Southlands. The March  2011  sampling  did  not  identify  the  presence  of  CHC  (although  this  round  occurred  when groundwater  levels were  low). Ambient air sampling (15‐month program) conducted  in March 2011 also reported no detections of CHC adjacent to Springvale Drain.  Additional surface water and ambient air sampling was completed during elevated shallow groundwater levels  in April 2011  (on two occasions). Elevated groundwater  levels occurred during this time due to a planned GTP shutdown and coincident rainfall. CHC were detected in surface water within the drain and in ambient air directly (30 cm) above, and at one location adjacent to the drain. Concentrations decreased from the northern to southern end of Springvale Drain on Southlands and decreased with distance from the drain (at 20 m no CHC were reported above the limits of reporting).  In April and June 2011, exceedances of the adopted surface water criteria (URS 2008e) occurred and these exceedances  correlate  to  shallow  groundwater  levels  at MWB03S being  close  to or  above 2.3 m AHD. However,  it  was  considered  important  to  note  that  the  surface  water  concentrations  remained significantly lower than those reported before operation of the GTP.  EnRiskS assessed the ambient air concentrations collected during elevated shallow groundwater levels in 2011 and indicated that they were:  

…below screening level air criteria relevant to the assessment of chronic health risks in the workplace. 

 and noted that: 

…there are no workplaces that are directly adjacent to the drain (current or proposed in the Southlands development), and no existing workplaces within Southlands. Air concentrations 20 m  from  the drain are  significantly  lower  than  at  the  drain  itself  indicating  an  additional margin  of  safety  exists where evaluating potential vapour risk issues by workers in areas located adjacent to the drain. 

 

4.8  Delineation of Remediation Areas (JBS&G 2014b) 

In  2014,  JBS&G  undertook  delineation  sampling  of  areas  requiring  remediation  as  identified  in  URS (2008e) and further defined in Golder (2012b), in accordance with JBS&G’s Revised RAP (JBS&G 2014a).   JBS&G carried out soil sampling on a 5 m grid at 0.5 m depth intervals, to refusal or until groundwater was encountered,  at  each  of  the  remediation  areas  identified  in  the  Revised  RAP.  Samples  were  initially chosen for analysis based on the depths at which impacts had been previously recorded in the vicinity of each  sampling  location.  Samples  located  0.5 m  above  and  0.5 m  below  the  initial  samples were  also analysed, unless they were located below groundwater.    Samples were analysed  for  the  relevant COPCs  for each of  the  remediation areas and  the  results were compared against investigation levels for commercial/industrial land use (HIL‐D) and other criteria derived or adopted for the site as described in the Revised RAP (JBS&G 2014a).  Based on assessment of the obtained delineation data, the vertical and lateral extents of impacted soils, identified  in the Revised RAP (JBS&G 2014a) as requiring remediation, were delineated and remediation 

24  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

approaches  for each of  the  remediation  areas were developed  to  guide  the  extent of  the excavations required to validate the hotspots.  

4.9  Asbestos and Vapour Assessment (JBS&G 2018b) 

In 2018, JBS&G undertook an asbestos and soil gas assessment of the compensatory flood storage located at  the  site.  The  objective  of  the  investigation  was  to measure  soil  vapour  concentrations  to  assess whether  a  vapour  risk  mitigation  system  is  necessary  and  to  provide  an  assessment  of  potential contaminants in soil on the site.  The scope of works included: 

soil sampling for asbestos analysis and asbestos quantification from 100 testpits (TP01 to TP100); 

installation of 6 soil vapour probes (SV01 to SV06) for sampling of soil vapour; 

submission of soil and soil vapour samples for laboratory analysis for asbestos and VOCs; and 

assessment of laboratory results of analysis against adopted criteria.  The location of the testpits are shown on Figure 4.  No visible ACM fragments were observed at the sampling locations. Asbestos Fines (AF)/Fibrous Asbestos (FA) in the soil samples were less than the adopted criteria with the exceptions of the following samples: 

0.0034 % w/w AF/FA in QC06032018‐1, a duplicate of TP03_0‐0.5; 

0.0024 % w/w AF/FA in TP18_0‐0.5; 

0.0025 % w/w AF/FA in TP20_0‐0.5; 

0.004 % w/w AF/FA in TP21_0‐0.5; 

0.0017 % w/w AF/FA in TP22_0‐0.5; 

0.0037 % w/w AF/FA in TP37_0‐0.5; 

0.0035 % w/w AF/FA in TP38_0‐0.5; 

0.0011 % w/w AF/FA in TP50_0‐0.5; 

0.0011 % w/w AF/FA in TP58_0‐0.5; 

0.0016 % w/w AF/FA in TP66_0‐0.5; 

0.0033 % w/w AF/FA in TP68_0‐0.5; 

0.002 % w/w AF/FA in TP70_0‐0.5; 

0.0137 % w/w AF/FA in TP71_0‐0.5; and 

0.0012 % w/w AF/FA in TP94_0‐0.5.  Review of results of laboratory analyses indicate that with the following exceptions, the concentrations of COPCs in soil vapour/gas were all less than the assessment criteria: 

19 000 μg/m3 1,1‐dichloroethane in SV03; 

9.4% carbon dioxide in SV02; 

11% carbon dioxide in SV03; and 

13% carbon dioxide in SV06.  Based on the results of the investigation undertaken at the site, JBS&G concluded that ACM and AF/FA in soil,  and  chlorinated  hydrocarbons  and  carbon  dioxide  in  soil  vapour/gas,  and  impacted  groundwater pose a human health risk to potential, future site receptors.  

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  25 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

JBS&G recommended that a RAP be prepared to manage potential risks from ACM and AF/FA in soils, and potential risks from soil vapour and ground gas, to render the site suitable for commercial/industrial use. Following remediation, a LTEMP will be required for on‐going management of asbestos  in soils, and soil vapour/ground gas, in addition to management requirements for CHC‐impacted groundwater.  

4.10  Auditor’s Review of Investigations 

The  summary  of  investigation work  presented  in  this  section  demonstrates  that  Lot  9,  and  adjacent properties,  have  been  the  subject  of  detailed  and  extensive  geoenvironmental  investigations  and  risk assessments extending over the period from 1990 to 2018.    These  investigations have shown that geological materials (including surface water and groundwater) at and below the surface of the site have been contaminated with a wide range of anthropogenic material including, particularly, asbestos and a number of CHC. Several plumes of groundwater contaminated with CHC extend beneath  the site, and continue beyond  the site boundaries. Some of  these compounds are DNAPL and they are present in dissolved, adsorbed and separate phases.  Ground gas investigations carried out in 2018 indicated the general presence of CHC in ground gas, as well as locally high concentrations of 1,1‐dichloroethane and carbon dioxide.   The significance of these findings is discussed in subsequent sections of this SAR.     

26  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

5.0  SUMMARY OF PREVIOUS REMEDIATION WORK 

5.1  Soil Hotspot Validation (JBS&G 2015d) 

This  section  provides  a  summary  of  the  remediation  work  undertaken  at  hotspots  and  stockpiles identified  in  JBS&G’s  Revised  RAP  (2014a).  The work was  carried  out  in  conjunction with  the  Stage  1 (Block 2) program. It included Lot 9 and adjacent areas of Block 1.  Note: Following preparation of the Revised RAP, JBS&G undertook sampling to delineate the lateral extent of  soil  impacts  within  the  remediation  areas  to  guide  the  extent  of  the  excavation  required  for remediation. The results of the delineation sampling are presented  in Delineation of Remediation Areas (JBS&G 2014b).  

5.1.1  Removal of Vegetation 

All vegetation with a height greater than 300 millimetres (mm) above the ground surface was removed, shredded and disposed off‐site as mulch to a  landscape supplier. The remaining vegetation  from across Block 1 was grubbed and stockpiled for mulching.    Material  considered  too high  in organic  content  for  compaction was placed  in  the Paper Waste Ponds within the area of the compensatory flood basin.  

5.1.2  Stripping of Superficial Soils 

Following removal of vegetation, stockpiles suitable to remain on‐site and all surface soils were stripped from  the  site  surface,  and  screened  to  remove oversized materials  and  allow  compaction of  the  soils. Where possible oversized materials were segregated  into stockpiles of concrete and brick and  inspected for the presence of ACM (none observed) or soil clods. Following washing, the bricks and concrete were removed offsite to licensed recycling facilities. Oversized materials that could not be segregated from fill and could not be used on the site  (for geotechnical reasons), were placed  in a mixed demolition waste stockpile (Stockpile Block 1) that was later disposed off‐site to a facility licensed to accept the waste.  

5.1.3  Monitoring and Extraction Well Decommissioning 

Prior to commencement of Stage 1 remediation work, 116 (of the 136 known) historical monitoring and extraction wells across Southlands (including Block 1) were decommissioned and grouted (generally from the base). Wells  less than 50 mm  in diameter were grouted from the top. The remaining 20 wells could not be located.  The  Auditor  reviewed  the  well  decommissioning  and  considered  that  it  had  been  carried  out  in accordance with the relevant guidelines (NUDLC 2012).  

5.1.4  Air and Environmental Monitoring 

Previous investigations at Block 1 had identified the presence of friable asbestos, in the form of asbestos fibres,  and  bonded  asbestos  in  fill  across  the  site.  Therefore,  as  a  condition  of  development  consent, airborne asbestos fibre monitoring was required for the duration of work involving disturbance of the fill materials. JBS&G was engaged to undertake this work in accordance with the CEMP (Golder 2012c).  Monitoring included daily checks to verify that the requirements of the CEMP, i.e. air quality management (including asbestos  fibres and  respirable dust),  sediment, water, waste and  traffic controls, were being implemented  by  the  remediation  contractor.  Monitoring  of  potential  noise  issues  relating  to  site remediation works was carried out and assessed by SLR Consulting Australia Pty Ltd  (SLR 2016) using a real‐time noise monitor located on the site close to the source of construction noise. The results of daily checks were summarised in weekly conformance reports.    Results of all asbestos  fibre monitoring were below acceptable  levels; and the results of respirable dust monitoring were all below the criterion of 100 μg/m3 nominated in the CEMP (Golder 2012c).  

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  27 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

The  Auditor  viewed  the  monitoring  dataset,  and  was  satisfied  that  it  was  suitable  for  its  intended purpose.  

5.1.5  Excavation of Hotspots and Stockpiles 

Table 5 provides a summary of the remediation work carried out at hotspots and stockpiles across Lot 9.  

5.1.6  Stockpiled Materials from the Compensatory Flood Basin 

As part of the early works program, it was proposed that excess fill material from the compensatory flood basin  excavated  on  Block  1  (i.e.  Lot  9) was  to  be  reused  on  Block  2.  Characterisation  samples were collected from the stockpiled material  in accordance with the Revised RAP (JBS&G 2014a) and review of the  analysis  results  against  the  assessment  criteria  indicated  the  following  exceedances:  SDB‐026  (8.9 mg/kg TCE); and SDB‐031 (21 mg/kg TCE).  The  materials  in  Stockpiles  SDB‐026  and  SDB‐031  were  considered  unsuitable  for  reuse  and  were classified  for waste  disposal  purposes  as  Special Waste  (Asbestos Waste)  ‐  General  Solid Waste  and Special Waste (Asbestos Waste) ‐ Hazardous Waste. Material considered as suitable for reuse was placed under marker and physical separation layers, on Block 2.  

5.1.7  Waste Materials Disposed Off‐Site or Placed on Block 2 

During  earthworks,  oversized  materials  such  as  concrete,  steel  and  general  demolition  waste  were removed  from  fill  material  and  either  disposed  off‐site  to  a  recycling  facility  (washed  concrete)  or disposed  to  landfill.  Other  material  excavated  during  remediation  work  were  sampled  for  waste classification  purposes,  and  either  appropriately  disposed  off‐site  to  suitable  facilities  or,  if  suitable, placed on Block 2 (i.e. stockpiled materials from the Compensatory Flood Basin).    

5.1.8  Soil from Block 2 

Laboratory analysis results of material excavated from remediation area GEBH09 (Block 2) were assessed against the site validation criteria and found to be suitable for reuse on Block 1.    In  addition,  high  organic‐content  vegetation  (grubbed  material)  from  outside  the  areas  on  Block  2 identified as requiring remediation was also assessed by JBS&G as suitable for placement on Block 1,  in the manner described in Section 5.1.1 above for similar material originating on Block 1.  

5.1.9  Validation Results 

On  the basis of  the extent of  remedial works carried out and  the  results of validation sampling,  JBS&G considered  that  the  contamination  hotspots  historically  identified  as  requiring  remediation  had  been removed from Block 1 via excavation and offsite disposal.    JBS&G  considered  all  hotspot  remedial  areas  to  have  been  appropriately  validated  based  on  either excavation of  the hotspot  to  the extent  indicated as necessary by delineation  sampling  results  (JBS&G 2014b)  (where  the excavation did not  intercept groundwater), or  to  the extent practicable  (where  the remedial excavation intercepted groundwater).  JBS&G noted that the southern extent of the remedial excavation at Area 10 extended to the boundary of the GTP access road where it is anticipated that additional TRH impacts are present.    JBS&G  concluded  that, provided  that  future Block 1 development  incorporates  remediation  to manage access to asbestos impacted soil and impacted groundwater and provides measures for gas mitigation in buildings, and also  that an  appropriate  LTSEMP  is  implemented  to manage exposure  to  the  remaining contamination following redevelopment of the site, Block 1 can be made suitable for its proposed use.   

28  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

TABLE 5Summary of Remediation Work at Hotspots and Stockpiles – Lot 9 

Sampling Location  

COPC  Summary of Remediation Work Carried Out  Waste Classification   Method of Disposal 

GETRS06  Mercury  Excavation of the top 1.5 m of soil, which was set aside for backfilling the excavation, between sampling locations DS065‐1, DS065‐2, DS157 and DS158; 

excavation of mercury impacted soil situated at depths between 1.5 and 2.5 m bgl; and 

stockpiling of the excavated impacted material on plastic sheeting in the stockpiling area for waste classification. 

Restricted Solid Waste – Special Waste (Asbestos Waste); and 

Hazardous Waste – Special Waste (Asbestos Waste) 

The stockpile was disposed of as Restricted Solid Waste to SITA, 1725 Elizabeth Drive, Kemps Creek, under specific Immobilisation Approval 2015‐S‐05 issued by the EPA on 1 September 2015 

TP31  Lead  Excavation of soil to within 1 m above the groundwater between sampling locations DS074 and DS077; 

excavation of potentially lead impacted soil situated at 0 to 1 m above groundwater; and 

stockpiling of the excavated impacted material on plastic sheeting in the stockpiling area for waste classification. 

Special Waste (Asbestos Waste) – General Solid Waste 

The stockpile, and 100 mm of the soil underlying the plastic, was disposed offsite to a landfill facility licensed to accept the waste. 

TP81, TP82, GEHA54 and GEHA55 

TRH  Excavation of the overlying soil to within 0.5 m of groundwater, which was guided by the depth to water at each of the delineation sampling locations.  This overlying soil was set aside for backfilling the excavation.  The maximum lateral extent to the south was limited by the boundary of the GTP access road; 

excavation of 1 m of soil, which comprised 0.5 m of soil above and 0.5 m of soil below the groundwater surface; and 

stockpiling of the excavated impacted material on plastic sheeting in the stockpiling area for waste classification. 

Special Waste (Asbestos Waste) – General Solid Waste; 

Restricted Solid Waste – Special Waste (Asbestos Waste); and 

Hazardous Waste – Special Waste (Asbestos Waste) 

The stockpile, and 100 mm of the soil underlying the plastic, was disposed offsite to a landfill facility licensed to accept the waste. 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  29 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

6.0  CONCEPTUAL SITE MODEL AND CONTAMINATION ASSESSMENT 

This section is substantially based upon the Conceptual Site Model (CSM) prepared by URS (2007b), with additions from the Review of Groundwater‐Surface Water Interaction at Springvale Drain (JBS 2013), the Updated CSM  (Orica 2017) and  some material added by  the Auditor. This model was prepared  for  the entire Botany site, but is highly relevant to the Southlands.    The Auditor intends that the hydrogeological information provided in this section be sufficient to enable an  understanding  of  this  report.  Reference  to  URS  (2007b)  and  some  of  its  primary  sources  is recommended if a comprehensive overview of site conditions and the hydrogeology of the Botany Sands aquifer is required.  Sections 6.1 to 6.4, describe the conceptual hydrogeological model of Southlands and Sections 6.5 and 6.6 summarise the contamination  issues that have been  identified,  including soil contamination on site, and groundwater contamination issues that impinge upon the site. Section 6.7 summarises the conclusions of the Updated CSM (Orica 2017).  

6.1  Topographic Setting 

The Southlands site  is  located within the Botany Basin – a natural topographic basin that surrounds and includes  Botany  Bay,  and  covers  an  area  of  approximately  80  square  kilometres  (km2).  The  basin  is  a depression  in  the  surface  of  the  Triassic‐age  bedrock  that  has  been  infilled with  estuarine  sediments topped by dune sands. To the north of Botany Bay, the land surface rises from sea level at the edge of the bay to around 35 to 40 m at the rim of the basin.  The two blocks of land that form Southlands lie at an elevation of approximately 4 m AHD.  This  area was  formerly  part  of  the  Veterans  Swamp, which  has  now  been  substantially  drained.  The slightly higher land to the north and north‐east (now the BIP) was formerly covered by sand dunes.  Block 1 and Block 2 of the Southlands site are separated by the Springvale Drain, which flows south from the Eastlakes golf course and drains the industrial area to the north of the site. The western boundary of Block 2 is marked by the Floodvale Drain, which also flows to the south and drains industrial land, but has a  smaller  catchment  than  the  Springvale  Drain.  The  drains  have  an  upstream  catchment  area  of  319 hectares. Both these drains were constructed  in the 1870s and discharge to Botany Bay via the Penrhyn Estuary.  To  the  south  of  the  site,  both  drains  are  substantially  culverted.  The  Springvale  Drain  flows beneath McPherson  Street  through  a box  culvert,  then  through pipe  culverts,  and  an  inverted  syphon beneath the South‐Western Sydney Ocean Outfall Sewer.  Prior to the recent construction of stormwater detention basins there was no other engineered drainage on Southlands; most rainfall onto the site infiltrated the sandy site surface, and was then either utilised by the former vegetation cover or percolated to the water table.  The  recent development of  Southlands Block 2  as  a  logistics hub  that  is  substantially paved with  fully engineered drainage and the current development of Block 1 have substantially changed this regime.  

6.2  Geology 

6.2.1  Regional 

Stratigraphically, the basin infill beneath Southlands and surrounding area is composed of Quaternary‐age interbedded sands, peaty sands, peat and mud, known as the Botany Sands, underlain by the Triassic‐age Hawkesbury Sandstone bedrock.  Structurally,  the  Botany  Basin  can  be  considered  to  be  a  superimposed  basin  within  the  larger Cumberland Basin. The shape of the bedrock surface  is complex – prior to deposition of the Quaternary sediments  it was eroded by stream  flows, which have cut deep valleys  into  the surface. Some of  these valleys  extend  out  into what  is  now  Botany  Bay  (Albani  et  al  1981),  and  they  are  now  infilled with 

30  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

sediments. One such major palaeovalley runs to the west of Southlands, extending from the Lachlan Lakes to beneath Botany Bay. Its position has been mapped using geophysics, and confirmed by drilling.  Regionally,  the Botany Sands are up  to 80 m  thick, with  their  thickness  substantially  controlled by  the bedrock  topography,  so  that  the  maximum  thickness  is  only  attained  in  the  deepest  parts  of palaeovalleys.  Fine‐medium  grained  sands  are  the dominant  lithology  in  the upper part of  the profile, although  interbeds of peat and peaty sand are common. Silts and clays are more abundant  in the  lower part of the sequence.  Hard  cemented  sand  layers  (formed  by  iron  and  humic  compounds),  locally  referred  to  as  ‘Waterloo Rock’, are also common in the upper portion of the aquifer.  The sandstone bedrock comprises predominantly well‐indurated quartz and quartz‐lithic sandstones, with shale interbeds.  

6.2.2  Local 

URS  (2007b) described a  three‐layer  stratigraphic model  for  the Botany Sands beneath Southlands and the  BIP.  This  has  been  slightly modified  by  the  Auditor  to  reflect  known  site  conditions,  as  shown  in Table 6.  

TABLE 6Site Stratigraphy 

Stratigraphic Layer Description Typical Thickness 

Fill  Randomly placed uncontrolled fill materials  0 to 3.6 m 

Surface soils  Predominantly peat and peaty sand  1 to 2 m 

Layer 1  Upper Sand   0 to 6 m 

Layer 2 (2A, 2B, 2C)  Middle Sand  10 to 20 m 

Layer 3  Basal Sand  2 to 10 m 

 The surface of Southlands is substantially covered by a layer of peat, and extensive peat layers also occur at depths of 8 to 10 m bgl.  In detail, URS described the sand units as follows. 

Layer 1 The uppermost  layer generally  contains 1  to 3 m of  fill underlain by  sand which  contains a  few  thin discontinuous peat or silt layers. On Southlands where shallow peat layers were removed, the depth of fill may be greater (approximately 6 m). The sand that underlies the fill  is of medium to high porosity, and  typically has a cone penetrometer  test  (CPT) cone  resistance of  less  than 25 Megapascals  (MPa). The sand is typically loose, fine to medium grained, sub‐angular to sub‐rounded, moderately sorted and quartzose, with minor fine heavy minerals. 

The thickness of Layer 1 ranges from 0 m to greater than 6 m, with the thickest sections developed on the north‐trending dune ridges which occur along Stephen Road to the west of Southlands, and further to the north adjacent to the Eastlakes Golf Course. 

Within  Southlands,  sediment/soil  lithology  beneath  and  adjacent  to  Springvale  Drain  consists  of  a surficial  layer of fill (0 to 1 m thick) underlain by a  layer of black organic rich sand and silt (0.5 to 1 m thick) and  sands. No peat was  found below or adjacent  to  the drain  in  Southlands and  total organic matter ranged between 2% and 20% in samples beneath the drain. 

Layer 2 Layer  2  is  predominantly  sand with  intercalated  peat,  sandy  peat  and  peaty  sand  layers.  The  sands typically have a CPT  cone  resistance of greater  than 25 MPa  (higher density and  lower porosity  than Layer 1). The quartzose  sand  is dense and generally  fine grained,  sub‐angular  to  sub‐rounded, poorly sorted, with minor  fine‐grained heavy minerals. The  sand  is  generally  finer  grained  and more poorly sorted  than  the sand encountered  in Layer 1. Layer 2 contains various  thin  (generally  less  than 0.5 m thick) discontinuous low‐permeability layers which variously contain peat, peaty clay, peaty sand, clayey 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  31 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

sand  and  silty  sand,  depending  on  the  localised  depositional  environment.  The  lateral  extent  of  the various  low‐permeability  layers  may  range  from  less  than  50  m  to  500  m.  The  Botany  Sands  are commonly tightly packed at deeper levels. 

Layer 2 is typically between 10 and 20 m thick, but ranges from less than 10 m thick over bedrock near the southern end of the BIP along Second Street, to over 30 m near the northern end of the BIP and in the lower reaches of the Lakes Valley Palaeochannel. The inferred surface of the top of Layer 2 dips from approximately 20 m AHD on the eastern margin of the Botany Basin to ‐0.6 m AHD. 

As  indicated above, Layer 2 has been  further  (evenly) divided  into sub‐layers: Layer 2A, Layer 2B and Layer 2C. The division is also somewhat related to the general sequence of low permeability layers (and hydrogeology) inferred to exist within Layer 2. 

Layer 3 Layer 3 is a basal zone of clayey sand and sandy clay with discontinuous layers of gravel, peat and peaty clay. The lithology of this layer is quite variable and reflects the various depositional environments. The top of Layer 3  is commonly characterised by  the presence of organic  rich  layers which are commonly clayey and appear to be relatively continuous across the Botany area. 

Beneath Southlands, Layer 3  is relatively thin (approximately 2 to 4 m), and  is  largely absent from the eastern part of  the model  area  as  the bedrock  surface  rises.  To  the west of  the model  area, where bedrock  deepens,  Layer  3  thickens  (reflecting  its  estuarine  and  restricted  lagoonal  depositional environments) and contains clayey layers with sand lenses. In general, Layer 3 is typically less than 10 m thick, with the exception of the palaeochannels where Layer 3 thickens to over 30 m. 

Whilst generally  incorporated  into Layer 3,  there  is also a deeper  (fourth) unit of  interbedded marine and estuarine shelly clays. Within  the palaeochannels  the sand and clays are underlain by basal sand, with some gravel of fluvial origin. 

 The groundwater system is shown in schematic cross‐section on Figure 5.  The  buried  surface  of  the  Hawkesbury  Sandstone  has  been  mapped  in  reasonable  detail,  using geophysical, cone penetrometer and borehole data; contours on this surface are shown on Figure 6.  The most important features identified by URS are: 

a broad basement valley beneath the northern end of the BIP that extends from Denison Street in a westerly direction beneath  the  former Polypropylene and Olefines  II plants  in  the north‐western part  of  the  BIP  (directly  north  of  Southlands  Block  1),  and  merges  into  the  Lakes  Valley palaeochannel, which extends south to Botany Bay; and 

a westerly  trending basement  ridge extending approximately under  the  southern portion of  the BIP, immediately north of Southlands. 

 

6.3  Hydrogeology 

6.3.1  Groundwater Flow Regime 

The Botany Sands contain a series of unconfined and semi‐confined aquifers that together are referred to as  the Botany  Sands Aquifer. Work  by URS  on  the BIP,  and  by  others  elsewhere  in  the Botany  Sands Aquifer, has made  it clear  that  this  is not a  single aquifer, but a multi‐aquifer  system containing many aquifer and aquitard units varying in hydraulic conductivity and in lateral and vertical extent. The aquifer units attain a degree of  lateral continuity because of the discontinuous nature of the aquitards, and are interconnected vertically by leakage through the aquitards.   Within  the aquifer system as a whole,  lateral groundwater  flow  is generally  to  the south‐west, under a hydraulic gradient of 0.008.  However,  in the past, changes and even reversals of the natural hydraulic gradient are assessed to have occurred as a  result of concentrated groundwater pumping  for  industrial purposes. Between  the 1950s and 1980s, groundwater flow in the vicinity of the BIP may have been towards the north and north‐west, due to heavy pumping from the Davis Gelatine wellfield.  

32  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

The direction of the vertical hydraulic gradient and consequent groundwater flow varies with location in the aquifer, being downwards in the recharge areas around Centennial Park and Moore Park in the north, and  upwards  in  discharge  areas  around  and  beneath  the  Alexandra  Canal  and  Botany  Bay.  It  is  also affected by local pumping.  Groundwater flow direction in the vicinity of the Southlands is now strongly influenced by pumping from the  primary  containment  area  (PCA),  located  along  the  southern  boundary  of  Southlands  adjacent  to McPherson  Street,  and  the  secondary  containment  area  (SCA),  located  along  the  centre  of  Foreshore Drive, south of Southlands.  On Southlands, prior to operation of the PCA wells, shallow groundwater was estimated to discharge to Springvale and Floodvale drains at rates between 1.6 and 3 megalitres per day (ML/d),  implying upward vertical  flow. Although some downward  flow  from the shallow aquifer to the deeper aquifers would be expected  as  a  consequence  of  pumping  from  the  PCA  wells  located  around  the  southern  edge  of Southlands,  hydrograph  data  from  2007  and  early  2008  indicated  that  there  had  been  little  effect  on shallow  groundwater  levels. However,  it  is  likely  that  there would  be  a  significant  lag  due  to  system storage.  Groundwater pumping to the GTP during the period October 2011 to September 2013 averaged 4.8 ML/d. About 40% of this would be attributable to the PCA located along the southern boundary of Southlands.  The PCA pumping captures most flow  in the deeper aquifer beneath Southlands. Both deep and shallow aquifer flow are captured by the SCA.  Groundwater discharge to Springvale Drain is now intermittent.  

6.3.2  Groundwater Levels 

Groundwater  levels  in  the shallow aquifer beneath Southlands  fluctuate with  rainfall but were  typically from a few centimetres to 3 m bgl (3.5 to 1.0 m AHD).   

6.3.3  Hydraulic Characteristics 

Table 7 shows the ranges of hydraulic conductivity and porosity reported by URS (2007b).   

TABLE 7Hydraulic Characteristics 

Stratigraphic Layer Average Measured 

Hydraulic Conductivity (m/d) 

Average Hydraulic Conductivity derived 

from Model Calibration (m/d) 

Porosity  Storativity Specific Yield 

Layer 1 (shallow aquifer) 

18  14  0.37  ‐  0.20 – 0.28 

Layer 2 (2A, 2B, 2C) (deep aquifers) 

23  26  0.30  0.001 – 0.005 

‐ 

Layer 3  1.2  1.0  0.35  0.001 – 0.003 

‐ 

Note:  m/d  metre per day 

 Groundwater  flow modelling at Southlands has been carried out by Merrick  (2004) and Laase  (2005). A vertical anisotropy factor of 0.1 (vertical hydraulic conductivity 1/10 of lateral hydraulic conductivity) was used in the most recent modelling. The model calibration also indicates that low hydraulic conductivity (2 to 10 m/d) is present in the south‐east corner of Southlands.  

 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  33 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

6.4  Groundwater and Surface Water Interaction near the Springvale Drain 

JBS (2013) compiled a review of interaction between groundwater and surface water at Southlands, using data collected before and after the commencement of pumping from the PCA and SCA to the GTP.  Prior to commencement of pumping, the mechanism for transport of contaminants from groundwater to surface water in Springvale Drain was described by WWC (1996) as: 

under non‐pumping conditions groundwater from the shallow aquifer discharges to the drain; and  

there is an upward hydraulic gradient from the intermediate/deep aquifer into the shallow aquifer with the potential for discharge of deeper groundwater to the drain. 

 During GTP operation the upward gradient reverses and there is a downward gradient from the shallow to deep aquifer.    In addition to the change in gradient, shallow groundwater levels are often below the invert of Springvale Drain. As a result, the drain becomes a source of groundwater recharge and allows relatively clean surface water to overlie deeper groundwater along the alignment of the drain.  Combined with the reversed vertical gradient during groundwater extraction a significant lens of relatively clean  groundwater  is  now  present  surrounding  Springvale  Drain  (noting  that  similar  processes  also occurred  in  the  depressions  on  Block  1).  In  general,  shallow  groundwater  at  Southlands  is  now significantly less contaminated than deeper groundwater.  The conceptual model of groundwater  flow at Springvale Drain  identifies  the presence of a  freshwater lens beneath and adjacent to the drain. This lens is the result of operation of the GTP which lowers deep groundwater  levels  and  induces  recharge  from  rainfall  and  flow  in  the  drain. When  the  GTP  is  not operating groundwater levels in the deep aquifer increase and flow is induced from the deep aquifer into the shallow system which then discharges to Springvale Drain. It is unclear the period of time after a GTP shutdown that deeper groundwater begins to significantly affect discharge although current  information indicates that it is greater than 6 months but likely to be less than 3 years.  A review of surface water and groundwater concentrations indicates that significant decreases have been observed since commencement of GTP operation. It is considered that total CHC concentrations in surface water that may occur after extended GTP shutdowns will be approximately 25% of those observed in the period prior to commissioning of the GTP. Some additional detail is as follows: 

The largest decreases are for EDC and VC. Concentrations of EDC will be significantly less (an order of magnitude)  than prior  to GTP operation. VC  concentrations will also be  lower  (as  these were largely associated with the Central Plume). 

Concentrations of the stickier compounds (CTC, PCE and TCE) will only be slightly lower than those observed prior to GTP operation. This is a result of their slow migration in the subsurface but also the fact that they are likely to be present in DNAPL. 

The most significant groundwater concentration decreases have occurred for wells at the northern end of Springvale Drain (where the sticky compounds were less prevalent). 

The surface water results indicate that the highest concentrations are now present at the northern end of Springvale Drain  (whereas historically concentrations  increased down  the drain) although total concentrations are significantly less than historically observed. 

 

6.5  Site Contamination Issues 

Southlands has been the subject of random and uncontrolled placement of fill materials, and the disposal of  liquid  and  sludge wastes  in  the  paper‐waste  ponds  and  elsewhere.  In  addition  to  a wide  range  of natural  materials,  fill  deposits  include  ash  from  Bunnerong  Power  Station,  and  building  rubble  and demolition wastes including brick, concrete, timber and ACM.  

34  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

Previous  industrial  and  waste  management  practices  on  the  former  ICI  site  (land  that  is  now predominantly  the  BIP,  but  also  the  northern  part  of  Block  1  of  Southlands)  resulted  in  extensive contamination  of  groundwater  by  CHCs  and  some metals.  Some  of  these materials  are  DNAPL,  and secondary  sources  of  contamination  including  residual  and  separate‐phase  (pooled)  DNAPL  remain beneath some parts of the BIP, and beneath the northern part of Block 1.  Extensive dissolved‐phase plumes of CHC traverse the shallow,  intermediate and deep aquifers beneath both Block 1 and Block 2.  Many of the CHC are volatile, and vapour‐phase materials are evolved from the dissolved phase plumes and  impacted  soils,  and may migrate  upwards  through  the  vadose  zone  to  be  emitted  at  the  ground surface. Shallow groundwater contaminated with CHC has in the past discharged to surface water bodies such as Springvale Drain, whence vapour emissions to the atmosphere occurred. Following reversal of the vertical hydraulic gradient due to operation of the pumping systems feeding the GTP, such discharge no longer occurs whilst the GTP is operating.  

6.6  Contaminants of Potential Concern 

COPC were identified progressively from the results of the investigations summarised in Section 4 of this SAR.  Earlier work  has  now  been  substantially  superseded  by  EnRiskS  (2015  and  2019)  and  therefore detailed discussion of COPC in soil and soil gas is provided in Section 7 of this SAR.  The main contaminants  identified  in groundwater are derived  from  the extensive plumes  that emanate from the BIP. These plumes have been characterised on the basis of their origin and principal contaminant components, and are shown on Figure 7.  Southlands is impacted by the central plumes identified at the BIP, which are dominated by: 

EDC; 

PCE; 

TCE; and 

VC;  and by the southern plumes, which are dominated by: 

CTC; 

PCE; 

TCE; and 

VC.  However,  a  range  of  other  chemicals  that  have  been  reported  in  groundwater may  be  derived  from former operations at the BIP as well as surrounding industrial areas. The investigations carried out in 1996 by  WWC  also  reported  the  presence  of  DNAPL  at  depth  within  the  northern  portion  of  Block  1; subsequent delineation work was  carried out by URS  to define  the  limits of  the DNAPL. This  residual/ pooled  DNAPL  is  regarded  as  a  source  area.  Further  discussion  of  the  current  status  of  groundwater contamination is provided in Section 7.  

6.7  Updated CSM (Orica 2017) 

An updated CSM (Orica 2017) has recently been prepared for the BIP, including the site and surrounding areas.  As  previously  recognised,  it  concluded  that  groundwater  beneath  the  site  has  potentially  been impacted by VOCs and SVOCs from contaminated soils that had been  located on BIP  land. The depth to groundwater is approximately 8 m beneath the site.  Potential future site receptors include on‐site workers, and maintenance workers that undertake intrusive works at the site for repair or maintenance of buried services, and construction workers associated with 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  35 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

site redevelopment. Potential exposure pathways, noting that contact with groundwater is unlikely due to its depth and  regulatory controls on  its use,  include contact with  impacted soils;  ingestion of  impacted soil: inhalation of potential contaminants in soil such as asbestos fibres; and inhalation of soil vapour from impacted soil and groundwater.  The Auditor considered  that  in conjunction with  the previous  investigations completed on Block 1,  this CSM  formed  an  appropriate  basis  for  the  site  assessment  and  risk  assessment work  on  Lot  9  that  is reviewed in this SAR.    

36  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

7.0  HUMAN HEALTH RISK ASSESSMENT 

URS completed a human health risk assessment (HHRA)  in 2008 (URS 2008d) that considered a range of specific aspects associated with the then‐proposed development and staged remediation of Southlands. However,  following  completion  of  the  2008  HHRA  and  prior  to  finalisation  of  the  Block  1  RAP,  the proposed redevelopment scenarios/stages and details specific to the proposed development changed. In addition,  some  further  information  became  available  in  relation  to  the  characterisation  of  risk  on Southlands. Therefore, in November 2013, EnRiskS prepared a Revised Human Health Risk Assessment for the Southlands project, relating specifically to the development of Block 2,  located to the west of Lot 9, and in 2015 EnRiskS was engaged to provide a revised HHRA (EnRiskS 2015) of part of Block 1 (that within Lot 10 in DP1205673, since subdived into Lots 100 and 101 in DP1223909) located to the east of Block 9, wherein the revised project development and additional information was considered.  As the Block 1 HHRA did not include any assessment of commercial/industrial development relating to Lot 9 in DP1205673, in 2019 Orica engaged EnRiskS to provide an addendum to the 2015 HHRA that included: 

a  quantitive  assessment  of  potential  risks  to  human  health  associated  with  the  proposed development  of  the  flood  detention  basin  located  on  Lot  9  (i.e.  building  construction  on  a suspended slab with a large open void beneath); and 

depending on the outcome of the HHRA, identify issues that require risk mitigation measures to be considered in the proposed development. 

 As  the HHRA Revision  is  considered  to be an addendum  to  the Block 1 HHRA, a  summary of both  the background  information provided  in  the Block 1 HHRA  (EnRiskS 2015) and  the  risk assessment  relating specifically to Lot 9 provided in the HHRA Revision (EnRiskS 2019) are provided in this section of the SAR.   The checklist completed by the Auditor during his review of the HHRA  is provided  in Appendix D of this SAR.  

7.1  Methodology 

The approach taken by EnRiskS (2015, 2019) to the quantitative assessment of human health risks was in accordance with the protocols and guidelines as outlined in the following: 

Environmental  Health  Risk  Assessment,  Guidelines  for  Assessing  Human  Health  Risks  from Environmental Hazards (enHealth 2012a); 

Australian Exposure Factors Guide (enHealth 2012b); 

Schedule B4, Guideline on Health Risk Assessment Methodology (ASC NEPM); 

Schedule B6, Guideline on Risk‐Based Assessment of Groundwater Contamination (ASC NEPM); and 

Schedule B7, Guideline on Health‐Based Investigation Levels (ASC NEPM).  In  addition  to  the  above,  guidance was obtained  from USEPA  (1989, 1991, 1996, 2002, 2004a, 2004b, 2009) and WHO (2008).  The  Auditor  notes  that  the  enHealth  and  ASC NEPM  documents  are  approved  by  the  EPA  under  the provisions of Section 105 of the CLM Act.  EnRiskS (2019) also considered the available information and data provided in the following: 

proposed development plans prepared by Axis Architectural, dated January 2018 (i.e. construction of  two  commercial/industrial warehouses, with  office  areas  but  no more‐sensitive  uses  such  as childcare, on a raised concrete deck built above the existing flood detention basin); 

soil vapour data at locations sampled by JBS&G within the flood detention basin in 2018; and 

groundwater and surface water data available to September 2018, reported by Golder (2018).  

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  37 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

The  various  guideline  documents  indicated  above  describe  the  standard  approach  to  risk  assessment, under which the conduct of an HHRA can be divided into the following four primary tasks. 

1. Issue Identification 

2. Exposure Assessment 

3. Hazard/Toxicity Assessment 

4. Risk Characterisation.  There is also a fifth task that may be considered: 

5. Risk Management.  

7.2  Risk Issues on Block 1 

Block 1 included a number of locations where CHC were detected in soil. While remediation extended to a depth where groundwater was intersected, the lateral extent of remediation was determined through the use  of  criteria  relating  to  volatile  impacts  that may  remain  in  outdoor  areas,  not  beneath  a  future building. While  the validation of excavations  in  this area had shown no detections of volatile chemicals following excavation, the potential  for vapour  intrusion  (into a building) risk  issues had been addressed through  the  collection  of  soil  vapour  data. Any  residual  soil  impacts  that  have  the  potential  to  affect vapour  intrusion  risks  had  thus  been  addressed  because  such  impacts would  have  contributed  to  the vapour concentrations measured.  

7.2.1  Review of Groundwater Data 

In September 2003, the EPA  issued a Notice of Clean‐up Action  (NCUA) No. 1030236 to Orica requiring remediation of the CHC contaminant plumes emanating from the BIP and present  in areas to the south and west of BIP.  The NCUA  required  the preparation and  implementation of a more extensive groundwater monitoring program  than  that which was  being  undertaken  at  the  time.  The  expanded monitoring  program was documented  in  a  Groundwater  Clean‐up  Plan  (GCP)  (2003)  and  included  installation  of  monitoring wells/bundled piezometers, and sampling and reporting of analytical data on a quarterly basis.    The GCP documented the proposed strategies adopted to address groundwater contamination at BIP and downgradient  of  BIP.  The  strategy  selected  to  achieve  hydraulic  containment  of  groundwater contamination  was  described  in  the  Botany  Groundwater  Cleanup  Project  Environmental  Impact Statement (URS 2004c) and comprised the installation and operation of three hydraulic containment lines (BIP, primary (PCL) and secondary) to achieve hydraulic containment and construction of a GTP to enable treatment of extracted groundwater.  Specifically,  in  relation  to Southlands,  there are a number of extraction wells and associated pipework associated with the PCL that are located along the southern boundary of Block 2 and part of Block 1.  In 2010, the NCUA was revoked by the EPA. At the same time the EPA  issued a notice of approval for a Voluntary Management Proposal (VMP) that replaced the NCUA. That approval was in turn replaced by an approval to a new VMP, issued on 12 August 2015, most recently amended on 19 June 2017.  Operation of the Groundwater Treatment Plant EnRiskS’s  (2015)  comparison  of  recent  and  historic  groundwater  quality  data  showed  a  decrease (approximately  2  orders  of  magnitude)  in  CHC  concentrations  of  shallow  sampling  locations  near Springvale  Drain  since  the  commencement  of  operation  of  the  hydraulic  containment  scheme.  The decrease is significant and is associated with both plume migration and the development of a downward vertical  gradient  and  associated  freshwater  lens  creation  due  to  hydraulic  containment  pumping.  The Auditor has checked the most recent monitoring data; these conditions have been maintained.  The  only  exposure  pathway  associated  with  the  presence  of  contamination  in  groundwater  beneath Block 1,  including  Lot 9,  that EnRiskS  (2015, 2019)  considered  complete was  the  inhalation of  vapours 

38  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

originating from volatile chemicals that may be present close to the water table formed by groundwater within the shallow aquifer (i.e. the upper surface of the phreatic zone and the capillary fringe within the vadose  zone).  Such  inhalation  could  occur  following  vapour migration  through  overlying  soils  into  the proposed buildings, outdoor air (to a lesser extent) and excavations.   Groundwater Treatment Plant Not Operating In the event that the GTP is permanently shut down, it is expected that the EPA would require installation of alternative measures to meet the requirements of the NCUA,  in particular that risks to human health and the environment (associated with all relevant exposure pathways)  in areas  located off site from the BIP remain low and acceptable. This would include exposure to workers within all areas of the proposed Southlands development.  If  the  situation arose where  the GTP was  to be  temporarily  shut‐down  for an extended period of  time there could be potential  for changes  in shallow groundwater concentrations  to occur, with consequent and  vapour  intrusion  risks. However,  the  identification  of  risk  issues  associated with  the  presence  of volatile compounds (in soil and groundwater) as well as ground gases confirmed the need to  implement vapour/gas mitigation beneath all buildings  to be constructed on  the site, as was  indicated  in the draft SAR  (CMJA  2008).  Because  these  measures  would  also  adequately  manage  any  variation  in  vapour concentrations derived from shallow groundwater that may occur following a GTP shutdown, no further detailed assessment of risk issues derived from shallow groundwater associated with a GTP shutdown was carried out by EnRiskS or presented in the HHRA.  

7.2.2  Review of Soil Gas and Flux Emissions Data 

EnRiskS carried out a review of the results of soil vapour monitoring carried out in February 2015 (JBS&G 2015a)  and  additional  soil  vapour  sampling  carried  out  in  May  2015  (JBS&G  2015c).  The  locations identified  by  JBS&G  were  considered  to  be  representative  of  locations  likely  to  be  beneath  future commercial/industrial buildings on Lot 10 (now Lots 100 and 101 in DP1223909).  EnRiskS’s  review of ground gas data  indicated  the presence of elevated and variable concentrations  (at some locations) of both methane and carbon dioxide. For most locations, the pressure and flow rate data indicated that methane and carbon dioxide are not being generated at any significant rate. However, at SV6,  the  sampling  conducted  in May  2015  identified  a  flow  rate  that  was  not  considered  negligible (reported on two consecutive days of sampling); flow rates on all other sampling days were negligible.  EnRiskS assessed that where no pressure driven flow is occurring in the subsurface, the levels of methane and carbon dioxide will attenuate through the overlying soil, with methane expected to biodegrade.  

7.2.3  Exposure Pathways ‐ Specifically Related to Lot 9 

Based on the information available at the time, EnRiskS (2015) identified the following risk issues that may warrant further consideration in relation to the proposed development on Lot 9: 

direct contact with soil; 

inhalation of vapours that may be derived from the migration of volatile contaminants  in shallow groundwater beneath the site into the proposed buildings (i.e. vapour intrusion); 

inhalation  of  vapours  that may migrate  onto  Lot  9  from  the  presence  of  volatile  chemicals  in surface water within Springvale Drain, located on the western side of Nant Street; and 

exposure to hazards associated with landfill gas in the subsurface beneath the site and other areas of Block 1 to the east. 

 Enrisks  (2019) noted that based on the proposed development there will be no potential  for any direct contact  with  groundwater  or  flood  water.  In  addition,  EnRiskS  acknowledged  that  an  appropriate management  plan  would  be  implemented  to  manage  risk  to  construction  and  other  intrusive maintenance  workers  from  exposure  to  subsurface  contamination  on  the  site,  and  these  potential exposures were therefore not considered in EnRiskS (2019).  

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  39 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

7.3  Assessment of Risk – Asbestos 

Following  its review of available data, EnRiskS (2015) concluded that asbestos materials were present  in soil on Block 1, and may be in the form of bonded ACM, FA and AF.  Asbestos in soil only poses a risk to human health when asbestos fibres are made airborne and inhaled (if asbestos is bound in a matrix, it is not readily made airborne except through substantial physical damage). ACM in sound condition represents a low human health risk. However, both FA and AF materials have the potential to generate, or be associated with, free asbestos fibres that may become airborne as a result of wind erosion or disturbance.  On  this  basis,  a methodology  for  the  assessment  of  asbestos  in  soil  is  presented  in  the  ASC  NEPM guidelines. This approach combines management with the use of risk‐based criteria for a range of  land‐use  scenarios.  In  particular,  the  following  approach  for  addressing  long‐term  exposures  to  asbestos materials in soil is recommended therein. 

If visible asbestos  is present and  it may be disturbed during work activities,  it must be  removed. This  includes  removing  visible  fragments  of  bonded ACM  from  exposed  trench  faces  and  those areas of the site where intrusive works may be carried out. 

No visible asbestos materials should be present in the top 10 cm of the site (this is the top 10 cm of the final ground surface level) or to a depth which may be excavated and moved on the site during future  development.  If  it  is  not  possible  to  remove  visible  asbestos  from  all  depths  relevant  to future  excavation  activities,  these materials may  be  placed  beneath  the  proposed  buildings  or hardstand areas, or placed at appropriate safe depth and subject to an appropriate long‐term site management plan  to  identify and manage  the potential presence of asbestos materials  in soil  in these areas. 

The  soil  investigation  criterion  for ACM  relevant  to  the  commercial/industrial  use  of  the  site  is 0.05% weight per weight  (w/w). For the presence of FA and AF  in soil, a guideline of 0.001% has been  established  for  all  land  uses.  These  criteria  are  based  on  calculations  presented  in  the Guidelines  for  the Assessment, Remediation and Management of Asbestos‐Contaminated Sites  in Western Australia (WA DOH 2009) guidance. Specifically, the guidelines for ACM were derived on the basis of the following: 

- As the inhalation pathway is the only pathway of concern, the guidelines have adopted the WHO  (2000)  asbestos  air  guideline of 0.001  fibres per millilitre  (f/ml) which  is  associated with a 10‐5 to 10‐6 risk for lung cancer. WHO notes that mesothelioma risk is about 10 times the  risk of  lung cancer and  since  the WHO air guideline  is based on  lung cancer a 10‐fold factor has been included by the WA DOH to establish an air guideline of 0.0001 f/ml that is based  on  a  10‐5  to  10‐6  risk  for mesothelioma. WA  DOH  (2009)  states  that  this  level  of increased risk is considered acceptable. 

- The movement of asbestos fibres from soil to air has been assessed on the basis of the study conducted by Swartjes et al (2003) and Swartjes & Tromp (2008). These studies indicate that maintaining a  concentration below 0.01% w/w  for  fibrous asbestos  in  soil  keeps asbestos fibres in air below 0.001 f/ml (WHO 2000) and probably below 0.0001 f/ml (WA DOH 2009). Similarly for non‐friable ACM a value of 0.1% w/w  in soil will keep asbestos  in fibres below the WA DOH air guideline. 

- The WA DOH  added  in  a  10  fold  factor  to  account  for  drier  soil  in Western  Australia  as compared to Western Europe. This resulted  in the derivation of a guideline of 0.001% w/w for FA and AF. This guideline has been set to the same value for all land use scenarios. 

- For  ACM,  the  soil  guideline  (including  the  10‐fold  factor)  is  0.01%  w/w  for  low‐density residential  land use. This value has been multiplied by the  land use  factors adopted  in the ASC  NEPM  HILs  to  establish  criteria  for  other  land‐uses  including  commercial/  industrial (where a 5‐fold factor has been used to derive a criterion of 0.05%). 

As the inhalation pathway is the only pathway of concern for the assessment of asbestos exposure, potential exposures by workers (who are assumed to be exposed 8 hours per day for 240 days of the year, compared with residents who are assumed to be exposed 24 hours per day for 365 days 

40  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

of the year) are approximately 5 times lower than for residents. Hence the application of the 5 fold factor in the derivation of the commercial/industrial criteria for ACM is reasonable. 

 Soil data for Block 1 indicate the presence of asbestos fibres in a fragment of bonded fibrous cement, in stockpiled materials. The available data do not suggest that ACM or FA/AF are widespread across Block 1; however this is based on a limited number of samples.   

7.3.1  Assessment of Risk ‐ Asbestos ‐ Specifically Related to Lot 9 

As  the proposed development will be  raised on a suspended concrete platform, 2.5 m above  the  flood detention basin, there will not be any site‐related soil accessible for these workers. On this basis, EnRiskS (2019) concluded that workers within the proposed development will have no potential for direct contact with soil.  In the landscaped setback areas around the perimeter of the raised concrete platform, some site‐related soil will be accessible to workers who may undertaken gardening or landscaping activities. Accessible soil within  Lot  9  was  remediated  in  2014  (JBS&G  2015d),  with  the  soil  validated  as  suitable  for commercial/industrial use. Therefore, EnRiskS  (2019)  concluded  that any direct  contact exposures  that may occur for these workers (which would likely be infrequent) are not considered to be of concern.  

7.4  Assessment of Risk – Vapour Intrusion 

The  only  exposure  pathway  associated  with  the  presence  of  contamination  in  groundwater  beneath Block 1  that  is  considered  complete  is  the  inhalation  of  vapours  from  volatile  chemicals  that may  be present at the surface of the groundwater (shallow aquifer), following vapour migration through overlying soils into the proposed buildings (and to a lesser extent outdoors).  As the assessment of risk for vapour  intrusion  in the Block 1 HHRA (EnRiskS 2015) relates specifically to the development of Blocks 100 and 100 in DP1223909 (i.e. commercial/industrial buildings constructed on a slab, with no basements permitted),  it  is not considered  relevant  to Lot 9. A summary of  the vapour intrusion risks described in HHRA (2019) are summarised below.  

7.4.1  Vapour Intrusion from Groundwater 

The  potential  for  soil  vapours  to migrate  into  the  proposed  buildings  is  considered  to  be  low  as  the development will be constructed on a raised concrete platform, that allows for the mixing and dilution of vapours in the 2.5 m high area above the flood detention basin, beneath the concrete platform.  The flood detention basin will not intersect shallow groundwater and is therefore not considered to be a preferential pathway  for  the movement of volatile chemicals closer  to  the proposed development. The depth  to groundwater beneath  the  flood detention basin will  remain beneath  the ground  surface. Any intrusive works  to be conducted  in  these areas will be  required  to be undertaken  in accordance with a construction environmental management plan  (CEMP) that addresses the potential presence of shallow contaminated groundwater.  EnRiskS noted that when the flood detention basin is managing surface water runoff (not assumed to be contaminated), this will saturate the soil within the basin, preventing the migration of vapours from the underlying  groundwater  diffusing  to  the  ground  surface  (as  this  needs  to  occur  through  the  air  pores within an unsaturated zone). Under these conditions the vapour intrusion pathway will be incomplete. It is not known how often, and for how  long soil within the detention basin will be saturated with surface water runoff.  EnRiskS  reviewed  the available soil vapour data  from Lot 9  to evaluate  the potential vapour  risk  issues related to vapour intrusion from groundwater, where the flood detention basin is dry.  Soil vapour was sampled from six  locations on Lot 9  in 2018 (JBS&G 2018b). The sample  locations were generally equally spread beneath Lot 9, with the highest concentrations of CHCs reported in SV3 located in the northern part of Lot 9. The soil vapour wells have been sampled on one occasion.  

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  41 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

The maximum  concentrations  reported  in  soil  vapour  have  been  summarised  in  Table  8, with  these compared  against  relevant  soil  vapour  screening  criteria  for  commercial/industrial  buildings  a  slab  on grade.  The screening criteria are consistent with  those adopted  in  the Block 1 HHRA and have been updated, where  relevant, based on any updates  to guidance. The VOCs  listed  in Table 8 are  those detected and screened  in the Block 1 HHRA. Some of these VOCs were not detected beneath Lot 9, however as they were detected  in other  adjacent  lots  the  analytical  limit of  reporting  (LOR) has  been  included  for  the purpose of screening.    

42  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

 

TABLE 8 Summary and Review of Soil Vapour Data ‐ Lot 9 (µg/m3) 

VOC Detected Maximum Concentration reported (LOR where the LOR is elevated for 

SV03) 

Soil Vapour Screening Criteria (Commercial/Industrial Land Use) 

ethyl acetate  ‐ (<90)  31,000A2 

tetrahydrofuran  ‐ (<70)  880,000A2 

propylene  ‐ (<43)  13,000A2 

heptane  ‐ (<100)  310,000 (adopted value for hexane) 

hexane  23 (<90)  310,000A2 

hydrogen sulphide  not analysed  880A2 

ethanol  ‐ (<500)  5,124A4 

isopropyl alcohol  4800*  88,000A2 

1,1,1‐trichloroethane  ‐ (<140)  230,000N 

1,1,2,2‐tetrachloroethane  4 (<170)  210A2 

1,1,2‐trichloroethane  5 (<140)  88A2 

1,1‐dichloroethane  19,000  16,500A3 

EDC  ‐ (<100)  920A1 

carbon tetrachloride  5 (<160)  610A1 

chloroform  20 (<120)  64,000A1 

chloroethane  ‐ (<70)  4,400,000A2 

PCE  58 (<170)  8,000N 

1,1‐DCE  120  92,000A1 

cis‐1,2‐DCE  28 (<100)  300N 

trans‐1,2‐DCE  7 (<100)  3,000N* 

trichloroethene  76 (<130)  80N 

VC  ‐ (<60)  100N 

2‐butanone (MEK)  ‐ (<70)  2,200,000A2 

cyclohexane  ‐ (<90)  440,000A2 

1,2,4‐trimethylbenzene  4 (<120)  26,000A2 

1,3,5‐trimethylbenzene  ‐ (<120)  26,000A2 

styrene  ‐ (<110)  26,000A1 

naphthalene  4 (<130)  1,300A2 

benzene  3 (<80)  10,000H 

toluene  8 (<90)  16,000,000H 

ethylbenzene  10 (<110)  4,600,000H 

xylene (m&p)  94 (<220)  3,200,000H 

xylene (o)  49 (<110)  3,200,000H 

C6‐C10 less BTEX (F1)  ‐ (<1000)  2,800,000H 

>C10‐C16 less naphthalene (F2)  ‐ (<2000)  2,400,000H 

carbon disulfide  ‐ (<80)  100,000A1 

hexachlorobutadiene  ‐ (<270)  560A2 

1,4‐dioxane  6 (<90)  250A2 

2‐propanone (acetone)  50 (<600)  14,000,000A2 

*  Detection of isopropyl alcohol likely to reflect the use of this chemicals for leak detection during the sampling N  NEPM Interim HIL for soil vapour, commercial/industrial land use (ASC NEPM) N*  Criteria for trans‐1,2‐DCE based on the NEPM Interim HIL for cis‐1,2‐DCE with the application of 10 fold factor as the toxicity of 

the trans‐isomer is 10 times lower than for the cis‐isomer (as per USEPA review) H   NEPM Health Screening Level (HSL) (ASC NEPM) for petroleum hydrocarbons, soil vapour HSLs for vapours 1 to <2m depth with 

sand overlying, commercial/industrial land use A  Soil  vapour  criteria modified  from  ambient  air  criteria  by  the  application  of  100  fold  attenuation  factor.  The  ambient  air 

guidelines are adopted from the following sources: 1  Air quality criteria or guideline value available from WHO, based on annual average. Where criteria is derived on the basis of 

a non‐threshold approach a target risk of 1x10‐5 is adopted. To address exposures by workers a correction factor of 4.6 has been applied to adjust for working 8 h/d for 240 d/y over a lifetime. 

2  Industrial air RSL available from USEPA (USEPA 2018), based on annual average. Where criteria  is derived on the basis of a non‐threshold approach a target risk of 1x10‐5 is adopted. 

3  Chronic Reference Exposure Level established by Ontario Ministry of the Environment. 4  Chronic  air  guideline  available  from  the  Massachusetts  Department  of  Energy  and  Environmental  Affairs 

http://www.mass.gov/eea/agencies/massdep/toxics/sources/air‐guideline‐values.html  

 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  43 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

A  review  of  the  results  for  Lot  9  indicates  that  the  maximum  concentration  of  1,1‐dichloroethane reported in soil vapour exceeds the screening criteria adopted. Even where the elevated LOR reported in SV3 is considered, no other volatile chemicals exceed the adopted screening criteria.  EnRiskS noted  that  the general  commercial/industrial  screening  criteria are overly  conservative  for  the assessment of vapour  intrusion  into  the proposed development. This  is  the case because  the proposed development  is  constructed on  a  concrete  slab  raised 2.5 m  above  the  ground  surface.  The  ground  is exposed and the sub‐floor area  is well ventilated. This will probably result  in the effective dispersion of any vapours that are emitted to air from the ground surface, however it could be conservatively assumed that  the mixing  that may occur  in  the sub‐floor are  results an additional 10  fold  factor  for attenuation. This  is  the  same  factor  as  would  be  conservatively  assumed  for  the  movement  of  vapours  from  a basement  into the ground  floor of a multi‐storey building. The value  is also  lower than the  factor of 14 determined from the measurement of tracer gas movements in 700 Dutch residential homes with crawl‐spaces below a suspended concrete slab (noting that these are low crawl‐spaces that are enclosed) (Otte et al. 2001; Van den Berg 1994). The actual additional attenuation is expected to be greater than this as the sub‐floor  is well ventilated  to ambient air  (with a high sub‐floor space),  rather  than being enclosed and well‐connected with upper floors as would be the case with a basement or a crawl‐space residential home in a colder climate.  Where  an  additional  10‐fold  attenuation  is  assumed,  to  account  for  the well‐ventilated  sub‐floor,  the screening  criteria  for  1,1‐dichloroethane  increases  to  165,000  μg/m3.  The  maximum  concentrations detected (19,000 μg/m3) is well below this modified criteria.  It  is  noted  that  higher  concentrations  of  soil  vapour were  reported  in  the  soil  vapour wells  located adjacent to Lot 9, and assessed  in the Block 1 HHRA (EnRiskS 2015). The Block 1 HHRA identified a large number of CHCs  that  required  further  assessment  in  relation  to  vapour  intrusion  risks,  into  a  slab‐on‐grade  commercial/industrial  premises.  The  risk  calculations  undertaken  and  presented  in  the  Block  1 HHRA determined that the nonthreshold risks were low and acceptable, however the maximum threshold hazard index (HI) was 2.3 (based on data collected from Lot 8). Where an additional attenuation factor of 10‐fold is assumed (as above) for the presence of a large well‐ventilated sub‐floor void beneath the slab, the HI  is  reduced  to 0.23, which  is considered acceptable. Hence, even where  these higher soil vapour concentrations are considered there are no vapour risk issues of concern for the proposed development.  On this basis, EnRiskS (2019) concluded that there are no vapour  intrusion risk  issues of concern, where the flood compensation basin  is not managing surface water and the soil between groundwater and the development is dry.  In  the  event  that  the GTP  is  shut  down,  it  is  expected  that  the  EPA would  require  the  installation  of alternative measures to meet the requirements of the NCUA, in particular that risks to human health and the environment (associated with all relevant exposure pathways)  in areas  located off‐site from the BIP are  low  and  acceptable.  This  would  include  exposures  by  workers  within  all  areas  of  the  proposed development.  

7.4.2  Vapour Intrusion from Springvale Drain 

Based on the proposed development plans, any building to be constructed on Lot 9 will be at least 20 m away from Springvale Drain, noting that Warehouse 2 is 5 m from the boundary of Lot 9, the Nant Street roadway is approximately 10 m and Springvale Drain is at least another 5 m to the west of Nant Street.  A  detailed  assessment  of  vapour  risks  derived  from  the  presence  of  VOCs  in  surface  water  within Springvale Drain  (when the GTP  is operating as well as when the GTP  is not operating) was undertaken and presented  in  the Block 2 HHRA  (EnRiskS 2013). This evaluation determined  that vapour  inhalation risks  posed  to workers  in  buildings  located  at  least  20 m  from  the  drain  are  not  considered  to  be  of concern.  As  the  section  of  Springvale  Drain  considered  in  the  Block  2  HHRA  is  the  same  as  for  this assessment, the assessment is considered applicable to potential exposures by workers in buildings within Lot  9.  On  this  basis,  EnRiskS  concluded  that  no  further  assessment  of  potential  vapour  inhalation exposures derived from Springvale Drain is required.  

44  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

EnRiskS noted that review of the available surface water and air data from Springvale Drain indicates that since the GTP has been operating, there  is a significant amount of time (93% of the time between 2007 and  2012) when  shallow  groundwater  is  not  being  discharged  to  the  drain,  and  there  are  no  vapour exposures  relevant  to  surface water within  the drain. Hence  the  assessment presented  in  the Block 2 HHRA was expected to be conservative while the GTP is operating.  

7.4.3  Assessment of Risk – Ground Gas 

The  Block  1  HHRA  (EnRiskS  2015)  identified  the  presence  of  elevated  levels  of methane  and  carbon dioxide in the subsurface, in a number of areas proposed to be developed (not Lot 9). There were some areas where  these  elevated  levels  occurred with  significant  levels  of  gas  flow.  It  is  inferred  that  the elevated levels are associated with the degradation of paper waste materials historically dumped in these areas.  The  issue  of  concern  in  relation  to  the  presence  of  elevated  concentrations  of methane  and  carbon dioxide  in  the  subsurface  is  the movement  of  these  gases  into  future  buildings.  The  gases  have  the potential  to  pose  an  asphyxiate  or  explosive  risk.  These  gases  are  not  generated  such  that  there  is significant pressure driven/advective gas movement at most locations.   The soil vapour sampling undertaken within Lot 9 (BS&G 2018b) included analysis for methane and carbon dioxide. No methane was detected in the samples collected. Carbon dioxide was reported to be at a level between  2.3  and  13%.  These  levels  of  carbon  dioxide  are  above  background  but  consistent with  the degradation of organic matter  in  the  subsurface. No  landfill gas bores were  installed or  sampled  from Lot 9.  While no methane was detected  in  the  soil vapour  samples  collected  from  Lot 9, elevated  levels were reported  in the adjacent  lots  (to the east of Lot 9) and some  lateral migration of  landfill gas may occur particularly close  to  the eastern boundary of Lot 9. For  the Lots assessed  in  the Block 1 HHRA  (EnRiskS 2015), the landfill gas data suggested gas characteristic situation (CS) 1 to 2. Data from one location (SV6 in Lot 7) resulted in CS 4 due to significantly elevated methane and gas flows. This location is significantly to the east of Lot 9 and is not considered relevant for the proposed development.  The development of  Lot 9  includes  a well‐ventilated  sub‐floor  that  is 2.5 m high. This provides  a  very effective passive gas mitigation measure, that would meet the gas mitigation requirements outlined in the Block  1 HHRA where  a  CS  of  2 may  be  present,  and  there  are  large  commercial warehouse  buildings resulting  in  the need  for Level 1 gas protection based on EPA guidance  (EPA 2012). Table 9 provides a summary  of  the  guidance  values  for  gas  protection  and  Table  10  sets  out  the  scores  for  protection measures, as described in EPA (2012).  On  this basis, EnRiskS  concluded  that  there are no  landfill gas  risk  issues of  concern  in  relation  to  the proposed development of Lot 9.     

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  45 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

 

TABLE 9 Guidance Values for Gas Protection 

CS 

Required Gas Protection Guidance Value 

Low Density Residential 

Medium‐High Density Residential (Strata Title) 

Public Buildings, Schools, Hospitals, Shopping Centres 

Standard Commercial Buildings (Offices, etc.) 

Large Commercial 

(Warehousing) and Industrial Buildings 

1  0  0 0 0 0 

2  3  3 3 2 1(a) 

3  4  3 3 2 2 

4  6 (b)  5 (b) 5 4 3 

5  6 (b)  6 (b) 6 (c) 5 4 

6  6 (b)  6 (b) 6 (c) 6 6 

Notes: (a) If maximum measured methane concentration exceed 20% volume per volume (v/v), increase to CS 3 (b) Residential development not  recommended at CS 4 and above without pathway  intervention and high 

level of management (c) Consideration of evacuation issues and social risks required 

CS  Where CS 1 is determined, no further action is required 

Where  CS  2  or  3  is  determined,  gas  protection  measures  are  required.  Appropriate  gas  protection measures for the specific site should be selected as outlined in EPA (2012) 

Where  CS  4  is  determined,  gas  protection  measures  are  required,  and  the  need  for  a  Level  3  risk assessment  should  be  considered.  If  a  Level  3  risk  assessment  is  not  considered  to  be  necessary,  the reasons for this decision should be documented, and appropriate gas protection measures for the specific site should then be selected as outlined in Section 5 of EPA (2012) 

Where CS 5 or 6 is determined, gas protection measures are required, and a Level 3 risk assessment must be carried out  to assess  the maximal  risk,  inform  the design of gas protection measures and assess  the residual risk following implementation of those measures 

 

TABLE 10 Scores for Protection Measures 

Measure or System Element  Score Comments

Venting and Dilution Measures 

Passive sub‐floor ventilation with very good performance (steady state concentration of methane over 100% of ventilation layer remains below 1% v/v at a wind speed of 0.3 metres per second ‐ m/s) 

2.5

Passive sub‐floor ventilation with good performance (steady state concentration of methane over 100% of ventilation layer remains below 1% v/v at a wind speed of 1 m/s and below 2.5% v/v at a wind speed of 0.3 m/s) 

1 If passive ventilation cannot meet this requirement then an active system will be required 

Subfloor ventilation with active abstraction or pressurisation 

2.5 Robust management systems must be in place to ensure long‐term operation and maintenance 

Ventilated car park (basement or undercroft) 4 Assumes that car park is vented to deal with exhaust fumes in accordance with BCA requirements 

Floor Slabs 

Reinforced concrete ground bearing floor slab 0.5 It is good practice to install ventilation in all foundation systems to effect pressure relief as a minimum. Breaches in floor 

Reinforced concrete ground bearing foundation raft with limited service penetrations cast into slab 

1

46  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

TABLE 10 Scores for Protection Measures 

Measure or System Element Score Comments

Reinforced concrete cast in situ or post‐tensioned suspended slab with minimal service penetrations and water bars around all penetrations and at joints 

1.5 slabs such as joints have to be effectively sealed against gas ingress to maintain these performances. 

Fully tanked basement  2

Membranes 

Taped and sealed membrane to reasonable levels of workmanship with inspection and validation 

0.5 The performance of membranes is dependent upon the design and quality of the installation, protection from and resistance to damage post installation and the integrity of joints in membranes that require joints. Materials that offer some degree of self‐sealing and repair are preferred. 

Proprietary gas resistant membrane to reasonable levels of workmanship under independent construction quality assurance (CQA) 

1

Proprietary gas resistant membrane to reasonable levels of workmanship under independent CQA with integrity testing and independent validation 

2

Monitoring and Detection (alarms) 

Intermittent monitoring using hand‐held equipment 

0.5 Monitoring and alarm systems are only valid as part of a combined gas protection system. Where fitted, permanent systems should be installed in the underfloor venting system but can also be provided in the occupied space as a back‐up 

Permanent monitoring system installed in the occupied space of the building 

1

Permanent monitoring system installed in the underfloor venting/dilution system 

2

Pathway Intervention 

Vertical barriers   ‐ Required for residential and public buildings at CS 4 and above Vertical venting systems  ‐ 

 

7.5  EnRiskS Conclusions 

On the basis of the review undertaken in relation to the proposed development of Lot 9, which comprises a commercial/industrial development on a raised concrete slab over the  flood detention basin, and the available data in relation to contamination, EnRiskS concluded that there are no human health risk issues of concern.  On  this  basis,  there  are  no  requirements  to  design  and  implement  any  risk management/mitigation measures for the proposed development.  EnRiskS noted  that  should  the proposed development  change,  then  the  assessment of  risks  to human health may need to be revised.  

7.6  Auditor’s Review of EnRiskS (2019) 

Methodology EnRiskS  used  a  standard  human  health  risk  assessment methodology  that  conforms  to  the  guidance approved by the EPA under Section 105 of the CLM Act. The Auditor considers that the methodology and guidelines adopted by EnRiskS were appropriate.  Contaminants of Potential Concern  EnRiskS identified the relevant contaminants of potential concern, assigned appropriate screening levels, and reviewed and evaluated the available data.  In the Auditor’s opinion, this screening and subsequent focus  on  identified  contaminants  of  concern  was  appropriate  and  in  accordance  with  the  guidance referenced above.     

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  47 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

Exposure Pathways EnRiskS identified the relevant exposure pathways as being direct inhalation exposure (from ACM in soil), inhalation  of  ground  gases  (carbon  dioxide)  and  inhalation  of  vapour  (volatile  CHC  present  in groundwater). The explosive risk due to the ground gas methane was also considered.  For  asbestos,  EnRiskS  relied  upon  the  generic  exposure  assessments  embedded  in  the  ASC  NEPM guidelines  (i.e.  the  exposure  assumptions made  in  the  derivation  of  the  health  investigation  level).  A management approach has been adopted for asbestos and other non‐volatile COPC.  EnRiskS quantified exposures that may occur via vapour flux from groundwater via soil vapour and surface water  under  the  proposed  site  development  scenario.  EnRiskS  evaluated  all  available  data  for  these pathways, and in the 2015 report assessed scenarios with the GTP working, and with it not working for an extended period. The data included ambient air and surface water data collected in 2013 during the GTP shutdown that occurred in May of that year.   Exposure‐point concentrations via the vapour intrusion pathway from soil gas were calculated by applying an attenuation factor to soil gas concentrations back‐calculated from vapour flux emission rates. Volatile CHC exposures over these pathways were summed.  The  Auditor  considers  that  the  approach  to  exposure  assessment  via  the  vapour  inhalation  pathways adopted by EnRiskS was rigorous and appropriate.  Toxicity Assessment The Auditor notes  that  the ASC NEPM HILs were used  in EnRiskS’s assessment. The HILs were derived following consideration of valid toxicological evaluations in line with good scientific practice and protocols established by NEPC  (2004) and enHealth  (2012a). These protocols provide  the basis  for ensuring  that published peer‐reviewed data/information are considered and the quantitative dose‐response approach adopted  follows  accepted,  peer‐reviewed  processes  to  ensure  that  all  adverse  health  effects  are adequately and appropriately addressed. More specifically, at the time of the assessment: 

Current data on  intakes of the chemicals evaluated by the general population from sources other than soil contamination (such as food, dental amalgam, water and air) was reviewed and included in the calculation of the revised HILs. 

Current  published  peer‐reviewed  evaluations  of  health  effects  and  quantitative  dose  response (toxicity)  information  for  the  chemicals  evaluated  (relevant  to  oral,  dermal  and  inhalation exposures) were reviewed in line with guidance provided by enHealth (2012a). 

 Where  individual VOC detected during  the  air  sampling did not have NEPC  air  guidelines,  the  EnRiskS referenced WHO  (2000).  In some cases air quality goals that have been updated by the WHO  in review documents were used. WHO (2000) provide guidelines for non‐cancer effects and carcinogenic effects for a specific averaging time. The selection of the WHO guidelines following those published by the NEPC is in accordance with the ASC NEPM guideline hierarchy.  The Auditor also notes that where RSLs (USEPA 2012) were used (owing to lack of NEPC or WHO data for specific COPC), these are conservative risk‐based values for soil, tap water and air. The values presented for  industrial  soil  (considering  exposure  via  ingestion,  dermal  contact,  inhalation  of  particulates  and inhalation of volatiles outdoors, and based on target risk levels of 10‐6 for carcinogenic effects and a HI of 1 for non‐carcinogenic effects) have been considered within this assessment. The target risk level used is more conservative than that generally adopted in Australia, by a factor of 10.  The Auditor has checked the screening criteria used by EnRiskS against (then) current RSLs and notes that whilst there have been some changes, the screening criteria used are conservative relative to the current RSL adopted, and adjusted where appropriate for a threshold risk level of 1x10‐5.  Because  the  RSLs  do  not  consider  vapour  intrusion  into  buildings  and  potential  effects  on  indoor  air quality, EnRiskS reduced the screening levels used for this pathway by a safety factor of 100 to provide a value  appropriate  for  screening  soil  concentrations  for  vapour  intrusion  into  buildings  located  directly 

48  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

above the contamination. The Auditor considers this to be an appropriately conservative approach that reflects  an  adequate  attenuation  factor  for  buildings  with  concrete  slab  floors  in  good  condition. However, as noted below and considered by EnRiskS, the proposed buildings will not be constructed on a ground slab but on a deck built above a large ventilated void.  The Auditor considers that the toxicity data adopted by EnRiskS were appropriate.  Risk Quantification and Characterisation The Auditor reviewed the risk quantification and characterisation carried out by EnRiskS and concluded that  a  standard  methodology  published  by  the  USEPA  was  adopted  by  EnRiskS  and  appropriately referenced.  The  Auditor  checked  EnRiskS’s  calculations  (on  an  audit  basis)  and  considers  them  to  be correct.  It should be noted that the description of the Risk Characterisation process provided in this SAR has been prepared  by  the  Auditor  on  the  basis  of  EnRiskS’s  report,  but  some material  has  been  added  by  the Auditor, for clarity.  The Auditor has  given  substantial weight  to  the  large  factor of  safety provided by  the open  and well‐ventilated void that will be present beneath the deck on which building construction will occur.  

7.7  Auditor’s Review of Potential Impacts on Neighbouring Properties 

In February 2019,  JBS&G  issued an assessment of  the potential  for ground gases  to be emitted and  to migrate laterally from the sub‐deck void associated with the proposed warehouse distribution and office development on Lot 9 (JBS&G 2019a). This assessment was carried out in response to concerns raised by the owner of one of the adjacent  lots concerning the  intensity (i.e. rate, or mass/time, per unit area) of emissions from Lot 9.  The  approach  adopted  by  JBS&G,  which  is  a  standard  risk  assessment  approach,  was  to  compare calculated concentrations in air beneath the deck structure with guideline values for human health. Those guideline values were themselves derived, using a risk assessment process, by national and international agencies. The process  for guideline derivation effectively  incorporates consideration of  intensity, at  the level of the human body (the receptor), using the relationship between a body loading ‐ calculated from the exposure concentration, the rate of uptake by the body, and the frequency and duration of exposure – and the experimentally‐derived toxicity of the contaminant. There are successive layers of conservatism built  into  this  process.  The  report  indicates  that  concentrations  beneath  the  deck,  and  therefore  the maximum possible concentrations migrating onto the lots to the east, will not exceed these conservative guideline values.  As  indicated  in the report, airborne contaminants will only be transported to the east when the wind  in blowing from the west or, at worst, in a general westerly direction between north‐west and south‐west. In those circumstances, all the emissions from the surface of Lot 9, wherever they occur on the lot, will be transported  to  the  east.  The  difference  between  current  and  proposed  conditions  is  that without  the deck, there  is greater opportunity for  lateral and, particularly, vertical dispersion of the airborne plume. Thus,  concentrations  over  neighbouring  lots may  be  somewhat  higher with  the  deck  than without  it. However, concentrations over those  lots cannot exceed, and are  likely to be  lower than, concentrations beneath  the  deck,  and  it  has  been  shown  that  those  concentrations  will  be  less  than  the  relevant guideline values.  The Auditor’s  review of  the  assessment  found  that  JBS&G  assessed maximum  vapour‐phase emissions from  the void  space beneath  the deck  structure  that,  it  is proposed, will be constructed on Lot 9, and demonstrated  clearly  that  such emissions will not have  an  adverse effect on workers on  adjacent  lots located to the east of Lot 9.      

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  49 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

8.0  REMEDIATION ACTION PLAN 

8.1  Remediation/Management Approach 

The RAP (JBS&G 2019b) was prepared in order to document the procedures and standards to be followed in order to manage the risks posed by contaminated soil and groundwater and associated vapours/gas, to make the site suitable for the proposed commercial/industrial land use, while ensuring the protection of human health and the surrounding environment.  JBS&G’s RAP relates specifically to part of Lot 9 in DP1205673.  Following  the  completion  of  the  hotspot  remediation  and  validation  work  (JBS&G  2015d),  and  after considering the results of the asbestos and vapour assessment (JBS&G 2018b) and taking into account the recommendations of EnRiskS (2015, 2019), the following  issues were  identified as requiring remediation or management: 

asbestos in fill material; 

ground gas (carbon dioxide); and 

potential vapour intrusion of volatile chlorinated hydrocarbons.  With  consideration  to  established  hierarchies  for  soil  remediation  options,  and  to  the  site‐specific contaminants and proposed environmental setting,  JBS&G’s preferred  remediation strategy  for  the site comprises: 

on‐site  containment of  fill materials  impacted by bonded  (i.e. ACM)  and  friable  (asbestos  fines) asbestos  using  marker  and  barrier  layers  across  the  site,  with  the  exception  of  an  existing vegetation buffer along the eastern portion of the site that will be retained in its current state and secured with a fence to minimise access; and 

management of potential intrusion into buildings by construction an any buildings on a suspended slab with a large open void beneath, which will provide a passive venting system for gas mitigation into buildings. 

 All underground services on the site are to be located and surveyed, by suitably qualified contractors, in order to avoid accidental encounters with underground services during remediation works and to enable incorporation of service and easement  locations  into a LTSEMP. Any new services to be  installed on the site will be installed on the underside of the suspended slab or in the void to minimise disturbance of the barrier layer.  The Auditor reviewed the approach proposed by JBS&G and considered it appropriate. In his opinion, the remediation  approach  adopted  in  JBS&G’s  RAP  was  consistent  with  the  general  guidance,  preferred hierarchy of options and risk management processes provided in the following guidelines: 

ASC NEPM; 

Guidelines for the NSW Site Auditor Scheme, 3rd edition (EPA 2017); 

Code of Practice: How to Manage and Control Asbestos in the Workplace (SafeWork 2016); 

Management of Asbestos in the Non‐Occupational Environment (enHealth 2005); and 

Guidelines  for  the  Assessment  and Management  of  Sites  Impacted  by Hazardous Ground Gases (EPA 2012). 

 

8.2  Geotechnical and Foundation Issues associated with Deck Construction 

The RAP  includes a review of the geotechnical assessment and recommendations  for  foundation design for deck construction (PSM 2019).  The RAP states that piled foundations will be required, and that piles will penetrate to a maximum depth of about 10 m bgl.    

50  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

The RAP reviews the potential for piling to create preferred pathways that may permit upward migration of ground gas or downward inter‐aquifer migration of contaminants in the dissolved or DNAPL phase.  The RAP states that for the piling design (300 mm‐diameter timber piles driven to a depth of 8 to 10 m bgl) recommended and required, there will be no significant risk of creating such pathways.  

8.3  Regulatory Compliance 

JBS&G’s  RAP  appropriately  identified  the  regulatory  approvals  and  licencing  required  to  permit implementation of the RAP.    

8.4  Barrier System (Management of Asbestos in Soil) 

JBS&G  concluded  that  a  barrier  system  is  required  to manage  the  potential  for  remaining  on‐site  soil impacts. The barrier will comprise at minimum a marker  layer separating potentially asbestos‐impacted soils  from  the  physical  barrier  layer. With  the  exceptions  of  an  existing  vegetated  batter  along  the northern, eastern and southern sides of the site, the barrier  layer will be  located  in all areas of the site. The barrier requirements are discussed in the following sections.  Marker Layer A marker layer comprising a bright orange geotextile, such as bidim or similar geotextile approved by the Auditor, will be installed prior to placement of the barrier layer.  Physical Barrier To minimise any potential off‐site disposal of soils and to retain the required flood capacity of the site, the physical barrier  requirements  across  the  site will be based upon  future  accessibility of  site  areas.  The following four areas, as shown on Figure 8, have been identified based on barrier layer requirements: 

A  0.1‐m  barrier  layer will  be  required  beneath  the  suspended  slab  across  the  undercroft.  The barrier  layer  in  this  area  will  comprise  a  porous  material,  to  allow  infiltration  of  detained floodwater, that will be required to be stable for capping purposes and to provide vehicular access. Alternatively, a layer of stabilised roadbase or similar material may be placed over most areas, with placement  of  porous materials  over  selected  areas  evenly  distributed  across  the  site  to  allow infiltration of detained floodwater. This area will be secured with fencing to prevent casual access. 

A  3‐m  wide  emergency  vehicle  access  road  adjacent  the  northern  and  eastern  sides  of  the proposed building platform. A minimum 0.1‐m barrier layer is required in this area. It will comprise a compacted roadbase material or similar that will provide a stable vehicular accessway. Because this area will be for emergency access, including a potential emergency exit path for site workers, it cannot be  locked to prevent casual access. Therefore, the capping material  in this accessway will require stabilisation with a bituminous spray seal to prevent access to the underlying material. 

An approximately 5‐m wide Orica easement along  the western boundary of  the  site  that will be landscaped. It is intended that this area is left in its current state without marker or barrier layers, and access will be  restricted by secured  fencing. The 10‐m wide strip of  land along  the southern McPherson Street frontage will be subdivided and maintained in Orica ownership. 

An approximately 7‐m wide  strip of  vegetated batter  is present along  the northern and eastern boundaries of the site, and approximately 10‐m wide Orica easement along the southern boundary of the site.  It  is  intended that those areas be  left  in their current state without marker or barrier layers. Access  to  these  areas will be  restricted by  secured  fencing.  The 10‐m wide  strip of  land along  the  southern,  McPherson  Street  frontage  will  be  subdivided  and  maintained  in  Orica ownership as it contains infrastructure associated with Orica’s hydraulic containment system. 

 It is noted there are two surface stormwater entry points on the eastern boundary of the site. The ground surface in these areas will treated with appropriate erosion control measures.     

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  51 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

Erosion Control Two surface water drainage points from adjoining  land to the east, enter along the eastern boundary of the site. Detailed drawings for erosion control at these discharge points will be prepared by the developer for review and approval by the Auditor.  

8.5  Vapour/Gas Mitigation System 

The  site  provides  flood  storage  capacity, which must be  retained  for  any  proposed  site  development. Therefore,  any  buildings  constructed  on‐site  are  to  be  constructed  on  a  suspended  slab  with  an undercroft, which will provide a passive venting system to mitigate the risk of gas migration into buildings. The design for the proposed development provides an undercroft with a clearance of between 1.5 and 2.5 m  across  the  construction  area. Orica  have  required,  generally  a  2.5‐m  clearance  across most  of  the undercroft.  Building construction on a suspended slab will require piled foundations  installed on approximately 5‐m spacings (single piles) or 11.5 m spacing (groups of 5 piles) and material will be imported to site to form a platform for the piling rig, also forming the physical barrier.  The Auditor understands that detailed designs for the piled foundations have not yet been completed, but two alternative concept desings are provided  in PSM  (2019). The Auditor  requested  that  two potential concerns be addressed in the RAP. These are: 

the potential for piles to act as preferred pathways for vertical vapour or gas migration; and 

the  potential  for  piles  to  provide  a  preferred  pathway  for  vertical  migration  of  groundwater contaminants in the dissolved and, particularly, DNAPL phases. 

 The first  issue  is considered  in a forthcoming revision of EPA (2012), where the following  information  is provided: 

These issues may be less important where the site is to be covered entirely by a slab suspended on piles, although the potential for piling to provide a vertical gas flow pathway needs to be addressed. Wilson and Mortimer (2018) provide a detailed discussion of this  issue from a UK standpoint, from which  it  is apparent that in circumstances where diffusive flow is dominant, neither large displacement‐driven piles nor  replacement  piles  are  likely  to  cause  preferenctial  pathways  for  ground  gas  migration.  The exceptions are driven H and I piles, where an open annulus may form. However, flows are unlikely to be significant unless piles are very closely spaced. Where advective flow  is dominant, and differential gas pressure relatively high and confirned by a thin layer of very stiff clay, annular gas flow may occur, with its significance again dependent on pile spacing. 

 To effectively address the second  issue,  it was necessary to consider proposed piling depths against the hydrogeological conceptual model, including the depth of inter‐aquifer confining layers, and current and potential future water table and poteniometric surface elevations.  These issues were addressed in Sections 5.2 and 5.3 of the RAP. The Auditor is satisfied that provided that the piling design is consistent with that outlined in the RAP, then piling will not result in an elevated risk of vertical contaminant migration.  

8.6  Waste Classification and Off‐Site Disposal of Soils 

The RAP  indicates that during remediation works, confirmation of waste classification will be completed as necessary to ensure that any material required to be removed from the site was classified, transported and disposed of appropriately. Soils to be disposed off‐site will require waste classification in accordance with EPA (2014).  As all fill materials at the site are considered to contain asbestos, any fill material to be disposed off‐site will  be  classified  as  Special  Waste  (asbestos  waste)  with  appropriate  supplementary  chemical classification; and disposed off‐site to a facility licensed to accept the waste.  

52  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

8.7  Backfilling of Excavations and Physical Separation Layer 

The RAP states that materials used to level the site prior to placement of the marker layer can be sourced from on‐site materials above the groundwater level.    Reinstated soils would need to meet compaction standards suitable for the proposed redevelopment as specified by a geotechnical consultant or structural engineer. Where vegetation is required to be grown in the area of fill placement, the soils will also need to be suitable for use as a growing medium.  Material  to be  imported,  including any material used  to  form  the barrier  layer,  is  required  to be either virgin  excavated natural material  (VENM) or  considered  suitable  for beneficial  reuse,  such  as material compliant with an appropriate EPA waste exemption approval (e.g. excavated natural material (ENM) or material subject  to a specific  tunnel spoil excemption). ENM must only be used  in accordance with  the conditions of the ENM exemption.  Appropriate documentation of the VENM or ENM classification of any imported material is required to be reviewed by the Auditor prior to receipt on site, and will be included in the validation report.  

8.8  Validation 

The RAP states that validation sampling and analyses will be conducted to verify: 

that materials imported to form the barrier layer are suitable for use at the site; and 

any unexpected finds have been appropriately remediated.   The RAP sets out general procedures for the sampling, analysis and validation of material imported for use on the site; the soil validation criteria are provided in Section 3.9 of this SAR.  

8.9  Unexpected Finds 

As ground conditions between sampling points may vary, and further hazards may arise from unexpected sources and/or  in unexpected  locations, the possibility exists  forpreviously‐unidentified residual hazards to be present at the site.  As  a  precautionary measure  to  ensure  the  protection  of  the workforce  and  surrounding  community, should any unexpected  finds be  identified,  the RAP provides procedures  to be  followed  to  identify and manage such finds.  

8.10  Ongoing Monitoring/Management 

JBS&G’s  remediation strategy  includes  the  requirement  for ongoing monitoring and management of all areas  of  the  site  to  ensure  the  continued  protection  of  human  health  and  the  environment.  This requirement included preparation and implementation of a LTSEMP.  The LTSEMP, detailing the ongoing management and monitoring requirements, is required to be prepared and  submitted  to  the  Auditor  and  appropriate  consent  authority  for  approval  prior  to  any  SAS  being issued for the site. The LTSEMP is required to contain the following elements: 

a statement of the objectives of the LTSEMP; 

methodology for piling works and any in‐ground works; 

a description of  the  residual contamination  issue(s)  requiring management,  including  the  type of contamination and location on the site (including a plan prepared by a registered surveyor showing the location of the marker layer); 

a  description  of  the  environmental  controls  required  to  manage  the  residual  contamination issue(s), including as built drawings of gas mitigation measures installed at the site, noting that the undercroft area is to remain open on all sides; 

a  statement of  responsibilities  for  implementing various elements of  the provisions contained  in the LTSEMP; 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  53 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

the timeframe for implementing various elements of the provisions contained in the LTSEMP; 

health and safety requirements for potential future sub‐surface activities; and 

a program of review and audits.  The RAP stated that the provisions of the LTSEMP must be feasible and be able to be legally enforced (i.e. a mechanism such as a development consent condition must exist to give the plan a basis in law); and the relevant  consent  authority must  be  satisfied  that  the  inclusion  of  a  development  consent  condition relating to the implementation of the LTSEMP is acceptable.  

8.11  Auditor’s Review 

The Auditor  reviewed  the  relevant documents  (listed previously  in  this  report) and  concluded  that  the proposals outlined in the RAP (JBS&G 2019b) were based on an appropriate assessment of adequate data, and were  technically  feasible.  As  outlined  in  the  RAP,  the  proposed  remedial measures  involved  the application of very common and well‐established civil engineering techniques (placement and compaction of  fill)  and  hydrogeological  principles  (operation  of  existing  containment  lines  and  GTP),  and  are considered by the Auditor to be technically feasible. They do not depend on a detailed understanding of the distribution of contaminants in the subsurface, and do not require access to the subsurface other than for monitoring.  The Auditor has previously stated, and still considers, that whilst the containment approach proposed for contaminated soil  is the  least preferred option  in the ASC NEPM hierarchy endorsed by the EPA,  it was appropriate  for  the  site,  and  the  proposed  remediation was  otherwise  consistent with  relevant  laws, policies and guidelines.  In addition, whilst not strictly a remedial measure, the proposed construction of buildings on Lot 9 on a deck above a  large ventilated void provides a substantial measure of protection from the risk of vapour and gas intrusion. The Auditor has given substantial weight to this consideration.  The Auditor has reviewed the RAP’s assessment of the potential for pile  installation to create preferred pathways  for vertical migration of ground gas or  fluids  (groundwater or DNAPL). He has considered the review  of  ground  gas mitration  issue  due  to  piling  proved  by Wilson  and Mortimer  (2018)  and  the maximum piling depth stated in the RAP. He agrees with JBS&G’s assessment that these risks are low and acceptable.  The Auditor has considered the potential for vapours emitted from the ground into the void beneath the deck  to  migrate  laterally  across  the  eastern  property  boundary,  resulting  in  risks  via  the  inhalation exposure pathway  to workers and others on  the adjacent  land. The Auditor has assessed  the possible emission  concentrations, dilution within  the  void  and dispersion during migration,  and  concluded  that such risks are very low, and essentially negligible.  The Auditor considered that if all the measures set out in the remediation action plan were implemented, then Lot 9 could be made suitable for the proposed commercial and/or industrial use.  

   

54  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

9.0  AUDITOR’S ASSESSMENT OF THE SUITABILITY OF THE REMEDIATION ACTION PLAN 

9.1  Risks to Human Health 

Potential hazards to human health during redevelopment of the site and in the long term, are identified and  the  risks due  to  these hazards are quantified  in  the HHRA and addenda. The RAP  relies upon  the conclusions of the HHRA.  The Auditor considers that placement of a physical separation layer is an appropriate and effective way to manage risks associated with asbestos‐containing materials and other non‐volatile contaminants present in site soils. The physical separation layer is to be of variable thickness depending on location‐specific land use and associated risks and constructed from  imported soil meeting the VENM criteria or subject to an appropriate  waste  order  and  exemption.  Exempt material  can  only  be  used  in  accordance  with  the conditions of the relevant exemption. It will be separated from underlying potentially‐contaminated soils by a layer of orange geofabric (the marker layer).  The Auditor accepts JBS&G’s assessment that following placement of the physical separation layer human health risks due to asbestos and other non‐volatile contaminants on Block 1 will be acceptable.  The HHRA prepared by EnRiskS  concluded  that  the  toxicity  risks posed by volatile COPC  in ground gas require long‐term management. Volatile COPC may be sourced from groundwater close to the water table in the shallow aquifer or from adsorbed phase residuals in soils above the water table.  Vapour and hazardous ground gas risks will be addressed through construction of all proposed buildings on an elevated deck constructed above a large open void.  The Auditor has reviewed the concept design for the deck and void and considers that it is adequate and appropriate to protect buildings constructed on the site and their users.  The system as proposed exceeds the requirements  for a Characteristic Gas Situation of 4 as outlined  in EPA (2012).  The Auditor has previously  identified uncertainties concerning  long‐term behaviour of groundwater and associated vapour contamination at the site.  The  Auditor  has  previously  written  (draft  Site  Audit  Report  ‐  Suitability  of  Remediation  Action  Plan, Southlands, 1 McPherson Street, Banksmeadow, November2008) that: 

..the key  issue  is that groundwater flow and contaminant transport processes  in the area beneath and around  the  site  are  complex,  involving  multiple  phases  and  many  types  of  material,  and  are  also dynamic. It is therefore not possible to predict with certainty how contaminant distribution and vapour flux will be affected by future changes in groundwater recharge (due to changes in surface conditions as well  as  changes  in  rainfall  patterns)  and  discharge  (due  principally  to  the  operation  of  groundwater containment  lines, and the shallow groundwater  interception system proposed  in the RAP, but also to other  processes  such  as  changes  in  sea  level).  Remediation  of  DNAPL  source  zones may  also  have downstream effects. 

Because of  the  consequent uncertainty  in  future  risks,  the Auditor  considers  that active measures  to prevent vapour intrusion should be incorporated in all buildings constructed on the site. 

 Operation of the GTP and containment  lines over the  intervening period helped to resolve some of this uncertainty;  the effect of GTP pumping on concentrations of volatile CHC  in  shallow groundwater, and correspondingly  on  vapour  flux  and  consequent  vapour  risk  has  been  to  cause  a  very  substantial reduction.  The mechanism by which  this has occurred  is demonstrated by measured  reversal of vertical hydraulic gradient and implied reversal of the vertical flow component.  

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  55 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

Uncertainty  remains  as  to  the  long‐term  behaviour  of  the  dynamic  groundwater  system  and  the  CHC plume.  This  can be  substantially  addressed by  the  long‐term monitoring  required under  the  approved VMP to which the site remains subject. Under the VMP, Orica  is responsible for continual monitoring of the CHC plumes and assessment of risks to those potentially exposed to the groundwater or vapours. The risks to offsite workers surrounding the BIP are regularly assessed by Orica.  The Auditor considers that, in conjunction with this regulatory support, the mitigation system (open‐sided void) proposed is sufficiently conservative to manage these uncertainties.  

9.2  Risk to Structures 

Explosive risks to structures are addressed by the gas risk mitigation system described above.  The Auditor considers that there is no evidence that soil or groundwater conditions on the site are likely to be aggressive  to building or  construction materials, and  the proposal  to place a physical  separation layer consisting of imported fill across the site prior to construction will provide additional confidence that there will be no  contamination‐related  risks  to  structural materials used  above  this  layer.  The Auditor understands  that  the  currently‐proposed  approach  to  construction  requires  the use of piles  extending below  the  separation  layer. Thus,  the CEMP will need  to address  risks arising  from penetration of  the separation layer, including: 

work health and safety risks during construction; and 

appropriate management of any spoil generated during piling activities.  The potential for piles to provide preferred pathways for gas, vapour, groundwater and DNAPL migration has been addressed in the RAP, and is considered by the Auditor to be low and acceptable. The detailed piling design should adopt the recommendations of PSM (2019) and the RAP.  Also,  piling  design  should  consider  the  corrosivity  of  groundwater  to  pile materials,  and  selection  of materials with appropriate durability  in the geochemical conditions of the Botany Sands at this site, and appropriate  specialist  advice  should  be  sought  on  this  matter.  The  Auditor  notes  that  PSM  (2019) recommends the use of timber piles.  

9.3  Risk to the Environment 

The  Auditor  is  satisfied  that  whilst  the  GTP  remains  operational,  risks  to  the  environment  via  the discharge of  contaminated  groundwater  to  surface water drains,  and  via  the emission of  vapour  from groundwater and soil to outdoor air, will be adequately controlled.  

9.4  Regulatory Compliance 

The  proposed  planning  and  environmental  approval  process,  including  the  preparation  and  review  of secondary documentation, should ensure compliance with applicable regulations.  

9.5  Potential Contaminant Migration 

There is clearly potential for contaminant migration from the site in groundwater and surface water, and currently via air emissions.  The work  reviewed  in  this  SAR has  indicated  that  air emissions  and emissions  to  surface water drains should be  substantially eliminated by  the  continued operation of pumping  from  the  containment  lines feeding the GTP. Groundwater issues are addreesed in the following section.  The Auditor has considered the potential for risks to arise due to lateral migration of vapour and gas from the ground into the void. The Auditor considers that such risks are very low and acceptable.  

9.6  Groundwater Issues 

Although groundwater beneath the site is significantly contaminated by CHCs, migration of contaminated groundwater from the site has been substantially controlled by the operation of the containment (pump‐

56  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

and‐treat)  lines feeding the GTP. Management of groundwater contamination at the site  is regulated by the EPA through the approved VMP and other measures, whilst off‐site risks have been addressed by DPI Water, through the controls on groundwater abstraction that have been implemented by that agency and its predecessors.  In  the  Auditor’s  opinion,  the  completed  and  proposed  development  of  the  site  including,  as  it  does, easements to allow access for groundwater management and other areas that will remain under Orica’s control,  should  not  restrict  management  of  groundwater  contamination  by  these  state  government agencies. The Auditor does not consider that the proposed site remediation should affect the operation of the containment lines. The current use of the area overlying DNAPL source zones for compensatory flood storage beneath  the proposed deck  should not  restrict  future  remediation of  those  zones,  should  that prove to be technically feasible at some time in the future. Similarly, the proposed works should not result in  further mobilisation of DNAPL provided  that  the design of piled  foundations  is  consistent with  that outlined in the RAP.  

9.7  Aesthetic Issues 

Episodic odour emissions from groundwater, swampland and particularly Springvale Drain, have been an issue  in  the  past.  The  Auditor  considers  that  the  proposed  remediation  should  not  exacerbate  odour emmissions  from on‐site  sources, but  clearly  cannot address odour associated with off‐site  (upstream) discharges to Springvale Drain.  

9.8  Chemical Mixtures 

Given the large number of chemical contaminants present in groundwater and soil beneath the site, the potential for chemical mixtures to occur is real. The approach adopted in the risk assessment is standard and  quite  conservative,  and  reflects  the  limited  current  knowledge  of  toxic  interaction  between chemicals.  This approach assumes additivity of threshold effects (in the calculation of a HI as the sum of the hazard quotients of the individual COPC) and also additivity of non‐threshold effects in the calculation of the total carcinogenic risk.  EnRiskS recognised that application of the adopted guidelines does require consideration of the potential for cumulative (additive) effects of mixtures, particularly those with similar health endpoints.  Hence where relevant (particularly where the exposure concentration  is close to the adopted guideline) EnRiskS considered the potential for cumulative effects in its identification of COPC.  The  remedial  approach  is  sufficiently  conservative  to  address  uncertainty  in  risk  estimates  due  to  the presence of chemical mixtures.  

9.9  Short‐Term and Long‐Term Management 

Appropriate short‐term management of remediation and  long‐term management of the remediated site will be required; this will be detailed  in the supplementary documentation required as conditions of the attached SAS, specifically the CEMP and the LTEMP for the site.  

9.10  EPA Guideline Requirements 

Section 4.3.1 of  the EPA’s Guidelines  for  the NSW Site Auditor Scheme  (2017) states  that a site auditor must be  satisfied  that any proposed  remediation  is  technically  feasible, environmentally  justifiable and consistent  with  relevant  laws,  policies  and  guidelines,  and  must  document  the  reasons  for  such satisfaction in the SAR.  The Auditor has reviewed the relevant documents (listed previously in this report) and concluded that the proposals outlined  in  JBS&G’s RAP are based on an appropriate assessment of adequate data, and are technically  feasible. As outlined  in  the RAP,  the proposed  remedial measures  involve  the application of very  common  and well‐established  civil  engineering  techniques  (placement  and  compaction  of  fill)  an effective means of mitigating vapour risk that  is consistent with the recommendation of EPA (2012) and 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  57 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

hydrogeological principles (operation of existing containment lines and GTP), and are certainly technically feasible.  They  do  not  depend  on  a  detailed  understanding  of  the  distribution  of  contaminants  in  the subsurface, and do not require access to the subsurface other than for monitoring.  In the Auditor’s opinion the proposed remediation  is environmentally  justifiable because  it will result  in enhanced beneficial use of  Lot 9 without  compromising  the effectiveness of  the existing use  for  flood detention and with no detrimental environmental  impacts, on or off  site. The proposed  remediation  is sustainable and has low incremental energy and greenhouse gas emission costs.  Whilst  the  containment  approach  proposed  for  contaminated  soil  is  the  least  preferred  option,  it  is appropriate for the site, and the proposed remediation is otherwise consistent with relevant laws, policies and guidelines, and the current Project Approval.  The Auditor considers that  if all the measures set out  in the RAP are  implemented, then the site can be made suitable for the proposed industrial and commercial use.  The  Auditor  will  therefore  issue  a  Section  B  site  audit  statement  to  that  effect,  with  the  following conditions: 

1. A  construction  environmental  management  plan  (CEMP)  to  manage  risk  associated  with contamination  in soil, groundwater and ground gas that may be encountered during remediation and construction activities must be prepared and submitted to a site auditor for review. 

2. A validation report that demonstrates that site work has been completed  in accordance with the RAP and CEMP and  includes verification of placement of  the contact barrier and confirmation of the construction of the deck, void and associated foundations must be prepared and submitted to a site auditor for review prior to construction of any permanent buildings on the site. 

3. A long‐term management plan for the site provides a legally‐enforceable mechanism to document the presence of  residual contamination by asbestos and hazardous ground gases at  the  site and manage  the  risks  associated with  that  contamination must  be  prepared  and  provided  to  a  site auditor for review. In this context the term hazardous ground gases includes vapour. 

4. A site audit statement confirming that the site is suitable for commercial and industrial use must be issued by a site auditor prior to occupation of any permanent buildings constructed on the site. 

   

58  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

10.0  AUDITOR’S CONCLUSIONS AND RECOMMENDATIONS 

10.1  Overview 

The  Southlands  and  adjacent  properties  have  been  the  subject  of  detailed  and  extensive geoenvironmental  investigations and assessments extending over the period from 1990 to 2019.   These investigations have  shown  that  geological materials  (including  surface water  and  groundwater)  at  and below  the  surface  of  the  site  are  severely  and  extensively  contaminated  with  a  wide  range  of anthropogenic  chemicals  including,  particularly,  a  number  of  CHCs.  Several  plumes  of  groundwater contaminated with  CHCs  extend  beneath  the  site,  and  continue  beyond  the  site  boundaries.  Some  of these compounds are DNAPL and  they are present  in dissolved, adsorbed and separate phases, and as vapours within the vadose zone. Other ground gases, in particular methane and carbon dioxide, are also present in the vadose zone. Asbestos is present in site soils.  

10.2  Adequacy of Investigation 

The Auditor considers that, the investigations and assessments of the site were carried out in an adequate and  appropriate manner,  and  in  accordance with  appropriate  guidelines. Where  guidelines were  not followed, an appropriate explanation has been provided.  As  discussed  in  this  SAR,  these  investigations  and  assessments  have  resulted  in  a  good  general understanding of  the distribution of contaminants on and beneath  the site, but do not permit detailed three‐dimensional  mapping  of  this  distribution.  Given  the  chemical  and  physical  properties  of  the contaminants, the complexity of the geological system and the dynamic nature of groundwater flow, such detailed mapping may never be possible.  The Auditor was satisfied that the remediation strategy set out in the RAP prepared by JBS&G did not rely upon precise definition of the contaminant distribution, and that the nature and extent of contamination have been determined to the degree necessary to enable effective implementation of the plan.  The Auditor was also satisfied that the extent of the DNAPL source zones had previously been defined to the degree necessary to ensure that the activities envisaged in the RAP would not further mobilise these materials, or restrict future remediation of the source zones should that prove to be technically feasible, provided that the piling design is consistent with that outlined in the RAP (JBS&G 2019b).  

10.3  Adequacy of Risk Assessment 

The  investigations have  also provided  an  adequate basis  for  assessment of  the  risks  to human health posed by the contaminants of concern, as outlined in this SAR, and the risk assessments upon which this SAR relies.  On  the  basis  of  his  review,  the  Auditor  considered  that  the  risk  assessments were  carried  out  in  an appropriate manner, and  in accordance with  the  relevant guidelines. The Auditor was  satisfied  that he was able  to  rely upon  the conclusions of  the  risk assessments  in his evaluation of  the suitability of  the RAP, and is similarly satisfied with regard to the completed remediation.  

10.4  Suitability of Remediation Action Plan 

The  Auditor  has  reviewed  the  RAP  and  considers  that  it  is  suitable  and  appropriate.  In  the  Auditor’s opinion, if the site is remediated and managed in accordance with the RAP and the conditions placed on the attached SAS, it can be made suitable for commercial and industrial use. 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  59 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

REFERENCES 

AGEE 1990,  State Pollution Control Commission,  ICI Botany Environmental  Survey,  Stage 1 Preliminary Investigations,  prepared  by  A  G  Environmental  Engineers  in  association  with  Woodward‐Clyde Consultants (USA), dated May 1990 

Albani et al 1981,  Sedimentary Environments and Pleistocene Chronology of  the Botany Basin, N.S.W., Australia, Geo‐Marine Letters, Vol. 1, 163‐167 

CMJA 2018, Site Audit ‐ Remediation, Validation and Ongoing Management, Lot 101  in DP1223909, 28A McPherson Street, Banksmeadow, prepared by C. M.  Jewell & Associates Pty  Ltd  (ref.  J1130.33R‐rev0), dated 11 January 2018 and accompanying Site Audit Statement SA263/5 

CMJA 2017, Site Audit – Remediation, Validation and Ongoing Management, Lot 100 in DP1223909, 28A McPherson Street, Banksmeadow, prepared by C. M.  Jewell & Associates Pty  Ltd  (ref.  J1130.29R‐rev0), dated 27 February 2017 and accompanying Site Audit Statement SA263/4 

CMJA 2015b, Site Audit – Suitability of Remediation Action Plan, Part of Block 1 Southlands, 28 McPherson Street, Banksmeadow, prepared by C. M. Jewell & Associates Pty Ltd (ref. J1130.23R‐rev0), dated 4 August 2015 and accompanying Site Audit Statement SA263/3 

CMJA 2015a, Site Audit – Validation of Part of Block 2 Southlands, 26 McPherson Street, Banksmeadow, prepared  by  C.  M.  Jewell  &  Associates  Pty  Ltd  (ref.  J1130.22R‐rev0),  dated  13  May  2015  and accompanying Site Audit Statement SA263/2 

CMJA 2014,  Site Audit –  Suitability of Remediation Action Plan, Block 2  Southlands, McPherson  Street, Banksmeadow, prepared by C. M.  Jewell & Associates  Pty  Ltd  (ref.  J1130.17R‐rev0), dated  30  January 2014 and accompanying Site Audit Statement SA263/1 

CMJA 2008, Draft  Site Audit  –  Suitability of Remediation Action Plan,  Southlands, 1 McPherson  Street, Banksmeadow, prepared by C. M. Jewell & Associates Pty Ltd (ref. J1130.10R‐rev0), dated 25 November 2008 and accompanying Draft Site Audit Statement SA263 

enHealth  2012b,  Australian  Exposures  Factors  Guide,  Environmental  Health  Standing  Committee, Commonwealth of Australia, Canberra 

enHealth 2012a, Environmental Health Risk Assessment, Guidelines for assessing human health risk from environmental  hazards,  Environmental  Health  Standing  Committee,  Commonwealth  of  Australia, Canberra 

enHealth  2005, Management  of Asbestos  in  the Non‐occupational  Environment,  Environmental Health Standing Committee, Commonwealth of Australia, Canberra. 

EnRiskS  2019,  Southlands Block  1 HHRA Revision: Development  of  Flood Detention Basin, prepared by Environmental Risk Sciences Pty Ltd, dated 24January 2019 

EnRiskS  2015,  Human  Health  Risk  Assessment,  Southlands  Block  1  Development,  prepared  by Environmental Risk Sciences Pty Ltd (ref. O/15/SDB1R001‐revB), dated 31 July 2015 

EnRiskS  2013,  Revised  Human  Health  Risk  Assessment,  Southlands  Development  Project,  prepared  by Environmental Risk Sciences Pty Ltd (ref. O/13/SDR001‐revD), dated 21 November 2013 

EnRiskS 2012, Review of Risk Issues – Groundwater Discharge to Springvale Drain. Letter Report prepared by Environmental Risk Sciences Pty Ltd, dated 1 June 2012 

EPA  2017,  Guidelines  for  the  NSW  Site  Auditor  Scheme,  3rd  edition,  NSW  Environment  Protection Authority, Sydney NSW 

EPA 2014, Waste Classification Guidelines, NSW Environment Protection Authority, Sydney NSW 

EPA 2012, Guidelines for the Assessment and Management of Sites Impacted by Hazardous Ground Gases, NSW Environment Protection Authority, Sydney NSW 

60  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

EPA 2011, Guidelines  for Consultants Reporting on Contaminated Sites, NSW Office of Environment and Heritage, Sydney NSW 

EPA 1995, Sampling Design Guidelines, NSW Environment Protection Authority, Chatswood NSW 

Golder 2012d, Environmental Management Strategy, Southlands Remediation and Development Project, prepared by Golder Associates Pty Ltd (ref. 117623055_006_Rev0), dated 25 July 2012 

Golder 2012c, Construction Environmental Management Plan, Southlands Remediation and Development Project, prepared by Golder Associates Pty Ltd (ref. 117623055_003_R_Rev1), dated 5 May 2012 

Golder  2012b,  Shallow  Contaminated  Soil/Fill  Delineation  and  Waste  Management  Report,  Orica Southlands, prepared by Golder Associates Pty Ltd (ref. 117623028‐002‐Rev1), dated 16 March 2012 

Golder  2012a, Geotechnical  Investigation,  Southlands Development, Botany, NSW,  prepared by Golder Associates Pty Ltd (ref. 117622012‐004‐R‐Rev1), dated 24 February 2012 

Golder  2011,  Groundwater  Well  Replacement  Plan,  Southlands  Redevelopment,  prepared  by  Golder Associates Pty Ltd (ref. 117623053_R_001‐RevA), dated 19 August 2011 

Golder 2009, Draft Report on Feasibility Study of Potential Vapour Mitigation Options, Orica Southlands Development, prepared by Golder Associates Pty Ltd (ref. 087663018 001 Rev0), dated 16 March 2009 

HLA 2005, Factual Report on Preliminary Soil Investigation, Orica Botany – Southlands, NSW, prepared by HLA‐Envirosciences Pty Limited (ref. S4039401_RPT_25Aug05), dated 25 August 2005 

JBS&G 2019b, Remediation Action Plan, 28 McPherson Street, Banksmeadow NSW, prepared by  JBS&G Australia Pty Ltd (ref. 54709/119224 Rev0), dated 15 May 2019 

JBS&G  2019a,  Assessment  of  Potential  for  Accumulation  of  Ground  Gases  Associated  with  Proposed Warehouse  Distribution  and  Office  Development,  Lot  9,  28  McPherson  Street,  Banksmeadow  NSW, prepared by JBS&G Australia Pty Ltd (ref. 54709‐119907 rev2), dated 7 February 2019 

JBS&G  2018b,  Asbestos  and  Vapour  Assessment,  Lot  9  in  DP1205673,  28  McPherson  Street, Banksmeadow, prepared by JBS&G Australia Pty Ltd (ref. 54709/114803 Rev A), dated 14 August 2018 

JBS&G  2018a,  Long  Term  Site  Environmental Management  Plan,  Lot  101 DP1223909,  28A McPherson Street,  Banksmeadow  NSW,  prepared  by  JBS&G  Australia  Pty  Ltd  (ref.  51950/112339  Rev3),  dated  8 January 2018 

JBS&G  2017b,  Long  Term  Site  Environmental Management  Plan,  Lot  100 DP1223909,  28A McPherson Street,  Banksmeadow NSW,  prepared  by  JBS&G  Australia  Pty  Ltd  (ref.  51950/106432  Rev0),  dated  25 February 2017 

JBS&G 2017a, Interim Validation Report, Lot 100 DP1223909, 28A McPherson Street, Banksmeadow NSW, prepared by JBS&G Australia Pty Ltd (ref. 51950/106432 Rev0), dated 24 February 2017 

JBS&G 2015e, Remediation Action Plan, Part Block 1,  Southlands, 28 McPherson  Street, Banksmeadow NSW, prepared by JBS&G Australia Pty Ltd (ref. 43499/100773 Rev0), dated 29 July 2015 

JBS&G 2015d, Soil Hotspot Validation Report, Block 1, Southlands, 28 McPherson Street, Banksmeadow NSW, prepared by JBS&G Australia Pty Ltd (ref. 43499/100797 Rev0), dated 31 July 2015 

JBS&G  2015c,  Landfill  Gas  Monitoring  Events  and  Additional  Gas  Well  Installation  Works,  28  McPherson  Street,  Banksmeadow,  NSW,  prepared  by  JBS&G  Environmental  Pty  Ltd  (ref.  50594‐100856), dated 16 June 2015 

JBS&G  2015b,  Validation  Report,  Stage  1,  Southlands,  26  McPherson  Street,  Banksmeadow,  NSW, prepared by JBS&G Australia Pty Ltd (ref. 43499/60744 Rev B), dated 21 April 2015 

JBS&G  2015a,  Soil  Vapour  Sampling  and  Analysis  Report,  Stage  2,  Southlands,  26 McPherson  Street, Banksmeadow, NSW, prepared by JBS&G Australia Pty Ltd (ref. 50594/61131 Rev 1), dated 2 March 2015 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  61 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

JBS&G  2014b,  Delineation  of  Remediation  Areas,  Southlands, McPherson  Street,  Banksmeadow, NSW, prepared by JBS&G Australia Pty Ltd (ref. 43499‐57915), dated 24 July 2014  

JBS&G  2014a,  Revised  Remediation  Action  Plan,  Block  2,  Stage  1,  Southlands  Development, Banksmeadow, NSW, prepared by JBS&G (NSW & WA) (ref. 42049‐53373‐Rev0), dated 30 January 2014 

JBS 2013, Review of Groundwater‐Surface Water Interaction at Springvale Drain, Southlands Development Site, Banksmeadow, NSW, prepared by JBS Environmental Pty Ltd (ref. JBS 42049‐54480), dated 23 May 2013 

JBS  2012b,  Groundwater Well  Replacement  Plan,  Southlands  Remediation  and  Development  Project, McPherson  Street,  Banksmeadow NSW,  prepared  by  JBS  Environmental  Pty  Ltd  (ref.  JBS  42049‐51749 Rev1), dated September 2012 

JBS 2012a, L002 Southlands ACM Advice, prepared by JBS Environmental Pty Ltd, dated 3 July 2012 

JBS  2008,  Temporary  Aquifer  Storage  and  Recovery  –  Groundwater  Flow Modelling  and  Assessment, prepared by JBS Environmental Pty Ltd (ref. JBS40317‐12365), dated 31 May 2008 

Laase  2008,  Review  of  Temporary  Aquifer  Storage  and  Recovery  –  Groundwater  Flow  Modelling Assessment, A. D. Laase Hydrologic Consulting, dated 24 June 2008 

Laase  2005,  Refinement  of  the Hydraulic Model  for  the Orica Groundwater  Extraction  System,  Botany NSW, A. D. Laase Hydrologic Consulting (EN1591‐61‐470) 

Merrick 2004, Optimal Groundwater Abstraction Rates for Hydraulic Containment of Contaminant Plumes and Source Areas, Botany NSW, National Centre for Groundwater Management 

NEPC  2004,  National  Environment  Protection  (Air  Toxics)  Measure,  National  Environment  Protection Council, Commonwealth of Australia, Canberra 

NUDLC  2012, Minimum  Construction  Requirements  for Water  Bores  in  Australia,  3rd  Edition,  National Uniform Drillers Licensing Committee 

Orica 2017, Conceptual Site Model, Orica Botany, prepared by Orica Australia Pty Ltd, dated 20 September 2017 

Orica 2008, Review of Environmental Factors, Temporary Aquifer Storage and Recovery, prepared by Orica Australia Pty Ltd (ref. EN.1591.61.025), dated 30 May 2008 

Otte, P. F., J. P. A. Lijzen, J. G. Otte, F. A. Swartjes & C. W. Versluijs 2001, Evaluation and revision of the CSOIL parameter set, RIVM Report 711701021, Bilthoven, The Netherlands 

SafeWork  2016,  Code  of  Practice: How  to Manage  and  Control  Asbestos  in  the Workplace,  SafeWork Australia 

SLR  2016,  Southlands Remediation  and Development  Project, Additional Noise  Compliance Monitoring, prepared by SLR Consulting Australia Pty Ltd (ref. 630.10344 R4), dated 5 December 2016 

Swartjes, F. A, & P. C. Tromp 2008, A Tiered Approach for the Assessment of the Human Health Risks of Asbestos  in Soils, National  Institute  for Public Health and  the Environment, Bilthoven, The Netherlands and TNO Environment and Geosciences, Apeldoorn, The Netherlands 

Swartjes, F.A, P. C. Tromp and J. M. Wezenbeek 2003, Assessment of the Risks of Soil Contamination with Asbestos, National Health and Environmental Institute, Netherlands, RIVM Report 711701034/2003 

URS 2008f, Surface Water and Ambient Air Monitoring for Springvale Drain, prepared by URS Australia Pty Ltd (ref. 43217781), dated 12 December 2008 

URS 2008e, Remediation Action Plan, Southlands Remediation and Development Project, prepared by URS Australia Pty Ltd & Goodman Pty Ltd (ref. 43217542), dated 2 October 2008 

62  Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

C. M. Jewell & Associates Pty Ltd  J1130.39R‐rev0 ‐ 16‐May‐19 

URS 2008d, Human Health Risk Assessment, Southlands Remediation and Development Project, prepared by URS Australia Pty Ltd (ref. 43217543), dated 2 October 2008 

URS  2008c,  Shallow  Groundwater  Interception  of  Springvale  Drain,  Review  of  Environmental  Factors, prepared by URS Australia Pty Ltd (ref. 43217757), dated 15 September 2008 

URS 2008b, Infilling of Springvale Drain Re‐alignment Channel, Review of Environmental Factors, prepared by URS Australia Pty Ltd (ref. 43217757), dated 29 July 2008 

URS 2008a, Environmental Monitoring at Springvale Drain – Orica Southlands, prepared by URS Australia Pty Ltd (ref. 43217651), dated 20 March 2008 

URS 2007b, Conceptual Site Model – Botany, prepared by URS Australia Pty Ltd (ref. 43217627, revision 0), dated 23 November 2007 

URS 2007a, Draft Phase 1 & Limited Phase 2 Assessment, Proposed Nant Street Extension, Banksmeadow, prepared by URS Australia Pty Ltd (ref. 43217562/R001D(II)), dated 25 January 2007 

URS  2006,  Southern  Plumes  Source  Area  Delineation  Investigation  ‐  February  2006,  prepared  by  URS Australia Pty Ltd (ref. 43346038.07901), dated 19 June 2006 

URS 2005b, Orica Botany Environmental Survey, Stage 4 ‐ Remediation, Progress Report, Southern Plumes DNAPL  Source  Area  Delineation  Investigation,  August  2005,  prepared  by  URS  Australia  Pty  Ltd  (ref. 43346038.07101, R031A_DNAPL_Southern), dated 23 December 2005 

URS  2005a,  Orica  Botany  Environmental  Survey  Stage  4  –  Remediation,  Groundwater  Cleanup  Plan Quarterly Groundwater and Surface Water Monitoring Report – March 2005, prepared by URS Australia Pty Ltd (ref. 43346038.06701/R025_A), dated 16 May 2005 

URS  2004b,  Orica  Botany  Environmental  Survey  Stage  4  –  Remediation,  2004  DNAPL  Source  Area Investigation, prepared by URS Australia Pty Ltd, dated August 2004 

URS 2004a, Orica Botany Environmental Survey Stage 4 – Remediation, Full Scale Reactive  Iron Barrier  ‐ Data Gaps ‐ Module 2a, prepared by URS Australia Pty Ltd (ref. 46160‐005/R010_A), dated 12 May 2004 

USEPA  2012,  Regional  Screening  Levels  RSLs  (formerly  PRGs), United  States  Environmental  Protection Agency, Washington DC http://www.epa.gov/region9/superfund/prg/ 

USEPA 2009, Risk Assessment Guidance for Superfund, Volume 1: Human Health Evaluation Manual (Part F,  Supplemental  Guidance  for  Inhalation  Risk  Assessment),  United  States  Environmental  Protection Agency, Washington DC 

USEPA 2004b, Risk Assessment Guidance for Superfund, Volume I: Human Health Evaluation Manual, (Part E, Supplemental Guidance for Dermal Risk Assessment), United States Environmental Protection Agency, Washington DC 

USEPA  2004a,  User’s  Guide  for  Evaluating  Subsurface  Vapor  Intrusion  into  Buildings,  United  States Environmental Protection Agency, Washington DC 

USEPA  2002,  Supplemental  Guidance  for  Developing  Soil  Screening  Levels  for  Superfund  Sites,  United States Environmental Protection Agency, Washington DC 

USEPA  1996,  Soil  Screening  Guidance:  Technical  Background  Document,  United  States  Environmental Protection Agency, Washington DC 

USEPA  1991,  Risk  Assessment  Guidance  for  Superfund:  Volume  1‐  Human  Health  Evaluation Manual (Part D,  Development  of  Risk‐based  Preliminary  Remediation  Goals),  United  States  Environmental Protection Agency, Washington DC 

USEPA 1989, Risk Assessment Guidance for Superfund, Volume 1, Human Health Evaluation Manual (Part A), United States Environmental Protection Agency, Washington DC 

Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow  63 

J1130.39R‐rev0 ‐ 16‐May‐19  C. M. Jewell & Associates Pty Ltd 

Van den Berg, R. 1994, Human Exposure to Soil Contamination: A Qualitatrive and Quantitative Analysis Towards Proposals for Human Toxicological Intervention Values, RIVM Report 725201011, Bilthoven, The Netherlands 

WA DOH 2009, Guidelines for the Assessment, Remediation and Management of Asbestos‐Contaminated Sites in Western Australia, Western Australian Department of Health, Perth WA 

WHO 2008, Part 1: Guidance Document on Characterizing and Communicating Uncertainty  in Exposure Assessment, World Health Organization, Geneva 

WHO 2000, Air Quality Guidelines for Europe, Second Edition, World Health Organization, Geneva 

Wilson, S. and S. Mortimer 2018, Piled  foundations and pathways  for ground gas migration  in  the UK, Environmental Geotechnics, Published Online: November 2017, https://doi.org/10.1680/jenge.17.00009 

WWC 1996, Block 2 Southlands DNAPL Investigation, prepared by AGC Woodward‐Clyde Pty Limited (ref. R004‐A), dated August 1996 

Important Information About Your Site Audit Report

Important Information SAR QaO.05 Rev 01/03/15 CMJ

CMJA

These notes will help you to interpret your Site Audit report. They are based on guidelines prepared by the NSW Environment Protection Authority (EPA).

Introduction to the NSW Site Auditor Scheme

Objectives

The objectives of the NSW Site Auditor Scheme are to:

ensure that public health and the environment are protected through proper management of contaminated sites, particularly during changes of land use

improve access to technical advice on contaminated sites for planning authorities and the community by establishing a pool of accredited site auditors

provide greater certainty for planning authorities and the community through the independent review by those auditors of contaminated site assessment and remediation reports, and reports that validate the successful completion of the assessment of remediation.

Background

In Australia, the use of accredited auditors to review work conducted by contaminated site consultants was first introduced in Victoria in 1989 through the Victorian EPA’s Environmental Auditor (Contaminated Land) Scheme.

In 1998, NSW commenced its own Site Auditor Scheme under the Contaminated Land Management Act 1997 (CLM Act). The scheme is administered by the EPA.

The CLM Act empowers EPA to accredit individuals as site auditors and to establish guidelines for them.

The Contaminated Land Management Regulation 1998 (CLM Regulation) specifies some of the procedural requirements of the scheme.

Site Audits in Relation to Contaminated Sites

Site auditors review the work of contaminated site consultants. The CLM Act calls these reviews ‘site audits’ and defines a site audit as an independent review:

a) that relates to investigation or remediation carried out (whether under the CLM Act or otherwise) in respect of the actual or possible contamination of land, and

b) that is conducted for the purpose of determining any one or more of the following matters:

i) the nature and extent of any contamination of the land

ii) the nature and extent of the investigation or remediation

iii) whether the land is suitable for any specified use or range of uses

iv) what investigation or remediation remains necessary before land is suitable for any specified use or range of uses

v) the suitability and appropriateness of a plan of remediation, a long-term management plan, a voluntary investigation proposal or a remediation proposal.

The main products of a site audit are a ‘site audit statement’ and a ‘site audit report’.

A site audit statement is the written opinion by a site auditor, on an EPA-approved form, of the essential findings of a site audit. It includes, where relevant, the auditor’s conclusions regarding the suitability of the site for its current or proposed use.

Before issuing a site audit statement, the site auditor must prepare and finalise a detailed site audit report. The report must be clearly expressed and presented and contain the information, discussion and rationale that support the conclusions in the site audit statement.

In some circumstances a site audit is required by law. These audits are known as ‘statutory site audits’ and may be carried out only by site auditors accredited under the CLM Act. A statutory site audit is one that is required by:

a regulatory instrument issued under the CLM Act, including EPA agreements issued by EPA to voluntary proposals.

the Environmental Planning and Assessment Act 1979, including an environmental planning instrument or development consent condition

any other Act.

Role of Site Auditors

The services of a site auditor can be used by anyone who needs an independent and authoritative review of information relating to possible or actual contamination of a site. The review may involve independent expert technical advice or ‘sign-off’ of contaminated site assessment, remediation or

Important Information About Your Site Audit Report Page 2

QaO.05 Rev 01/03/15 CMJ Important Information SAR

validation work conducted by a contaminated site consultant.

Site Assessment and Audit Process

The usual stages in the assessment, remediation and validation of a contaminated site, and in the audit of those activities, are as follows:

Consultant is Commissioned to Assess Contamination

In most cases, a site owner or developer engages a contaminated site consultant to assess a site for contamination and, where required, to develop a remediation plan, implement the plan and validate the remediation.

The contaminated site consultant designs and undertakes the site assessment and, where required, all remediation and validation activities to achieve the objectives specified by the owner or developer.

Site Auditor Reviews the Consultant’s Work

The site owner or developer commissions the site auditor to review the consultant’s work. The auditor prepares a site audit report and a site audit statement at the conclusion of the review, which are given to the owner or developer.

Where the local planning authority or EPA uses its legal powers to require the carrying out of a site audit, the site owner or developer must commission a site auditor accredited under the CLM Act to perform this task. This is known as a ‘statutory’ audit. The CLM Act requires that an auditor must notify EPA when he or she has been commissioned by anyone other than EPA to perform a statutory site audit. The auditor is also required to furnish the local authority and EPA with a copy of the completed site audit statement.

In some cases, the site owner or developer may wish to have a site audit undertaken although it is not a legal requirement. The audit is termed ‘non-statutory’. If their intention is to obtain a site audit statement, they must commission a site auditor accredited under the CLM Act to perform this task. This is because only a site auditor so accredited can issue a site audit statement and they are obliged to issue one at the end of any site audit. For non-statutory audits, the site auditor must give a copy of the site audit report to the local authority or EPA, or both, on request.

As required by the CLM Act, EPA maintains a record of all statutory site audit statements issued in relation to land that is the subject of a regulatory instrument under the CLM Act. Copies are available for public inspection through EPA’s website at http://www.epa.nsw.gov.au/prclmapp/searchregister.aspx.

If the local council receives a copy of a site audit statement, it must list the statement on any certificate it issues under section 149 of the Environmental Planning and Assessment Act 1979 in relation to the land concerned.

Limitations of Your Site Audit Report

The following notes have been added by the Auditor who prepared this report, to highlight some important limitations on the use of this report.

This report has been prepared by C. M. Jewell & Associates Pty Ltd for the use of the client who commissioned it, and relevant government agencies, for the specific purpose described in the report.

Consistently with the objectives of the NSW Site Auditor Scheme, it may be appropriate for others to rely upon this report in some circumstances.

However, the original purpose of this report and the site conditions prevailing at the time the report was prepared – as described in the report – should be considered first.

If you are not the person for whom the report was prepared, or you wish to use it for a different purpose to that for which it was prepared, or site conditions appear to differ from those described in this report, or a significant period of time has elapsed since the report was prepared, then PLEASE CONSULT THE SITE AUDITOR BEFORE RELYING UPON THE REPORT.

It is also important to recognise that a site audit is primarily a review of work carried out by other companies and individuals.

The site auditor has checked data and interpretations, ascertained whether or not appropriate guidelines have been followed, and satisfied himself that the available data are adequate to support the conclusions he has reached.

However, all environmental sampling programs have an inherent degree of uncertainty. Even when sampling fully complies with guidelines, it is possible for areas of contamination to remain undetected, but be revealed by more extensive excavations during site redevelopment. This risk is usually quantified using statistical confidence limits.

The site audit report identifies data limitations and uncertainties where these are recognised, but users must accept the finite and unavoidable risk that some contamination may remain undetected during even a diligent site assessment and audit process.

If there is a need to copy this report, it must be reproduced in full. No reliance whatsoever should be placed upon partial copies of a site audit report.

Site Audit – Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow

Figure 1

Site Location

Report Ref: J1130.39R Rev: 0 Rev Date: 11-Apr-19 Author: naa C. M. Jewell & Associates Pty Ltd

1 Kilometre The Site

Source: LPI NSW

Site Audit – Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow

Figure 2

Site Setting

Report Ref: J1130.39R Rev: 0 Rev Date: 11-Apr-19 Author: naa C. M. Jewell & Associates Pty Ltd

Nant Street Tank Farm

Gazal

Block 2

Solvay Internox

Maritime Container Services

Botany Industrial Park

200 metres

Source: NSW LPI

Lot 100

Lot 101

Block 1

Lot 9 (the Site)

Site Audit – Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow

Figure 3

Proposed Development

Report Ref: J1130.39R Rev: 0 Rev Date: 11-Apr--19 Author: naa C. M. Jewell & Associates Pty Ltd

Source: EnRiskS 2019

Site Audit – Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow

Figure 4

Location of Testpits (JBS&G 2018)

Report Ref: J1130.39R Rev: 0 Rev Date: 11-Apr-19 Author: naa C. M. Jewell & Associates Pty Ltd

Site Audit – Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow

Figure 5

Schematic Cross-Section of Groundwater Flow System

Report Ref: J1130.39R Rev: 0 Rev Date: 11-Apr-19 Author: naa C. M. Jewell & Associates Pty Ltd

LAYER 3

LAYER 2

LAYER 1

Site Audit – Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow

Figure 6Contours on the Buried Surface

of the Hawkesbury Sandstone

Report Ref: J1130.39R Rev: 0 Rev Date: 11-Apr-19 Author: naaC. M. Jewell & Associates Pty Ltd

Source: URS 2007

LEGEND: Inferred RL of Bedrock Surface

Paleochannels Contours are presented in 5-metre increments Aerial Photograph from Google Earth 2007

Site Audit – Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow

Figure 7

Location and Nomenclature of Groundwater Contaminant Plumes

Report Ref: J1130.39R Rev: 0 Rev Date: 11-Apr-19 Author: naa C. M. Jewell & Associates Pty Ltd

Nor

ther

n (N

4/N

5) P

lum

e - C

TC, P

CE,

ED

CC

entra

l Plu

me

- EDC

& V

C

Sou

ther

n (S

1) P

lum

e - M

ixed

PC

E, T

CE

, CT

Sout

hern

(S2)

Plu

me

- PC

E &

CTC

Sout

hern

(S3)

Plu

me

- PC

E &

TC

EPlume Centreline

Site Audit – Suitability of Remediation Action Plan, Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow

Figure 8

Barrier Layer Areas

Report Ref: J1130.39R Rev: 0 Rev Date: 11-Apr-19 Author: naa C. M. Jewell & Associates Pty Ltd

APPENDIX A

Contaminant Groups

J1130.39R-rev0.AppenA C. M. Jewell & Associates Pty Ltd

Individual Species Making up Contaminant Groups  

TOTAL RECOVERABLE HYDROCARBONS 

C6‐C10 fraction 

>C10‐C16 fraction 

>C16‐C40 fraction 

 

MONOCYCLIC AROMATIC HYDROCARBONS 

Benzene 

Toluene 

Ethylbenzene 

Total xylenes 

meta‐ & para‐xylene 

ortho‐xylene 

Styrene 

Isopropylbenzene 

n‐propylbenzene 

1,3,5‐trimethylbenzene 

tert‐butylbenzene 

1,2,4‐trimethylbenzene 

sec‐butylbenzene 

 

POLYCYCLIC AROMATIC HYDROCARBONS 

Naphthalene 

Acenaphthylene 

Acenaphthene 

Fluorene 

Phenanthrene 

Anthracene 

Fluoranthene 

Pyrene 

Benzo(a)anthracene 

Chrysene 

Benzo(b) & (k) fluoranthene 

Benzo(a)pyrene 

Indeno(1,2,3‐c,d)pyrene 

Dibenz(a,h)anthracene 

Benzo(g,h,i)perylene 

 

HALOGENATED ALIPHATIC HYDROCARBONS 

ALKANES 

Chloromethane 

Dichloromethane 

Carbon tetrachloride (tetrachloromethane) 

Dichlorodifluoromethane 

Trichlorofluoromethane 

Bromomethane 

Dibromomethane 

Bromochloromethane 

Chloroethane 

1,1‐dichloroethane (1,1‐DCA) 

1,2‐dichloroethane (EDC) 

1,1,1‐trichloroethane (1,1,1‐TCA) 

Individual Species Making up Contaminant Groups  2 

J1130.39R‐rev0.AppenA  C. M. Jewell & Associates Pty Ltd 

1,1,2‐trichloroethane (1,1,2 TCA) 

1,1,1,2‐tetrachloroethane 

1,1,2,2‐tetrachloroethane 

Hexachloroethane 

1,2‐dibromoethane 

1,2‐dichloropropane 

2,2‐dichloropropane 

1,3‐dichloropropane 

1,2,3‐trichloropropane 

1,2‐dibromo‐3‐chloropropane 

 

TRIHALOMETHANES 

Trichloromethane (Chloroform) 

Bromodichloromethane 

Dibromochloromethane 

Tribromomethane (Bromoform) 

 

ALKENES 

Vinyl chloride (chloroethene) 

1,1‐dichloroethene (1,1‐DCE) 

Cis‐1,2‐dichloroethene (Cis 1,2‐DCE) 

Trans‐1,2‐dichloroethene (trans 1,2‐DCE) 

Trichloroethene (TCE) 

Tetrachloroethene (PCE) 

1,1‐dichloropropene 

Cis‐1,3‐dichloropropene 

Trans‐1,3‐dichloropropene 

Hexachloropropene (Hexachloropropylene) 

Hexachlorocyclopentadiene 

Hexachlorobutadiene 

 

HALOGENATED AROMATIC HYDROCARBONS 

Chlorobenzene 

Bromobenzene 

2‐chlorotoluene 

4‐chlorotoluene 

1,2‐dichlorobenzene 

1,3‐dichlorobenzene 

1,4‐dichlorobenzene 

1,2,4‐trichlorobenzene 

1,2,3‐trichlorobenzene 

Pentachlorobenzene 

Hexachlorobenzene 

 

HEAVY METALS 

Arsenic (As) 

Cadmium (Cd) 

Chromium (Cr) 

Copper (Cu) 

Lead (Pb) 

Mercury (Hg) 

Individual Species Making up Contaminant Groups  3 

J1130.39R‐rev0.AppenA  C. M. Jewell & Associates Pty Ltd 

Nickel (Ni) 

Zinc (Zn) 

 

SEMI VOLATILE ORGANIC COMPOUNDS 

PHENOLS 

Phenol 

2‐chlorophenol 

2‐methylphenol 

3‐ & 4‐methylphenol 

2‐nitrophenol 

2,4‐dimethylphenol 

2,4‐dichlorophenol 

2,6‐dichlorophenol 

4‐chloro‐3‐methylphenol 

2,4,5‐trichlorophenol 

2,4,6‐trichlorophenol 

Pentachlorophenol 

 

  PHTHALATE ESTERS 

Dimethyl phthalate 

Diethyl phthalate 

Di‐n‐butyl phthalate 

Butyl benzyl phthalate 

Bis(2‐ethylhexyl)phthalate 

Di‐n‐octyl phthalate 

 

  NITROSAMINES 

N‐nitrosomethylethylamine 

N‐nitrosodiethylamine 

N‐nitrosopyrrolidine 

N‐nitrosomorpholine 

N‐nitrosodi‐n‐propylamine 

N‐nitrosodibutylamine 

N‐nitrosodiphenylamine & Diphenylamine 

Diallate 

Methapyrilene 

 

  NITROAROMATICS AND CYCLIC KETONES 

2‐picoline 

Acetophenone 

Nitrobenzene 

Isophorone 

2,6‐dinitrotoluene 

2,4‐dinitrotoluene 

1‐naphthylamine 

4‐nitroquinoline‐N‐oxide 

5‐nitro‐o‐toluidine 

Azobenzene 

1.3.5‐Trinitrobenzene 

Phenacetin 

4‐aminobiphenyl 

Individual Species Making up Contaminant Groups  4 

J1130.39R‐rev0.AppenA  C. M. Jewell & Associates Pty Ltd 

Pentachloronitrobenzene 

Pronamide 

Dimethylaminoazobenzene 

Chlorobenzilate 

 

  HALOETHERS 

Bis(2‐chloroethyl)ether 

Bis(2‐chloroethoxy) methane 

4‐chlorophenyl phenyl ether 

4‐bromophenyl phenyl ether 

 

  CHLORINATED HYDROCARBONS 

Polychlorinated benzenes 

Hexachlorinated alkanes and alkenes 

 

ANILINES AND BENZIDINES 

Aniline 

4‐chloroaniline 

2‐nitroaniline 

3‐nitroaniline 

Dibenzofuran 

4‐nitroaniline 

Carbazole 

3.3’‐dichlorobenzidine 

 

ORGANOCHLORINE PESTICIDES 

Hexachlorobenzene (HCB) 

‐Benzene hexachloride (‐BHC) ‐Benzene hexachloride (‐BHC) ‐Benzene hexachloride (‐BHC) ‐BHC (Lindane) Heptachlor 

Heptachlor epoxide  

Aldrin 

Dieldrin 

Endrin 

Alpha‐chlordane 

Trans‐chlordane 

Cis‐chlordane 

Gamma‐chlordane 

Oxychlordane 

Trans nonachlor 

DDD 

DDE 

DDT 

‐Endosulfan/Endosulfan‐1 ‐Endosulfan/Endosulfan‐2 Endosulfan sulfate 

Methoxychlor 

Endrin aldehyde 

Endrin ketone 

Individual Species Making up Contaminant Groups  5 

J1130.39R‐rev0.AppenA  C. M. Jewell & Associates Pty Ltd 

ORGANOPHOSPHORUS PESTICIDES 

Dichlorvos 

Mevinphos 

Ethoprop 

Phorate 

Demeton‐S‐methyl 

Diazinon 

Disulfoton 

Ronnel 

Chlorpyrifos‐methyl 

Chlorpyrifos  

Merphos 

Parathion‐methyl 

Fenthion 

Malathion 

Fenitrothion 

Prothiofos 

Stirophos 

Ethion 

Bolstar 

Fensulfothion 

Azinphos‐methyl 

Coumaphos 

 

POLYCHLORINATED BIPHENYLS 

Arochlor 1016 

Arochlor 1221 

Arochlor 1232 

Arochlor 1242 

Arochlor 1248 

Arochlor 1254 

Arochlor 1260 

Arochlor 1262 

Arochlor 1268 

 

ASBESTOS 

Amosite 

Crocidolite 

Crysotile 

APPENDIX B

Copies of the Associated Reports the Auditor has Specifically Relied Upon

APPENDIX C

Copies of Relevant Letter Reports, Supporting Documentation and

Communications

C.M. Jewell & Associates Pty Ltd A.C.N. 056 283 295 A.B.N. 54 056 283 295

Water and Environmental Management

1/13 Kalinda Road, Bullaburra, NSW 2784, Australia P.O. Box 10, Wentworth Falls, NSW 2782

Phone: (02) 4759 3251 Fax: (02) 4759 3257 Email: [email protected]

Principal: Chris Jewell BSc (Geology) MSc (Hydrogeology) MEnvLaw C.Geol C.WEM CP.SAM

Ref: J1130.36L 15 February 2018 DBL Property Pty Limited 437 Kent Street SYDNEY NSW 2000 Attention: Mr Jeffrey Lord Dear Jeff

Lot 9 Southlands, McPherson Street, Banksmeadow NSW As discussed at our meeting on 14 February 2018, I have reviewed the concept plans for construction on Lot 9 at Southlands. I understand that all buildings would be built on a suspended concrete deck that would be approximately 1.5 metres above ground level, so as to retain the flood retention capability of the basin. I consider that, from a site audit perspective, the proposed concept is likely to be feasible, because such a high-volume, open-sided void would be adequate to mitigate any likely ground gas or vapour risk on the site. As discussed, some further information will be required to confirm that the gas regime is within the range that would be anticipated on the basis of the information available from adjacent sites, and to enable appropriate control measures to be developed for other potential contaminants of concern. However, it is likely that the concept would remain viable regardless of the outcome of such investigations. This communication has been provided as interim advice only. Where applicable, the information provided is consistent with NSW EPA guidelines and policies. The advice does not constitute a site audit report or site audit statement and does not pre-empt the conclusions which will be drawn at the end of the audit process. A site audit report and site audit statement will be issued when the audit process has been completed. For and on behalf of C. M. JEWELL & ASSOCIATES PTY LTD CHRIS JEWELL Site Auditor accredited under the Contaminated Land Management Act 1997

C.M. Jewell & Associates Pty Ltd A.C.N. 056 283 295 A.B.N. 54 056 283 295

Water and Environmental Management

1/13 Kalinda Road, Bullaburra, NSW 2784, Australia P.O. Box 10, Wentworth Falls, NSW 2782

Phone: (02) 4759 3251 Fax: (02) 4759 3257 Email: [email protected]

Principal: Chris Jewell BSc (Geology) MSc (Hydrogeology) MEnvLaw C.Geol C.WEM CP.SAM

Ref: J1130.37L

8 February 2019

Orica Australia Pty Ltd

16-20 Beauchamp Road

MATRAVILLE NSW 2036

Attention: Mr Kevin Sonnemann

Dear Kevin

Assessment of Potential for Accumulation of Ground Gases Associated with Proposed Distribution and Office Development - Lot 9 Southlands, 28 McPherson

Street, Banksmeadow NSW

As requested, I have reviewed the Assessment of Potential for Accumulation of Ground Gases

Associated with Proposed Warehouse Distribution and Office Development, Lot 9, 28 McPherson

Street, Banksmeadow NSW, prepared by JBS&G Australia Pty Ltd (ref. 54709-119907-rev2), dated

7 February 2019.

In my opinion the risk assessment approach used by JBS&G was robust. There are many layers of

conservatism built into the analysis, as outlined in the report.

The report assesses maximum vapour-phase emissions from the void space beneath the deck structure

that, it is proposed, will be constructed on Lot 9. In my opinion it demonstrates clearly that such

emissions will not have an adverse effect on workers on adjacent lots located to the east of Lot 9.

The report does not explicitly address the concerns raised by Ian Edwards, the owner of one of those

lots, concerning the intensity (i.e rate, or mass/time, per unit area) of emissions from Lot 9. However,

it does contain the information required to do so.

The approach adopted by JBS&G, which is a standard risk assessment approach, was to compare

calculated concentrations in air beneath the deck structure with guideline values for human health.

Those guideline values were themselves derived, using a risk assessment process, by national and

international agencies. The process for guideline derivation effectively incorporates consideration of

intensity, at the level of the human body (the receptor), using the relationship between a body loading

- calculated from the exposure concentration, the rate of uptake by the body, and the frequency and

duration of exposure – and the experimentally-derived toxicity of the contaminant. There are

successive layers of conservatism built into this process. The report indicates that concentrations

beneath the deck, and therefore the maximum possible concentrations migrating onto the lots to the

east, will not exceed these conservative guideline values.

As indicated in the report, and as is obvious, airborne contaminants will only be transported to the east

when the wind in blowing from the west or, at worst, a general westerly direction between north-west

Lot 9 Southlands, 28 McPherson Street, Banksmeadow NSW 2

J1130.37L- 8-Feb-2019 C. M. Jewell & Associates Pty Ltd

and south-west. In these circumstances, all the emissions from the surface of Lot 9, wherever they

occur on the lot, will be transported to the east. The difference is that without the deck, there is greater

opportunity for lateral and, particularly, vertical dispersion of the airborne plume. Thus,

concentrations over neighbouring lots may be somewhat higher with the deck than without it.

However, concentrations over those lots cannot exceed, and are likely to be lower than, concentrations

beneath the deck, and it has been shown that those concentrations will be less than the relevant

guideline values.

This communication has been provided as interim advice only. Where applicable, the information

provided is consistent with NSW EPA guidelines and policies. The advice does not constitute a site

audit report or site audit statement and does not pre-empt the conclusions which will be drawn at the

end of the audit process. A site audit report and site audit statement will be issued when the audit

process has been completed.

For and on behalf of

C. M. JEWELL & ASSOCIATES PTY LTD

CHRIS JEWELL

Site Auditor accredited under the

Contaminated Land Management Act 1997

cc: Mr Jeffrey Lord, DBL Property Pty Limited

Dr Greg Dasey, JBS&G Pty Ltd.

C.M. Jewell & Associates Pty Ltd A.C.N. 056 283 295 A.B.N. 54 056 283 295

Water and Environmental Management

1/13 Kalinda Road, Bullaburra, NSW 2784, Australia P.O. Box 10, Wentworth Falls, NSW 2782

Phone: (02) 4759 3251 Fax: (02) 4759 3257 Email: [email protected]

Principal: Chris Jewell BSc (Geology) MSc (Hydrogeology) MEnvLaw C.Geol C.WEM CP.SAM

Ref: J1130.38L

8 March 2018

DBL Property Pty Limited

437 Kent Street

SYDNEY NSW 2000

Attention: Mr Jeffrey Lord

Dear Jeff

Lot 9 Southlands, McPherson Street, Banksmeadow NSW

As discussed at our meeting on 14 February 2018, I have reviewed the concept plans for construction

on Lot 9 at Southlands.

I understand that all buildings would be built on a suspended concrete deck that would be

approximately 1.5 metres above ground level, so as to retain the flood retention capability of the basin.

I consider that, from a site audit perspective, the proposed concept is likely to be feasible, because

such a high-volume, open-sided void would be adequate to mitigate any likely ground gas or vapour

risk on the site.

As discussed, some further information will be required to confirm that the gas regime is within the

range that would be anticipated on the basis of the information available from adjacent sites, and to

enable appropriate control measures to be developed for other potential contaminants of concern.

However, it is likely that the concept would remain viable regardless of the outcome of such

investigations.

I propose to prepare a site audit report and Section B Site Audit Statement to assess the suitability of

the Remedial Action Plan prepared by JBS&G (54709/119224 Rev B18 February 2019) and the

overall concept. As indicated above, I do not foresee that there are likely to be significant issues with

this proposal. However, due to my current workload and travel commitments it will be approximately

5 weeks before this can be completed. I will be happy to make any comments arising during the

review process available to DoPE.

Lot 9 Southlands, McPherson Street, Banksmeadow NSW 2

J1130.38L- 8-Mar-2019 C. M. Jewell & Associates Pty Ltd

This communication has been provided as interim advice only. Where applicable, the information

provided is consistent with NSW EPA guidelines and policies. The advice does not constitute a site

audit report or site audit statement and does not pre-empt the conclusions which will be drawn at the

end of the audit process. A site audit report and site audit statement will be issued when the audit

process has been completed.

For and on behalf of

C. M. JEWELL & ASSOCIATES PTY LTD

CHRIS JEWELL

Site Auditor accredited under the

Contaminated Land Management Act 1997

APPENDIX D

Auditor Checklists

APPENDIX D1

Auditor’s Assessment of the Consultant’s Use of Data Quality Objectives and Data

Quality Indicators, and Review of Quality Assurance/Quality Control Data

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 1 

CMJA This checklist should be used for the consultant’s reports that are being audited. 

The checklist should be completed as  the audit progresses.    In particular,  the  ‘investigation’,  ‘remediation’,  ‘validation’ 

and ‘management’ parts of this checklist should be completed as the corresponding consultant’s reports are audited. 

A separate checklist is used for CMJA’s Site Audit Report.  Only one of these should be completed.  

Audit No:  SA263/6  Report No: J1130.39R‐rev0 

 

Title:  Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

 

GENERAL 

Review Type:  Statutory Audit (NSW) 

Audit Notified to EPA:  Yes 

Titles of Consultant’s Reports: 

Remediation Action Plan, 28 McPherson Street, Banksmeadow NSW, prepared by  JBS&G Australia 

Pty Ltd (ref. 54709/119224 Rev0), dated 15 May 2019 

 

EXECUTIVE SUMMARY 

EPA Guidelines indicate that an Executive Summary (ES) should be included in all reports. However, an ES is 

essential for all reports with more than about 15 pages of text, and for shorter reports if particularly complex. 

 

When/if required, each ES should generally include: 

 

 

 

 

 

 

 

 

Overall, are the ES acceptable? 

 

The RAP does not include an ES. Given the nature of the report, the Auditor does not consider this to be of 

great concern. 

 

Background  

Objectives  

Scope  

Results  

Conclusions  

Yes No

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 2 

CMJA

REPORT CONTENTS  Comments

INTRODUCTION   

Background   

Site identification  Location and cadastral 

Previous background, including a summary of the investigation 

and remediation work that has taken place    

Purpose and Objectives  

Clear statements of purpose and objectives   

List of reports relied upon   

Scope of Report   

Clear statement of scope present  X  

OVERVIEW OF WORKS COMPLETED   

Overview of work completed and involvement of Auditor   

SITE INFORMATION     

Site Identification   

Street number, name and suburb   

Certificate of Title, Lot / DP number   

Site ownership  X Not specific company 

Map references (AMG or Lat/Long)   

Site area   

Zoning details   

Location map present   

Site Setting 

Verbal description of site location   

Current use of surrounding land   

Sensitive uses identified in surroundings (e.g. child care)  Detector dog facility 

Site Layout   

Verbal description of site, including boundaries   

Current use of site   

Boundary fencing   

Erosion and soil stability   

Visible signs of contamination  X Not applicable 

Visible signs of plant stress  X Not applicable

Presence of waste materials  X Not applicable

Presence of drums  X Not applicable

Presence of odours  X Not applicable

Condition of buildings  X Not applicable

Condition of pavement  X Not applicable

Topography   

Landform description   

Elevation   

Slope direction and magnitude indicated   

Natural surface drainage direction and fate indicated   

Quality of surface water indicated   

Sensitive environments identified   

Artificial surface drainage discussed   

Flood potential mentioned   

Drainage   

On site drainage (man‐made / natural)   

Off‐site drainage (man‐made / natural)   

Off‐site receptors   

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 3 

CMJA

Geology   

Soils   

Stratigraphy   

Unified soil classification system used  X Not applicable 

Lithology   

Structure   

Location and extent of fill   

Origin of fill  X Unknown 

Hydrogeology   

Regional setting 

This information is detailed in reports previously 

reviewed by the Auditor. An adequate summary 

is provided in the RAP. 

Local setting  Meteorology  Aquifer condition  Aquifer type  Depth / elevation of water table or potentiometric surface  Direction and slope of lateral hydraulic gradient  Preferential flow paths  Hydraulic conductivities  Groundwater flow direction  Groundwater flow rate (qualitative)  Groundwater discharge point identified  Groundwater recharge discussed  Background groundwater quality described  Borehole records  Local groundwater utilisation discussed  Borehole location map/description provided 

Site History   

Land ownership history – title search  X

This information is detailed in reports previously 

reviewed by the Auditor. It is not summarised in 

the RAP. 

Land use history, ownership implications, air photo review, 

Council records, zoning, DA/BA X 

EPA licensing  X

Site plans  X

Site photographic  X

Staff interview records  X

Chemical use / storage inventories  X

Process descriptions  X

Underground storage tanks  X

Above‐ground storage tanks  X

WorkCover search  X

Waste disposal  X

Waste discharge points  X

Trade waste agreement  X

Resident interviews  X

Complaints  X

Prosecutions  X

Regulatory notices  X

Implications of surrounding land use  X

Integrity assessment  X

Contaminant Source Areas 

Actual or potential contaminant sources 

X This information is detailed in reports previously 

reviewed by the Auditor. It is not summarised in 

the RAP. 

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 4 

CMJA

Contaminants of Concern

Actual or potential contaminants of concern from on and off‐

site sources    

Proposed Development  

Proposed land use  Full details and reference to concept design. 

Assessment Criteria   

Assessment criteria identified for the proposed use of site   

Soil   

Groundwater  X  

Vapour   

INVESTIGATION / REMEDIATION / VALIDATION     

Relevant Investigation reports to be summarised and include:   

A clear statement of the work carried out  Section 3 of RAP 

A summary of all analytical results and an evaluation of those 

results    

AUDITOR’S EVALUATION OF SAMPLING     

Evaluation of quality assurance and quality control plans, 

including appropriate implementation of sampling plans, 

sampling handling, collection and transport processes 

   

A summary and justification of environmental quality criteria 

used by the auditor in assessing the reports of consultants    

AUDITOR’S ASSESSMENT OF THE ADEQUACY OF CONSULTANT’S WORK AND REPORTING STANDARDS 

General comments regarding adequacy of work  The RAP is adequate and appropriate. 

Compliance with regulatory guidelines  The RAP generally complies with guidelines. 

Documentation of instances where consultants have departed 

from applicable guidelines and whether these departures are 

acceptable 

  Departures are detailed in this Checklist. 

AUDITOR’S ASSESSMENT OF RISK     

Human health  Adequately assessed and acceptable. 

Structures X 

Not assessed in RAP, Auditor assessed as 

acceptable subject to design review. 

Environment  Acceptable 

Regulatory  Compliant 

Potential contaminant migration  Low risk 

Groundwater  Managed by NSW EPA under approved VMP 

Aesthetic issues and odours  Acceptable 

Chemical mixtures  Acceptable 

Short‐term and long‐term management  Detailed and acceptable 

Other issues  None significant 

AUDITOR’S CONCLUSIONS AND RECOMMENDATIONS 

Adequacy of investigation, proposed remediation and validation  Adequate 

Suitability of site for proposed use  Can be made suitable 

Details of how conclusion has been reached  Adequate provision 

Recommendations  RAP appropriate 

   

 

 

  

__________________________ 14/04/2019

Auditor Date

7.0 DATA QUALITY OBJECTIVES CHECKLIST

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 5 

CMJA

The Guidelines for the NSW Site Auditor Scheme (3rd edition 2017) state that site auditors must check that a consultant has 

properly addressed and adopted Data Quality Objectives  (DQO)  for the  investigation or validation program  (as outlined  in 

the checklist below), and that the consultant’s report includes the following: 

a statement of pre‐determined DQO for field and laboratory procedures, including quantitative DQO; 

a plan to achieve pre‐determined DQO; and 

procedures to be undertaken if the data do not meet the expected DQO. 

 

The key reference document for the DQO process is Guidance on Systematic Planning using the Data Quality Objectives 

Process (USEPA QA/G‐4, February 2006). That document describes the DQO process as follows. 

The DQO Process is used to establish performance or acceptance criteria, which serve as the basis for designing a plan for collecting 

data of sufficient quality and quantity to support the goals of a study. The DQO Process consists of seven  iterative steps that are 

documented in Figure 2. While the interaction of these steps is portrayed in Figure 2 in a sequential fashion, the iterative nature of 

the DQO Process allows one or more of these steps to be revisited as more information on the problem is obtained. 

Each step of the DQO Process defines criteria that will be used to establish the final data collection design. The first five steps are 

primarily focused on identifying qualitative criteria, such as: 

the  nature  of  the  problem  that  has  initiated  the  study  and  a  conceptual model  of  the  environmental  hazard  to  be 

investigated; 

the decisions or estimates that need to be made and the order of priority for resolving them; 

the type of data needed; and 

an analytic approach or decision  rule  that defines  the  logic  for how  the data will be used  to draw conclusions  from  the 

study findings. 

The sixth step establishes acceptable quantitative criteria on the quality and quantity of the data to be collected, relative to the 

ultimate use of  the data. These  criteria are known as performance or acceptance  criteria, or DQOs. For decision problems,  the 

DQOs are typically expressed as tolerable limits on the probability or chance (risk) of the collected data  leading you to making an 

erroneous decision. For estimation problems, the DQOs are typically expressed in terms of acceptable uncertainty (e.g. width of an 

uncertainty band or interval) associated with a point estimate at a desired level of statistical confidence. 

In the seventh step of the DQO Process, a data collection design is developed that will generate data meeting the quantitative and 

qualitative criteria specified at the end of Step 6. A data collection design specifies the type, number, location, and physical quantity 

of samples and data, as well as the QA and QC activities that will ensure that sampling design and measurement errors are managed 

sufficiently  to meet  the performance or acceptance criteria  specified  in  the DQOs. The outputs of  the DQO Process are used  to 

develop a QA Project Plan and for performing Data Quality Assessment. 

 

The 7‐step process is shown diagrammatically in the following table. 

7.0 DATA QUALITY OBJECTIVES CHECKLIST

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 6 

CMJA

  EPA QA/G‐4 states that the DQO Process may be applied to all programs  involving the collection of environmental data 

and  apply  to  programs with  objectives  that  cover  decision making,  estimation,  and modeling  in  support  of  research 

studies, monitoring programs, regulation development, and compliance support activities. When the goal of the study is 

to support decision making, the DQO Process applies systematic planning and statistical hypothesis testing methodology 

to decide between alternatives. When  the goal of  the study  is  to support estimation, modeling, or  research,  the DQO 

Process develops an analytic approach and data collection strategy that is effective and efficient. 

 

   

7.0 DATA QUALITY OBJECTIVES CHECKLIST

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 7 

CMJA

The  following  compliance  checklist  is  generic  and  was  developed  primarily  for  more  typical  site  assessment  and 

remediation validation programs. The expected outputs are  those  listed  in Appendix  IV of Guidelines  for  the NSW Site 

Auditor Scheme (3rd Edition 2017) and Appendix B of Schedule B2 of the National Environment Protection (Assessment of 

Site Contamination) Measure 1999 (ASC NEPM). This checklist applies to the Validation Plan included in the RAP. 

 

DQO Steps and Outputs  Auditor Comments 

Step 1 – State the problem 

A concise description of the problem.     

A list of the planning team members and a decision maker.  X   

A summary of available resources and relevant deadlines for the study.  X   

A conceptual model of the site based on information prior to the commencement of 

the investigation/validation.  X Not included per se although 

required information is in Section 

2. Note this is not an SAQP. 

Step 2 – Identify the decisions / goals 

A decision statement that links the principal study question to actions that will solve 

the problem.    

Step 3 Identify information inputs to decisions 

A list of informational inputs needed to resolve the decision statement.     

A list of environmental variables or characteristics to be measured.   

Table 6.4 

Information required to allow informed decisions to be made to address the decision 

statements.  

Identification of the media (fill, soil, groundwater) to be investigated / validated.   Identification of the criteria for each medium.   Identification of the analytical methods required for chemicals of concern relative to 

the site criteria. X   

Identification of defined concentrations for field screening (and a response if 

reached) X  Not applicable 

Any other information required to make decisions.    Thickness of fill 

Step 4 – Define the boundaries 

A detailed description of the spatial and temporal boundaries of the problem.     

Identification of any practical constraints that may interfere with the study.  X  Not applicable 

Step 5 – Develop decision rules 

Definition of acceptable limits for: chemicals of concern detected in field blanks; 

recoveries of laboratory spike additions; and RPDs of matrix spike and matrix spike 

duplicates. 

  DQIs in Table 6.3 

Identification of the statistical parameters of interest that characterise the 

population (e.g. 95% UCL). X  Mentioned but not detailed 

A statement that the criteria exceed the laboratory reporting limits.  X   

Any contingency measures.  X   

Step 6 – Specify limits on decision errors 

Justification of decision error rates based on a consideration of the consequences of 

making an incorrect decision. X   

Step 7 – Optimise the design 

Was data collection optimised?     

Was a sampling analytical and quality plan (SAQP) developed and provided?  X  Not required at this stage 

 

Adequacy     

Are the DQO, as outlined above, provided by the consultant 

adequate for the purpose of this audit?  

 

    If no, provide comments above as appropriate 

 

 

   

____________________________  14/04/2019 

Auditor  Date 

Yes No

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 14 

CMJA

Yes No

Yes No

RISK ASSESSMENT 

General 

Has a specific risk assessment been undertaken?  

If so, has the consultant provided suitable justification for undertaking the risk 

assessment?   Yes, fully justified 

Does the risk assessment satisfy all the Requirements in the Human Health Risk 

Assessment Checklist? (Appendix A of the Guidelines).    

Is the site‐specific risk assessment scientifically valid and do the recommended 

site‐specific criteria protect the public health and the environment?    

 

OTHER ENVIRONMENTAL IMPACTS, INCLUDING AESTHETIC ISSUES AND SEDIMENT QUALITY 

 

Has the consultant addressed, where appropriate,   

the potential for degradation of surface water and/or groundwater  X Not applicable 

the potential for contaminant impacts on building structures  X  

aesthetic issues (including any odours and/or any discolouration of soil 

arising from contamination)    

sediment contamination and, where relevant, addressed the issues 

contained in the Sediment Quality Guidelines (ANZECC 2000) X  Not applicable 

 

OFF‐SITE MIGRATION OF CONTAMINANTS 

 

Has the consultant adequately addressed all potential (or actual) issues arising 

from off‐site migration of contaminants?  

VMP ‐ groundwater separate 

report ‐ air 

Does off‐site migration need to be addressed to protect human health or the 

environment?  

No requirement ‐ air VMP ‐ 

groundwater 

Where appropriate, has the site owner or occupier been advised of the off‐site 

migration risk by the consultant?    

Where appropriate, has the site owner or occupier been advised of the off‐site 

migration risk by the Auditor?    

 

REMEDIAL ACTION 

Remediation Policy and Issues  Applicable? 

 

Do remediation strategies or remediation actions have regard for the provisions 

of appropriate national and state remediation policies?    

Has the ASC NEPM preferred order of options for site remediation been 

adopted?   No, but considered 

Is the completed or proposed remediation technically and environmentally 

justifiable?    

Where vertical mixing of low‐level contaminated surface soils with cleaner soils 

at depth has been undertaken and is outside the scope of the EPA’s Vertical 

Mixing Guideline document, has this strategy been discussed with the EPA? 

X  Not applicable 

Where appropriate, has the consultant taken into consideration the provisions 

of the Waste Legislation (POEO Act 1997, POEO (Waste) Regulation 2014) and 

Planning Legislation (EPA Act 1979), and supporting regulation and guidelines? 

   

Have appropriate controls been applied to the Handling, storage, treatment 

and/or disposal of any wastes?    

Where appropriate, has the consultant taken into consideration chemical wastes 

that are subject to a Chemical Control Order (CCO), and where applicable, does 

the management strategy comply with the requirements for the relevant CCO? 

 Not explicitly but implied by 

waste classification proposal 

Have appropriate risk assessment procedures been applied to any 

contamination left at depth?    

 

   

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 15 

CMJA

Yes No

Yes No

Yes No

Yes No

 

Capping and Containing  Applicable? 

 

Where cap and containment has been used or is proposed, is this appropriate 

for the contaminants of concern?    

Does it maximise the long‐term engineering security of the works?   

Where applicable, minimize the potential for leachate formation and/or 

volatilization? X  Not an objective 

Exclude the erection of structures on the capped or contained areas that may 

result in risk of harm to the public health or the environment?    

Include a notification mechanism to ensure that the capped or contained areas 

are protected from any unintentional or uncontrolled disturbance that could 

breach the integrity of the physical barrier? 

   

 

 

Bioremediation  Applicable?  

Has consideration been given to the use of local species before foreign 

organisms are/were introduced for bioremediation purposes?    

Where imported organisms have been introduced for bioremediation purposes, 

has the consultant:    

obtained appropriate documentation for any species that has been imported 

from overseas (relating to Australian Quarantine Inspection Services permit), 

including any conditions accompanying the permit? 

   

obtained a certificate from a recognized laboratory, identifying the species to 

be released?    

identified any potential risks to human health and animal health risks?   

demonstrated appropriate knowledge of distribution of the organisms in 

Australia and the dispersal mechanisms in air, water and soil?    

assessed the expected survival period of the organisms in the environment and

possible consequences of the release?    

documented the estimated number of organisms to be released and 

frequency of release?    

monitored the survival of the organisms to be released and frequency of 

release?    

put in place contingency measures to remove or destroy the organisms if a 

hazard becomes evident?    

 

 

Consent, Licence, Notification and Other Requirements  Applicable? 

 

Has the consultant identified any consents, licences, notifications or other 

regulatory requirements relating to the site, and if so, have they been 

appropriately addressed in site reports? 

   

Have the requirements of SEPP55 been complied with?   

 

 

Waste Management  Applicable? 

 

Were materials removed from the site appropriately classified for waste 

disposal?    

Has disposal documentation been sighted and checked?   

Were waste materials transported to an appropriately licenced waste facility or 

other legally permissible destination?    

Do waste tonnages correspond to site volumes within reasonable error?   

 

   

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 16 

CMJA

Yes No

Yes No

 

 

Asbestos  Applicable? 

 

Has asbestos waste been appropriately managed?  Proposed 

Have asbestos clearance certificates been sighted?  X Proposed 

 

 

Groundwater Clean‐Up and Management  Applicable?  

Have all primary and secondary sources of contamination been addressed?  VMP 

Have the impacts of residual dissolved‐phase contamination been adequately 

assessed?   VMP 

Is any proposed use of monitored natural attenuation (MNA) appropriate?  X  

 

Overview  

Is the remediation appropriate for the site?   

Has the remediation been satisfactorily completed and validated?  Not applicable 

 

CONCLUSIONS AND RECOMMENDATIONS  

Are findings summarised?   

Are findings supported by data?   

Are findings appropriate?   

Are assumptions stated?  X  

Are uncertainties/limitations stated?   

Is a statement of constraints included?   

Are recommendations for further work appropriate?   

 

AUDITOR’S ASSESSMENT  

Are the reports, as amended and clarified by the Consultant, adequate for the 

purposes of this audit?    

Is the site suitable for the intended use?  Not yet ‐ RAP  

Is a site management plan required?   

Is notification of groundwater contamination (including advice to the client, 

notation on the site audit statement and discussion with EPA) required?   Subject to VMP 

 

 

 

 

 

____________________________  14/04/2019 

Auditor  Date 

   

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 1 

CMJA This checklist should be used for the consultant’s reports that are being audited. 

The checklist should be completed as  the audit progresses.    In particular,  the  ‘investigation’,  ‘remediation’,  ‘validation’ 

and ‘management’ parts of this checklist should be completed as the corresponding consultant’s reports are audited. 

A separate checklist is used for CMJA’s Site Audit Report.  Only one of these should be completed.  

Audit No:  SA263/6  Report No: J1130.39R‐rev0 

 

Title:  Lot 9 in DP1205673, 28 McPherson Street, Banksmeadow 

 

GENERAL 

Review Type:  Statutory Audit (NSW) 

Audit Notified to EPA:  Yes 

Titles of Consultant’s Reports: 

Asbestos  and  Vapour  Assessment,  Lot  9  in  DP1205673,  28  McPherson  Street,  Banksmeadow, 

prepared by JBS&G Australia Pty Ltd (ref. 54709/114803 Rev A), dated 14 August 2018 

 

EXECUTIVE SUMMARY 

EPA Guidelines indicate that an Executive Summary (ES) should be included in all reports. However, an ES is 

essential for all reports with more than about 15 pages of text, and for shorter reports if particularly complex. 

 

When/if required, each ES should generally include: 

 

 

 

 

 

 

 

 

Overall, are the ES acceptable? 

 

 

Background  Objectives X 

Scope X 

Results  Conclusions  

Yes No

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 2 

CMJA

REPORT CONTENTS  Comments

INTRODUCTION   

Background   

Site identification   

Previous background, including a summary of the investigation 

and remediation work that has taken place    

Purpose and Objectives  

Clear statements of purpose and objectives   

List of reports relied upon   

Scope of Report   

Clear statement of scope present   

OVERVIEW OF WORKS COMPLETED   

Overview of work completed and involvement of Auditor   

SITE INFORMATION     

Site Identification   

Street number, name and suburb   

Certificate of Title, Lot / DP number   

Site ownership  X Not specific company 

Map references (AMG or Lat/Long)   

Site area   

Zoning details   

Location map present   

Site Setting 

Verbal description of site location   

Current use of surrounding land   

Sensitive uses identified in surroundings (e.g. child care)  Detector dog facility 

Site Layout   

Verbal description of site, including boundaries   

Current use of site   

Boundary fencing   

Erosion and soil stability   

Visible signs of contamination  X Not applicable 

Visible signs of plant stress  X Not applicable

Presence of waste materials  X Not applicable

Presence of drums  X Not applicable

Presence of odours  X Not applicable

Condition of buildings  X Not applicable

Condition of pavement  X Not applicable

Topography   

Landform description   

Elevation   

Slope direction and magnitude indicated   

Natural surface drainage direction and fate indicated   

Quality of surface water indicated  X  

Sensitive environments identified   

Artificial surface drainage discussed   

Flood potential mentioned   

Drainage   

On site drainage (man‐made / natural)   

Off‐site drainage (man‐made / natural)   

Off‐site receptors   

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 3 

CMJA

Geology   

Soils   

Stratigraphy   

Unified soil classification system used  X Not applicable 

Lithology   

Structure   

Location and extent of fill   

Origin of fill  X Unknown 

Hydrogeology   

Regional setting 

Note: This information is summarised in the 

HHRA Revision but is detailed in the recently‐

updated Conceptual Site Model prepared by 

others (Senversa). 

Local setting  Meteorology  X

Aquifer condition  Aquifer type  Depth / elevation of water table or potentiometric surface  Direction and slope of lateral hydraulic gradient  Preferential flow paths  Hydraulic conductivities  Groundwater flow direction  Groundwater flow rate (qualitative)  Groundwater discharge point identified  Groundwater recharge discussed  Background groundwater quality described  Borehole records  Local groundwater utilisation discussed  Borehole location map/description provided 

Site History   

Land ownership history – title search  X

Note: This information has been adequately 

presented in previous reports but is not 

provided and not necessary here. 

Land use history, ownership implications, air photo review, 

Council records, zoning, DA/BA X 

EPA licensing  X

Site plans  X

Site photographic  X

Staff interview records  X

Chemical use / storage inventories  X

Process descriptions  X

Underground storage tanks  X

Above‐ground storage tanks  X

WorkCover search  X

Waste disposal  X

Waste discharge points  X

Trade waste agreement  X

Resident interviews  X

Complaints  X

Prosecutions  X

Regulatory notices  Implications of surrounding land use  Integrity assessment  X

Contaminant Source Areas 

Actual or potential contaminant sources  X  

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 4 

CMJA

Contaminants of Concern

Actual or potential contaminants of concern from on and off‐

site sources    

Proposed Development  

Proposed land use   

Assessment Criteria   

Assessment criteria identified for the proposed use of site:   

Soil   

Groundwater  X  

Vapour   

INVESTIGATION / REMEDIATION / VALIDATION     

Relevant Investigation reports to be summarised and include:   

A clear statement of the work carried out   

A summary of all analytical results and an evaluation of those 

results    

AUDITOR’S EVALUATION OF SAMPLING     

Evaluation of quality assurance and quality control plans, 

including appropriate implementation of sampling plans, 

sampling handling, collection and transport processes 

  As per this checklist 

A summary and justification of environmental quality criteria 

used by the auditor in assessing the reports of consultants   As per NEPM and relevant international criteria 

AUDITOR’S ASSESSMENT OF THE ADEQUACY OF CONSULTANT’S WORK AND REPORTING STANDARDS 

General comments regarding adequacy of work  Work completed to an adequate standard 

Compliance with regulatory guidelines  Compliant 

Documentation of instances where consultants have departed 

from applicable guidelines and whether these departures are 

acceptable 

   

AUDITOR’S ASSESSMENT OF RISK     

Human health 

Not applicable to this report 

Structures 

Environment 

Regulatory 

Potential contaminant migration 

Groundwater 

Aesthetic issues and odours 

Chemical mixtures 

Short‐term and long‐term management 

Other issues 

AUDITOR’S CONCLUSIONS AND RECOMMENDATIONS 

Adequacy of investigation, proposed remediation and validation  Investigation adequate for RAP 

Suitability of site for proposed use  X N/A report to support RAP 

Details of how conclusion has been reached   

Recommendations  

RAP required ‐ supported by data and agreed by 

Auditor 

   

 

 

  

__________________________ 14/04/2019

Auditor Date

7.0 DATA QUALITY OBJECTIVES CHECKLIST

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 5 

CMJA

The Guidelines for the NSW Site Auditor Scheme (3rd edition 2017) state that site auditors must check that a consultant has 

properly addressed and adopted Data Quality Objectives  (DQO)  for the  investigation or validation program  (as outlined  in 

the checklist below), and that the consultant’s report includes the following: 

a statement of pre‐determined DQO for field and laboratory procedures, including quantitative DQO; 

a plan to achieve pre‐determined DQO; and 

procedures to be undertaken if the data do not meet the expected DQO. 

 

The key reference document for the DQO process is Guidance on Systematic Planning using the Data Quality Objectives 

Process (USEPA QA/G‐4, February 2006). That document describes the DQO process as follows. 

The DQO Process is used to establish performance or acceptance criteria, which serve as the basis for designing a plan for collecting 

data of sufficient quality and quantity to support the goals of a study. The DQO Process consists of seven  iterative steps that are 

documented in Figure 2. While the interaction of these steps is portrayed in Figure 2 in a sequential fashion, the iterative nature of 

the DQO Process allows one or more of these steps to be revisited as more information on the problem is obtained. 

Each step of the DQO Process defines criteria that will be used to establish the final data collection design. The first five steps are 

primarily focused on identifying qualitative criteria, such as: 

the  nature  of  the  problem  that  has  initiated  the  study  and  a  conceptual model  of  the  environmental  hazard  to  be 

investigated; 

the decisions or estimates that need to be made and the order of priority for resolving them; 

the type of data needed; and 

an analytic approach or decision  rule  that defines  the  logic  for how  the data will be used  to draw conclusions  from  the 

study findings. 

The sixth step establishes acceptable quantitative criteria on the quality and quantity of the data to be collected, relative to the 

ultimate use of  the data. These  criteria are known as performance or acceptance  criteria, or DQOs. For decision problems,  the 

DQOs are typically expressed as tolerable limits on the probability or chance (risk) of the collected data  leading you to making an 

erroneous decision. For estimation problems, the DQOs are typically expressed in terms of acceptable uncertainty (e.g. width of an 

uncertainty band or interval) associated with a point estimate at a desired level of statistical confidence. 

In the seventh step of the DQO Process, a data collection design is developed that will generate data meeting the quantitative and 

qualitative criteria specified at the end of Step 6. A data collection design specifies the type, number, location, and physical quantity 

of samples and data, as well as the QA and QC activities that will ensure that sampling design and measurement errors are managed 

sufficiently  to meet  the performance or acceptance criteria  specified  in  the DQOs. The outputs of  the DQO Process are used  to 

develop a QA Project Plan and for performing Data Quality Assessment. 

 

The 7‐step process is shown diagrammatically in the following table. 

7.0 DATA QUALITY OBJECTIVES CHECKLIST

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 6 

CMJA

  EPA QA/G‐4 states that the DQO Process may be applied to all programs  involving the collection of environmental data 

and  apply  to  programs with  objectives  that  cover  decision making,  estimation,  and modeling  in  support  of  research 

studies, monitoring programs, regulation development, and compliance support activities. When the goal of the study is 

to support decision making, the DQO Process applies systematic planning and statistical hypothesis testing methodology 

to decide between alternatives. When  the goal of  the study  is  to support estimation, modeling, or  research,  the DQO 

Process develops an analytic approach and data collection strategy that is effective and efficient. 

 

   

7.0 DATA QUALITY OBJECTIVES CHECKLIST

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 7 

CMJA

The  following  compliance  checklist  is  generic  and  was  developed  primarily  for  more  typical  site  assessment  and 

remediation validation programs. The expected outputs are  those  listed  in Appendix  IV of Guidelines  for  the NSW Site 

Auditor Scheme (3rd Edition 2017) and Appendix B of Schedule B2 of the National Environment Protection (Assessment of 

Site Contamination) Measure 1999 (ASC NEPM). This checklist applies to the Validation Plan included in the RAP. 

 

DQO Steps and Outputs  Auditor Comments 

Step 1 – State the problem 

A concise description of the problem.    Clearly explained 

A list of the planning team members and a decision maker.  X   

A summary of available resources and relevant deadlines for the study.  X   

A conceptual model of the site based on information prior to the commencement of 

the investigation/validation.  X Not provided in report but 

comprehensive site‐wide CSM 

available 

Step 2 – Identify the decisions / goals 

A decision statement that links the principal study question to actions that will solve 

the problem.    

Step 3 Identify information inputs to decisions 

A list of informational inputs needed to resolve the decision statement.     

A list of environmental variables or characteristics to be measured.   

 

Information required to allow informed decisions to be made to address the decision 

statements.  

Identification of the media (fill, soil, groundwater) to be investigated.   Identification of the criteria for each medium.   Identification of the analytical methods required for chemicals of concern relative to 

the site criteria. X   

Identification of defined concentrations for field screening (and a response if 

reached) X  Not applicable 

Any other information required to make decisions.  X  Not applicable 

Step 4 – Define the boundaries 

A detailed description of the spatial and temporal boundaries of the problem.     

Identification of any practical constraints that may interfere with the study.  X   

Step 5 – Develop decision rules 

Definition of acceptable limits for: chemicals of concern detected in field blanks; 

recoveries of laboratory spike additions; and RPDs of matrix spike and matrix spike 

duplicates. 

  DQI are discussed under Step 6 

Identification of the statistical parameters of interest that characterise the 

population (e.g. 95% UCL).    

A statement that the criteria exceed the laboratory reporting limits.  X   

Any contingency measures.  X   

Step 6 – Specify limits on decision errors 

Justification of decision error rates based on a consideration of the consequences of 

making an incorrect decision. X  Discussed in terms of DQI only 

Step 7 – Optimise the design 

Was data collection optimised?     

Was a sampling analytical and quality plan (SAQP) developed and provided?     

 

Adequacy     

Are the DQO, as outlined above, provided by the consultant 

adequate for the purpose of this audit?  

 

    If no, provide comments above as appropriate 

 

 

   

____________________________  14/04/2019 

Auditor  Date 

Yes No

8.0 REPORTING OF FIELD AND LABORATORY QUALITY ASSURANCE AND QUALITY CONTROL

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 8 

CMJA

This section  is a generic QA/QC checklist  that  is based on Appendix V of  the Guidelines  for  the NSW Site Auditor Scheme  (3rd 

Edition  2017).  It  contains  the  essential  issues  ‘which must  be  included  in  the  quality  assurance  program’  conducted  by  a 

contaminated site consultant during site assessment and remediation processes. 

Item  Comments 

Does the consultant’s site assessment report include a quality assurance / quality control (QA/QC) narrative describing all information relevant to the site assessment? 

   

Does the consultant’s sampling program include assessment of all relevant environmental media, including: 

   

  Soil     

  Dust  ‐   

  Surface water  ‐   

  Groundwater  ‐   

  Air ‐ soil vapour     

  Sediments  ‐   

  Biota  ‐   

Is the sampling strategy clearly defined and justified on the basis of project objectives, site conditions and history? 

   

Sampling strategy is: 

    Systematic        Random      Stratified      Judgemental      Combination 

Was the sampling strategy appropriate for the conditions at the site and the nature of the contamination? 

   

Is the rationale for the strategy described in the consultant’s report?    Ref. WA DOH 2009 

Does the rationale include:   

  Sampling pattern 

 

 

  Sampling density   

  Estimated size of residual hotspots that may remain undetected  X 

  Sampling depths   

  Analytes   

  Analytical methods   

  Were all samples analysed for all analytes of concern?   

Justification of decisions concerning samples to be analysed and samples not to be analysed 

NA   

Does the number of sample locations comply with EPA sampling design guidelines?  NA   

Are divergences from guidelines adequately justified?  NA   

Is overall coverage of site adequate?     

Are the sampling locations shown on a scaled site sampling plan?     

Are sample depths stated?     

Are borehole / test pit logs provided?  X  Soil description in table 

Was sampling investigation depth sufficient?     

Was fill material adequately investigated?     

Was number of depth samples sufficient to give adequate coverage of profile?     

Are sample collection, handling and transportation procedures documented and appropriate to meet the project DQO? 

   

Was sampling representative of site conditions, based on the selection of appropriate number of sampling points and of samples from each relevant strata and material types stated in a site sampling plan to meet the project DQO? 

   

Are sampling procedures adequately described?     

Are sampling procedures adequate and appropriate for the site?     

Was composite sampling used? 

  Were composite samples laterally adjacent? 

  Were composites from the same depth interval? 

  Were samples for analysis for volatile analytes composited? 

N  

NA   

NA  

NA  

Adequate description of investigation methods?     

8.0 REPORTING OF FIELD AND LABORATORY QUALITY ASSURANCE AND QUALITY CONTROL

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 9 

CMJA

Sampling equipment description (including drilling plant)     

Has an assessment of the reliability of field procedures been undertaken by the consultant by using the Data Quality Indicators (DQI) (precision, accuracy, representativeness, completeness and comparability)? 

   

Were the appropriate media sampled according to SAQP?     

Have all media identified in SAQP been sampled?     

Are SOPs appropriate and complied with?     

Have all critical locations been sampled?     

Have all required samples been collected (from grid and at depth)?     

Was an experienced sampler used on each occasion?    Not stated 

Is the documentation correct?     

Have the same SOPs been used on each occasion?     

Have comparisons been made regarding climatic conditions (temperature, rainfall, wind, etc.)? 

X   

Were the applicability and limitations of field methodology discussed appropriately in the consultant’s report? 

   

Has the consultant ensured adequate calibration of instruments?    Certificates provided 

[EPA] Has the consultant’s report adequately assessed the significance of the results of field screening methods compared with the results of laboratory analyses, for example that the results reported for field screening using a photo‐ionisation detector are compatible with the results reported by the laboratory for volatile organic compounds? 

NA   

[CMJ] Have the results of screening methods and laboratory analyses been compared and discussed (including an explanation of non‐compatibility)? 

NA   

[CMJ] Where not compatible, has the consultant’s report adequately explained this?  NA  

Are the applicability and limitations of any screening methodology used by the laboratory appropriately discussed in the consultant’s report? 

NA   

Is screening method performance known and expressed as a multiple of specific analytical method performance? 

NA   

Has a field QA/QC plan been included in the consultant’s report?     

Does the report include details of the sampling team?  X  

Does the report include details of sampling method(s), including the actual methods employed for obtaining samples, sample devices and equipment, type(s) of sample containers and seal used, order and degree of filling, preservation, labelling, logging, custody? 

   

Does the report include details of evidence of appropriate decontamination procedures carried out between sampling events? 

NA   

Does the report include details of logs for each sample collected showing time, location, initials of sampler, duplicate locations, duplicate type, chemical analyses to be performed, site observations and weather conditions? 

   

Does the report include details of chain‐of‐custody documentation fully identifying for each sample: 

   

  Name of sampler 

 

 

  Nature of sample   

  Collection date   

  Analyses to be performed   

  Sample preservation method  NA 

  Departure time from the site   

  Dispatch courier(s)  X 

  Condition of samples at dispatch   

Does the report include details of sample splitting techniques?  NA   

Does the report include details of a statement of duplicate frequency for intra‐laboratory and inter‐laboratory duplicate samples and duplicate sample results? 

   

Does the report include details of background sample results  X  

Does the plan include details of rinsate sample results?  NA   

Does the report include details of laboratory‐prepared trip spike results for volatile analytes? 

   

8.0 REPORTING OF FIELD AND LABORATORY QUALITY ASSURANCE AND QUALITY CONTROL

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 10 

CMJA

Does the report include details of trip blank results?     

Does the report include details of field instrument calibrations on‐site (when used)?   

Does the consultant’s field QA/QC program include replicate samples split in the field and submitted to two separate laboratories in accordance with the requirements of the ASC NEPM? 

   

Has an assessment of the reliability of analytical results has been undertaken by the consultant by using the DQI (precision, accuracy, representativeness, completeness and comparability)? 

   

Have all samples been analysed according to SAQP?     

Analysis of:   

  Intra‐laboratory and inter‐laboratory duplicates with relative percentage differences (RPD) 

  

  Field duplicates with RPD   

  Laboratory‐prepared volatile trip spikes   

Analysis of:   

  Field blanks 

 

 

  Rinsate blanks  NA 

  Reagent blanks  X 

  Method blanks   

  Matrix spikes   

  Lab duplicates   

  Matrix spike duplicates   

  Surrogate spikes   

  Certified reference materials (CRM)  X 

  Laboratory control samples   

  Laboratory‐prepared spikes   

Have all critical samples been analysed according to the SAQP?     

Have all analytes been analysed according to the SAQP?     

Have appropriate methods and practical quantitation limits (PQL) been used?     

Is sample documentation complete?     

Have sample holding times been complied with?     

Have the same analytical methods been used (including extraction and clean‐up)?     

Sample PQL (justify / quantify if different)     

Same laboratories (justify / quantify if different)     

Same units (justify / quantify if different)     

Are the analytical methods used for site validation of appropriate precision and accuracy? 

   

Are the sensitivity and selectivity of the analytical methods appropriate for the assessment of the risk? 

   

Do the precision and accuracy criteria set out in the consultant’s QA/QC plan, for a given method and matrix, meet the performance expected of the reference method? 

   

Has the consultant included in their reports written documentation on quality of data supplied by the analytical laboratory which meets the objectives of the testing laboratory’s quality plan for at least 95% of test results? 

X   

Names of the accredited laboratories used and relevant details of their accreditation for each analytical method. 

   

A statement that laboratories were accredited for all analyses by the National Association of Testing Authorities (NATA) or an equivalent (government‐endorsed provider of accreditation for laboratories). 

  On lab certificates 

A statement that sample analyses use appropriate methodologies for each potential contaminant in the matrix. 

X  Appropriate methods used 

A statement that PQL are appropriate for the chemicals of concern for use in the assessment of risk. 

X PQL were appropriate apart 

from 2 x HCBD samples 

A copy of signed chain‐of‐custody forms acknowledging receipt date and time, conditions of samples on receipt and identity of samples included in shipments. 

   

Record of holding times and a comparison with method specifications.     

8.0 REPORTING OF FIELD AND LABORATORY QUALITY ASSURANCE AND QUALITY CONTROL

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 11 

CMJA

Analytical methods used.     

Laboratory accreditation for analytical methods used.     

Laboratory performance in inter‐laboratory trials for the analytical methods used, where available. 

X   

Acceptance limit(s) for each QC test, such as duplicate RPD and recoveries for laboratory quality control analyses. 

   

Where used, the origin of CRM, its batch number and the concentrations of the chemicals of potential concern. 

X   

Results for blind duplicate samples collected from the field.     

Description of surrogates and spikes used     

Per cent recoveries of spikes and surrogates     

Instrument detection limit  X   

Method detection limits  X   

Matrix or practical quantification limits     

Standard solution results  X   

CRM sample results  X   

Daily check sample results  X   

Laboratory (method) blank results     

Laboratory standard charts  X   

The laboratory specifying compliance with the requirements of the ASC NEPM and equivalence with the reference method or non‐standard methods. 

   

Does the consultant’s site assessment report address all QA/QC checklist items in the Guidelines for Consultants Reporting on Contaminated Sites (EPA 1997) related to field quality assurance and quality control, laboratory QA/QC and data evaluation QA/QC reporting? 

  Effective compliance 

QC results relevant to the sample analysis.     

For each sample, the highest measurement result wherever replicate measurements are taken (or all measurement results for each sample). 

   

Results for all data tabulated separately according to each type of soil, fill materials, groundwater, surface water and sediments, with appropriate statistical analysis according to ASC NEPM requirements. 

   

Is a QA/QC narrative that substantially complies with EPA (2017) and (1997) guidelines included in the report? 

   

 

 

9.0 AUDITOR’S REVIEW OF FIELD AND LABORATORY QUALITY ASSURANCE AND QUALITY CONTROL

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 12 

CMJA

Adequacy 

Is the QA/QC information, as outlined above, provided by the consultant, adequate for the purpose of this audit?  If no, provide comments as appropriate.  

 

 

 

 

 

Adequacy of Fieldwork and Methods 

In addition to the QA/QC information provided by the consultant, are the QA/QC samples obtained by the consultant and their associated laboratory results, adequate for the purpose of this audit?  If no, provide comments as appropriate.  

 

 

 

 

 

Adequacy of Laboratory 

In addition to the QA/QC information provided by the consultant, are the laboratory QA/QC procedures sufficient to ensure that the laboratory results are adequate for the purpose of this audit?  If no, provide comments as appropriate.  

 

 

 

 

 

Data Usability 

In summary, are the field and laboratory analytical data provided of adequate quality for the purpose of this audit?  Comment further as necessary.  

 

 

 

 

 

    

 

____________________________  14/04/2019 

Auditor  Date 

 

Yes No

Yes No

Yes No

Yes No

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 13 

CMJA

Yes No

Yes No

Yes No

Yes No

ARE THE ASSESSMENT CRITERIA APPROPRIATELY PRESENTED?  

The reviewer should note the following: 

    Comments 

Assessment criteria tabulated   

Assessment criteria discussed   

Assessment criteria appropriate   

Assessment criteria appropriately referenced   

Limitation of criteria stated and discussed   

 

 

Has the consultant evaluated land use suitability? 

 

The reviewer should note the following: 

Has the consultant followed the decision process for assessing urban 

redevelopment sites (pp.45‐46 of the Auditor guidelines) when assessing the 

suitability for a particular land use? 

  Not applicable 

 

 

Are the Soil Investigation Levels (SIL) appropriate: 

 

The reviewer should note the following: 

Has the consultant used HIL?   

Have HIL been used appropriately and competently by the consultant?   

If HIL have not been used, has the consultant undertaken a site‐specific risk 

assessment?  

Undertaken by others on behalf of 

client 

Has the consultant used ESLs/EILs?  X Not applicable 

Has site‐specific bioavailability or ecotoxicity testing been carried out?  X Not applicable 

Are limitations of ecotoxicity testing addressed?  X Not applicable 

 

If relevant, with regard to petroleum hydrocarbons: 

 

Has the consultant used ASC NEPM criteria? 

 

 

Does the laboratory analysis support the use of ASC NEPM criteria? 

 

 

 

Are the results adequately presented?  

The reviewer should note the following: 

Summary of previous work  X Table only 

Borehole/testpit logs correctly referenced  X Table ‐ not logs 

On‐site test results described in text   

On‐site test results in appendix   

Cross‐check between text and appendix   

All laboratory results in appendix   

Exceedances discussed in text   

Exceedances shown on plan   

Appropriate and correct discussion of hydrogeology   

Comparison of analytical results with criteria   

Assessment of contaminant transport and fate  X  

Discussion of human health risk implications  X Separate HHRA 

Discussion of ecological risk implications  X  

   

Yes No

Yes No

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 14 

CMJA

Yes No

Yes No

RISK ASSESSMENT 

General 

Has a specific risk assessment been undertaken?  

If so, has the consultant provided suitable justification for undertaking the risk 

assessment?   By others 

Does the risk assessment satisfy all the Requirements in the Human Health Risk 

Assessment Checklist? (Appendix A of the Guidelines).   By others 

Is the site‐specific risk assessment scientifically valid and do the recommended 

site‐specific criteria protect the public health and the environment?   By others 

 

OTHER ENVIRONMENTAL IMPACTS, INCLUDING AESTHETIC ISSUES AND SEDIMENT QUALITY 

 

Has the consultant addressed, where appropriate,   

the potential for degradation of surface water and/or groundwater  X  

the potential for contaminant impacts on building structures  X  

aesthetic issues (including any odours and/or any discolouration of soil 

arising from contamination)    

sediment contamination and, where relevant, addressed the issues 

contained in the Sediment Quality Guidelines (ANZECC 2000) X   

 

OFF‐SITE MIGRATION OF CONTAMINANTS 

 

Has the consultant adequately addressed all potential (or actual) issues arising 

from off‐site migration of contaminants?   Separate report 

Does off‐site migration need to be addressed to protect human health or the 

environment? X   

Where appropriate, has the site owner or occupier been advised of the off‐site 

migration risk by the consultant?    

Where appropriate, has the site owner or occupier been advised of the off‐site 

migration risk by the Auditor?    

 

REMEDIAL ACTION 

Remediation Policy and Issues  Applicable? 

 

Do remediation strategies or remediation actions have regard for the provisions 

of appropriate national and state remediation policies?    

Has the ASC NEPM preferred order of options for site remediation been 

adopted?    

Is the completed or proposed remediation technically and environmentally 

justifiable?    

Where vertical mixing of low‐level contaminated surface soils with cleaner soils 

at depth has been undertaken and is outside the scope of the EPA’s Vertical 

Mixing Guideline document, has this strategy been discussed with the EPA? 

   

Where appropriate, has the consultant taken into consideration the provisions 

of the Waste Legislation (POEO Act 1997, POEO (Waste) Regulation 2014) and 

Planning Legislation (EPA Act 1979), and supporting regulation and guidelines? 

   

Have appropriate controls been applied to the Handling, storage, treatment 

and/or disposal of any wastes?    

Where appropriate, has the consultant taken into consideration chemical wastes 

that are subject to a Chemical Control Order (CCO), and where applicable, does 

the management strategy comply with the requirements for the relevant CCO? 

   

Have appropriate risk assessment procedures been applied to any 

contamination left at depth?    

 

   

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 15 

CMJA

Yes No

Yes No

Yes No

Yes No

 

Capping and Containing  Applicable? 

 

Where cap and containment has been used or is proposed, is this appropriate 

for the contaminants of concern?    

Does it maximise the long‐term engineering security of the works?   

Where applicable, minimize the potential for leachate formation and/or 

volatilization?    

Exclude the erection of structures on the capped or contained areas that may 

result in risk of harm to the public health or the environment?    

Include a notification mechanism to ensure that the capped or contained areas 

are protected from any unintentional or uncontrolled disturbance that could 

breach the integrity of the physical barrier? 

   

 

 

Bioremediation  Applicable? 

 

Has consideration been given to the use of local species before foreign 

organisms are/were introduced for bioremediation purposes?    

Where imported organisms have been introduced for bioremediation purposes, 

has the consultant:    

obtained appropriate documentation for any species that has been imported 

from overseas (relating to Australian Quarantine Inspection Services permit), 

including any conditions accompanying the permit? 

   

obtained a certificate from a recognized laboratory, identifying the species to 

be released?    

identified any potential risks to human health and animal health risks?   

demonstrated appropriate knowledge of distribution of the organisms in 

Australia and the dispersal mechanisms in air, water and soil?    

assessed the expected survival period of the organisms in the environment and

possible consequences of the release?    

documented the estimated number of organisms to be released and 

frequency of release?    

monitored the survival of the organisms to be released and frequency of 

release?    

put in place contingency measures to remove or destroy the organisms if a 

hazard becomes evident?    

 

 

Consent, Licence, Notification and Other Requirements  Applicable? 

 

Has the consultant identified any consents, licences, notifications or other 

regulatory requirements relating to the site, and if so, have they been 

appropriately addressed in site reports? 

   

Have the requirements of SEPP55 been complied with?   

 

 

Waste Management  Applicable? 

 

Were materials removed from the site appropriately classified for waste 

disposal?    

Has disposal documentation been sighted and checked?   

Were waste materials transported to an appropriately licenced waste facility or 

other legally permissible destination?    

Do waste tonnages correspond to site volumes within reasonable error?   

 

   

Site Audit Checklist

J1130.39R‐rev0 – JBS&G Australia Pty Limited  Page 16 

CMJA

Yes No

Yes No

 

 

Asbestos    Applicable? 

 

Has asbestos waste been appropriately managed?   

Have asbestos clearance certificates been sighted?   

 

 

Groundwater Clean‐Up and Management  Applicable? 

 

Have all primary and secondary sources of contamination been addressed?   

Have the impacts of residual dissolved‐phase contamination been adequately 

assessed?    

Is any proposed use of monitored natural attenuation (MNA) appropriate?   

 

Overview 

 

Is the remediation appropriate for the site?   

Has the remediation been satisfactorily completed and validated?   

 

CONCLUSIONS AND RECOMMENDATIONS  

Are findings summarised?   

Are findings supported by data?   

Are findings appropriate?   

Are assumptions stated?   

Are uncertainties/limitations stated?   

Is a statement of constraints included?   

Are recommendations for further work appropriate?   

 

AUDITOR’S ASSESSMENT  

Are the reports, as amended and clarified by the Consultant, adequate for the 

purposes of this audit?    

Is the site suitable for the intended use?   

Is a site management plan required?   

Is notification of groundwater contamination (including advice to the client, 

notation on the site audit statement and discussion with EPA) required?    

 

 

 

 

 

____________________________  14/04/2019 

Auditor  Date 

   

APPENDIX D2

Auditor’s Review of the Human Health Risk Assessment

Human Health Risk Assessment Checklist

Southland Block 1 HHRA Revision: Development of Flood Detention Basin ‐ 24 January 2019  Page 1 

CMJA The Guidelines for the NSW Site Auditor Scheme (3rd edition, October 2017) state that the following checklist must be used by an auditor to review any human health risk assessments undertaken by a consultant.  Where the auditor’s check reveals that  the consultant’s  risk assessment has omitted one or more of  the points  specified  in  the checklist,  the auditor must document this in the site audit report and take this into account in reaching their site audit conclusions.  

Title of Report: Southlands Block 1 HHRA Revision: Development of Flood Detention Basin 

Report Number: 24 January 2019  

Item 

C = Compliance 

P = Partial Compliance 

N = Non‐compliance 

NA = Not Applicable 

Comments 

Hazard Identification 

Have all appropriate sources of information regarding chemicals of potential concern been identified and assessed? 

C

Section 4 ‐ Identification of Risk Issues 

Has justification been given for the selection of the chemicals of potential concern? 

C

Toxicological Information 

Have the critical toxic effects been identified?C 

This report is an addendum to a series of previous HHRA for the Orica site. It utilises screening criteria derived from a number of identified and referenced sources. Previous HHRA have considered toxicology in more detail. Sources are recognised and appropriately used. 

Have the effects on each body system (for example renal, hepatic, cardiovascular and developmental) and the types of effects (for example genotoxic and carcinogenic) been summarised? 

Has the dose‐response relationship for chemicals of potential concern been discussed? 

Have all relevant toxicological data been considered and checked for accuracy? 

Has the adequacy of the available toxicological database been commented on? 

Have relevant primary toxicological resources been considered? 

Have different toxicity data from different resources been assessed and discussed? 

Have the selected toxicity data been adequately justified? 

Exposure Assessment 

Has a comprehensive and appropriate conceptual site model been presented that indicates all potential pathways and receptors? 

P Not in this report but present and relevant in cross‐referenced reports. 

Have all potential receptors been identified? P On site issues in this report, off‐site addressed in separate report. 

Have the estimated or measured exposure concentrations for each exposure route and chemical of potential concern been quantified? 

C Source concentration in vapour measured. Exposure point concentrations estimated using attenuation factors. 

Human Health Risk Assessment Checklist

Southland Block 1 HHRA Revision: Development of Flood Detention Basin ‐ 24 January 2019  Page 2 

CMJA

Item 

C = Compliance 

P = Partial Compliance 

N = Non‐compliance 

NA = Not Applicable 

Comments 

Risk Characterisation 

Has the acceptable risk level been identified and justified? 

C

Non‐threshold criteria of 1x10‐5 and threshold Hazard Index of 1.0 identified and considered appropriate and consistent with usual Australian practice. 

Have all potential receptors and pathways been considered? 

C

Has the relative significance of each exposure pathway, based on the risk analysis, been discussed? 

C

Has a sensitivity / uncertainty analysis been presented? 

N

Equations 

Have all equations used in the risk assessment been presented in the report? 

NA

Screening criteria only used 

Are all equations consistent?  NA

Have all parameters and values in each equation been clearly defined? 

NA

Have the correct units been allocated to each parameter? 

NA

Are all equations dimensionally correct?  NA

Have all unit conversion factors, where applicable, been included in the equations? 

NA

Has all pertinent information been provided to enable calculations to be checked through in a step‐wise process? 

NA

Data Evaluation 

Have the data collection objectives been stated and are they consistent with the requirements of the risk assessment? 

P

In investigation report 

Have the laboratories that did the chemical analyses been noted, and do they have NATA accreditation (or equivalent) to perform each particular chemical analysis? 

P

Has laboratory quality assurance / quality control (QA/QC) been reported and analysed? 

P

Has field QA/QC been reported and analysed? P

Have statements of the accuracy of the laboratory data for each contaminant been made and have these been considered in the risk assessment? 

N

Assessment and Report Presentation 

Has information been presented coherently and in an appropriate sequence to enable efficient appraisal of the report? 

CAuditor considers that these issues clearly and adequately explained. 

Human Health Risk Assessment Checklist

Southland Block 1 HHRA Revision: Development of Flood Detention Basin ‐ 24 January 2019  Page 3 

CMJA

Item 

C = Compliance 

P = Partial Compliance 

N = Non‐compliance 

NA = Not Applicable 

Comments 

Have the objectives and scope been clearly stated? 

C

Auditor considers that these issues clearly and adequately explained. 

Has information from previous reports on the site been appropriately selected and incorporated into this report? 

C

Has the analysis been based on up‐to‐date literature? 

C

Have all assumptions and data been identified and justified? 

C

Have all tables and figures been referred to correctly in the text of the report? 

C

Have adequate data been presented to support the conclusions? 

C