sinus representative office 53 le ngoc han str., hai ba trung …sinus.internetdsl.pl/sinus.pdf ·...
TRANSCRIPT
SINUS LTD.Przemysłowa 2
83-000 Pruszcz Gdański
PolandTEL: +48 58 6823011FAX: +48 58 6823015e-mail: [email protected]
Sinus Representative Office53 Le Ngoc Han Str.,Hai Ba Trung District,
Hanoi, VietnamTEL: +84 4 976 5228/9FAX: +84 4 976 5227e-mail: [email protected]
FSO-5 PROJECT
As informed by The Hanoi Timeson 15 January, 2009 – „A floating storage and offloading unit (FSO) which has a capacity of 150,000 tonnes, the FSO5, was successfully launched today by the Nam TrieuShipbuilding Industrial Corporation. This is the biggest vessel built by Vietnamese shipbuilders so far.
FSO5, built for the PetrovietnamTechnical Services Corporation (PTSC), is over 258 meters long, 46 meters wide.”
The FSO-5 was designed by SINUS Ltd. Co., (Poland) and examined by the GL/ABS andthe Vietnam Register of Shipping. The vessel is 276.14 meters long, 46.4 meters wide, and 24 meters high and will be equipped with three engines with a capacity of 800-1,200 KW. FSO5 can store and supply crude oil to refinery with an output of 3,500-5,000 cubicmetres an hour.
ARTICLES ABOUT BALTECOLOGICALSHIP
EUREKA - E! 2772
www.bg.pg.gda.pl/pmr.html
ARTICLES ABOUT ECOLOGICAL DOCK
EUREKA - E! 2968
www.bg.pg.gda.pl/pmr.html
ARTICLES ABOUT INCOWATRANS
EUREKA - E! 3065
www.bg.pg.gda.pl/pmr.html
ARTICLES ABOUT STEEL SANDWICH PANELSEUREKA - E! 3074
ARTICLES ABOUT CORET
EUREKA - E! 3614
www.bg.pg.gda.pl/pmr.html
NAVAL ARCHITECTURE / MARINE ENGINEERING / MARINE CONSULTING
SINUS Ltd was set up in 24.04.1989 to provide high class technical service for the vessels of different types. It was headed by TomaszLacki, assisted by a team of highly qualified Naval Architects / Marine Engineers who had came from former ship design and construction office of Gdansk Shipyard Ltd. All of them are licensed engineer. The team of designers, headed by Wlodzimierz Lacki —formerly senior Naval Architect of Gdansk Shipyard Design-Office, brought to the company their experience gained during years of practice based on hundreds of vessels delivered to different owners all over the world.
Since June 2001 SINUS has completed ISO 9001 requirements confirmed by CERTIFICATE.Now the company is in the process renewal the ISO 9001:2000 CERTIFICATE (in three Authority: DnV, GL and PRS) and the new ISO 14001 CERTIFICATE implementation.
Since 2001 SINUS has managed the co-operation with Faculty of Ocean Engineering & Ship Technology in Gdansk University of Technology.
ORGANISATIONAL DIAGRAM:
Chairman
T. Łącki
Vice Chairman
M. Łącka
Quality Manager
Cz. Szpanowski
General Designer
W. Łącki
Naval Architect
K. Sroka
Project Manager
L. Milewicz
ARCHIVE
Safety supervisorCz. Janczała
ChairmanassistantJ. Kozieł
IT DepartamentS. Ryba
R .Ostapkowicz
SecretaryB. Rams
English languageconsultant
J.Jankowska
Leader ofhull
structure
J. Cetnarski
Leader of
engine
R. Tyszkiewicz
Leader of
electricity
A. Łukiewski
Leader ofmachineryand piping
M. Tarczyński
Leader ofdeck
equipment
J. Kort
Leader ofarchite-cture
K. Nowacka
28 persons
7 persons
3 persons
10 persons
4 persons
2 persons
Engineering Manpower:
Activity No. of engineerspermanent
General Design- senior project managers 3Hull and structural design, Theoretical calculations 28Eng. room and machinery and Piping Systems 17Accommodation arrangements 2Electric, Navigation, Automation Systems 3Deck machinery 5Surveys and inspections 2
Number of persons that presently work in other companies: - 9 persons in NORWAY; - 3 persons in Stralsund Shipyard, GERMANY - 6 persons working for GL Engineering Service, GERMANY
VIETNAM OFFICE,
MARINE TECHNIC Ltd.
“TRIBON” engineers for detail design
Department Number ofTRIBON Users
Remarks
Hull 16 Hull modelling, structure, nestingand production information
Eng. room and machinery and Piping Systems 13 Structure for machinery, piping
Accommodation arrangements 1 Accommodation, structure andinsulation
Electric, Navigation, Automation Systems 3 Cabling, structure for electricalequipment
Deck machinery 4 Structure and piping for deckequipment
General Design 2 Lines fairing – NAPA forTRIBON
Total of Project values Number of Projects Maximum Engineering - hours
DEPENDS ON THE PROJECT 1 TO 4 15000 hours per month
SINUS Sp. z o.o. is possible to increase the number of designers up to 100 persons.
Additional possibilities :
• Electric balance calculations
• Principal and detail diagrams
• Inclining tests
• Lofting and cutting information on data files
• Surveys and inspections
• Certified welders and Ship Mechanics
ENGINEERING SERVICE
Structural engineering
Machinery and propulsion systems
Detail design drawings
Deck equipment
Stability Calculations according to IMO codes
Class drawings with approval
Piping systems
Electric, automation and navigation systems
FEM Analysis
Arrangements and layout
Fire control and safety plans
ENGINEERING TOOLS
AUTOCAD 2000
TRIBON M3
Class programs PRS, DnV, LR, BV, ABS, GL
AUTOSHIP
AUTOHYDRO
AUTOPOWER
Cutting Information in ESSI Code with possibility to read AutoCad
ANSYS
Order From...to... ProjectName
Major buisness Client or project number
1 08.1996 –12.1996
820 TEUContainerCarrier
Class drawings hull,partly hull systemsand deck equipmentincluding classapproval.
Preussag Noell / Sheller
2 12.1996 –05.1997
1300 TEUContainerCarrier
Class drawings hull,partly hull systemsand deck equipmentincluding classapproval.
Preussag Noell / LeonardBlumberg
3 1997 1700 TEUContainerCarrier
Whole class designincluding approval
Preussag Noell / ChristianAhrenkiel
4 08 – 11 1997 Gas carrier3750 cbm
Hull systems, classand productiondrawings
Preussag Noell / Ferrostaal
5 1998 Car carrier Workshop drawingsand cuttinginformation for 6blocks
MARITECH German Owner
SINUS Reference List
Order From...to... ProjectName
Major buisness Client or project number
6 1998 Offshoresupportvessel
Workshop drawings MARITECH Norwegian Owner
7 11.1997 –06.1998
ConversionM/T ARTICA
Design package fornew part from front ERbulkhead.
FKAB / Naval Yard Gdynia
8 05 – 07 1998 Cargo Ship13000 TDWSine 101
Contract andclassification projectwit approval in GL
ERKA SHIPPING – HamburgGermany
9 06 – 08 1998 Conversionof M/V TEGEfromheavylift tocontainervessel
Main contractor forturn-key projectincluding finance,management for sub-contractor (YantarShipyard), supervisingand engineering.
CHRISHIP AS J Christiansen,Norway
SINUS Reference List
Order From...to... Project Name
Major buisness Client or project number
10 02.1998 – 05.1999
Conversion of six bulk carrier
MS “DUOBULK”, “TRIOBULK”, “QUATROBULK”, “CINCOBULK”, “SEISBULK” and SP507. Main contractor for turnkey project including finance, management for sub-contractor (Yantar-Shipyard), supervising and engineering. Lengthening 15,4 m with new hatch coamings and covers plus general R&M work. Additionally in “QUATROBULK”, “CINCOBULK”, “SEISBULK” and SP507 rebuilding E.R. and new main engine.
Vang Shipmanagement AS FB Invest AS, Norway
SINUS Reference List
Order From...to... ProjectName
Major buisness Client or project number
11 1998 Localassistanceat Hull Dept
Classification andworkshop drawings onNB 498, cruise vesselfor COSTA.
Kvaerner Masa Yards
12 1998 Bulkdischargingbin
General layout of bulkdischarging bin
Malmo Hamn AB
13 07 – 11 1998 Containercarrier2500TEU,NB 8184
Workshop drawingswith cutting files forcargo hold sections.
Gdynia Shipyard Poland
14 07 – 09 1998 Car carrierfor 6000mobiles, NB8168
Drawings of bottom,sides and deckssections, and NCdocumentation
Gdynia Shipyard Poland
15 1998 Conversionof “MANSALOFF-SHORE”
General engineering,strength calculations,class approval andworkshop drawings.
Malta drydock
SINUS Reference List
Order From...to... ProjectName
Major buisness Client or project number
16 1998 MalmoHamn AB
Project for design andmeasures to improveinternal and externalenvironment includingreduction of dustlevels spread by wind.Project plan andspecification forlandscaping.
Malmo Hamn AB
17 1998 ROROconversion
Conversionspecification for rorovessel
Tor Line AB
18 1998 Fishingvesseldesign
Feasibility study onfishing vessel designfor Namibia Industryinvestments.
A&P Inc. Switzerland
SINUS Reference List
Order From...to... ProjectName
Major buisness Client or project number
19 1998 NB 68,Ropax2000+
Local assistance atYard for checking andcorrections of classand workshopdrawings on steel andinterior. NB 68, Ropax2000+ for COTUNAV
FOSEN MEK Norway
20 02 –07 1999 Multipurpose vessel m/v“HARJUMAA”
Finalising of buildingand taking over toEstonian Owner
ESCO Shipping - Estonia
21 1999 Tankervessel -105.000 T,NB 8183
NC documentation. Gdynia Shipyard - Poland
22 01 – 05 1999 CableLayingVessel430/431 TEU
Whole class design. VWS Yard, Stralsund - Germany
SINUS Reference List
Order From...to... ProjectName
Major buisness Client or project number
23 08 – 11 1999 Product/chemical carrier78500 m3,NB 8185
Hull workshopdrawings and NCdocumentation.
Gdynia Shipyard- Poland
24 1999 Hull fairing Preparation andsupervising of hullfairing technology.
Clipper Star
25 07 – 08 1999 Product/chemical carrierNB 8221
Contract design. Gdynia Shipyard- Poland
26 1999 Product/chemical carrier
Hull workshopdrawings and NCdocumentation.
Gdynia Shipyard- Poland
27 11 – 12 1999 Passengerferry NB 69
Hull workshop drawing– 4 sections.NC – 25 sections
F.K.A.B – Sweden
SINUS Reference List
Order From...to... ProjectName
Major buisness Client or project number
28 02.2000 –01.2001
RO-LO14800tNB 8222
Workshop drawings,NC documentation, 3DMachinery Modellingand detail engineering
Gdynia Shipyard- Poland
29 06 – 11 2000 ContainerCarrier 2000TEU, NB8200
Hull workshopdrawings and NCdocumentation.
Gdynia Shipyard- Poland
30 01 – 03 2001 ISIS FPSO Conversion of Tankerto Floating ProductStorage and Offloadingvessel in Malta.
Malta Drydocks - Malta
31 2001 1200 TEUContainerCarrier
Hull Class drawings. Christian Ahrenkiel - Germany
32 2001 3000 TEUContainerCarrier -Panamaxsize
Hull Class drawings -working andclassification drawingin TRIBON.
MAERSK - Germany
SINUS Reference List
Order From...to... ProjectName
Major buisness Client or project number
33 2002 BARGE AG4131
Workshop drawingsand NC documentation- 10 blocks
FKAB - SWEDEN
34 2002 AsphaltTanker 4950DWT
Technical drawings,strength and thermalcalculation, approvalin GL.
SDM - Germany
35 2002 - 2004 ENVIRON-MENTFRIEN-DLYSHIPS FORBALTICAREA –RESEA-RCH.PROJECTEUREKA -E!2772
Preliminary project,technical drawingsand approval in GL 4new “CLEAN DESIGN”vessels:SINE 202 - Containercarrier 950TEU,SINE 203 - Tankervessel,SINE 204 - RO-ROvessel, and ESINE 205 - River/Seavessel
TECHNICAL UNIVER-SITY INGDANSK AND SZCZECIN
SINUS Reference List
Order From...to... ProjectName
Major buisness Client or project number
36 2003 - 2005 ENVIRONMENT FRIEN-DLY FLOA-TING DOCK– RESE-ARCHPROJECTEUREKA -E!2968
Preparation oftechnical require-ments, estimation ofbuilding costs and lifetime cost prediction,preliminary design ofreconstruction andmodification ofexisting floatingdocks, materialmanagement andmarketing activities inrelation toenvironment friendlyfloating dock.
TECHNICAL UNIVER-SITY INGDANSK AND WARSAW
37 2003 CONTAI-NERVESSEL4100TEU -SINE 211TD
Preparation oftechnicaldocumentation withapproval inGermanischer Lloyd
RADEREI PATJENS e.K. -Germany
SINUS Reference List
Order From...to... ProjectName
Major buisness Client or project number
38 2004 - 2006 RESE-ARCHPROJECTEUREKA -E!3065‘INCOWATRANS’
Preparing of technicalrequirement for designof inland and coastalships environmentallyfriendly.Planned projects of 4types of vessels:SINE 207 - INLANDGENERALCARGO/CONTAINER18/36TEU.SINE 208 - INLANDRORO VESSELSINE 209 - INLANDBULKCARRIER /CHEMICAL CARRIERSINE 210 - INLANDRESEARCH VESSEL
TECHNICAL UNIVER-SITY INGDANSK
SINUS Reference List
Order From...to... ProjectName
Major buisness Client or project number
39 2004 - 2007 RESE-ARCHPROJECTEUREKA -E!3074‘ASPIS’
Application of multi-layers steel panels inships construction.Analysis ofconstruction andtechnological solutionin existing ships fromthe double-layerstructure applicationpoint of view.Strength analysis ofnew constructionsolutions with panelsapplication.
TECHNICAL UNIVER-SITY INGDANSK
40 2005 UMBILICALLAYINGVESSEL
TechnicalDocumentation
S 282 - SAW 2017
41 2005 UMBILICALLAYINGVESSEL
TechnicalDocumentation
S 336 - SAW 2019
SINUS Reference List
Order From...to... ProjectName
Major buisness Client or project number
42 2005 TimberCarrier
Technical design Herman Buss - Germany
43 2006 FJELLSTRAND AS -AHTS
Conversion S 360
44 2006 Drilling Rig I Workshop hulldrawings for part ofplatform
Energomontarz Gdynia /AkerKvarner
45 2006 GEOMSTER- AHTS
Conversion S 330
46 2006-2007 Drilling Rig I Workshop hulldrawings for part ofplatform
Energomontarz Gdynia /AkerKvarner
SINUS Reference List
Order From...to... Project Name
Major buisness Client or project number
47 2007 FSO 150 000 DWT
Class design and workshop documentation
Monobuoy / Vinashin Offshore / PTSC
48 2006 POLAR VENTURER - AHTS
Conversion S 265
49 2007-05 to 2007-10
FPSO Documentation for conversion of vessel (class and workshop) and model
TEEKAY PETROJARL (Norway
50 2007 M/V GOESEA - AHTS
Conversion S 079
51 2007 CGG DUKE - AHTS
Conversion S 008
SINUS Reference List
53Order
From...to... Project Name
Major buisness Client or project number
52 2007
1250 TEU Container
Ship – SINE 214
PT Documentation Raderei Patjens e. K. - Germany
53 2007 H602 Platform
Technical Documentation Elektromontaz
54 2007 FPSO SIRI
Technical Documentation of Container Ship tp FPSO conversion
Petrojarl Production AS
SINUS Reference List
Order From...to... Project Name
Major buisness Client or project number
55 2008 ST.
BARBARA - AHTS
Conversion and modernisation of hull
construction and onboard equipment
and systems, in order to use modified drill rig
and moonpool to perform sea bottom
examination.
MILIANA SHIPPING COMPANY / PETROBALTIC
56 2008 BN 162 - - AHTS
Workshop piping documentation
BERGEN GROUP NEWBUILDING AS
57 2008
3200 TEU Container
Ship – SINE 215
PT Documentation Raderei Patjens e. K. - Germany
58 2008 FSO-5 Working Documentation
Vinashin Offshore / PTSC Vietnam
SINUS Reference List
EUREKA PROJECT - E!2772 BALTECOLOGICALSHIP - SINE 202 -Container Vessel 950 TEU
EUREKA PROJECT – E!2772BALTECOLOGICALSHIP - SINE 203 -Oil Product Tanker Ship
EUREKA PROJECT – E!2772 BALTECOLOGICALSHIP - SINE 204-RO-RO Vessel 7400 TDW
EUREKA PROJECT – E!2772 BALTECOLOGICALSHIP - SINE 205 -RIVER-SEA Vessel 2900 TDW
EUREKA PROJECT - E!3065 INCOWATRANS - SINE 207 -Inland General Cargo / Container 18 /36 TEU
EUREKA PROJECT – E!3065 INCOWATRANS - SINE 208 -Tug and Barge
EUREKA PROJECT –E!2969 ECOLOGICAL DOCK - SINE 212 -Ecological Dock
PROJECT No SINE 0012 – 1700 TEU Container Carrier
Owner: Preussag Noell
Scope of work: complete class documentation.
PROJECT No 430/431 – Cable LayingVessel
Client: VWS Yard Stralsund.
Scope of work: complete classdocumentation.
PROJECT No NB 8221 – Product/ Chemical Carrier
Client: Gdynia Shipyard
Scope of work: contract documentation.
PROJECT No SINE 210 Oil Tanker 4500 DWT
Scope of work: complete technical documentation.
PROJECT Asphalt Tanker 4950 DWT
Client: SDM Germany
Scope of work: complete technical documentation.
PROJECT No SINE 211-TD –Container Vessel 4100 TEU
Client: Raderei Patjens
Scope of work: complete technical documentation.
PROJECT No SINE 201-III-TD –Container Vessel 950 TEU
Client: Raderei Patjens
Scope of work: complete technical documentation
PROJECT OSTSEE-TD/0110-1–
Multi-Purpose Dry Cargo Vessel
Client: HERMANN BUSS GmbH & Cie
Scope of work: complete technical documentation
PROJECT ISIS FPSO– Conversion
Client: Malta Drydocks
Scope of work: documentation for conversion of Tanker to Floating ProductStorage and Offloading vassel in Malta
PROJECT ISIS FPSO– Conversion . Client: Malta DrydocksExample of hull drawings - NEW SEA CHEST CONSTRUCTION.
PROJECT ISIS FPSO– Conversion.
Client: Malta Drydocks
Example of hull drawing - HELICOPTER DECK-SUPPORT CONSTRUCTION
PROJECT ISIS FPSO– Conversion . Client: Malta DrydocksExample of piping drawing - HYDRAULIC CONTROL LINES ARRANGEMENT
PROJECT ISIS FPSO– Conversion . Client: Malta DrydocksExample of piping drawing - DECK PURGE LINE ARRANGEMENT (ON DECK)
PROJECT ISIS FPSO– Conversion. Client: Malta DrydocksExample of piping drawing - PROCESS DISCHARGE LINE ARRANGEMENT ON DECK INCLUDING TYPICAL SUPPORT
PROJECT ISIS FPSO– Conversion. Client: Malta DrydocksExample of piping drawing - FLARE PIPING ARRANGEMENT
PROJECT ISIS FPSO– Conversion. Client: Malta DrydocksExample of piping drawing - PRODUCED WATER PIPING ARRANGEMENT ON DECK
PROJECT ISIS FPSO– Conversion Client: Malta Drydocks
Example of electrical drawing -CABLES ROUTING
PROJECT ISIS FPSO– Conversion. Client: Malta DrydocksExample of electrical drawing -CARGO HIGH HIGH ALARMS ARRANGEMENT ON DECK
FPSO SIRI – Conversion
Client: Teekay Petrojarl
3D model in TRIBON
FPSO SIRI – Conversion
Client: Teekay Petrojarl
Drilling Platform H-600
workshop and welding documentation
Drilling Platform H-600
workshop and welding dokumentation
Example of piping and cable tray laying
Drilling Platform H-600
workshop and welding documentation
FSO-5 PROJECT Client: PTSC
Shipyard: Vinashin - Nasico
FSO-5 PROJECT Client: PTSC
Shipyard: Vinashin - Nasico
TURRET
FSO-5 PROJECT Client: PTSC
Shipyard: Vinashin - Nasico
FSO-5 PROJECT Client: PTSC
Shipyard: Vinashin - Nasico
FSO-5 PROJECT Client: PTSC
Shipyard: Vinashin - Nasico
Example of piping co-ordination
FSO-5 PROJECT Client: PTSC
Shipyard: Vinashin - Nasico