sinumerik 808d mcp product information 2016/02 · mcp layout replacing & customizing the mcp...
TRANSCRIPT
MCP layout
Replacing & customizing the MCP strips
Replacing the MCP strips
Customizing the MCP strips
A5E32394901-002
SSINUMERIK 808D MCP Product Information
Mounting hole (22 mm) for the emergency stop button (The button is not included in the scope of delivery.)
Handwheel key, operating mode keys, and program control keys
Tool number display
User-defined keys
Axis traversing keys
Spindle control keys
Keys for program start, stop, and reset
Feedrate override switch
Spindle override switch
Mounting holes (16 mm) for external devices
MCP strips T1-T6: Used for the CNC turning variant and pre-inserted in the MCP M1-M6: Used for the CNC milling variant and included in the delivery
The turning variant of the MCP insertion strips is pre-inserted in the MCP. For the MCP used for the milling variant of the CNC, you need to remove these strips, and then insert the milling variant of the insertion strips in the MCP. When inserting the strips, follow the order of marks T1 to T6 and M1 to M6 on the strips.
2016/02
You can customize the pre-defined insertion strips for user-defined keys if the strips cannot meet your requirements. In the folder \examples\SINUMERIK_808D\MCP (PPU141.2) or \examples\SINUMERIK_808D_ADVANCED\MCP (PPU160.2 and PPU161.3) on the Toolbox DVD, you can find a symbol library file and an insertion strip template file. Copy any desired symbol from the symbol library file to the blank insertion strip template, and then use a laser printer to print the template to the A4-sized plastic sheet, which accompanies the MCP in the delivery and contains detachable blank insertion strips.
10 2
1
2
3
4
5
6
7
8
9
10
11
1
4 5 6 7
Horizontal MCP
Vertical MCP with the reserved handwheel slot
Vertical MCP with the spindle override switch
Reserved handwheel slot
10 113 9 8
© Siemens AG 2013-2016 All Rights Reserved
The control elements on the vertical MCP are the same as those on the horizontal MCP. Here, please refer to the control element description of the horizontal MCP.
Dimensional drawing (in mm) Cut-out dimensions (in mm)
Note:
PPU
Connection between the PPU and the MCP
The MCP is connected to the PPU via an MCP connection cable that is included in the delivery.(The following illustration takes a horizontal PPU and horizontal MCP for example.)
A5E32394901-002
X30 X10
PPU MCP
MCP connection cable
Opening a mounting hole
1 Prise the plastic ring with a slotted screwdriver or cut it off with a diagonal cutting nippers.
or
Paper knife
2 Cut off the film with a paper knife. You are recommended to prick the center first, and then cut off the film right aroud the hole edge.
Make sure there is enough space around the MCP for the screws to be tightened into the operating cabinet.
© Siemens AG 2013-2016 All Rights Reserved
120
405
30 3858
105
420Horizontal MCP
Vertical MCP
Horizontal PPU and MCP Vertical PPU and MCP
Thickness: 2 to 5
>18
106+
1
406+1
PPU
MCP
Cabinet
Thickness: 2 to 5
Cabinet
245+1
245+1
MCP
PPU
>80
186+
1
>80
211+
1
>26
308+1
406+1
265
230 21
0
244
30 3858
The two types of vertical MCPs have the same dimensions and reserved hole for fixing the USB cable on the back. The following illustration takes the vertical MCP with the reserved handwheel slot for example.
A
A D
< 9
A-A
Reserved hole for fixing the USB cable
When mounting a horizontal PPU together with a vertical MCP or vice versa, follow the requirement for the clearance between a vertical PPU and a vertical MCP shown above.
50.8
44
3 x 4
D
15
7