  • 8/3/2019 Sink Hole Presentation

    1/38

    1

    Sinkhole rehabilitation at RustenburgChrome Mine: Lanxess Mining Pty Ltd

    David Nyungu

  • 8/3/2019 Sink Hole Presentation

    2/38

    2

    Content

    Location of Rustenburg Chrome Mine and sinkhole

    Background on the sinkhole occurrence and definition of

    problem

    Challenges faced before and during sinkhole rehabilitation

    Rehabilitation of alternative ingress and egress declines

    Sinkhole rehabilitation

    Outlook of the rehabilitation project so far

  • 8/3/2019 Sink Hole Presentation

    3/38

    3

    Location of Rustenburg Chrome Mine

  • 8/3/2019 Sink Hole Presentation

    4/38

    4

  • 8/3/2019 Sink Hole Presentation

    5/385

    Schematic representation of the sinkholelocation at Rustenburg Chrome Mines 7 East# Declines

  • 8/3/2019 Sink Hole Presentation

    6/386

    Aerial view of the 7 East # collars and surfaceinfrastructure

  • 8/3/2019 Sink Hole Presentation

    7/387

    Sinkhole occurrence depicted in 2005 withprojected outlines of old pit highwalls

  • 8/3/2019 Sink Hole Presentation

    8/388

    Surface sag captured in 2005 30m from theworkshops

  • 8/3/2019 Sink Hole Presentation

    9/38

    9

    Sinkhole subsequently filled with compactedwaste material temporarily solving the problem

  • 8/3/2019 Sink Hole Presentation

    10/38

    10

    A shot through the resultant holing into theDecline roadway taken from surface

  • 8/3/2019 Sink Hole Presentation

    11/38

    11

    Brake test ramp slump noticed in 2010

  • 8/3/2019 Sink Hole Presentation

    12/38

    12

    Surface tension cracks at the Brake Test Ramp(2010)

  • 8/3/2019 Sink Hole Presentation

    13/38

    13

    A shot taken from the 7 East # Decline roadwayduring the peak of the 2010 rain season

  • 8/3/2019 Sink Hole Presentation

    14/38

    14

    Replacement of old rotten timber leggings andcross beams with steel sets and void fill

  • 8/3/2019 Sink Hole Presentation

    15/38

    15

    Decline hanging and side walls covered withvoid fill. Void fill sagging from water pressure

  • 8/3/2019 Sink Hole Presentation

    16/38

    16

    Brake test ramp excavated out showing theestimated sink hole position (2011)

  • 8/3/2019 Sink Hole Presentation

    17/38

    17

    Sloughing of waste rock dump adjacent to thesink hole position on surface (2011)

  • 8/3/2019 Sink Hole Presentation

    18/38

    18

    Free dig waste rock material previously filledinto the sinkhole being excavated (2011)

  • 8/3/2019 Sink Hole Presentation

    19/38

    19

    Challenges faced during rehabilitation process

    Uncertainty of the exact position of the sink hole and its extend

    below surface.

    Uncertainty over the rock mass strength hosting the sinkhole.

    Excavating blind to expose the sinkhole.

    Void fill previously applied in the Declines covered the existing

    pillars from assessment for strength and failure. Since the 7 East Declines is the main conveyance Decline there

    was need to have a secondary transport Decline.

    Onset of the rainy season produced a danger of inundation of

    the exposed sink hole. Unavailability of dedicated equipment and machinery delayed

    progress

  • 8/3/2019 Sink Hole Presentation

    20/38

    20

    Extrapolated sinkhole position in relation tothe position of the Belt Decline

  • 8/3/2019 Sink Hole Presentation

    21/38

    21

    Tent required to cover the sinkhole fromingress of rain water

  • 8/3/2019 Sink Hole Presentation

    22/38

    22

    The Overstep Decline used as alternativeaccess required support rehabilitation

  • 8/3/2019 Sink Hole Presentation

    23/38

    23

    Alternative access ways into the mineduring the sinkhole rehabilitation

    processThe Overstep Decline and the 7 West Decline

  • 8/3/2019 Sink Hole Presentation

    24/38

    24

    Decline collared in weathered Norite withportal cut in topsoil

  • 8/3/2019 Sink Hole Presentation

    25/38

    25

    Weathered Norite hosting the Declines

  • 8/3/2019 Sink Hole Presentation

    26/38

    26

    Soft weathered Norite walls hosting theDeclines

  • 8/3/2019 Sink Hole Presentation

    27/38

    27

    Very friable hanging rock mass in the OverstepDecline

  • 8/3/2019 Sink Hole Presentation

    28/38

    28

    Outlook in the Overstep Decline after a coat ofThin Sprayed Liner (TSL)

  • 8/3/2019 Sink Hole Presentation

    29/38

    29

    Outlook in the Overstep Decline after supportrehabilitation. RSJ sets with timber cribbingand void fill were installed

  • 8/3/2019 Sink Hole Presentation

    30/38

    30

    Outlook in the Overstep Decline after supportrehabilitation

  • 8/3/2019 Sink Hole Presentation

    31/38

    31

    Sinkhole rehabilitation process Remove and re-build the test ramp to a new location

    Excavate all fill material from the sinkhole down to the opening in the

    Decline roadway Construct a strong base using RSJ steel sets for the concrete plug at the

    bottom

    Strap and re-enforce all pillars in the Declines

    Construct a 45 MPa strength concrete plug at the sinkhole opening in the

    Decline

    Fill sinkhole with cemented waste aggregate mixed with a binding

    accelerator and compacted

    Construct a concrete slab and drainage around the sinkhole

    Fence off and barricade sinkhole area from traversing by machinery andtrucks

  • 8/3/2019 Sink Hole Presentation

    32/38

    32

    Excavation of waste fill material and timberpacks previously filled into the sinkhole

    k d i b k i l f d

  • 8/3/2019 Sink Hole Presentation

    33/38

    33

    Waste rock and timber pack material free dugleaving fairly competent weathered Noritewalls

    P h b k b h t d t t

  • 8/3/2019 Sink Hole Presentation

    34/38

    34

    Push back benches were excavated to createaccess ramps for the excavators reach andstable walls

    P h b k ll d th i kh l

  • 8/3/2019 Sink Hole Presentation

    35/38

    35

    Push back walls around the sinkhole

    H li t d th D li d

  • 8/3/2019 Sink Hole Presentation

    36/38

    36

    Holing towards the Decline roadway

    Push back area around the sinkhole

  • 8/3/2019 Sink Hole Presentation

    37/38

    37

    Push back area around the sinkhole

  • 8/3/2019 Sink Hole Presentation

    38/38

    38

    Outcome

    Sinkhole rehabilitation work is still underway

    Sinkhole excavation was carried out successfully without injuries or damage

    to equipment

    Expert advice and people with previous experience with the sinkhole

    occurrence were consulted

    Sinkhole limits were exposed after excavation of waste fill material allowingfor better planning and design of rehabilitation and filling

    The extrapolated position and orientation of the sinkhole were confirmed

    The cemented waste fill material will be set on a competent base and all

    water sources diverted

    Once set the concrete plug should prevent water ingress into the declines

    Surface run water drainage and bunkers should divert water from entering

    the sinkhole area.