Guardian 275® 2 ¾” Single Slope Endwall Installation Manual MAJOR INDUSTRIES, INC. / 888-759-2678 / 715-842-4616 / WWW.MAJORSKYLIGHTS.COM Guardian 275® 2 ¾” Single Slope Endwall Installation Manual This instructional manual provides “General Installation Instruction.” Installers should refer to the "as-built" shop drawings for specific guidance as it relates to your system. For additional information, contact Major Industries.

Upload: others

Post on 31-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    MAJOR INDUSTRIES, INC. / 888-759-2678 / 715-842-4616 / WWW.MAJORSKYLIGHTS.COM

    Guardian 275® 2 ¾” Single Slope

    Endwall Installation Manual

    This instructional manual provides “General Installation Instruction.” Installers should refer to

    the "as-built" shop drawings for specific guidance as it relates to your system. For additional

    information, contact Major Industries.

  • Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    MAJOR INDUSTRIES, INC. / 888-759-2678 / 715-842-4616 / WWW.MAJORSKYLIGHTS.COM

    INTRODUCTION

    Quality installation in a timely manner requires

    careful attention to planning and detail. We need

    your help to ensure a successful weather-tight

    installation.

    We produce our custom-fabricated daylighting

    products to precise dimensions under factory-

    controlled conditions. Everything has been checked

    and verified to meet shop drawings and the

    architectural requirements. Your job is perhaps the

    most important step yet to be completed. Our

    analysis of warranty claims indicates that over 85%

    of all field complaints are the result of improper

    installation or - equally damaging - an improper

    assembly during installation. All Major Industries

    daylighting products are designed as a system - you

    must assemble the parts and pieces in exact

    sequence. Any effort to “freelance” or do it in a new

    way risks our common goal of ensuring weather-

    tightness and owner satisfaction.

    Finally, our warranty commitment sold with this job

    is predicated on satisfactory site conditions. Please

    take the time to perform a thorough site audit prior

    to starting your installation, and ask yourself the

    following questions before installation. If even one

    of them is false, you are almost guaranteed to have a

    less than optimal installation.

    UNLOADING

    Unloading should be organized to minimize material

    handling. If hoisting is required by either crane or

    forklift, the skylight’s weight should be evenly

    distributed to prevent distorting or damaging the

    material. Use only approved nylon lift slings that are

    in good condition and sized to the load. Crates are

    for shipping purposes only and should not be relied

    upon for hoisting or storage.

    INSPECTION

    Upon receipt, inspect the shipment to ensure that

    materials were not damaged during shipping. If

    damage is visible or suspected, note it on the bill of

    lading and contact Major Industries as soon as

    possible. Count material and check it immediately

    against the packing list. If there is a shortage, note it

    on the bill of lading and contact Major immediately.

    STORAGE

    While a single panel easily withstands exposure to

    sunlight and the elements, a stack of panels will trap

    heat and moisture, causing clouding in the panels.

    To avoid this irreversible effect, panels must be

    stored in a dry, shaded, well-ventilated area. Skids

    should be elevated at one end by wood spacers. It is

    the installer’s responsibility to protect materials until

    they are installed - unless otherwise specified. When

    placing materials on the roof, it is the installer’s

    responsibility to make sure roofing materials are not

    damaged. Failure to comply with recommended

    storage procedures will negatively affect the

    warranty on the panels.

    INSTALLATION NOTES

    Major Industries does not recommend walking on

    the panels. If the installer must walk on the panels,

    the panel surface MUST be protected by applying a

    layer of foam carpet padding over the panel surface,

    followed by a sheet of plywood or other similar

    smooth material to distribute weight.

    It is the installer’s responsibility to correctly install

    and seal the entire unit. Always install only a

    quantity of panels that can be fully protected with

    glazing caps at the end of the day. Glazing panels are

    not designed to be left unprotected from the

    weather. Water damage during installation is not

    covered by warranty. Always remember that water

    can be drawn up into the skylight due to negative

    interior building pressure. Properly clean all building

    surfaces to be caulked with approved cleaning

    solutions. Make sure caulking and sealants make

    uniform contact with all surfaces being sealed. It is

    important that all necessary sealants and caulking

    are properly applied. Installers need to verify with

    the sealant supplier and manufacturer as to the

    proper sealant type required for the application.

    Failure to do so may cause the system to fail, causing

    possible interior damage.

    The installer must have the sign-off sheet (supplied

    with the Major Industries purchase order) signed by

    the job site superintendent before leaving the job

    site. No payments will be released to the contractor

    until this sign-off sheet is forwarded to Major.

    These instructions have been supplied to assist with

    installation. They are correct to the best of our

    knowledge - however, no warranty is expressed or

    implied. Each installation is unique and attention

    must be given to the approved shop drawings

    supplied specifically for this project. Any

    modifications require factory approval. Major

  • Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾” Single Slope Endwall Install Manual - Page 3

    MAJOR INDUSTRIES, INC. / 715-842-4616 / WWW.MAJORSKYLIGHTS.COM

    Industries expects its installers to be knowledgable

    and complete all work professionally and to industry

    standards.

    DAMAGE WARNING

    Do not attempt to weld or cut any materials near an

    installed skylight or wall system. Damage may occur

    to the panel from flames, hot metal or sparks unless

    they are fully protected by fireproof material.

    We want our installers and customers to have the

    best daylighting system possible, and we encourage

    you to call us with your questions and concerns.

    Major's experienced personnel can troubleshoot the

    problem and help you choose the best option.

    IF YOU NEED ADDITIONAL INFORMATION,

    CONTACT MAJOR AT 888-759-2678.

    APPROVED MATERIALS

    Cleaning Solutions: Mild Soap & Water, Non-corrosive, Non-abrasive - NO Ammonia, NO Chlorine,

    NO Acetone, NO MEK

    Sealants: Tremco, G.E., Dow-Corning

    Shims: Pressure Treated Wood, Metal, Plastic

    TOOLS REQUIRED

    Safety Glasses, Tape Measure, Framing Squarel Level, Hammer, Rubber Mallet, Chalk Linel Hacksaw, Circular Saw,

    Drill and Drill Bits, Center Punch, Caulking Gun, Phillips Head Screwdriver (#2 and #3 Phillips Bit), Regular Head

    Screwdriver, Screwgun with Clutch, Socket Wrench Set, Hex Head Driver Bits, Cleaning Supplies, OSHA Approved

    Fall Protection

    SITE AUDIT

    1. I have checked all opening dimensions against the shop drawings

    to confirm that they meet system and weather requirements of +0.25/-0 inches.

    o True o False

    2. All masonry/EIPS is in place for wall openings and single-ply membranes have been applied to roof curbs. (7 out

    of 10 installations “leak” when this recommended installation sequence is reversed. Major will not provide an

    unconditional warranty if we are forced to install our product before other responsible trades complete site

    preparation according to architectural specification.) I will schedule other trades to minimize leaks by following the

    recommended sequence.

    o True o False

    3. Sill, head and jamb conditions are plumb, straight and match the stated dimensions per the final field drawings.

    o True o False

  • Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾”

    MAJOR INDUSTRIES, INC. /

    Guardian 275® Endwall

    1.1 - Skylight Curb

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾” Single Slope Endwall Install Manual - Page 4

    MAJOR INDUSTRIES, INC. / 715-842-4616 / WWW.MAJORSKYLIGHTS.COM

    Note: Use the endwall layout

    to determine the correct

    steps to follow in order to

    complete the installation

    process to the best of your

    abilities. (Always assume this

    layout is being viewed from

    the exterior unless otherwise

    noted).

    STEP 1

    1.1 DO NOT attempt to

    install endwall system on an

    improperly prepared curb.

    Check all curb sizes. Make

    sure that dimensions agree

    with erection drawings.

    Check all support sill and

    steel for proper mounting.

    Make sure that openings are

    plumb, square, and/or

    1.2 Place a tape measure

    across the corners as a check

    to make sure the opening is

    square.

    1.3 If there are any

    discrepancies, please notify

    Major Industries’

    Engineering Department and

    the general contractor

    before proceeding.

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    MAJORSKYLIGHTS.COM

    te: Use the endwall layout

    to determine the correct

    steps to follow in order to

    complete the installation

    process to the best of your

    abilities. (Always assume this

    layout is being viewed from

    the exterior unless otherwise

    DO NOT attempt to

    install endwall system on an

    improperly prepared curb.

    Check all curb sizes. Make

    sure that dimensions agree

    with erection drawings.

    Check all support sill and

    steel for proper mounting.

    Make sure that openings are

    plumb, square, and/or true.

    1.2 Place a tape measure

    across the corners as a check

    to make sure the opening is

    1.3 If there are any

    discrepancies, please notify

    Major Industries’

    Engineering Department and

    the general contractor

    before proceeding.

  • Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾”

    MAJOR INDUSTRIES, INC. /

    2.1 - Endwall Curb Flashing

    3.1 - Endwall Support Angle

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾” Single Slope Endwall Install Manual - Page 5

    MAJOR INDUSTRIES, INC. / 715-842-4616 / WWW.MAJORSKYLIGHTS.COM

    STEP 2

    2.1 Set endwall curb flashing

    on the top of the curb using

    approved sealant (see page

    3).

    2.2 Nip the drip edge and

    condensation gutter from

    the flashing and bend at 90°

    to ensure a watertight seal

    at all corners.

    2.3 Overlap adjoining pieces

    of flashing by six inches at

    splices (if necessary). Clean

    any excess caulking from all

    exposed surfaces.

    STEP 3

    3.1 Apply a bead of caulk on

    the sill flashing and set the

    endwall support angle per

    project erection drawings

    and fasten at the pre

    holes as shown above.

    3.2 Caulk as necessary on

    the front and back of the

    support angle where it

    meets the sill flashing to

    ensure a watertight seal.

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    MAJORSKYLIGHTS.COM

    2.1 Set endwall curb flashing

    on the top of the curb using

    approved sealant (see page

    2.2 Nip the drip edge and

    condensation gutter from

    the flashing and bend at 90°

    to ensure a watertight seal

    at all corners.

    2.3 Overlap adjoining pieces

    of flashing by six inches at

    splices (if necessary). Clean

    any excess caulking from all

    exposed surfaces.

    3.1 Apply a bead of caulk on

    the sill flashing and set the

    endwall support angle per

    project erection drawings

    and fasten at the pre-drilled

    holes as shown above.

    3.2 Caulk as necessary on

    the front and back of the

    support angle where it

    meets the sill flashing to

    ensure a watertight seal.

  • Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾”

    MAJOR INDUSTRIES, INC. /

    4.1 - Endwall Sill Corner Angle Connection

    4.1 - Endwall Head Frame Connection

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾” Single Slope Endwall Install Manual - Page 6

    MAJOR INDUSTRIES, INC. / 715-842-4616 / WWW.MAJORSKYLIGHTS.COM

    Sill Corner Angle Connection

    STEP 4

    In the following steps you

    will be assembling the

    endwall separately from the

    condition and setting it into

    place once it has been

    erected.

    4.1 Secure sill and jamb

    mitered corners of interior

    perimeter

    using P-1108 corner angles.

    4.2 Apply sealant to mitered

    ends of perimeter frame and

    slide corner angles into

    extruded slots until they fit

    snugly.

    Endwall Head Frame Connection

    4.3 Secure head and jamb

    mitered corners of interior

    perimeter frame together

    using P-1108

    angles.

    4.4 Apply sealant to mitered

    ends of perimeter frame and

    slide corner angles into

    extruded slots until they fit

    snugly.

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    MAJORSKYLIGHTS.COM

    In the following steps you

    will be assembling the

    endwall separately from the

    condition and setting it into

    place once it has been

    4.1 Secure sill and jamb

    mitered corners of interior

    perimeter frame together

    1108 corner angles.

    4.2 Apply sealant to mitered

    ends of perimeter frame and

    slide corner angles into

    extruded slots until they fit

    4.3 Secure head and jamb

    corners of interior

    perimeter frame together

    1108-1 corner

    4.4 Apply sealant to mitered

    ends of perimeter frame and

    slide corner angles into

    extruded slots until they fit

  • Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾”

    MAJOR INDUSTRIES, INC. /

    4.5 - Perimeter Frame Assembly

    5.3 - Head Perimeter Frame Attachment

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾” Single Slope Endwall Install Manual - Page 7

    MAJOR INDUSTRIES, INC. / 715-842-4616 / WWW.MAJORSKYLIGHTS.COM

    4.5 Once steps 4.1 thru 4.4

    are finished a complete

    perimeter frame assembly

    should exist.

    Head Perimeter Frame Attachment

    STEP 5

    5.1 Apply sealant to the

    endwall tube prior to setting

    perimeter frame in place.

    Attach the head

    frame to the endwall tubes

    using tek screws. Pay

    attention to the location of

    the perimeter frame on the

    tube per the erection

    drawings.

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    MAJORSKYLIGHTS.COM

    Once steps 4.1 thru 4.4

    are finished a complete

    perimeter frame assembly

    should exist.

    5.1 Apply sealant to the

    endwall tube prior to setting

    perimeter frame in place.

    Attach the head perimeter

    frame to the endwall tubes

    using tek screws. Pay

    attention to the location of

    the perimeter frame on the

    tube per the erection

  • Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾”

    MAJOR INDUSTRIES, INC. /

    5.2 - Perimeter Frame Anchor Option

    5.3 - Endwall Tube Shelf Angle

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾” Single Slope Endwall Install Manual - Page 8

    MAJOR INDUSTRIES, INC. / 715-842-4616 / WWW.MAJORSKYLIGHTS.COM

    Perimeter Frame Anchor Option

    5.2 In the event where there

    is a lower slope

    perimeter frame corner will

    not have the corner angles

    mentioned in step 4.1. Use

    (2) PH Pan HD SS tek screws

    through factory drill holes in

    sill framing at the corners

    into the endwall tube. Caulk

    all fastener heads with

    approved sealant (see pa

    3).

    5.3 Attach the endwall shelf

    angle support to the wall

    condition using (2) fasteners

    provided by installer. Locate

    the angle support properly

    so it slides inside of the

    endwall tube.

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    MAJORSKYLIGHTS.COM

    5.2 In the event where there

    is a lower slope endwall a

    perimeter frame corner will

    not have the corner angles

    mentioned in step 4.1. Use

    (2) PH Pan HD SS tek screws

    through factory drill holes in

    sill framing at the corners

    into the endwall tube. Caulk

    all fastener heads with

    approved sealant (see page

    5.3 Attach the endwall shelf

    angle support to the wall

    condition using (2) fasteners

    provided by installer. Locate

    the angle support properly

    so it slides inside of the

    endwall tube.

  • Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾”

    MAJOR INDUSTRIES, INC. /

    6.1 - Shelf Angle Attachment

    6.3 - Endwall Frame Placement

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾” Single Slope Endwall Install Manual - Page 9

    MAJOR INDUSTRIES, INC. / 715-842-4616 / WWW.MAJORSKYLIGHTS.COM

    STEP 6

    6.1 Apply caulk to the top of

    the angle and flashing

    already in place where you

    will be setting the endwall

    framing assembly.

    6.2 Set the endwall framing

    assembly in place according

    to the project erection

    drawings. Slide the endwall

    tube over the shelf angle

    support and attach using (2)

    PH FL HD SS tek screws

    through factory drilled holes.

    6.3 Butt the back of the

    perimeter frame against the

    support angle

    using hex HD SS tek screws.

    Fasten the endwall tubes

    using PH FL HD SS tek screws

    as shown above, (2) per end.

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    MAJORSKYLIGHTS.COM

    6.1 Apply caulk to the top of

    the angle and flashing

    already in place where you

    will be setting the endwall

    framing assembly.

    6.2 Set the endwall framing

    assembly in place according

    to the project erection

    drawings. Slide the endwall

    tube over the shelf angle

    support and attach using (2)

    PH FL HD SS tek screws

    through factory drilled holes.

    6.3 Butt the back of the

    perimeter frame against the

    support angle and attach

    using hex HD SS tek screws.

    Fasten the endwall tubes

    using PH FL HD SS tek screws

    as shown above, (2) per end.

  • Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾”

    MAJOR INDUSTRIES, INC. /

    6.4 - Jamb Frame Attachment

    7.1 - Panel Setting Block Location

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾” Single Slope Endwall Install Manual - Page 10

    MAJOR INDUSTRIES, INC. / 715-842-4616 / WWW.MAJORSKYLIGHTS.COM

    6.4 Install jamb frame

    fasteners (supplied by

    installer) and check framing

    members for squareness.

    Shim as required or if

    necessary.

    STEP 7

    7.1 Install panel setting

    blocks (P-1052) and attach

    them to the interior surface

    of the perimeter framing at

    the sill using shop

    two sided tape. Space

    setting blocks at quarter

    points within panel

    openings.

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    MAJORSKYLIGHTS.COM

    6.4 Install jamb frame

    fasteners (supplied by

    installer) and check framing

    members for squareness.

    Shim as required or if

    necessary.

    7.1 Install panel setting

    1052) and attach

    them to the interior surface

    of the perimeter framing at

    the sill using shop applied

    two sided tape. Space

    setting blocks at quarter

    points within panel

  • Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾”

    MAJOR INDUSTRIES, INC. /

    Panel Setting Block Location

    8.1 - Panel Installation

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾” Single Slope Endwall Install Manual - Page 11

    MAJOR INDUSTRIES, INC. / 715-842-4616 / WWW.MAJORSKYLIGHTS.COM

    NOTE: Use the factory label

    on the side of the panel to

    ensure that the panel setting

    block is attached in the

    correct direction.

    CAUTION: It is important

    that the setting blocks are

    installed properly according

    to the drawing above

    without blocking the weep

    holes.

    STEP 8

    8.1 Insert panel and hold in

    place, space panel from

    to-side at recommended

    dimensions.

    NOTE: Do not leave panel

    perimeters exposed to the

    weather. Retaining caps are

    to be installed daily. Major

    Industries, Inc. will not be

    responsible for material that

    is damaged due to failing to

    comply with these

    instructions.

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    MAJORSKYLIGHTS.COM

    NOTE: Use the factory label

    on the side of the panel to

    ensure that the panel setting

    block is attached in the

    direction.

    CAUTION: It is important

    that the setting blocks are

    installed properly according

    to the drawing above

    without blocking the weep

    8.1 Insert panel and hold in

    place, space panel from side-

    side at recommended

    dimensions.

    NOTE: Do not leave panel

    perimeters exposed to the

    weather. Retaining caps are

    to be installed daily. Major

    Industries, Inc. will not be

    responsible for material that

    is damaged due to failing to

    comply with these

    structions.

  • Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾”

    MAJOR INDUSTRIES, INC. /

    9.1 - Perimeter Frame Cap

    10.1 - Exterior Sealant Application

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    Guardian 275® 2 ¾” Single Slope Endwall Install Manual - Page 12

    MAJOR INDUSTRIES, INC. / 715-842-4616 / WWW.MAJORSKYLIGHTS.COM

    STEP 9

    9.1 After installation and

    alignment of the panels,

    install exterior perimeter

    snap cover.

    CAUTION: When installing

    exterior wall system snap

    caps, use a rubber mallet

    and wood block to

    denting or marring finish. DO

    NOT hammer over

    weatherstrip.

    NOTE: Caution must be used

    at sill. Weep holes must

    remain open; obstructing

    the weep holes could result

    in water damage to the

    panels or building. Seal all

    exterior metal

    joints and connections with

    silicone.

    STEP 10

    10.1 Caulk the perimeter

    framing to the opening and

    caulk all exterior framing and

    weatherstrip joints with

    approved sealant See figure

    10.1 (For approved

    see page 3).

    Guardian 275® 2 ¾” Single Slope Endwall Installation Manual

    MAJORSKYLIGHTS.COM

    9.1 After installation and

    alignment of the panels,

    install exterior perimeter

    snap cover.

    CAUTION: When installing

    exterior wall system snap

    caps, use a rubber mallet

    and wood block to avoid

    denting or marring finish. DO

    NOT hammer over

    weatherstrip.

    NOTE: Caution must be used

    at sill. Weep holes must

    remain open; obstructing

    the weep holes could result

    in water damage to the

    panels or building. Seal all

    exterior metal-to-metal

    d connections with

    10.1 Caulk the perimeter

    framing to the opening and

    caulk all exterior framing and

    weatherstrip joints with

    approved sealant See figure

    10.1 (For approved sealants

    see page 3).