Simulation Status Simulation Status Gerrit van Nieuwenhuizen Bates R&E Meeting June 15, 2005

Upload: zaina

Post on 06-Jan-2016

24 views

Category:

Documents


0 download

DESCRIPTION

Simulation Status. Gerrit van Nieuwenhuizen Bates R&E Meeting June 15, 2005. FST. IST. FGT. HFT. IGT!. SSD. And another layer: IGT!. Special request of Nikolas Smirnov to improve TPC tracking 2 different GEM sizes Collision with existing SSD mechanics - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Simulation Status

Simulation StatusSimulation Status

Gerrit van NieuwenhuizenBates R&E MeetingJune 15, 2005

Page 2: Simulation Status

HFT

IST

SSD

FST

FGT

IGT!

Page 3: Simulation Status

And another layer: IGT!

● Special request of Nikolas Smirnov to improve TPC tracking

● 2 different GEM sizes

● Collision with existing SSD mechanics

● Make same size modules

● Move layers out a bit to avoid collisions

Page 4: Simulation Status

'Final' Inner GEM Tracker design

● 928(!) GEM modules

● Took some effort to convert the 'Smirnov design' to something more 'starsim design'

● Outer IGT layer awfully close to inner TPC field cage

Page 5: Simulation Status

IGT software, ugh, ugh, ugh!!!

Page 6: Simulation Status

IGT software, ugh, ugh, ugh!!!!!

Page 7: Simulation Status

STAR software, ugh, ugh, ugh!!!

Geometries

STARSIM=GEANT

ZEBRA File

BFC=generic ROOT4STAR converter

ROOT file with hit objects

YOUR CODE HERE

nTUPles

OK until here

Page 8: Simulation Status

'Old' Helix fit for forward tracks

● Mirko Planinic from Zagreb working full time now

● Sees hits from FST and FGT

● Still has problems, find pretty bad momentum resolution

● Not exactly clear what is going on Could be problems with magnetic field definition Or simply picking up the wrong hits

● It was suggested to take well defined hits, no smearing etc., and do the fitting

● More news coming Friday

Page 9: Simulation Status

New ITTF fit for central tracks● Willie Leight & Mike Miller from MIT

● Sees hits pumped into ITTF coming out

● Track fitting in progress, more news coming Friday

Page 10: Simulation Status

To do list

Make sure that GEANT geometries and simulation geometries agree in detail

Keep checking IST/IGT/FST/FGT hits

Using ITTF tracking code for HFT/IST/IGT/SSD

Using old Helix fit code for FST/FGT

Make scripts according to MC requests

As soon as IGT problem is resolved we

can start the MC generation on 2 dedicated

workstations

Page 11: Simulation Status

$120,740 for Barrel NRE and prototypes

$177,294 for Disk NRE and prototypes

6 months to get prototypes!

Page 12: Simulation Status

-----------------------------------+Adds up to 1.4 M$