L3 CMP Games Design – Group 01 HA4 - SIMS Concept Schedule John Forest DRAFT ONE Monday Tuesday Wednesday Thursday Friday Saturday Sunday AM PM EV E AM PM EV E AM PM EV E AM PM EV E AM PM EV E AM PM EV E AM PM EV E w/b 30.01 .12 LightBot Tutorial 07 LightBo t Tutoria l 08 LightBot Tutorial 08 w/b 06.02 .12 HA4 – Task 1 Walkabo ut and choose areas. LightBot Tutorial 09 LRC and Cafe Bar HA4 – Task 1 Begin schedul e. LightBo t Tutoria l 09 HA4 – Task 1 Complet e schedul e and start product ion log. HA4 – Task 2 LRC – Begin measurin g and photogra phy HA4 – Task 2 Cafe Bar – Begin measurin g and photogra phy w/b 13.02 .12 HA4 – Task 2 LRC and Cafe Bar – Measure d diagram s HA4 – Task 3 Scale template footprin ts and check proporti ons. Update producti on log. HA4 – Task 3 Additio nal measuri ng and diagram s. HA4 – Task 3 Build basic shell for both areas. Update product ion log. HA4 – Task 3 Additio nal measuri ng and diagram s. HA4 – Task 3 Build basic shell for both areas. Update producti on log. HA4 – Task 3 Screensh ots of work to date. Email home. Update producti on log. w/b 20.02.12 H/T w/b 27.02 .12 HA4 – Task 3 LRC and Cafe Bar detail added – furnitur e, plants, Update product ion log. HA4 – Task 3 LRC and Cafe Bar detail added – furnitu re, HA4 – Task 3 Additio nal measuri ng and diagram s. HA4 – Task 3 LRC and Cafe Bar surfaces confirme d. Update producti on log.

Upload: wildoakforrest

Post on 14-Dec-2014

83 views

Category:

Education


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: SIMS Project Schedule

L3 CMP Games Design – Group 01HA4 - SIMS Concept ScheduleJohn Forest

DRAFT ONEMonday Tuesday Wednesday Thursday Friday Saturday SundayAM P

MEVE

AM

PM

EVE AM PM EVE

AM PM EVE

AM PM

EVE

AM PM EVE

AM

PM EVE

w/b 30.01.12

LightBot Tutorial 07

LightBot Tutorial 08

LightBot Tutorial 08

w/b 06.02.12

HA4 – Task 1 Walkabout and choose areas.

LightBot Tutorial 09

LRC and Cafe BarHA4 – Task 1 Begin schedule.

LightBot Tutorial 09

HA4 – Task 1 Complete schedule and start production log.

HA4 – Task 2 LRC – Begin measuring and photography

HA4 – Task 2 Cafe Bar – Begin measuring and photography

w/b 13.02.12

HA4 – Task 2 LRC and Cafe Bar – Measured diagrams

HA4 – Task 3 Scale template footprints and check proportions.Update production log.

HA4 – Task 3 Additional measuring and diagrams.

HA4 – Task 3 Build basic shell for both areas.Update production log.

HA4 – Task 3 Additional measuring and diagrams.

HA4 – Task 3 Build basic shell for both areas.Update production log.

HA4 – Task 3 Screenshots of work to date. Email home.Update production log.

w/b 20.02.12 H/T

w/b 27.02.12

HA4 – Task 3 LRC and Cafe Bar detail added – furniture, plants, mouldings etc.

Update production log.

HA4 – Task 3 LRC and Cafe Bar detail added – furniture, plants, mouldings etc.

HA4 – Task 3 Additional measuring and diagrams.

Update production log.

HA4 – Task 3 LRC and Cafe Bar surfaces confirmed.

Update production log.

w/b 05.03.12

HA4 – Task 4 Begin evaluation. Review production log.

HA4 – Task 3 LRC and Cafe Bar models rendered through

Update production log.

HA4 – Task 3 LRC and Cafe Bar models rendered through

HA4 – Task 4 Evaluation. Upload production log to blog.

Final checks and renders.Update production log and blog.

Upload HA4 front sheet to Moodle.

DL 01

Page 2: SIMS Project Schedule

Layout. Layout.

Harry’s Sessions

Self-Directed

Other Sessions

Task 1 - OutlineChoose and commit to model two areasProduce Schedule – include LightBot overrun and new Deadline.List any problems you might have that you need to take into account – Modeller skills, time management etc.Start production log.

Task 2 - PlanShoot reference imagery and textures, make measurements and draw diagrams – Include this in your production log – either directly blogged or within a PowerPoint presentation / Word document. Schedule in review sessions.

Task3 - RespondBuild the two objects in stages – be careful not to focus on just one or parts of one. Plan out the production carefully – break it up into chunks.

Task 4 - ReviewWrite an evaluation of your project. Leave enough time for this before the deadline. You can’t fully evaluate the work until the project is finished and presented.

L3 CMP Games Design – Group 01

Page 3: SIMS Project Schedule

HA4 - SIMS Concept Schedule

DRAFT TWOMonday Tuesday Wednesday Thursday Friday Saturday SundayAM P

MEVE

AM

PM

EVE

AM PM EVE

AM PM EVE

AM PM EVE

AM

PM

EVE

AM

PM

EVE

w/b 30.01.12

LightBot Tutorial 07

LightBot Tutorial 07

Lightbot tutorial 08

w/b 06.02.12

LightBot Tutorial 09

HA4 Task 1: Choose areas and walk around

LRC and Cafe Bar HA4 Task 1: Begin Schedule

HA4 Task 2: Start to take photographs of both of my selected areas.

HA4 Task 2: Create basic outline for LRC taking and using measurements

w/b 13.02.12

HA4 Task2: Start taking measurements for the details in the LRC.

HA4 Task 2: Start production log for the LRC area

HA4 Task 3: Start modelling details within the LRC

HA4 Task 3: Continue to model details within the LRC

HA4 Task 2: E-mail updated screenshots to home and update production log.

w/b 20.02.12 H/T

w/b 27.02.12

HA4 Task 2: Measure details on the LRC

HA4 Task 3: Continue to model details and furniture of the LRC

HA4 Task 2: Measure details and furniture of the LRC.

HA4 Task 3: Continue to model details and furniture of the LRC

HA4 – Task 1: Update production log.

HA4 Task 3: Finish modelling the LRC, review and update production log

HA4 – Task 2 Cafe Bar – Begin measuring and photography

w/b 05.03.12

HA4 Task 2: Create basic outline for Cafe Bar taking and using measurement. Edit production log

HA4 – Task 3 Additional Cafe Bar measuring and diagrams.

HA4 – Task 3 Build basic shell for both areas.Update production log.

HA4 – Task 3 Additional measuring and diagrams for Cafe Bar

HA4 – Task 3 Cafe Bar

HA4 – Task 3 Screenshots of work to date. Email home.Update production log.

DL 01

w/b 12.03.1

HA4 – Task 3 Cafe Bar detail added

Update production log.

HA4 – Task 3 Cafe Bar

HA4 – Task 3 Additional

HA4 – Task 3 Cafe Bar

Update production log.

Page 4: SIMS Project Schedule

2 – furniture, plants, mouldings etc.

detail added – furniture, plants, mouldings etc.

measuring and diagrams.

Update production log.

w/b 19.03.12

HA4 – Task 3 Cafe Bar detail added – furniture, plants, mouldings etc.

Update production log.

HA4 – Task 3 Cafe Bar detail added – furniture, plants, mouldings etc.

HA4 – Task 3 Additional measuring and diagrams.

Update production log.

HA4 – Task 3 LRC and Cafe Bar surfaces confirmed.

Update production log.

w/b 26.03.12

HA4 – Task 4 Begin evaluation. Review production log.

HA4 – Task 3 LRC and Cafe Bar models rendered through Layout.

Update production log.

HA4 – Task 3 LRC and Cafe Bar models rendered through Layout.

HA4 – Task 4 Evaluation. Upload production log to blog.

Final checks and renders.Update production log and blog.

Upload HA4 front sheet to Moodle.

DL 02

Harry’s Sessions

Self-Directed

Other Sessions

DRAFT THREEMonday Tuesday Wednesday Thursday Friday Saturday Sunday

Page 5: SIMS Project Schedule

AM PM

EVE

AM

PM

EVE

AM PM EVE

AM PM EVE

AM PM EVE

AM

PM

EVE

AM

PM

EVE

w/b 30.01.12

LightBot Tutorial 07

LightBot Tutorial 07

Lightbot tutorial 08

w/b 06.02.12

LightBot Tutorial 09

HA4 Task 1: Choose areas and walk around

LRC and Cafe Bar HA4 Task 1: Begin Schedule

HA4 Task 2: Start to take photographs of both of my selected areas.

HA4 Task 2: Create basic outline for LRC taking and using measurements

w/b 13.02.12

HA4 Task2: Start taking measurements for the details in the LRC.

HA4 Task 2: Start production log for the LRC area

HA4 Task 3: Start modelling details within the LRC

HA4 Task 3: Continue to model details within the LRC

HA4 Task 2: E-mail updated screenshots to home and update production log.

w/b 20.02.12 H/T

w/b 27.02.12

HA4 Task 2: Measure details on the LRC

HA4 Task 3: Continue to model details and furniture of the LRC

HA4 Task 2: Measure details and furniture of the LRC.

HA4 Task 3: Continue to model details and furniture of the LRC

HA4 – Task 1: Update production log.

HA4 Task 3: Finish modelling the LRC, review and update production log

HA4 – Task 2 Cafe Bar – Begin measuring and photography

w/b 05.03.12

HA4 Task 2: Create basic outline for Cafe Bar taking and using measurement. Edit production log

HA4 – Task 3 Additional Cafe Bar measuring and diagrams.

HA4 – Task 3 Build basic shell for both areas.Update production log.

HA4 – Task 3 Additional measuring and diagrams for Cafe Bar

HA4 – Task 3 Cafe Bar

HA4 – Task 3 Screenshots of work to date. Email home.Update production log.

DL 01

w/b 12.03.12

HA4 – Task 3 Cafe Bar detail added – furniture, plants, mouldings etc.

Update production log.

HA4 – Task 3 Cafe Bar detail added – furniture, plants, mouldings etc.

HA4 – Task 3 Additional measuring and diagrams.

Update production

HA4 – Task 3 Cafe Bar

Update production log.

Page 6: SIMS Project Schedule

log.

w/b 19.03.12

HA4 – Task 3 Cafe Bar detail added – furniture, plants, mouldings etc.

Update production log.

HA4 – Task 3 Cafe Bar detail added – furniture, plants, mouldings etc.

HA4 – Task 3 Additional measuring and diagrams.

Update production log.

HA4 – Task 3 LRC and Cafe Bar surfaces confirmed.

Update production log.

w/b 26.03.12

HA4 – Task 4 Begin evaluation. Review production log.

HA4 – Task 3 LRC and Cafe Bar models rendered through Layout.

Update production log.

HA4 – Task 3 LRC and Cafe Bar models rendered through Layout.

HA4 – Task 4 Evaluation. Upload production log to blog.

Final checks and renders.Update production log and blog.

Upload HA4 front sheet to Moodle.

DL 02

Harry’s Sessions

Self-Directed

Other Sessions