signal and telecommunication department for speed, …€¦while maintaining the reliability...

5
SIGNAL AND TELECOMMUNICATION DEPARTMENT FOR SPEED, SAFETY, RELIABILITY AND PUNCHULITY Migration of Technology from mechanical lever operated semaphore Signal & overhead communication to panel interlocking with LED signal & OFC based communication was really fast in Solapur divn. At Solapur we always look forward to adopt state of the art advance technology for safe & reliable operation of train. There have been considerable increase of DESU, still significant reduction in Signalling failure could be achieved by adopting Remote, Online Conditional Monitoring of Signalling equipment and continuous knowledge up gradation of maintainer (Mechanical to relay based color light Signalling, Overhead to OFC communication). Out motto is to reduce the maintenance efforts while maintaining the reliability To keep pace with change in technology a Divisional training Center have also been set up with in-house recourses Signalling Panel Interlocking: 75 out of 78 stations are provided with a PI including three major RRI. 1441 out of 2690 main aspects & 1018 auxiliary aspects of Signals are provided with LED Signals. Predictive Monitoring/Maintenance free System: All PI/RRI stations 75 are provided with a Dataloggger along with networking at the divisional Signal Control for Preventative Maintenance of Signalling gears and analyzing the cause of unusual incidences. Point Health Monitoring Unit is provided for 944 out of 1108 Point machines for condition based maintenance. Track battery Monitoring system has been provided for 1713 out of 1805 track circuit. 71 Stations has been provided with the Auto change over fuse alarm system to arrest failure due to fuse blowing. 41 Block Sections are provided with an Alcatel make Digital Axle counter for the last Vehicle check on B-Route.

Upload: others

Post on 29-Oct-2019

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SIGNAL AND TELECOMMUNICATION DEPARTMENT FOR SPEED, …€¦while maintaining the reliability Exothermic welding for rail joints & track lead wire connection has been provided. Magnetic

SIGNAL AND TELECOMMUNICATION DEPARTMENT FOR SPEED, SAFETY,

RELIABILITY AND PUNCHULITY

Migration of Technology from mechanical lever operated semaphore Signal & overhead

communication to panel interlocking with LED signal & OFC based communication was really

fast in Solapur divn. At Solapur we always look forward to adopt state of the art advance

technology for safe & reliable operation of train.

There have been considerable increase of DESU, still significant reduction in Signalling failure

could be achieved by adopting Remote, Online Conditional Monitoring of Signalling equipment

and continuous knowledge up gradation of maintainer (Mechanical to relay based color light

Signalling, Overhead to OFC communication). Out motto is to reduce the maintenance efforts

while maintaining the reliability

To keep pace with change in technology a Divisional training Center have also been set up

with in-house recourses

Signalling

Panel Interlocking: 75 out of 78 stations are provided with a PI including three major

RRI. 1441 out of 2690 main aspects & 1018 auxiliary aspects of Signals are provided

with LED Signals.

Predictive Monitoring/Maintenance free System:

All PI/RRI stations 75 are provided with a Dataloggger

along with networking at the divisional Signal Control for

Preventative Maintenance of Signalling gears and analyzing

the cause of unusual incidences. Point Health Monitoring

Unit is provided for 944 out of 1108 Point machines for

condition based maintenance. Track battery Monitoring

system has been provided for 1713 out of 1805 track circuit.

71 Stations has been provided with the Auto change over

fuse alarm system to arrest failure due to fuse blowing.

41 Block Sections are

provided with an Alcatel

make Digital Axle counter

for the last Vehicle check

on B-Route.

Page 2: SIGNAL AND TELECOMMUNICATION DEPARTMENT FOR SPEED, …€¦while maintaining the reliability Exothermic welding for rail joints & track lead wire connection has been provided. Magnetic

Lightening &Surge Protection: Solapur division is prone to lightning, to avoid any

damage to Signalling & Telecom equipment all installations are provided with B & C

Class surge protection devices and Maintenances Free Earth for the power equipments.

Most of the stations in KWV-LUR section are unmanned; to reduce maintenance efforts

while maintaining the reliability Exothermic welding for rail joints & track lead wire

connection has been provided.

Magnetic boom Lock has been provided on 34 Nos of LC as an additional safety measure

to ensure positive locking of the LC gate in closed position.

Remote Power supply & Battery Monitoring System:

Power Supply: Power supply is the heart of Signalling

System any defect/failure of Power supply leads to

complete shutdown of Signalling System. Accordingly

special emphasis has been given to Power supply. IPS has

been provided at all PI stations (71) (excluding major

RRI) including 12 interlocked gates to prevent the

blanking of the signal.

To charge of batteries during long power cut 175 Diesel

Generator Set has been provided at stations & Interlocked

LC gates.

Reliable working of IPS and battery is essential

for functioning of Signalling equipment. GIU

based Remote Power Supply monitoring

(Integrated Power Supply) system in Daund-

Manmad section & Remote predictive battery

monitoring system for Padhegaon station have

been commissioned for first time on Indian

Railway. This will ensure round the clock

monitoring of IPS & individual battery from

Centralized Control. This will also enable to

monitor the running of DG & will ensure saving

in fuel consumption.

Page 3: SIGNAL AND TELECOMMUNICATION DEPARTMENT FOR SPEED, …€¦while maintaining the reliability Exothermic welding for rail joints & track lead wire connection has been provided. Magnetic

Solar Charging of IPS battery

Telecommunication

Train Control Communication: Omnibus control circuits at each station provided on OFC in B

& D route and on quad cable in E-Route. 6-Quad cable and 4-Quad Cable have been provided

for the Block/ Gate Working and emergency communication. All stations on the B-Route are

provided with a Hot line communications with the adjacent station on OFC network.

The short-haul STM1 equipment is provided at every station (53 stations) in B & D-route. The

STM1 network is protected by long-haul STM4 (7 stations) self healing ring network.

VHF Communication: 5 watts walkie-talkies have been provided to Driver, Guard along with

25 watts VHF set at stations to establish communication between moving train & station staff. In

addition 5 watt Walki Talki sets have also been provided to staff of maintenance dept.

Telephone Exchanges: For Railways Internal Communication requirements telephone exchange

(7 numbers) have been provided at important stations (Solapur, Wadi, Gulberga, Kurduwadi,

Daund and Ahemdnagar). Solapur is connected with the Zonal Headquarter by tie line and NGN

network. BSNL Telephones have been provided at all Railway stations with Caller IDs.

Direct Inward Dialing (DID) is provided at a Solapur Main Exchange form the BSNL as well

as from the mobile user. Each station is provided with the Railway auto telephone from the

nearby telephone exchanges which improve the communication reliability as well as reduction in

the BSNL telephone bills.

Data Communications: Computerized Passengers Reservation System (PRS) is provided at a

12 stations. Unreserved Ticketing System (UTS) is provided at 73 stations. Crew Management

System (CMS) is provided at 5 Crew Lobbies. Freight Operation Information System (FOIS) /

Coach Operation Information System (COIS) is provided at all 16 loading station on the

division.

Railnet connection is provided at Divisional office as well as Residence of Officers.

To conserve the

running of DG sets,

Solar Panel have

been provided at 4

mid section

interlocked gate for

charging of battery.

Page 4: SIGNAL AND TELECOMMUNICATION DEPARTMENT FOR SPEED, …€¦while maintaining the reliability Exothermic welding for rail joints & track lead wire connection has been provided. Magnetic

Integrated coach guidance system

GPS Clocks

Monitoring of Breath Analyzer Test by CCTV

Passenger Information System: PC based Public Address System is provided at 11 stations

to announce the arrival & departure of trains and useful information to travelling passengers.

Train Indication Boards are provided for indicating the train timing and platform numbers at

9 important Railway stations. Coach Indication Boards are provided for indicating the coach

position of the train on the platform at 8 important Railway stations. Token System for the

PRS has been provided at Solapur, Gulbarga and Ahemdnagar station. All the UTS & PRS

windows are provided with terminal repeaters to display fair and journey details to the

passengers.

GPS Platform Clocks are provided at 44 stations.

8 Nos GPS based clocks at control office along with 44 GPS clock

with ASM. GPS clock is being progressively provided to all the

ASM to ensure correct/uniform timing at stations & control.

Closed Circuit Television: IP

based Video Surveillance system is

provided at a Solapur station being

monitored by the Security

department.

Electronic surveillance system provided at all (4)

lobbies for monitoring the Breath Analyzer test of

running staff. All the CCTV has been connected

on network & can be remotely monitored from

Solapur.

Page 5: SIGNAL AND TELECOMMUNICATION DEPARTMENT FOR SPEED, …€¦while maintaining the reliability Exothermic welding for rail joints & track lead wire connection has been provided. Magnetic

POET

Training

To keep pace with rapidly changing technology, continuous knowledge up-gradation of the

maintainer is essential hence special emphasis has been given on providing in-house training to

maintainer. Week maintainers and key resource persons are being identified by depot in-charge

continuously. Confidence Building Course is being conducted by the KRP on various Signalling

& Telecom subject including hands on training. Our MOTO is to provide 2% man-days training

to each maintainer in a year.

Token Indicator System

For PNR enquiry POET (Passenger operated

enquiry Terminal) have been provided at Solapur,

Daund, Ahamdnagar, Gulbarga, Shahabad, Wadi,

Kurduwadi and Pandharpur stations.

Token Indicator System is

provided at Solapur, Gulbarga and

Ahamadnagar stations in PRS

office to have self discipline

among the commuter while

booking their tickets