SIGNAL AND TELECOMMUNICATION DEPARTMENT FOR SPEED, SAFETY,
RELIABILITY AND PUNCHULITY
Migration of Technology from mechanical lever operated semaphore Signal & overhead
communication to panel interlocking with LED signal & OFC based communication was really
fast in Solapur divn. At Solapur we always look forward to adopt state of the art advance
technology for safe & reliable operation of train.
There have been considerable increase of DESU, still significant reduction in Signalling failure
could be achieved by adopting Remote, Online Conditional Monitoring of Signalling equipment
and continuous knowledge up gradation of maintainer (Mechanical to relay based color light
Signalling, Overhead to OFC communication). Out motto is to reduce the maintenance efforts
while maintaining the reliability
To keep pace with change in technology a Divisional training Center have also been set up
with in-house recourses
Signalling
Panel Interlocking: 75 out of 78 stations are provided with a PI including three major
RRI. 1441 out of 2690 main aspects & 1018 auxiliary aspects of Signals are provided
with LED Signals.
Predictive Monitoring/Maintenance free System:
All PI/RRI stations 75 are provided with a Dataloggger
along with networking at the divisional Signal Control for
Preventative Maintenance of Signalling gears and analyzing
the cause of unusual incidences. Point Health Monitoring
Unit is provided for 944 out of 1108 Point machines for
condition based maintenance. Track battery Monitoring
system has been provided for 1713 out of 1805 track circuit.
71 Stations has been provided with the Auto change over
fuse alarm system to arrest failure due to fuse blowing.
41 Block Sections are
provided with an Alcatel
make Digital Axle counter
for the last Vehicle check
on B-Route.
Lightening &Surge Protection: Solapur division is prone to lightning, to avoid any
damage to Signalling & Telecom equipment all installations are provided with B & C
Class surge protection devices and Maintenances Free Earth for the power equipments.
Most of the stations in KWV-LUR section are unmanned; to reduce maintenance efforts
while maintaining the reliability Exothermic welding for rail joints & track lead wire
connection has been provided.
Magnetic boom Lock has been provided on 34 Nos of LC as an additional safety measure
to ensure positive locking of the LC gate in closed position.
Remote Power supply & Battery Monitoring System:
Power Supply: Power supply is the heart of Signalling
System any defect/failure of Power supply leads to
complete shutdown of Signalling System. Accordingly
special emphasis has been given to Power supply. IPS has
been provided at all PI stations (71) (excluding major
RRI) including 12 interlocked gates to prevent the
blanking of the signal.
To charge of batteries during long power cut 175 Diesel
Generator Set has been provided at stations & Interlocked
LC gates.
Reliable working of IPS and battery is essential
for functioning of Signalling equipment. GIU
based Remote Power Supply monitoring
(Integrated Power Supply) system in Daund-
Manmad section & Remote predictive battery
monitoring system for Padhegaon station have
been commissioned for first time on Indian
Railway. This will ensure round the clock
monitoring of IPS & individual battery from
Centralized Control. This will also enable to
monitor the running of DG & will ensure saving
in fuel consumption.
Solar Charging of IPS battery
Telecommunication
Train Control Communication: Omnibus control circuits at each station provided on OFC in B
& D route and on quad cable in E-Route. 6-Quad cable and 4-Quad Cable have been provided
for the Block/ Gate Working and emergency communication. All stations on the B-Route are
provided with a Hot line communications with the adjacent station on OFC network.
The short-haul STM1 equipment is provided at every station (53 stations) in B & D-route. The
STM1 network is protected by long-haul STM4 (7 stations) self healing ring network.
VHF Communication: 5 watts walkie-talkies have been provided to Driver, Guard along with
25 watts VHF set at stations to establish communication between moving train & station staff. In
addition 5 watt Walki Talki sets have also been provided to staff of maintenance dept.
Telephone Exchanges: For Railways Internal Communication requirements telephone exchange
(7 numbers) have been provided at important stations (Solapur, Wadi, Gulberga, Kurduwadi,
Daund and Ahemdnagar). Solapur is connected with the Zonal Headquarter by tie line and NGN
network. BSNL Telephones have been provided at all Railway stations with Caller IDs.
Direct Inward Dialing (DID) is provided at a Solapur Main Exchange form the BSNL as well
as from the mobile user. Each station is provided with the Railway auto telephone from the
nearby telephone exchanges which improve the communication reliability as well as reduction in
the BSNL telephone bills.
Data Communications: Computerized Passengers Reservation System (PRS) is provided at a
12 stations. Unreserved Ticketing System (UTS) is provided at 73 stations. Crew Management
System (CMS) is provided at 5 Crew Lobbies. Freight Operation Information System (FOIS) /
Coach Operation Information System (COIS) is provided at all 16 loading station on the
division.
Railnet connection is provided at Divisional office as well as Residence of Officers.
To conserve the
running of DG sets,
Solar Panel have
been provided at 4
mid section
interlocked gate for
charging of battery.
Integrated coach guidance system
GPS Clocks
Monitoring of Breath Analyzer Test by CCTV
Passenger Information System: PC based Public Address System is provided at 11 stations
to announce the arrival & departure of trains and useful information to travelling passengers.
Train Indication Boards are provided for indicating the train timing and platform numbers at
9 important Railway stations. Coach Indication Boards are provided for indicating the coach
position of the train on the platform at 8 important Railway stations. Token System for the
PRS has been provided at Solapur, Gulbarga and Ahemdnagar station. All the UTS & PRS
windows are provided with terminal repeaters to display fair and journey details to the
passengers.
GPS Platform Clocks are provided at 44 stations.
8 Nos GPS based clocks at control office along with 44 GPS clock
with ASM. GPS clock is being progressively provided to all the
ASM to ensure correct/uniform timing at stations & control.
Closed Circuit Television: IP
based Video Surveillance system is
provided at a Solapur station being
monitored by the Security
department.
Electronic surveillance system provided at all (4)
lobbies for monitoring the Breath Analyzer test of
running staff. All the CCTV has been connected
on network & can be remotely monitored from
Solapur.
POET
Training
To keep pace with rapidly changing technology, continuous knowledge up-gradation of the
maintainer is essential hence special emphasis has been given on providing in-house training to
maintainer. Week maintainers and key resource persons are being identified by depot in-charge
continuously. Confidence Building Course is being conducted by the KRP on various Signalling
& Telecom subject including hands on training. Our MOTO is to provide 2% man-days training
to each maintainer in a year.
Token Indicator System
For PNR enquiry POET (Passenger operated
enquiry Terminal) have been provided at Solapur,
Daund, Ahamdnagar, Gulbarga, Shahabad, Wadi,
Kurduwadi and Pandharpur stations.
Token Indicator System is
provided at Solapur, Gulbarga and
Ahamadnagar stations in PRS
office to have self discipline
among the commuter while
booking their tickets