siempre viva business park - murphy development...
TRANSCRIPT
50,000 SF - 130,000 SF Build-to-SuitAvailable For Lease or Sale
SIEMPRE VIVA BUSINESS PARKBUILDING 17 & 18 San Diego, California 92154
Spec Building 18 Available Q1 2016
Siempre Viva Business Park Advantages
n A 116 acre corporate industrial and technology parkn State-of-the-art industrial and technology buildingsn Corporate landscaping and CC&R'sn U.S. Department of Commerce Foreign Trade Zonen Otay Mesa's highest quality business parkn All street, gutter, sidewalk, and utility infrastructure in placen Sustainable building and site designn Plan completed - Shell delivery in 150 days
Otay Mesa Advantages
n New freeways: SR-905 and SR-125n Estate and family-oriented homes in Otay Ranch and Eastlake provide spectacular housing for executives and staffn South Bay offers San Diego County's most plentiful labor supplyn Time-saving reverse commutes against traditional traffic
SIEMPRE VIVA BUSINESS PARK A 2,100,000 SF master-planned, corporate quality industrial park located in the Otay Mesa area of the City of San Diego.
n Building 17 79,050 square feetn Building 18 121,790 square feet
INDUSTRIAL BUILD-TO-SUITS FOR SALE OR LEASE
PROJECT SUMMARY
DET
ENTI
ON
BA
SIN
BUILDING17
79,050 SF
PROPOSEDOFFICEAREA
PROPOSEDOFFICE
TRUCK COURT
26 D
OCK
HIGH
LOAD
ING
DOOR
S 50'
PROP
OSED
OFF
ICE
557'
470'
155'
56'
210'
KERNS STREET
SIEMPRE VIVA ROAD
MEL
KSEE
STR
EET
RAMP
19 D
OCK
HIGH
LOAD
ING
DOOR
S TRUCK COURT
PROPOSEDOFFICEAREA
56'
50'
BUILDING18
121,970 SF
PROPOSEDOFFICEAREA
132'
RAMP
192'
132'
BUILDING 178625 SIEMPRE VIVA ROAD
BUILDING 17 FEATURES
MEZZANINE AREA 6,200 SFBUILDING FOOTPRINT AREA 72,850 SFTOTAL AVAILABLE AREA 79,050 SF DIVISIBLE FROM 36,425 SFMINIMUM CLEAR HEIGHT 28’TYPICAL COLUMN SPACING 50’ X 56’BUILDING DIMENSIONS 155’ X 470’MINIMUM TRUCK YARD DEPTH 192’DOCK HIGH LOADING DOORS 19GRADE LOADING DOORS 2STANDARD PARKING 143STANDARD PARKING RATIO 1.5 / 1,000LAND AREA 4.2 ACRES
nCORPORATE ENTRYnCONFERENCE ROOM BALCONYn3.0% VENTED SKYLIGHTSnHIGH LEVEL NATURAL WAREHOUSE LIGHTINGnOFFICE SPACE TO SUITnWIDE CONCRETE TRUCK COURTSnESFR SPRINKLERSn480 / 277 VOLT 3 PHASE POWERnAMPLE POWER, SEWER, AND WATER
BUILD-TO-SUIT AVAILABILITY
RENTAL RATE: $.695 NNN
DET
ENTI
ON
BA
SIN
BUILDING17
79,050 SF
PROPOSEDOFFICEAREA
PROPOSEDOFFICE
TRUCK COURT
26 D
OCK
HIGH
LOAD
ING
DOOR
S 50'
PROP
OSED
OFF
ICE
557'
470'
155'
56'
210'
KERNS STREET
SIEMPRE VIVA ROAD
MEL
KSEE
STR
EET
RAMP
19 D
OCK
HIGH
LOAD
ING
DOOR
S TRUCK COURT
PROPOSEDOFFICEAREA
56'
50'
BUILDING18
121,970 SF
PROPOSEDOFFICEAREA
132'
RAMP
192'
132'
BUILDING 188602 KERNS STREET
BUILDING 18 FEATURES
MEZZANINE AREA 5,000 SFBUILDING FOOTPRINT AREA 116,970 SFTOTAL AVAILABLE AREA 121,970 SF DIVISIBLE FROM 21,000 SFMINIMUM CLEAR HEIGHT 28’TYPICAL COLUMN SPACING 50’ X 56’BUILDING DIMENSIONS 210’ X 557’MINIMUM TRUCK YARD DEPTH 132’DOCK HIGH LOADING DOORS 26GRADE LOADING DOORS 4STANDARD PARKING 186STANDARD PARKING RATIO 1.5 / 1,000LAND AREA 10.44 ACRES
nCORPORATE ENTRYnCONFERENCE ROOM BALCONYn3.0% VENTED SKYLIGHTSnHIGH LEVEL NATURAL WAREHOUSE LIGHTINGnOFFICE SPACE TO SUITnWIDE CONCRETE TRUCK COURTSnESFR SPRINKLERSn480 / 277 VOLT 3 PHASE POWERnAMPLE POWER, SEWER, AND WATERn5 EXCLUSIVE INGRESS / EGRESS POINTS TO THE SITE
BUILD-TO-SUIT AVAILABILITY
RENTAL RATE: $.695 NNN
805INTERSTATE
5INTERSTATE
905
905
125
11
DowntownSan Diego
San DiegoIntl Airport
Coronado
Point Loma
TJ IntlAirport
Brown FieldAirport
Otay MesaPort of Entry
Brittania Blvd
Otay Mesa Rd
Airway Rd
Siemp
re Vi
va R
dCross BorderTerminal
N
Inte
rnat
iona
l Bor
der
Pacifi c Ocean
BROWN FIELDTECHNOLOGY PARK
Bldg 17Bldg 18
OTAY MAJOR TENANTS AERIAL
PARK SUMMARYWestern Phase [In Process]
Tenant / User Land Area Total SF
FedEx / Pacific World (14) 12.4 248,136General Dynamics (15) 11.3 225,763Tyson / Circle Foods (16) 9.7 159,631Building 17 4.8 79,050Building 18 7.6 121,970
Total 45.1 834,550
Eastern Phase [Completed]
Tenant / User Land Area Total SF
Hitachi Transport (8) 6.3 112,000Hitachi Transport (9) 12.2 257,972US Joiner/Mattel (10) 7.6 115,290Kojima America (11) 6.4 103,908
Total 32.5 589,170
Siempre Viva Business Park Summary
Land Area Total SF
Central Phase 37.9 670,603Eastern Phase 32.5 589,170Western Phase 45.1 834,550
Total 115.5 2,094,323
Central Phase [Completed]
Tenant / User Land Area Total SF
San Diego Coil Center (SDCC) 4.2 82,000Samwha USA, Inc. (1) 2.7 44,185Triboro (2) 3.5 66,243Pioneer / NYK (3) 3.4 56,120Air Tiger / Art Leather (4) 3.4 56,120UPS-SCS / BOSE (5) 6.2 118,550Iron Mountain (6) 10.0 187,625UPS-SCS / Eaton (7) 4.5 59,760
Total 37.9 670,603
AERIAL
ORIGINAL SIEMPRE VIVA BUSINESS PARK TENANTS AND OWNER USERS
1
2
3
4
5
7
8
9
10
11
14
16
SDCC
FUTURE BUILDING 17
FUTURE BUILDING 18
PACIFIC WORLDC O S M E T I C S
VF Corporation
15
6
163
54
67
125
15
5
15
OTAY MESAUNITED STATES
MEXICO
POWAY
CLAIREMONTMESA
TIERRASANTA
NATIONALCITY
BONITA
OTAY RANCH
EASTLAKE
DEL MAR
BROWN FIELDAIRPORT
LA JOLLA
POINTLOMA
MISSIONBAY
CORONADO
IMPERIALBEACH
SAN DIEGO
EL CAJON
24MILES
KEARNY MESA22
MILES
UNIVERSITYTOWN CENTER
27MILES
LINDBERGHFIELD21
MILES DOWNTOWN19
MILES
MID-CITY LA MESA
54
67
125
125
125
905905
56
54
94
163
94
52 52
8055
15
15
15
5
8
805
805
8
SANTEE
SPRINGVALLEY
MISSION VALLEY
Freeway access to allSan Diego locations
OTAY RANCH
▪ 23,000 ACRES
▪ MASTER-PLANNED FOR UP TO 40,000 HOMES
57MILES
OCEANSIDE
JAMUL
GRANITE HILLS 361MILES
PHOENIX
51MILES
CARLSBAD
BROWN FIELDTECHNOLOGY PARK
FREEWAY MAP
UNITED STATES
MEXICO
BROWN FIELDMUNICIPAL AIRPORT
TIJUANA INTERNATIONALAIRPORT
OTAY MESA RD
AIRWAY RD
SIEMPRE VIVA RD
BRITANNIA BLVD
CACTUS RD
HERITAGE RD
LA MEDIA RD
125
905
905
ALTA RD
ENRICO FERMIN DR
OTAY MESABORDER CROSSING
HIGHWAY 11UNDER CONSTRUCTION
FUTURE OTAY MESA IIPORT OF ENTRY
5
DET
ENTI
ON
BA
SIN
SIEMPRE VIVA ROAD
KERNS STREET KERNS STREETKERNS STREET
LA M
EDIA
RO
AD
EN
AL REK
CUR
D
TE
ERTS
NE
NR
AS
1110
1
16
14
2
3PIONEER
5
BOSE
6
NYKDISTRIBUTIONS
SAMWHAUSA UPS-SCS
EATONIRONMOUNTAIN
PACIFICWORLD
KOJIMA AMERICA
CIRCLE FOODS
FEDEX
15GENERAL DYNAMICS
/ NASSCO
HITACHITRANSPORT
USJOINERMATTEL
MDC
SANDIEGOCOIL
CENTER7
CONTAINERFREIGHT STATION
8
4
40 AVAILABLE TRAILER PARKING SPACES
17 79,020 SF
TEERTS EESKLE
M
18121,970 SF
WESTERN PHASECENTRAL PHASE EASTERN PHASE
9
CROSS BORDER TERMINAL UNDERCONSTRUCTION
SIEMPRE VIVABUSINESS PARK
BFTP
BFTP
BFBP
BFBP
SDBP
SDBP
BFBP Brown Field Business Park
BFTP Brown Field Technology Park
SDBP San Diego Business Park
Freeway On/Off Ramp
SUBMARKET MAP
MURPhY DEVELOPMENT COMPANY OTAY MESA ExPERIENCE
OTAY MESA BUILD-TO-SUIT OR LEASE TRANSACTIONSSan Diego Business Park Square Feet
Sanyo: Phase 1 323,745Sanyo: Phase 2 443,000Maxell America 108,000American Home Products 229,000Casio 76,800Hitachi Transport System America 57,600Nippon Seiko / Electrolux 86,600
Total San Diego Business Park 1,324,745
Brown Field Business Park
Masterplanned 2,000,000Constructed:Honeywell 205,800Graphite Design International 84,000
Total Brown Field Business Park 289,800
Brown Field Technology Park
Masterplanned 3,200,000
Total Brown Field Technology Park 3,200,000
Siempre Viva Business Park Square Feet
San Diego Coil Center 82,000Samwha USA, Inc. 44,185Triboro 66,243Pioneer / NYK Distributions 56,120Air Tiger Express / Art Leather 56,120UPS-SCS / BOSE 118,550Iron Mountain 187,625UPS-SCS / Eaton 59,760Hitachi Transport (Buildings 8 & 9) 369,972US Joiner / Mattel 115,290Kojima America 103,908VF Corporation / Other 248,136General Dynamics 225,763Tyson / Circle Foods 159,631
Total SVBP Buildings Constructed 1,893,303
Buildings Available
Buildings 17 79,050Buildings 18 121,970
Total SVBP Buildings 2,094,323
Otay Mesa Corporate Parks Net Land Acres Master-Planned Square Feet Status
San Diego Business Park 80 acres 1,324,745 completedBrown Field Business Park 155 acres 2,000,000 completedSiempre Viva Business Park 116 acres 2,094,323 currentBrown Field Technology Park 50 acres 3,200,000 current
Total 401 acres 8,619,068
hISTORY
For More Information Please Contact
ANDY IRWIN619.710.8000 x13
MURPHY DEVELOPMENT COMPANY2750 Womble Road, Suite 102San Diego, California 92106
www.murphydev.com
CONTACT