  • 8/13/2019 Siemens PLM TMC Cancela Cs Z3

    1/5

    Product

    NX, Teamcenter

    Business challenges

    Improve time-to-market

    Quickly adapt to market

    demands

    Increase productivity

    Ensure traceability of data

    Offer high value-added

    products

    Keys to success

    Utilize exibility enabled by

    integration/synchronization of

    NX and Teamcenter

    Adjust processes to PLM best

    practices

    Use unique codes for all parts in

    all processes and departments

    Results

    Responded more quickly to

    market demand

    Signicantly increased

    productivity

    Enhanced traceability and

    integration of data

    Reduced product develop-

    ment time

    Increased effectiveness and

    control of all processes

    TMC Cancela signicantlyincreases productivity

    Taking advantage of trustworthy tools

    TMC Cancela is based in Galicia, Spain, and

    designs and manufactures agricultural and

    forestland machinery, such as mowers and

    shredders. Founded in 1971 to providecustomized and repair services to local

    farmers, TMC Cancela is currently leading

    its sector in Spain with sales growing over

    20 percent annually.

    We are committed to provide high value-

    added products based on design, quality

    and the pursuit of excellence, says J.

    David Sears, head of design at TMC

    Cancela.

    Industrial machinery and equipment

    www.siemens.com/plm

    TMC CancelaAgricultural machinery manufacturer uses NX and Teamcenter toquickly respond to market demand

    The company employs fty people, and is

    planning to expand to meet the growing

    international demand for its products. TMC

    Cancela products are sold in most of

    Europe, the United States, Canada, Latin

    America and Africa. It is expected that, in

    2013, exports will account for nearly 50

    percent of the companys total revenue.

    Key factors in the companys success

    include its vibrant and creative staff,

    extensive industry experience, a willing-

    ness to continuously adapt to consumer

    demands and a strong focus on research

    and development (R&D), which the com-

    pany dedicates 12 percent of revenue

    annually.

    http://www.siemens.com/plmhttp://www.siemens.com/plm
  • 8/13/2019 Siemens PLM TMC Cancela Cs Z3

    2/5

    We have a lot of talent and creativity at ourdisposal in the technical and R&D departmentbut that talent would be useless withouttrustworthy tools like NX and Teamcenter.J. David Sears

    Head of Design

    TMC Cancela

    We design and develop our products with-

    out outsourcing anything, says Sears.

    Our technical and R&D departments are

    the brain and soul of the company. The

    communication between different depart-

    ments, suppliers and customers is, with

    the support of good software, a key factor

    to be productive and avoid downtime.

    Since 2010, that good software has

    included NX software and Teamcentersoftware from product lifecycle manage-

    ment (PLM) specialist Siemens PLM

    Software. We have a lot of talent and cre-

    ativity at our disposal in the technical and

    R&D department, but that talent would be

    useless without trustworthy tools like NX

    and Teamcenter, says Sears.

    Gaining an edge with 3D design

    In 2010, TMC Cancela decided to imple-

    ment 3D computer-aided design (CAD)

    Another reason that we

    selected NX was because it

    was produced by Siemens

    PLM Software, a renowned

    multinational company. This

    gives you a great sense of

    security, because you know

    the company wont disap-

    pear, youll have strong

    technical support and you

    know big companies around

    the world are committed toSiemens PLM Software.

    J. David Sears

    Head of Design

    TMC Cancela

    software. Until that time, we worked with

    a 2D system, says Sears. To manufac-

    ture a prototype, we needed months to

    play with templates, and a lot of materials

    and working hours were wasted.

    After spending several months analyzing

    3D CAD tools and collecting user experi-

    ences from several companies, TMC

    Cancela selected NX. We thought NX was

    a good value and we liked the fact that NX

    was highly congurable and modular soft-ware, able to grow and improve along

    with the company, says Sears. Another

    reason that we selected NX was because it

    was produced by Siemens PLM Software, a

    renowned multinational company. This

    gives you a great sense of security,

    because you know the company wont dis-

    appear, youll have strong technical sup-

    port and you know big companies around

    the world are committed to Siemens PLM

    Software.

  • 8/13/2019 Siemens PLM TMC Cancela Cs Z3

    3/5

    In just one week, TMC Cancela imple-

    mented NX with the support and training

    of Avantek, a partner of Siemens PLMSoftware.

    Despite having never worked with 3D

    software, the staff quickly adapted due to

    the usability of the tool, and as a result,

    the improvements quickly became obvi-

    ous, says Sears. By changing from 2D

    to 3D, we noticed a drastic improvement

    in the speed of response, prototyping and

    management of the technical documenta-

    tion. To say that we improved production

    by 100 percent with NX would be an

    understatement.

    Thanks to 3D design, our prototypes have

    become far more polished; much more like

    the nished machines that we have in

    mind, says Nicols Pichel, head of engi-

    neering at TMC Cancela. With NX, we

    have the agility to design and make modi-

    cations that allow us to market more new

    products and be highly exible in our rela-

    tions with our customers; if they ask us for

    a particular model or customization, we

    can respond very quickly.

    Using Teamcenter to improve productivityWith the successful implementation of NX,

    TMC Cancela decided to take another

    step forward to improve its processes by

    adopting a complete PLM solution. The

    Teamcenter implementation took about

    three months and included a review of

    previous procedures.

    We decided on Teamcenter because it

    seamlessly communicates directly and in

    real time with NX, and because we had

    very good references on it from othercompanies, says Sears. We also decided

    that Teamcenter would be the starting

    point for the whole companys way of

    working. We started using it for coding

    items for all processes and departments.

    This proved to be a major improvement

    because today, we enjoy higher levels of

    order, quality, exibility and agility, with-

    out duplications or redundancies through

    the organization.

    Sears says the decision to adjust the

    companys processes to the specic cus-tomization tools within Teamcenter was

    critical to the projects success: If a com-

    pany is tempted to tailor Teamcenter too

    much to its traditional ways of working, it

    risks repeating the same mistakes it had

    been making. Instead, it is worth making

    an effort to adapt to the predened fea-

    tures of the new tool. In our case, this

    resulted in a great improvement in

    productivity.

    To say that we improved

    production by 100 percentwith NX would be anunderstatement.J. David Sears

    Head of Design

    TMC Cancela

  • 8/13/2019 Siemens PLM TMC Cancela Cs Z3

    4/5

    Using NX to increase operational

    efciencyTMC Cancela uses ve NX modules

    modeling, sheet metal, assembly, drawing

    and simulation for designing, dimension-

    ing, manufacturing assemblies and manag-

    ing technical documentation, such as

    assembly, parts and manufacturing draw-

    ings handbooks. Sears points out that in

    relation to other design software, NX is

    very suited to manage mechanical parts

    catalogs, especially because of its perfect

    integration and synchronization with

    Teamcenter.

    Sears particularly appreciates the stabil-

    ity and exibility of NX: The management

    of multi-level assemblies is very easy,

    because you just need to cut and paste.

    Users can design their pieces at their own

    pace without worrying about technical

    procedures or a preconceived structure. I t

    is also very easy to use. The environment

    is very clean, intuitive and easily customiz-

    able. Ultimately, the stability, exibility

    and user-friendly features of NX resulted

    in signicant operational efciency.

    Managing with agility

    The Teamcenter solution is used at TMC

    Cancela for document management in the

    design and production launch areas.

    PLM has played a very important role for

    us, says Pichel. We have a large range of

    models, with many variations within each.

    Bringing a document management system

    for each model with an independent prod-

    uct lifecycle gives us great agility when

    managing items such as spare parts and

    all after-sales activities.

    Pichel notes that Teamcenter enables users

    to quickly access information of any part

    or item in relation to the design, the pro-

    duction launch and the changes or valida-

    tions. Therefore, information can be easily

    traced, which is crucial to effective quality

    control. He notes, It is very easy to search

    for any part thanks to the large number of

    customizable lters.

    When going from an existing design to a

    new design, Teamcenter gives us a lot of

    exibility to make changes, and review

    and save assemblies and parts, with no

    linking problems, adds Picehl. With

    Teamcenter, it is easy to handle bothlarge and small assemblies. He notes,

    Teamcenter is also an exceptionally

    usable tool, because it delivers a very

    simple environment to work in.

    Getting a new product to

    market before your competi-

    tors is essential, because they

    have probably detected the

    same needs in the market as

    you have. Therefore, it is

    necessary to speed up the

    product development process

    as much as possible, and that

    is something that the SiemensPLM Software solutions

    allow us to do very well.

    J. David Sears

    Head of Design

    TMC Cancela

  • 8/13/2019 Siemens PLM TMC Cancela Cs Z3

    5/5

    Solutions/Services

    NX

    www.siemens.com/nx

    Teamcenter

    www.siemens.com/teamcenter

    Customers primary business

    TMC Cancela designs,

    develops and manufactures

    agricultural and forestland

    machinery, such as mowers

    and shredders. Founded in

    1971 to provide customized

    and repair services to local

    farmers, TMC Cancela has

    grown into a major manufac-

    turer, with customers and

    dealers all over the world.

    www.tmccancela.com

    Customer location

    Galicia

    Spain

    Partner

    Avantek

    2013 Siemens Product Lifecycle Management Software Inc. Siemens and the Siemens logo are registered trademarks of

    Siemens AG. D-Cubed, Femap, Geolus, GO PLM, I-deas, Insight, JT, NX, Parasolid, Solid Edge, Teamcenter, Tecnomatix and

    Velocity Series are trademarks or registered trademarks of Siemens Product Lifecycle Management Software Inc. or its

    subsidiaries in the United States and in other countries. All other logos, trademarks, registered trademarks or service marks

    used herein are the property of their respective holders.

    Z3 37192 10/13 Awww.siemens.com/plm

    Siemens Industry Software

    Americas +1 314 264 8499

    Europe +44 (0) 1276 413200

    Asia-Pacic +852 2230 3308

    When going from an existingdesign to a new design,Teamcenter gives us a lot offlexibility to make changes, andreview and save assemblies

    and parts, with no linkingproblems.Nicols Pichel

    Head of Engineering

    TMC Cancela

    Getting to market faster

    Three years after implementing Siemens

    PLM Software technology, TMC Cancela is

    clearly enjoying the results. For that rea-

    son, the company plans to update NX

    and Teamcenter and acquire new

    licenses. Other projects in the works

    include connecting Teamcenter to its

    enterprise resource planning (ERP) sys-

    tem and expanding the use of this solu-

    tion to the purchasing, production and

    after-sales departments.

    Getting a new product to market before

    your competitors is essential, because

    they have probably detected the same

    needs in the market as you have, says

    Sears. Therefore, it is necessary to

    speed up the product development pro-cess as much as possible, and that is

    something that the Siemens PLM

    Software solutions allow us to do

    very well.

    http://www.siemens.com/nxhttp://www.siemens.com/nxhttp://www.siemens.com/teamcenterhttp://www.siemens.com/teamcenterhttp://www.tmccancela.com/http://www.tmccancela.com/http://www.siemens.com/plmhttp://www.siemens.com/plmhttp://www.tmccancela.com/http://www.siemens.com/teamcenterhttp://www.siemens.com/nx