TRAINING REPORT Submitted to the Department of Mechanical engineering of B.G.I.E.T SANGRUR Providing the Details of Six Months Training At YERIK INTERNATIONAL(LUDHIANA) Submitted To: Submitted By: Er. Gurmeet Singh Cheema Shubham Garg 100111128504 DEPARTMENT OF MECHANICAL ENGINEERING BHAI GURDAS INSTITUTE OF ENGINEERING & TECHNOLOGY (SANGRUR) Jan-June (2014)

Upload: jasvir-singh

Post on 19-Jan-2016

38 views

Category:

Documents


0 download

DESCRIPTION

6 month training file

TRANSCRIPT

Page 1: Shubham Final File

TRAINING REPORT

Submitted to the Department of Mechanical engineering of

B.G.I.E.T SANGRUR

Providing the Details of Six Months Training

At

YERIK INTERNATIONAL(LUDHIANA)

Submitted To: Submitted By: Er. Gurmeet Singh Cheema Shubham Garg

100111128504

DEPARTMENT OF MECHANICAL ENGINEERING

BHAI GURDAS INSTITUTE OF ENGINEERING &

TECHNOLOGY

(SANGRUR)

Jan-June (2014)

Page 2: Shubham Final File

`

Page | 3

ACKNOWLEDGEMENT

I would like to thank the entire yerik international who has provided me this

six months training. I am thankful to the HRD officer of training centre who

organized my training schedule and also the DGM’s and AGM’s of various shop

departments who have provided me the various knowledge about their respective

shops.

I also thanks to the workers of their respective departments, who were always

ready to clarify our doubts and helped us to increase our knowledge by illustrating us

to the finer points.

I wish to express my deep gratitude to all the concerned persons, whose co-

operation and co-ordination have given me the success to complete my training in

organization.

I hope that my report will reflect our technical knowledge and innovativeness

Page 3: Shubham Final File

`

Page | 4

PREFACE

Industrial training is part and parcel of every technical course and gives a face or form

to all the theoretical knowledge we gain in our classroom. We get to have a virtual

experience of the processes, methods, objects and phenomenon which used to be just

an imaginary picture in our minds. It also gives an exposure to the environment of the

industries and workshops which are virtual components of our professional life. We

too were provided with this opportunity this summer.

We are thankful to our college administration that handed this invaluable

chance to us and at the same time we pay our regards to the administration of HMT

Pinjore (Machine Tools Division) that proved to be a great supporting force for the

fulfillment of the purpose. The officials and the workers of the firm provided us with

the best of their attention and share ample of knowledge of their concerned field with

us.

Page 4: Shubham Final File

`

Page | 5

ABSTRACT

Industrial Training plays very much significant role in the course of engineering. It

provides the student during the engineering course a boost to enhance his technical

skills, abilities and creativity. Industrial training backens up the theoretical knowledge

by practical knowledge gained during the course. As is widely said, ”ounce of

practical is better than the tons of theory”. In fact, both these two things are

incomplete without each other. In this report, I have tried my level best to present the

work undertaken by me during my training period in liquid, concise and precise

manner. Engineering means optimum utilization of resources for the achievement of

the desired objectives. Projects and some suggestions given by me in this report under

the guidance of my Industrial Tutor, Mr. Dinesh Rana MR. is a step forward towards

the definition of engineering.

Page 5: Shubham Final File

`

Page | 6

TABLE OF CONTENTS

Chapters Contents Page No.

1. Introduction 8

2. Raw Material Procurement 14

3. Manufacturing Infrastructure 16

3.1. Bar Drawing Facility 17

3.2. Forging Facility 19

3.3. Heat Treatment 20

3.4. Machine Shop (forged

components)

21

3.5. Machine Shop (Drawn

Components)

22

3.6. Surface Treatment 24

3.7. Tool Room 25

4. Components Manufactured 26

4.1. Spring Pin 29

4.2. U-bolt 32

4.3. Over running clutch 36

4.4. Top link pipe 37

4.5. Eye bolt 38

4.6. Top link pin 39

5. Hot Forging Shop 40

6. Cold Forging Shop 42

7. Heat Treatment 44

7.1. Annealing 45

7.2. Hardening 46

7.3. Tempering 47

7.4. Induction Hardening 51

8. Non-Ferrous Bush Shop 54

9. Surface Treatment

10.1. Zinc-Plating Shop 59

Page 6: Shubham Final File

`

Page | 7

10.2. Phosphating Shop 60

11. Projects

11.1. Project 1 62

Page 7: Shubham Final File

`

Page | 8

CCHHAAPPTTEERR11::

IINNTTRROODDUUCCTTIIOONN

1.1 COMPANY PROFILE

The word, YERIK, is the synonym of God’s own creation. This is the feeling behind

all the actions and activities undertaken at YERIK INTERNATIONAL.

YERIK, which is a venture into Steel Industry, has its roots in the companies which

are the trend setters, the pioneers, the leaders, catering to your needs of Agriculture

Machinery, Steel Forgings and other allied Engineering Products for the last 18 years.

The cultures of industrial giants, Resource International & Excell Exports (in which

Mr. M.K. Chopra was a partner) and Preet Forgings Pvt. Ltd., have seeped into the

paraphernalia of YERIK by virtue of the substantial involvement of its proprietor, Mr.

M.K. Chopra into the working and trendsetting activities of these companies, with

him being the mind and soul of the group.

His experience of the world market and scrupulous and conscientious dealing with his

customers since 1990 has finally materialized in the form of YERIK

INTERNATIONAL.

Tanav Chopra who is elder son of Mr. M.K. Chopra, after completing his Masters in

Business Administration (from university of WALES) has joined Yerik. He is

assisting his father in sales & management. Tanav is also a diploma holder in Tools &

Die making.

The group goes global with YERIK, taking care of the Agriculture machinery,

Engineering goods & Hand tool markets of US, Europe, Australia, South Africa,

Middle East & Asia Pacific.

The overall working of the group is governed by Mr. Mohinder Chopra, with the help

of the trust worthy and Mr. Yash Pal Trehan (Vice President-Technical) along with a

Page 8: Shubham Final File

`

Page | 9

vast team of over 800 dedicated Workers and Engineers (some have been trained in

Italy), who give their 100% every second, to the company and its growth.

Beside business activities YERIK group is involved in sports activities. Mr. M.K.

Chopra is President of Ludhiana Badminton Academy which is providing free

coaching to children from the age group of 6-13 years. Academy is also providing

scholarship to needy & poor kids.

1.2 PRODUCT RANGE

1. Forged Top links & Parts

.

Fig. no. – 1.2 (a)

2. Pto Adaptors

Fig. no. – 1.2 (b)

3. Draw Bars & Stay Straps

Page 9: Shubham Final File

`

Page | 10

Fig. no. 1.2 (c)

4. Weldons

Fig. no. 1.2 (d)

5. Forged Top Links & Parts

Fig.no- 1.2(e)

6. Stabilizers

Fig. no.-1.2(f)

7. Pins

Page 10: Shubham Final File

`

Page | 11

Fig. no.-1.2(g)

8. Hitch balls

Fig. no. -1.2(h)

9. Tine bushes

Fig. no. 1.2 (i)

10. Weather caps

Page 11: Shubham Final File

`

Page | 12

Fig. no. 1.2 (j)

11. Levelling boxes

Fig. no. 1.2 (k)

12. Small parts

Page 12: Shubham Final File

`

Page | 13

Fig. no. 1.2 (l)

pin

Page 13: Shubham Final File

`

Page | 14

CHAPTER 2:

RAW MATERIAL PROCUREMENT

The raw material is in form of long cylindrical rods. The raw material is different

types of nuts & bolts. The colour codification for different for different materials are

as follows:

Material

Colour Code

Mild Steel /C-30 No colour

6T/EN-8K White

EN-8D Black

CK-45 Brown

SAE-1541 Yellow

SAE-4140 Sky Blue

SAE-8620 Pink

EN-353 Green

41 Cr 4 Navy Blue

H.D.S. 9% W White, Red

H.C.H. Cr Yellow, Red

O.H.N.S. Yellow, Navy Blue

H.S.S. 16:4:1 (TCV) White, Yellow

H.S.S. 6:5:2 White, Navy Blue

EN-24 Yellow, Green

EN-31 Sky-Blue, Navy Blue

EN-36 Yellow, Black

H.D.S. 5% Cr Sky Blue, Red

EN-45 White, Green

42 Cr Mo2 Smoke Grey

SAE 15B41 Orange

Page 14: Shubham Final File

`

Page | 15

2.1 RAW MATERIAL SUPPLY

As per the quality policy of every industry the raw material for a manufacturing must

be of excellent quality as per the requirement. These materials are passed through a

metallurgy laboratory for inspection and testing as per requirements. There are

various Indian industries for fulfilling the raw material requirement of the industry.

Some of the majors industries which supply the raw material to are listed as follow:-

1. Garg Industries, Dhandari

2. O.K. Industries Pvt. Ltd.Dhandari

3. Prem Auto Ltd.

4. Surinder Engineering Works

When the raw material is once unloaded in the industry, then the yellow tag is

given to it. Yellow tag is used to show that the material is going under inspection and

testing in the metallurgy laboratory. After the inspection and testing if it is found that

material has a quality and properties as per industrial requirements, then green tag is

given to it and if it fails as per the requirements, then red tag is given to it.

Page 15: Shubham Final File

`

Page | 16

CHAPTER 3:

MANUFACTURING INFRA-STRUCTURE

BAR DRAWING FACILITY

COLD FORGING FACILITY

HOT FORGING FACILITY

HEAT TREATMENT FACILITY

Carburising

Hardening

Tempering

Annealing

INDUCTION HARDENING

MACHINING FACILITY

SURFACE TREATMENT

Phosphating

Auto black

Zinc Electro-plating

Painting

TOOL ROOM

FERROUS & NON FERROUS BUSH SHOP

Page 16: Shubham Final File

`

Page | 17

33..11 MMANUFACTURING FFACILITIES

The strength and expertise in the development and manufacture of Components due to

our In-house facilities has explored new horizons to provide a vast range

of components. Almost all the operations are carried out under One-roof.:-

3.1 Bar Drawing Facility

Step Turning Acid Pickling Bar Drawing

Bar Straightening Power Press Band Saw

Fig: 3.1 Processes in Bar Drawing

In a rod or bar drawing, the product must remain straight. In the Bar Drawing Section

the following steps are followed:-

1. Step turning

2. Pickling

Page 17: Shubham Final File

`

Page | 18

3. Drawing

4. Straightening

5. Cutting

6. Facing & chamfering

There are the following machines in the bar drawing section:-

1. Step turning machines 3

2. Pickings tanks 8

3. Chain draw benches 5

4. Straightening machines 5

5. Cutting machine

Shearing presses 7

Band saws 3

6. Facing & chamfering

Single end chamfering 5

Both end chamfering 3

Page 18: Shubham Final File

`

Page | 19

33..22 FFOORRGGIINNGG FFAACCIILLIITTYY

Fig. 3.2 Forging Process

Facilities:

Friction Screw & Power Press

Centre Lathes

Drilling

SPMs.

Dia Reduction

Cold Heading Double Stroke &

Single Stroke

Page 19: Shubham Final File

`

Page | 20

33..33 HHEEAATT TTRREEAATTMMEENNTT

(Carburizing, Hardening, Tampering, Annealing )

Fig. 3.3 Induction hardening & Muffle Furnaces

Facilities:

Oil Fired Salt Bath Furnace

Oil Quenching

Water Quenching

Air Circulated Furnace

Electric Muffle Furnace

Electric Salt Bath Furnace

Tempering Plant Air Circulated

Electric Pre-Heating

Annealing

Induction Hardening

Page 20: Shubham Final File

`

Page | 21

33..44 MMAACCHHIINNEE SSHHOOPP

(Forged Components)

Fig. 3.4 Machining Process

Facilities:

Production Lathes

Milling

Threading, Thread Rolling

Polishing

Drilling

Rotary Milling

Tapping

Page 21: Shubham Final File

`

Page | 22

33..55 MMAACCHHIINNEE SSHHOOPP

(Drawn Components)

Fig. 3.5 Drawn Components

Facilities:

Grinding

Bore Grinding

Tool Grinder

Slot Making

Drilling

Automatic Cutting

Tapping

Spl. Purpose Coping

Facing

Milling

Nut Forming

Page 22: Shubham Final File

`

Page | 23

Bar End Turning

Thread Rolling

U-Bolt Bending

Bar Turning

Production Lathes

Copy Turning

Bar Drawing

Wire Drawing

Bar Straightening

Circular Metal Cutting

Descaling & Re-Coiling

Coil Opening

Page 23: Shubham Final File

`

Page | 24

33..66 SSUURRFFAACCEE TTRREEAATTMMEENNTT

Fig.3.6 Painting & Electroplating Process

Facilities:

Zinc Plating Plant

Auto Blackening Plant

Phosphating Plant,

Shot Blasting M/c

Paint Booth

Page 24: Shubham Final File

`

Page | 25

33..77 TTOOOOLL RROOOOMM

Fig. 3.7 Tool Room

Facilities:

Grinding

Tool & Cutter Grinder

Milling

Shaping

Drilling

Planner

Slotting

Pedestral Grinding

Electric Drill

Tap Resharpening

Surface Plate

Page 25: Shubham Final File

`

Page | 26

CHAPTER 4:

COMPONENTS MANUFACTURED

For all the components produced, the procedure, before going to machine

shop, is same; which is as follows:

Annealing: The raw material is first of all annealed to refine its grain structure.

Step turning: The first operation is step turning. The long round bar is loaded onto

a platform & is fed to a lathe machine in which a fixture is there to support the tools.

The tooling arrangement is such that four tools are set in circular arrangement. The

rod is sent to the tools which rotate & reduce the diameter of the bar up to a certain

length.

Acid pickling: This operation is done in order to remove any kind of surface

defects on the surface of long round bars. The bars of different diameter are put in

sulphuric acid (commercial grade). The quantity of sulphuric acid required for

different rods of U-bolts is as follows:

Bar thickness Sulphuric acid

(commercial Grade)

11-16 mm 10.0 ltr.

18-20 mm 12.0 ltr.

21-23 mm 15.0 ltr.

24-32 mm 17.5 ltr.

33-45 mm 20.0 ltr.

Page 26: Shubham Final File

`

Page | 27

The time period for different rods to be acid pickled is 6-8 hours depending on the

diameter.

Cold bar drawing: Then the acid treated bar is sent to the bar- drawing machine.

The reduced end of the bar is put in the die of required diameter. The end is gripped

by a lock. Then the lock is pulled by a very large force which is applied by a big chain

powered by a heavy motor. Thus the bar gets reduced in diameter but is elongated.

Bar cutting: The elongated bar is then cut by using a power- press. The required

length is once set & an obstacle is fixed at that length. Each time the bar strikes that

obstacle the press is actuated and the bar is cut. But this method is conventional one.

The production is not so high in this case, because at a time only one piece can be cut

& also the quality of cut is not good. So a much advanced method is used, which is

automatic power hacksaw. 8-10 bars are loaded on the machine at a time & hacksaw

is started. Due to automation the hacksaw each time cuts equal length & quality of cut

is also good.

Bar straightening: The bar when elongated gets bent & has to be straightened

before machining. So it is sent to the bar straightening machine. The bars are sent into

the machine in whish two skew rollers are there. These rollers are set to rotate and bar

is passed through them. These rollers straighten the bar.

Page 27: Shubham Final File

`

Page | 28

Fig. 4 Plant 1

List of the product manufactured in plant:

SPRING PIN

U-BOLT

OVER RUNNING CLUTCH

TOP LINK PIPE

EYE BOLT

TOP LINK PIN

Page 28: Shubham Final File

`

Page | 29

44..11 SSPPRRIINNGG PPIINN

Fig. 4.1 Spring Pin

This section deals in manufacturing of various types of pins. This section has total 31

machines.

1. Special purpose facing machine

4

2. Horizontal drilling machine

5

3. Vertical drilling machine

2

4. Horizontal milling machine

3

5. Vertical drilling machine

4

6. Horizontal milling machine (single spindle)

5

7. Tapping machine (horizontal)

1

8. Tapping machine (vertical)

3

9. Grooving machine (SPM)

2

Page 29: Shubham Final File

`

Page | 30

10. Pneumatic press

1

11. Magna flux crack detection machine

1

The Various Operation performed in manufacturing Spring Pin are

given as.

S. No. Process Description.

1. Step turning.

2. Pickling.

3. Bar Drawing.

4. Straightening.

5. Peel off.

6. a) Auto cutting, Tap hole, Counter sinking & chamfering.

b) Raw grinding.

7. a) Manual cutting.

b) Side facing.

c) Raw grinding.

d) Tap hole drilling.

e) Counter sinking.

f) Chamfering.

8. Stamping .

9. Grease hole drilling.

Page 30: Shubham Final File

`

Page | 31

10. Cotter slot .

11. Grease slot .

12. Cross hole drill.

13. De burring of cross hole.

14. Tapping .

15. Oil flow test .

16. Visual inspection.

17. Induction hardening.

18. Inspection hardener.

19. Outer dia grinding.

Important Points :-

.

1. Material used:- C K – 45.

2. Application :- it is used to hold the leaf spring with bracket, it is

mainly used in heavy automobiles

.

Page 31: Shubham Final File

`

Page | 32

44..22 UU –– BBOOLLTT

Fig. 4.2 U-Bolts

This section deals with the manufacturing of u bolts. These section has a total

of 29 machines.

1. SPM facing

4

2. SPM turning

5

3. Hydraulic press (vertical)

3

4. Hydraulic press (horizontal)

1

5. Profile threading machine

3

6. Center less grinder

1

Page 32: Shubham Final File

`

Page | 33

7. Hot bending machine

2

8. Cold bending machine

2

9. Grinding machine

1

10. Air compressor

1

11. SPM for nut assembly

1

12. Stamping machine

2

13. Heater

3

Page 33: Shubham Final File

`

Page | 34

The various operations performed in manufacturing U bolts are

given below:-

Sr. No. Process Description.

1. Step turning.

2. Pickling.

3. Bar drawing.

4. Straightening.

5. Blank cutting.

6. End facing.

7. Roll dia turning.

8. Roll dia grinding.

9. Stamping.

10. Thread rolling.

11. Center forging.

12. U forming.

13. Heat treatment.

a) Hardening .

b) Tempering.

14. Surface treatment.

a) Zinc plating .

b) Phosphating.

c) Painting .

Page 34: Shubham Final File

`

Page | 35

d) Hydrogen de – embrittlement ( heated air circulated

furnace).

15. Final inspection.

16. Nut assembly.

17. Packing.

Important Points :-

1. Material used :- M.S., C-45, EN 8K.

2. Daily production :- 2500pcs (local ), 1500pcs(export).

3. Application :- Clamping the leaf spring with axle.

Page 35: Shubham Final File

`

Page | 36

44..33 OOVVEERR RRUUNNNNIINNGG CCLLUUTTCCHH

Fig. 4.3 Over Running Clutch

The various operations performed in manufacturing over running

clutch are given below:-

S.NO. PROCESS DESCRIPTION

1. Forging

2. Rough Machining

3. CNC Machining – 1st

4. Broaching

5. Machining on male part

6. Press Fitting

7. MIG Welding

8. CNC Machining – 2nd

Page 36: Shubham Final File

`

Page | 37

9. Slotting

10. Drilling

11. Finishing

12. Zinc Plating

44..44 TTOOPP LLIINNKK PPIIPPEE

Fig. 4.4 Top Link Pipe

The various operations performed in manufacturing TOP LINK

PIPE are given below:-

S.NO. PROCESS DESCRIPTION

1. Cutting

2. Reducing

3. Boring

4. Threading

Page 37: Shubham Final File

`

Page | 38

5. Drilling

6. Buffing

7. Plating

44..55 EEYYEE BBOOLLTT

Fig. 4.5 Eye Bolt

The various operations performed in manufacturing EYE BOLT are given

below:-

S.NO. PROCESS DESCRIPTION

1. FORGING

2. CNC MACHINING- 1st

33.. CCNNCC MMAACCHHIINNIINNGG –– 22NNDD

44.. TTHHRREEAADDIINNGG

55.. BBRRIIGGHHTT ZZIINNCC PPLLAATTIINNGG

Page 38: Shubham Final File

`

Page | 39

44..66 TTOOPP LLIINNKK PPIINN

Fig. 4.6 top Link Pin

The various operations performed in manufacturing Top link Pin

are given below:-

SS..NNOO.. PPRROOCCEESSSS DDEESSCCRRIIPPTTIIOONN

1. Cutting

2. Machining

3. Drilling

4. Grinding

5. Zinc Plating

Page 39: Shubham Final File

`

Page | 40

CHAPTER 5 HHOOTT FFOORRGGIINNGG SSHHOOPP

In this shop the hot forging is done on the specimen (Rod) by the forging press having

pully mechanism to make the parts.

The detail of hot forging shop

1. Part Name : Clevises

Material : Mild Steel

Machine : Hot Forging Machine

2. IInd machine of hot forging power press to make forged lashing bracket for D-

ring.

Part Name : Forged Lashing Bracket for D-ring

Material : Mild Steel

Machine : Hot forging machine

3. IIIrd forging press machine is the make forged lashing rings.

Part Name : Forged Lashing Rings

Material : Mild Steel

Machine : Hot Forging Power Press

Page 40: Shubham Final File

`

Page | 41

4. IV machine is to make fringes by hot forging press

Part Name : Fringes

Material : Mild Steel

Machine : Hot forging press.

Page 41: Shubham Final File

`

Page | 42

CHAPTER 6

CCOOLLDD FFOORRGGIINNGG SSHHOOPP

Various machines in the card forging shop as below:-

1. Trimming machine

2. Cold heading machine

3. Trimming cum reducing machine

4. Cold heading machine (Single stage)

5. Power press

6. Power Press

7. SPM for facing

8. SPM for facing

9. Power press

10. Power Press

11. Power Press

12. Motor Stamping machine

13. Tool Grinding

14. Tool Grinder

15. Tool Grinder

16. Power Press

17. Centre lathe for coiling

18. Centre Lathe

19. Thread rolling machine

20. Vertical drilling machine

Page 42: Shubham Final File

`

Page | 43

21. Vertical drilling machine

22. Vertical drilling machine

23. Vertical drilling machine

24. SPM for facing

25. Thread rolling machine

26. SPM for roll dia turning

27. SPM for roll dia turning

28. SPM for Stud Facing

29. SPM for Stud Facing

30. Caustic Soda Drum

31. Saw Dust Drum

32. Fire Brick Cutter

33. Trimming machine

34. Header (Single stage)

Page 43: Shubham Final File

`

Page | 44

CHAPTER 7

HHEEAATT TTRREEAATTMMEENNTT

Heat treatment is an important operation in the manufacturing process of many

machine parts and tools. Only by heat treatment is it possible to impart the high

mechanical properties to steel required for the normal operation of modern machinery

and tools.

Heat treatment of various items is done in this section. Heat treatment is

defined as an operation of heating and cooling of metal in the solid state to induce

certain desired properties of steel by changing the size and shape of the grain of which

it is composed or by changing its micro-constituents. It is generally employed for the

following purpose:-.

1. To improve machinability.

2. To change or refine grain size.

3. To relieve the stress of the metal induced during hot and cold working.

4. To increase resistance to wear, heat and corrosion.

5. To produce a hard surface on a ductile interior.

The heat treatment processes used here are:-

1. ANNEALING

Page 44: Shubham Final File

`

Page | 45

2. HARDENING

3. TEMPERING

77..11 AANNNNEEAALLIINNGG

Fig. 7.1 Annealing Furnace

Annealing is one of the most important widely- used

operations in the heat treatment of the steel . The purpose of annealing is to

obtain softness, improve machinability, increase or restore ductility and

toughness relive internal stresses, refine grain size and to prepare steel for

subsequent heat treatment. Slow cooling is required in annealing to enable the

austenite to decompose at low degree of super cooling so as to form

pearlite+ferrite structure in hypoeutectoid steel.

Page 45: Shubham Final File

`

Page | 46

77..22 HHAARRDDEENNIINNGG

Fig. 7.2 Induction Hardening

Hardening is heat treatment process in which steel is heated to a temperature

above the critical point, held at this temperature and then quenched in water ,oil ,or

molten salt baths. Hardened steel is in a stressed condition and is very brittle so that it

cannot be employed for practical purpose after hardening steel must be tempered to

reduce the brittleness relive the internal stress caused by hardening and to obtain

predetermined mech. Properties. Hardening temperature& time depends upon

chemical composition and resence of carbon contents. The more carbon and alloying

admixtures in a steel and the more intricate and large the part being hardened the

slower it should heated to avoid stresses due to temperature difference between the

internal and external layer of metal , warping , and even cracking.

Page 46: Shubham Final File

`

Page | 47

77..33 TTEEMMPPEERRIINNGG

Fig. 7.3 Muffle Furnace

Tempering leads to the decomposition martensite

into a ferrite-cementite mixture and strongly affects all properties of steel. At low

tempering temperature the hardness changes only to a small extent and the true tensile

strength and bending strength are increased. A further increase in tempering

temperature reduce the hardness true tensile strength, propotional limit and yield point

while the relative elongation and reduction of area are increased. The cooling rate

after tempering has a great effect on the residual stresses. The slower an article is

cooled, the less the residual stresses will be. The properties of steel after hardening

followed by tempering are always higher than that of annealed steel.

The various heat treatment processes being given to various categories of jobs involve

the following procedure.

Page 47: Shubham Final File

`

Page | 48

1. The given pieces of jobs are tied together with an ordinary piece of wire just for

the purpose of holding the group of pieces so that they could be properly dipped in

the tank.

2. Now the various are suspended in the preheated tank for the preheating purpose.

Temperature involves is about 400 degree celcius. The pre heater consist of three

electrode and a thermocouple for detecting the temperature of the bath. Panel

consisting of regularity temp. Controls the whole process.

3. After preheating the pieces are now ready for any further heat treatment process.

Now for hardening purpose the material are again suspended in hardening furnace

whose temperature about 830 to 880 degree Celcius. The bath consists of salt

neutral in character and melts to liquid form under heating. The soaking time

consist of for 9mm.thick object are 15 min. then for quenching the materials are

dipped in oil tank till the material gets cooled to room temp. The quenching media

consist of various type depending upon the material composites and properties, for

e.g. :- for mild steel they use water and for hot die steel they use air as a medium

for cooling purpose.

4. Tempering is carried out in order to remove brittleness of the material .Tempering

consist of heating it about 555 to 720 degree celcius, range differ for different

material

Page 48: Shubham Final File

`

Page | 49

5. . The soaking time is about 20 min.

6. Then the piece is clean with the help of caustic soda and hydrochloric acid. They

use caustic soda to remove grease, oil etc.

7. Next the surface finished process of phosphating \ auto black \ zinc plating is

carried out.

8. The thickness of coating is about 10 microns. Special care has to be made for the

U-bolt increases after heat treatment process .The gap has to be reduced manually

by means of hammer.

PROCEDURES FOR HEAT TREATMAENT

1. TITLE:-Procedure for control of heat treatment process.

PURPOSE:-To ensure that the process is carried out under controlled conditions by

qualified operators to ensure that specific requirements are met.

SCOPE:-This process covers all the items requiring heat treatment.

Page 49: Shubham Final File

`

Page | 50

RESPONSIBILITY:-Section in charge is responsible for implementation to this

procedure. H.O.D works and plant in charge are overall responsible for

implementation of this procedure.

2. TITLE:-Procedure for material storage and material handling at shop floor.

PURPOSE:-To ensure proper handling, damage free movement and proper storage of

material during process.

SCOPE:-It covers all the activities related to the material handling and storage for all

the material being processed at shop floor.

RESPONSIBILITY:-All section in charge and plant in charges are responsible for

effective implementation of this procedure in respective area’s H.O.D works is overall

responsible.

SR. NO. MATERIAL HARDENING /

NORMALIZING

TEMPERING

1. EN-8D/C-45 830-860 550-660

2. EN-15/SAE-1541 840-870 550-660

Page 50: Shubham Final File

`

Page | 51

3. EN-18/14Cr4 850-880 550-700

4. EN-14/SAE-4140 850-880 550-720

5. EN-45 870-930 400-550

6. EN-353/SAE-8620 780-820 150-200

7.4 IINNDDUUCCTTIIOONN HHAARRDDEENNIINNGG

Fig. 7.4 Induction Hardening

Surface hardening is a selective heat treatment in which the surface layer of a metal

are hardened to a certain depth while a relatively soft core is maintained.

Page 51: Shubham Final File

`

Page | 52

TYPES OF INDUCTION HARDENING

A. Hardening with high frequency induction heating

B. Harding with electrical contact resistance heating

C. Hardening with electrolytic heating

D. Oxyacetylene flame hardening.

The principle purpose of surface hardening is to increase the hardness and wear

resistance of the surface of metal articles. At the same time, the reliability in operation

of a machine component is increased, as well as its fatigue limit.

At YERIK INTERNATIONAL a high frequency current about 200 Hz is

passed through a cooper inductor block, which acts as a primary coil of transformer,

the block is placed around but does not touch the surface to be hardened. The heating

effect is due to the induction eddy current and hysteresis loss in the surface material

.The heated jobs are then quenched immediately by spray of water delivered through

numerous of small holes in the block. A depth case of approximately 3mm. is

obtained in about 5 sec.

Page 52: Shubham Final File

`

Page | 53

ADVANTAGES OF INDUCTION HARDENING

1. It enables the time requirement for heat treatment to be sharply reduced ,thereby

increasing the labor productivity.

2. Article may be heated with practically no scaling so that the metal allowance for

subsequent machining may be reduced.

3. Deformation due to heat treatment is considerably reduced.

Page 53: Shubham Final File

`

Page | 54

CHAPTER 8

NNOONN FFEERRRROOUUSS BBUUSSHH SSHHOOPP

Fig. 8.1 Aluminium Bronze Bushes

Cell-1

1. SPM Lathe

2. SPM Lathe

3. SPM Lathe

4. SPM Lathe

5. Grinding machine

6. Grinding Machine

Page 54: Shubham Final File

`

Page | 55

Cell-2

1. SPM Lathe

2. SPM Lathe

3. SPM Lathe

4. SPM Lathe

5. Grooving machine

Cell No.-3

1. SPM Lathe

2. SPM Lathe

3. SPM Lathe

4. SPM Lathe

Cell No. 4

1. Drilling machine

2. SPM Lathe

3. SPM Lathe

4. SPM Lathe

5. SPM Lathe

6. Facing Machine

7. Grooving Machine

Page 55: Shubham Final File

`

Page | 56

8. Reaming machine

PROCESS FOR MAKING NON FEROUS BUSH SHOP

1. Make core from the core sand for the bush

2. Then place the core in the die

3. Pour the molten brass in the die

4. After cooling of the bush the runner and riser are break with the help of

hammer.

5. The milling operation is done on the bush.

There are different-2 sizes of bush of different diameter and different length.

These are machine and in the machining section. There are four cell- Cell No. 1,

2,314 for making bush of different sizes.

i) Spring Bush

ii) Bell Crank Bush Big

iii) Bush for King Pin.

The machining operation done on spring bush in Cell No.1

Cell No. 1

Operations Machines

1. Internal diameter SPM Lathe

turning (rough)

Page 56: Shubham Final File

`

Page | 57

2. Internal Diameter SPM lathe

turning final

3. Outer Diameter Turning SPM lathe

facing, chamfering and

inner diameter chamfer

4. 2nd

side facing SPM lathe

5. Grinding Grinding Machine

6. Packing Manually

SPRING BUSH

Operations

1. Internal Diameter turning rough

2. Internal Diameter tuning final

3. Outer diameters turning

4. 2nd

side facing

5. Oil grooving

Cell No.3

Bell Crank Bush Big

1. Internal Diameter turning rough

2. Internal Diameter reaming

3. Outer Diameter turning

4. Facing

Page 57: Shubham Final File

`

Page | 58

5. Grinding

Cell No. 4

Bush for king Pin

1. Internal diameter turning rough

2. Internal diameter turning final

3. Outer diameter turning final

4. Side facing

5. Grinding

6. Oil grooving

7. Stamping

Page 58: Shubham Final File

`

Page | 59

CHAPTER 9

SURFACE TREATMENT

99..11 ZZIINNCC PPLLAATTIINNGG SSHHOOPP

Fig.10.1 Electroplating Barrel

The products are transferred from machine shop to zinc plating shop for zinc

plating. The procedure for zinc plating is as under

1. Caustic is done to removed the Grease on the products

2. Wash in the cold water tank

3. H.C.L. tank

4. Electrolysis– Electrolysis i.e. Zinc-plating is done in tank in which there are

two zinc plates and the one barrel which is reveled by the gear and the products are to

which zinc planting is done are placed in it. After that they are take off from the tank

and wash, them check with Gauge for the correct quality ( Salt in the tank like boric

acid etc.) There are small 2 holes in the barrel for go salt solution in the barrel for zinc

platting.

In this way the zinc plating is done.

Page 59: Shubham Final File

`

Page | 60

99..22 PPHHOOSSPPHHAATTIINNGG SSHHOOPP

After the heat treatment is done, nut, bolt are phosphating or auto black. There

are number of tanks in which dilute solution for auto black

or for phosphating. We discuss below the process how the phosphating

is done.

PROCEDURE OR STEPS FOR BLACK PHOSPHATING

1. Degreasing – So that Grease on the product should be removed

2. Cold water

3. Cold water

4. Acid pickling (HCL acid)

5. Cold water

6. Cold water

7. Cold water

8. Blackening by black Fast (BF 100)

9. Cold water

10. Oil coat (OC 20)

11. Oil coat (OC 20)

Page 60: Shubham Final File

`

Page | 61

PROCEDURE OR STEPS FOR GREY PHOSPHATING

1. Degreasing – So that Grease on the product should be removed

2. Cold water

3. Cold water

4. Acid pickling (HCL acid)

5. Cold water

6. Cold water

7. Cold water

8. Blackening by grey Fast (BF 99)

9. Cold water

10. Oil coat (OC 20)

11. Oil coat (OC 20)

Page 61: Shubham Final File

`

Page | 62

PROJECT -1 :-

Aim of the Project

To reduce set up time in formation of stud using cold forging and hence improve the

production.

Research methodology

1. To study the whole cycle of stud formation using cold forging

2. Analyse the whole process

3. Suggest ways to improve the whole cycle and increase the efficiency of machine.

INTRODUCTION

Cold forging Cold forging deforms metal while it is below its recrystallization point.

Cold forging is generally preferred when the metal is already a soft metal, like

aluminum. This process is usually less expensive than hot forging and the end product

requires little, if any, finishing work. Sometimes, when aluminum is cold forged into

a desired shape, it is heat treated to strengthen the piece. This is called "tempering.”

The Cold Forging Process

Despite the word "cold," cold forging actually occurs at or near room temperature.

The most common metals in cold forging applications are usually standard or carbon

alloy steels. One of the most common types of cold forging is a process called

impression-die forging, where the metal is placed into a die that is attached to an

anvil. The metal is then hit by a descending hammer and forced into the die.

Page 62: Shubham Final File

`

Page | 63

Depending on the product, the hammer may actually be dropped on the metal

numerous times in a very rapid sequence.

Cold Forging Considerations We choose cold forging over hot forging for a

number of reasons—since cold forged parts require very little or no finishing work,

that step of the fabrication process is often dispensable, which saves money. Cold

forging is also less susceptible to contamination problems, and the final component

features a better overall surface finish. Other benefits of cold forging include:

Easier to impart directional properties

Improved interchangeability

Improved reproducibility

Increased dimensional control

Handles high stress and high die loads

Produces net shape or near-net shape parts

Some possible disadvantages include:

Easier to impart directional properties

Improved interchangeability

Improved reproducibility

Increased dimensional control

Handles high stress and high die loads

Produces net shape or near-net shape parts

Page 63: Shubham Final File

`

Page | 64

The metal surfaces must be clean and free of scale before forging occurs

The metal is less ductile

Residual stress may occur

Heavier and more powerful equipment is needed

Stronger tooling is required

INTRODUCTION TO PROJECT SET UP TIME Setup Time is defined as the

time to change from the last item of the previous order to the first good item of the

next order. It is also known as changeover time. IN GENERAL TERMS it is The

time between the last good part off the current run and the first good part off the next

run.

IT INCLUDES

1 Preparation. 30%

2 Removing and

mounting.

5%

3 Measurements,

calibration and

settings.

15%

4 Trail runs and

adjustments.

50%

The present set up includes formation of stud using cold forging on single header

machine .This machine works on a simple principle in which the rotational force of a

motor is transformed into a translational force vector. Therefore the energy in a

Page 64: Shubham Final File

`

Page | 65

mechanical press comes from the motor. Mechanical presses are generally faster than

hydraulic or screw presses. Unlike some presses, in a mechanical press, the

application of force varies in both speed and magnitude throughout the distance of the

stroke. When performing a manufacturing operation using a mechanical press, the

correct range of the stroke is essential.These types of presses are commonly used in

forging manufacture, and sheet metal working. A mechanical press is often a good

choice for impact extrusion, since a fast, quickly repeatable application of force over a

limited distance is what is needed for that type of manufacturing operation. The

eccentric press uses a motor to drive an eccentric shaft, rotating in a connecting rod.

The connecting rod moves a ram in a slider joint one dimensionally. The eccentric

shaft itself is round, therefore it may completely rotate within the connecting rod. The

center of the drive is not the center of the overall shaft. As the motor rotates, the

center of the drive remains stable but the overall center of the shaft changes. This

causes the shaft to change position, providing motion.

The rotation of shaft causes the header to move forward which has a die fixed in its

mouth .

Page 65: Shubham Final File

`

Page | 66

Raw material is loaded onto a platform and it is automatically feeded into the slot

where die is fixed in the base of machine. The system is controlled by a cam

mechanism which drives its 114

power from the shaft itself with the help of bevel gears. When the ingot is placed into

the mouth the header strikes and the metal piece is forged with the help of the die. In

the slot side a ejector pin is provided which ejects the work piece once it is forged.

This ejector is operated with the help of cam which derives its

power from main shaft. The system is such that in 2 strokes of header only 1 single

piece is formed. This is done so because sometimes the work piece gets stuck in the

header so that can deform the whole work piece and can harm the machine itself. The

cam system is also adjusted according to that.

Page 66: Shubham Final File

`

Page | 67

With the current set up around 17 pieces are manufactured per minute. The main

problem arising with this set up is that the production rate is too low. So to increase

the production rate following remedies are provided. 116

REMEDIES

PROPOSAL 1

First solution to this problem is to provide an ejector pin on the inner side of the

header that can strike the work piece that gets struck into the header if any. This

ejector pin will work wiyh the help of a cam operated system driving power from the

machine itself . This proposal if implemented precautiously after taking due

Page 67: Shubham Final File

`

Page | 68

limitations into consideration can increase the production to about 35 work pieces in a

minute.

PROPOSAL 2 "SMED" (Single Minute Exchange of Dies)

Setup includes preparation, replacement, location and adjustment activities.It is easy

to experience a reduction of set-up time from hours to minutes by following a simple

process called "SMED" which means "Single Minute Exchange of Dies." This process

was developed in Japan by Shigeo Shingo during the 1950's. Firstly we should

determine which activities are internal and external. External elements of work can be

completed while the machine is still running e.g. get the next tool, get all your clamps,

get lifting equipment in place, put equipment away, etc. Internal elements of work can

only be done while the machine is stopped e.g. change the tool, adjust the machine

depth, sharpen a tool (which requires the machine to be stopped), etc. Incredible

reductions is total setup time have been realized simply by making internal activities

external activities. The following four-step approach may be used to reduce setup

time:

EXAMPLE FIGURE

1. Classify each setup step as either Internal or External. Internal steps are those done

while the process is inactive. External steps are done while the process is operating.

2. Convert Internal steps to External steps. We want to reduce the time the process is

non-operational, so we need to reduce the time associated with the Internal steps. The

quickest way to do this is to do as many of these steps as we can while the process is

operational. For example, if we can collect the money from the customer as their

burgers are being cooked, then the total cycle time is reduced.

Page 68: Shubham Final File

`

Page | 69

3. Reduce time for remaining Internal steps. There are some Internal steps that cannot

be donewhile the process is operational. We now want to concentrate on reducing the

time required to complete those steps that require the process to be delayed. For

example, since the burgers cannot be cooked until we know what the customer wants

to order, we will try to reduce the time it takes to place the customer order.

4. Eliminate adjustments. Adjustments, as discussed in the Analyze stage, can be

reduced through effective process control. Designed Experiments may be used to

understand the causes of process variation that precede the adjustment. As you can see

from the diagram once you can define an internal or external element, you can

separate them. This will allow us to complete all external elements for the next set-up

while the machine is still running the current parts. When the current run is finished,

everything required for changeover to the next part is available and ready.

CONCLUSION :-

This proposal if implemented precautiously after taking due limitations into