SHREWS Ltd. Energy from Waste The Way Forward. John Birchmore Managing Director SHREWS Ltd 24 Lyne Park West Linton Peeblesshire EH46 7HP Tel +44 (0) 1968 660022 Mob +44 (0) 7711 33755 Fax +44 (0) 870 120 6872 [email protected] - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SHREWS Ltd

SHREWS LtdSHREWS Ltd

Energy from WasteEnergy from Waste

The Way ForwardThe Way Forward

Page 2: SHREWS Ltd

John BirchmoreJohn BirchmoreManaging DirectorManaging DirectorSHREWS LtdSHREWS Ltd24 Lyne Park24 Lyne ParkWest LintonWest LintonPeeblesshirePeeblesshireEH46 7HPEH46 7HP

Tel +44 (0) 1968 660022Tel +44 (0) 1968 660022Mob +44 (0) 7711 33755Mob +44 (0) 7711 33755Fax +44 (0) 870 120 6872Fax +44 (0) 870 120 [email protected]@shrews.co.ukwww.shrews.co.ukwww.shrews.co.uk and and www.energyfromwaste.co.ukwww.energyfromwaste.co.uk

Page 3: SHREWS Ltd

The ProblemThe Problem

We are creating waste and do We are creating waste and do not know what to do with itnot know what to do with it

Page 4: SHREWS Ltd

National Waste StrategyNational Waste Strategy

• ReduceReduce

• RecycleRecycle

• RecoverRecover

• But still left with lots of waste and But still left with lots of waste and need to find a safe need to find a safe environmentally benign solutionenvironmentally benign solution

Page 5: SHREWS Ltd

Size of the problem?Size of the problem?

• Scotland produces each yearScotland produces each year3 million tonnes household waste3 million tonnes household waste2 million tonnes commercial waste2 million tonnes commercial waste2 million tonnes industrial waste (excl. 2 million tonnes industrial waste (excl.

demolition)demolition)

• only 3.5% is recycledonly 3.5% is recycled

Page 6: SHREWS Ltd

The throw away solutionThe throw away solution

• 3 tonnes of MSW about equal to 1 3 tonnes of MSW about equal to 1 tonne of oil so Scotland putting about tonne of oil so Scotland putting about 1 million tonnes of oil into the ground 1 million tonnes of oil into the ground each yeareach year

Page 7: SHREWS Ltd

Changes from EU and greater Changes from EU and greater environmental awarenessenvironmental awareness

• Diversion targetsDiversion targets

• Recycling targetsRecycling targets

• Stricter regulations Stricter regulations what can go to landfillwhat can go to landfill emissions standardsemissions standardsRecycling requirementsRecycling requirements

Page 8: SHREWS Ltd

Optimistic approachOptimistic approach

• Scotland reaches 50% reduction Scotland reaches 50% reduction recycling, but still putting 0.5 million recycling, but still putting 0.5 million tonnes oil equivalent into the groundtonnes oil equivalent into the ground

Page 9: SHREWS Ltd

Own goal for thermal Own goal for thermal treatment?treatment?

Mass burn incinerators:-Mass burn incinerators:-

• Big and expensiveBig and expensive

• Poor emissions standardsPoor emissions standards

• InflexibleInflexible

• Easy option which discouraged Easy option which discouraged recyclingrecycling

Page 10: SHREWS Ltd

BEST PRACTICE BUSINESS BEST PRACTICE BUSINESS PLANNINGPLANNING

Page 11: SHREWS Ltd

Energy from Waste ConceptEnergy from Waste Concept

Waste arisings

 

Source segregation

 

Residual waste

 

Energy from Waste

 

Residue

 

Inert carbonfree to Landfill

     

recycle economic hydrocarbo

nsHeat and Power Recyclate

Page 12: SHREWS Ltd

OpportunityOpportunity

• niche for small, agile companyniche for small, agile company

• niche for small scale projectsniche for small scale projects

• demand for local solutionsdemand for local solutions

• multiple non-specific waste streamsmultiple non-specific waste streams

• technologies developing to point of technologies developing to point of being commercialbeing commercial

Page 13: SHREWS Ltd

Acceptable technologies?Acceptable technologies?

To make a success in the niche market To make a success in the niche market identified had to use advanced identified had to use advanced thermal processes based on pyrolysis thermal processes based on pyrolysis and gasificationand gasification

Page 14: SHREWS Ltd

Technology developmentTechnology development

Plants now:Plants now:

• Small scaleSmall scale

• ModularModular

• Integrated with power production and Integrated with power production and recovery of heatrecovery of heat

• Very high emissions standardsVery high emissions standards

• Reducing perceived technological riskReducing perceived technological risk

Page 15: SHREWS Ltd

The technologyThe technology

Page 16: SHREWS Ltd

Energy Conversion- Exhaust gases passed through a steam boiler- Up to 80% of available energy from waste recovered- Steam used for power generation and/or combined heat and power (CHP) applications

Pyrolysis- Materials heated in the absence of oxygen - Temperature up to 800ºC- Hydrocarbons converted to simple gases- Residues of carbon char and inert materials

Gasification- Carbon residues reacted out with air and steam- Hydrogen and carbon monoxide produced

GASPRODUCTION

ENERGY RECOVERY

GASCOMBUSTION

High Temperature Oxidation- Gases reacted at high temperature (1,250ºC) for more than 2 seconds- Organic pollutants & particulates destroyed- Energy released

Process descriptionProcess description

Page 17: SHREWS Ltd

Environmental ImpactEnvironmental Impact

mg/Nm3

11% 02@ 273K & 101.3kPa

EU Directive

Limits s: spot / d:daily ½ hour

Compact Power

Particulates 10 (d) 30 0.2

VOC’s as carbon 10 (d) 20 Trace

NO (NO + NO2) 200 (d) 400 <37

HCl 10 (d) 60 2

HF 1 (d) 4 <0.1

SO2 50 (d) 200 < 25

CO 50 (d) 150 Trace

Cd & Tl 0.05 (s) 0.006

Mercury 0.05 (s) 0.006

Pb Cr Cu Mn Ni As Sb Co V Sn

0.5 (s) 0.006

Dioxins TEQ ng/Nm3 0.1 (s) <0.003

N2O 30 (d) Trace

NH3 10 (d) 20 < 1

Page 18: SHREWS Ltd

Planet BOS System

Page 19: SHREWS Ltd

Problem ?Problem ?

Where?Where?

• Site where can get planning consentSite where can get planning consent

• Get agreement of owner to sell lease Get agreement of owner to sell lease the sitethe site

• Power connectionPower connection

• Close to waste streamClose to waste stream

• AccessAccess

Page 20: SHREWS Ltd

Project 1 – Dargavel, Project 1 – Dargavel, DumfriesDumfries• Access to main roadAccess to main road

• Adjacent to landfill siteAdjacent to landfill site

• Restored quarryRestored quarry

• Willing ownerWilling owner

• No hostile neighboursNo hostile neighbours

• No inherent site contaminationNo inherent site contamination

• Power off-take possiblePower off-take possible

• Heat outletHeat outlet

Page 21: SHREWS Ltd

Site found – what then?Site found – what then?

• Secure leaseSecure lease

• Secure SRO for 7.2MWeSecure SRO for 7.2MWe

• Do basic engineeringDo basic engineering

• Commission EISCommission EIS

• PR programmePR programme

• Commission architectsCommission architects

• Secured planning consent (secured Secured planning consent (secured May 2001)May 2001)

Page 22: SHREWS Ltd

Location of PlantLocation of Plant

Page 23: SHREWS Ltd

Revenue streamsRevenue streams

• Waste – council PFI for MSW/RDF, Waste – council PFI for MSW/RDF, tyres, industrial waste, meat and tyres, industrial waste, meat and bone meal, abattoir, etc. - 64,000 bone meal, abattoir, etc. - 64,000 tonnes per year with average CV tonnes per year with average CV 18MJ/kg18MJ/kg

• Power – SRO for 7.2 MWePower – SRO for 7.2 MWe

• Heat – looking at optionsHeat – looking at options

Page 24: SHREWS Ltd

Environmental Environmental ConsiderationsConsiderations• Emissions to air:Emissions to air: cleaner than the air in cleaner than the air in

Princes StreetPrinces Street Less pollution than burning Less pollution than burning

3 tonnes garden waste3 tonnes garden waste

• Ash:Ash: 5-20% original weight5-20% original weight Inert and sterileInert and sterile Can be used for Can be used for

construction construction

Page 25: SHREWS Ltd

Financial ConsiderationsFinancial Considerations

• Capital cost about £26 millionCapital cost about £26 million

• Banks won’t go more than 70% debtBanks won’t go more than 70% debt

• Returns currently 20% on equity Returns currently 20% on equity

• Banking on real increases in gate feesBanking on real increases in gate fees

Page 26: SHREWS Ltd

TimescaleTimescale

• First thought of in 1998First thought of in 1998• Lease option secured 1998Lease option secured 1998• SRO awarded March 1999SRO awarded March 1999• Planning consent May 2001 Planning consent May 2001 • Avonmouth plant commissioned and IPPC Avonmouth plant commissioned and IPPC

20012001• Funding secure May 2005Funding secure May 2005• Construction start June 2005Construction start June 2005• Testing Feb 2006Testing Feb 2006• Full production June 2006Full production June 2006

Page 27: SHREWS Ltd

Royal Botanic Garden Royal Botanic Garden EdinburghEdinburgh• 10,000 -13,000 tonnes per year of 10,000 -13,000 tonnes per year of

MSW and other controlled wastesMSW and other controlled wastes• Production of 2.2+MWh to heat Production of 2.2+MWh to heat

offices and glass housesoffices and glass houses• Oil boiler back upOil boiler back up• Education and demonstration roleEducation and demonstration role• Reduces primary hydrocarbon use by Reduces primary hydrocarbon use by

c85%c85%

Page 28: SHREWS Ltd

RBGERBGE

• Urban environmentUrban environment

• Edinburgh introducing source Edinburgh introducing source segregationsegregation

• Backing of Royal Botanic Garden Backing of Royal Botanic Garden EdinburghEdinburgh

• Heat for glass housesHeat for glass houses

• Reduce primary source of carbon by Reduce primary source of carbon by about 90%about 90%

Page 29: SHREWS Ltd

Royal Botanic Garden Royal Botanic Garden EdinburghEdinburgh

Page 30: SHREWS Ltd

Project 2 – Planet Batch Project 2 – Planet Batch SystemSystem

Page 31: SHREWS Ltd

RBGE Concepts and plant RBGE Concepts and plant layoutlayout

Page 32: SHREWS Ltd

Project 3Project 3

Island of ArranIsland of Arran

No landfill and costly to get off the No landfill and costly to get off the islandisland

Energy shortagesEnergy shortages

So combined biomass/waste project So combined biomass/waste project generating about 3.5MWegenerating about 3.5MWe

Page 33: SHREWS Ltd

Key issuesKey issues

Depends on Depends on political willpolitical will (Scotland, UK, EU, International (Scotland, UK, EU, International

agreements) agreements) Finding sitesFinding sites Planning process Planning process Landfill taxLandfill tax Landfill restrictionsLandfill restrictions ROS regulationsROS regulations Vested interestsVested interests Investment funds and banks coming on boardInvestment funds and banks coming on board Equity partnersEquity partners

Page 34: SHREWS Ltd

Potential?Potential?

• 7 million tonnes of waste7 million tonnes of waste

• Say 50% recycling, reduction and recoverySay 50% recycling, reduction and recovery

• Leaves 3.5 million tonnesLeaves 3.5 million tonnes

• At 15,000 tonnes generates 1 MWeAt 15,000 tonnes generates 1 MWe

• 2300 MWe 2300 MWe

• Landfill at 15% reduced to 525,000 tonnesLandfill at 15% reduced to 525,000 tonnes