Litana Group is one of the major companies in the Baltic region,providing shipbuilding, ship repair and offshore contracting services forover 20 years. Currently we employ more than 900 specialists able tocarry out:
• Welding works;
• Assembling of Ship blocks, Hulls and various Offshore structures;
• Installation of various equipment and pipes;
• Prefabrication and installation of various pipe and ventilation systems;
• Insulation and painting works;
• Electrical installation works.
Corporate presentation 2020
CURRENT SHIPBUILDING ACTIVITIES
Currently in operation at:
• Meyer Turku, Finland - since 2006 - Ongoing;
• Chantiers de l‘Atlantique, St. Nazaire France - since 2007 - Ongoing;
• Naval Group, Lorient France - since 2009 - Ongoing;
• Meyer Werft, Papenburg – since 2018 – Ongoing;
• Neptun Werft, Rostock – since February 2019.
Corporate presentation 2020
SHIPBUILDING: RECENT PROJECTS
Project COSTA SMERALDA
Works
performed
Assembly and welding of
sections, fitting to blocks,
grand blocks and hull;
Instalation of piping; electrical
works and painting.
Project
volumes
337 m in length, 42 m in
width; LNG powered vessel
Client MEYER TURKU
Ultimate
Client
CARNIVAL CORPORATION
Shipbuilding
location
Turku, Finland
Corporate presentation 2020
SHIPBUILDING: RECENT PROJECTS
Project NORWEGIAN BLISS
Works
performed
Welding and fitting works,
block assembly and hull
assembly works.
Cable pulling and
connections in Fire zone
areas.
Project
volumes
333 m in length, 41 m in
width; 4000 passengers.
Client Meyer Werft GmbH
Ultimate
Client
Norwegian Cruise Line
Shipbuilding
location
Papenburg, Germany
Corporate presentation 2020
SHIPBUILDING: RECENT PROJECTS
Project Corvettes, frigates
Works
performed
Assembly and welding of
sections, fitting to blocks,
grand blocks and hull;
Instalation of piping; outfiting,
foundation works and
painting.
Project
volumes
Making 50% hull works from
all amount
Client Naval Group, Lorient
Ultimate
Client
Naval Group, Lorient
Shipbuilding
location
Naval Group, Lorient
Corporate presentation 2020
SHIPBUILDING: RECENT PROJECTS
Project Viking Longships
Works
performed
Fitting and welding to blocks,
assembly to hull;
Installation of pipes and
outfitting.
Project
volumes
135 m in length, 11,5 m in
width; 190 passengers.
Client NEPTUN WERFT
Ultimate
Client
Viking River Cruises
Shipbuilding
location
Rostock, Germany
Corporate presentation 2020
SHIPBUILDING: RECENT PROJECTS
Project Celebrity Apex
Works
performed
Fitting and welding of
sections, assembling to
blocks, grand blocks and
hull;
Instalation of doors; piping;
painting works.
Project
volumes
306 m in length, 39 m in
width;
Client Chantiers de lÁtlantique SA
Ultimate
Client
Royal Caribbean Cruises
Shipbuilding
location
Saint-Nazaire, France
Corporate presentation 2020
SHIPBUILDING: RECENT PROJECTS
Project Harmony of the Seas
Works
performed
Fitting and welding of
sections, assembling to
blocks, grand blocks and hull;
Instalation of doors; piping;
painting.
Project
volumes
362 m in length, 66 m in
width; 60,000 tons of steel.
Client STX France
Ultimate
Client
Royal Caribbean International
Shipbuilding
location
Saint-Nazaire, France
Corporate presentation 2020
SHIPBUILDING: RECENT PROJECTS (2019-2020) - ELECTRICAL WORKS
Corporate presentation 2020
• Costa Smeralda (NB 394), Mardi Gras (NB 396) - Cable pulling
and connections in different zones and areas at Meyer Turku,
Finland;
• Norwegian Encore (NB 708), Spirit of Adventure (NB 715) - Cable
pulling and connections in Ex zone and in cabins at Meyer Werft,
Papenburg;
• Walther Herving, OPV2400 (Navy ship), Cemex GO Inovation –
Cable pulling, terminations of main and secondary switch boards,
monitoring console, generators at Damen shipyards Galati;
SHIPBUILDING: RECENT PROJECTS
Project Multifunctional Icebreaking
Supply Vessels NB 511-514
(4 ships)
Works
performe
d
Block fabrication and hull
assembly, pipe installation,
outfitting and equipment
installation works.
Project
volumes
8362 t, L=105 m,
Client Arctech Helsinki Shipyard
Ultimate
Client
SCF
Assembly
location
Helsinki, Finland
Corporate presentation 2020
SHIPBUILDING: RECENT PROJECTS
Project POLA Mx Module 3
(Powerplant)
Works
performe
d
Pipe systems installation
works.
Project
volumes
41 t
Client DAMEN SCHELDE NAVAL
SHIPBUILDING
Assembly
location
Vlissingen, The
Netherlands
Corporate presentation 2020
Project S.713
Location Papenburg, Germany
ScopesHVAC, piping and
eqiupment instaliation
ClientMeyer Werft, Papenburg,
Germany
SHIPBUILDING: RECENT PROJECTS
Corporate presentation 2020
Project COSTA SMERALDA
Location Turku Finland
ScopesHVAC, piping and
eqiupment instaliation
Client Meyer Turku
SHIPBUILDING: RECENT PROJECTS
Corporate presentation 2020
QUALITY CERTIFICATES
ISO 9001
ISO 3834-2 DNV GL WWA
ISO 14001OHSAS 18001
Corporate presentation 2020
HEALTH AND SAFETY
During more than 20 years of Litana’s:
• 0 serious health injuries in workplace at shipbuilding and industrial projects.
To ensure the highest Health and Safety standards we have:
• OHSAS-18001 (Occupational Health & Safety standard);
• Implemented internal procedures for Health and Safety with higher demands
than required by the standards.
Corporate presentation 2020