sheet general notes - sjeccd 0048 evc mep... · 2014. 5. 12. · sheet general notes 1. contractor...
TRANSCRIPT
M104
AS SHOWN
SS / PS CSH
BT DR
417 Montgomery Street Suite 700 San Francisco California 94104 USA
T 1 415 283 4970 F 1 415 283 4980
W www.ghd.com
Drawing No.
Drawing Revisions
Rev.
No. Revision
Title
Drawn Date
Client
Project
Note: * indicates signatures on original issue of drawing or last revision of drawing
Original Size
Ansi D
Date
CheckDrafting
Scale
Drawn
CheckDesign
Designer
This Drawing must not be used for Construction unless Signed and Sealed as Approved
(Project Director)Approved
JobManager
ProjectDirector
Plot Date: Cad File No:4 September 2013 - 10:31 AM P:\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436M104.dwgPlotted by: Chris Hanzel
Contract No.
Sht of
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the
property of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s written
authorization. © GHD Inc. 2013
GHD Inc.
DAN REITER
8410431
G2010.0048 EVC MECHANICAL, ELECTRICAL,
AND PLUMBING UPGRADE PROJECT (BID
PACKAGE #2)
1
SHEET GENERAL NOTES
1. CONTRACTOR SHALL VERIFY IN FIELD THE
LOCATION OF THE VERTICAL DROPS OF
NATURAL GAS PIPING AS THE DRAWINGS
PROVIDED AS BACKGROUNDS MAY DIFFER
FROM THE ACTUAL INSTALLED CONDITIONS.
MOUNT NEW SHUT OFF VALVES 48" AFF.
2. CONTRACTOR SHALL PATCH, PRIME, AND
PAINT THE ENTIRE WALL WHENEVER A
PENETRATION IS MADE TO LOCATE THE GAS
PIPING. DO NOT PAINT ONLY THE LOCALIZED
AREA OF DAMAGE.
3. PROVIDE LABELLING ON EACH GAS VALVE
ACCESS PANEL STATING WHICH
ROOM/PORTION OF A ROOM THE GAS VALVE
SHUTS OFF. IF MORE THAN ONE VALVE IS
REQUIRED TO BE SHUT OFF IN ORDER TO
CLOSE ALL GAS SERVICE TO THE ROOM
STATE WHICH NUMBER OF THE TOTAL
NUMBER OF VALVES IS IN THE ROOM. FOR
EXAMPLE, IF THERE ARE 5 VALVES IN A ROOM
STATE FOR EACH, "SHUT OFF VALVE 1 OF 5.
ROOM #XXX."
DEMOLITION NOTES
1.
KEYNOTES
1. INSTALL NEW SHUT OFF VALVE IN VERTICAL
SECTION OF NATURAL GAS PIPING. PROVIDE
ACCESS PANEL IN WALL TO ACCESS THE
VALVE AND SHUT OFF FROM ROOM 107.
2. INSTALL NEW SHUT OFF VALVE IN VERTICAL
SECTION OF NATURAL GAS PIPING. PROVIDE
ACCESS PANEL IN WALL TO ACCESS THE
VALVE AND SHUT OFF FROM ROOM 107.
ACCESS TO THIS VALVE SHUTS OFF NATURAL
GAS TO BOTH ROOMS 107 AND 106.
3. INSTALL NEW SHUT OFF VALVE IN VERTICAL
SECTION OF NATURAL GAS PIPING. PROVIDE
ACCESS PANEL IN WALL TO ACCESS THE
VALVE AND SHUT OFF FROM ROOM 106.
4. INSTALL NEW SHUT OFF VALVE IN VERTICAL
SECTION OF NATURAL GAS PIPING. PROVIDE
ACCESS PANEL IN WALL TO ACCESS THE
VALVE AND SHUT OFF FROM ROOM 115.
1SEQUOIA 1ST FLOOR PLAN - WEST
0 8'4'2'
1/4"=1'-0"
1
4
4
4
3
2
3
1
115 - PRESERVED MATERIALS
106 - ENVIRONMENTAL SCIENCE LAB
107- - PHYSIOLOGY LAB
- ****(3) THREE ROOMS WITH WORK TO BE PERFORMED****
ROOM 129
ROOM 127
ROOM 126
M105
AS SHOWN
SS / PS CSH
BT DR
417 Montgomery Street Suite 700 San Francisco California 94104 USA
T 1 415 283 4970 F 1 415 283 4980
W www.ghd.com
Drawing No.
Drawing Revisions
Rev.
No. Revision
Title
Drawn Date
Client
Project
Note: * indicates signatures on original issue of drawing or last revision of drawing
Original Size
Ansi D
Date
CheckDrafting
Scale
Drawn
CheckDesign
Designer
This Drawing must not be used for Construction unless Signed and Sealed as Approved
(Project Director)Approved
JobManager
ProjectDirector
Plot Date: Cad File No:4 September 2013 - 10:26 AM P:\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436M105.dwgPlotted by: Chris Hanzel
Contract No.
Sht of
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the
property of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s written
authorization. © GHD Inc. 2013
GHD Inc.
DAN REITER
8410431
G2010.0048 EVC MECHANICAL, ELECTRICAL,
AND PLUMBING UPGRADE PROJECT (BID
PACKAGE #2)
1
SHEET GENERAL NOTES
DEMOLITION NOTES
1.
KEYNOTES
1. INSTALL NEW SHUT OFF VALVE IN VERTICAL
SECTION OF NATURAL GAS PIPING. PROVIDE
ACCESS PANEL IN WALL AND SHUT OFF FROM
ROOM 128.
2. INSTALL NEW SHUT OFF VALVE IN VERTICAL
SECTION OF NATURAL GAS PIPING. PROVIDE
ACCESS PANEL IN WALL AND SHUT OFF FROM
ROOM 105.
3. INSTALL NEW SHUT OFF VALVE IN VERTICAL
SECTION OF NATURAL GAS PIPING. PROVIDE
ACCESS PANEL IN WALL AND SHUT OFF FROM
ROOM 118.
4. INSTALL NEW SHUT OFF VALVE IN VERTICAL
SECTION OF NATURAL GAS PIPING. PROVIDE
ACCESS PANEL IN WALL AND SHUT OFF FROM
ROOM 112.
5. INSTALL NEW SHUT OFF VALVE IN VERTICAL
SECTION OF NATURAL GAS PIPING. PROVIDE
ACCESS PANEL IN WALL AND SHUT OFF FROM
ROOM 103.
6. INSTALL NEW SHUT OFF VALVE IN VERTICAL
SECTION OF NATURAL GAS PIPING. PROVIDE
ACCESS PANEL IN WALL AND SHUT OFF FROM
ROOM 102.
7. INSTALL NEW SHUT OFF VALVE IN VERTICAL
SECTION OF NATURAL GAS PIPING. PROVIDE
ACCESS PANEL IN WALL TO ACCESS THE
VALVE AND SHUT OFF THE FUME HOODS IN
ROOMS 112 AND 113.
8. INSTALL NEW SHUT OFF VALVE IN VERTICAL
SECTION OF NATURAL GAS PIPING. PROVIDE
ACCESS PANEL IN WALL AND SHUT OFF FROM
ROOM 111.
9. INSTALL NEW SHUT OFF VALVE IN VERTICAL
SECTION OF NATURAL GAS PIPING. PROVIDE
ACCESS PANEL IN WALL TO ACCESS THE
VALVE AND SHUT OFF THE FUME HOOD IN
ROOM 109.
10. INSTALL NEW SHUT OFF VALVE IN VERTICAL
SECTION OF NATURAL GAS PIPING. PROVIDE
ACCESS PANEL IN WALL TO ACCESS THE
VALVE AND SHUT OFF THE FUME HOODS IN
ROOMS 108 AND 109.
1SEQUOIA 1ST FLOOR PLAN - EAST
0 12'4' 8'
3/16"=1'-0"
10
9
8
7
4
8
3
3
3
2
2
2
2
5
2
1
2
3
1. CONTRACTOR SHALL VERIFY IN FIELD THE
LOCATION OF THE VERTICAL DROPS OF
NATURAL GAS PIPING AS THE DRAWINGS
PROVIDED AS BACKGROUNDS MAY DIFFER
FROM THE ACTUAL INSTALLED CONDITIONS.
MOUNT NEW SHUT OFF VALVES 48" AFF.
2. CONTRACTOR SHALL PATCH, PRIME, AND
PAINT THE ENTIRE WALL WHENEVER A
PENETRATION IS MADE TO LOCATE THE GAS
PIPING. DO NOT PAINT ONLY THE LOCALIZED
AREA OF DAMAGE.
3. PROVIDE LABELLING ON EACH GAS VALVE
ACCESS PANEL STATING WHICH
ROOM/PORTION OF A ROOM THE GAS VALVE
SHUTS OFF. IF MORE THAN ONE VALVE IS
REQUIRED TO BE SHUT OFF IN ORDER TO
CLOSE ALL GAS SERVICE TO THE ROOM
STATE WHICH NUMBER OF THE TOTAL
NUMBER OF VALVES IS IN THE ROOM. FOR
EXAMPLE, IF THERE ARE 5 VALVES IN A ROOM
STATE FOR EACH, "SHUT OFF VALVE 1 OF 5.
ROOM #XXX."
128 - TELECOM CUSTODIAL ROOM
- ****(8) EIGHT ROOMS WITH WORK TO BE PERFORMED****
105 - ANIMAL BIOLOGY
118 - SPECIMENS & LIVING MATERIALS
103 - PLANT BIOLOGY LAB
111 - CLEAN ROOM
112 - INCUBATOR ROOM
109 - MICROBIOLOGY LAB
108 - ANATOMY LAB
ROOM 112
ROOM 124
ROOM 114
ROOM 135 ROOM 123ROOM 126
ROOM 119
ROOM 113
ROOM 114
ROOM 115
ROOM 110
ROOM 111.
M107
AS SHOWN
SS / PS CSH
BT DR
417 Montgomery Street Suite 700 San Francisco California 94104 USAT 1 415 283 4970 F 1 415 283 4980W www.ghd.com
Drawing No.
Drawing Revisions
Rev.
No. Revision
Title
Drawn Date
Client
Project
Note: * indicates signatures on original issue of drawing or last revision of drawing
Original Size
Ansi D
Date
CheckDrafting
Scale
Drawn
CheckDesign
Designer
This Drawing must not be used for Construction unless Signed and Sealed as Approved
(Project Director)Approved
JobManager
ProjectDirector
Plot Date: Cad File No:4 September 2013 - 10:18 AM P:\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436M107.dwgPlotted by: Chris Hanzel
Contract No.
Sht of
Reuse of DocumentsThis document and the ideas and designs incorporated herein, as an instrument of professional service, is theproperty of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s writtenauthorization. © GHD Inc. 2013
GHD Inc.
DAN REITER
8410431
G2010.0048 EVC MECHANICAL, ELECTRICAL,AND PLUMBING UPGRADE PROJECT (BIDPACKAGE #2)
1
SHEET GENERAL NOTES
DEMOLITION NOTES
1.
KEYNOTES
1. EXISTING SHUT OFF VALVE ABOVE CEILINGTO REMAIN.
2. MAKE POINT OF CONNECTION FOR 1-1/4"NATURAL GAS BRANCH LINE TO NEW ROOFMOUNTED GENERATOR ABOVE THE CEILING.VERIFY IN FIELD THE ROUTE FROM ABOVETHE FIRST FLOOR CEILING THROUGH THESECOND FLOOR SO THAT PIPING IS NOTEXPOSED. ROUTE PIPING WITHIN THE WALLSTHROUGH THE SECOND FLOOR TO THE ROOF.REPAIR ANY DAMAGE TO WALLS, CEILING,AND FLOORS WHILE INVESTIGATING THEROUTE OF THE GAS PIPING. SEE SHEET E102FOR ADDITIONAL INFORMATION.
1 SEQUOIA 1ST CEILING PLAN - WEST0 12'4' 8'
3/16"=1'-0"
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1. CONTRACTOR SHALL VERIFY IN FIELD THELOCATION OF THE VERTICAL DROPS OFNATURAL GAS PIPING AS THE DRAWINGSPROVIDED AS BACKGROUNDS MAY DIFFERFROM THE ACTUAL INSTALLED CONDITIONS.
2. CONTRACTOR SHALL PATCH, PRIME, ANDPAINT THE ENTIRE WALL WHENEVER APENETRATION IS MADE TO LOCATE THE GASPIPING. DO NOT PAINT ONLY THE LOCALIZEDAREA OF DAMAGE.
3. PROVIDE LABELLING ON EACH GAS VALVEACCESS PANEL STATING WHICHROOM/PORTION OF A ROOM THE GAS VALVESHUTS OFF. IF MORE THAN ONE VALVE ISREQUIRED TO BE SHUT OFF IN ORDER TOCLOSE ALL GAS SERVICE TO THE ROOMSTATE WHICH NUMBER OF THE TOTALNUMBER OF VALVES IS IN THE ROOM. FOREXAMPLE, IF THERE ARE 5 VALVES IN A ROOMSTATE FOR EACH, "SHUT OFF VALVE 1 OF 5.ROOM #XXX."
GENERATOR SKID 1
2'-0"
S101
AS SHOWN
SS CC
BT
417 Montgomery Street Suite 700 San Francisco California 94104 USAT 1 415 283 4970 F 1 415 283 4980W www.ghd.com
Drawing No.
Drawing Revisions
Rev.
No. Revision
Title
Drawn Date
Client
Project
Note: * indicates signatures on original issue of drawing or last revision of drawing
Original Size
Ansi D
Date
CheckDrafting
Scale
Drawn
CheckDesign
Designer
This Drawing must not be used for Construction unless Signed and Sealed as Approved
(Project Director)Approved
JobManager
ProjectDirector
Plot Date: Cad File No:4 September 2013 - 9:25 AM P:\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436S101.dwgPlotted by: Chris Hanzel
Contract No.
Sht of
Reuse of DocumentsThis document and the ideas and designs incorporated herein, as an instrument of professional service, is theproperty of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s writtenauthorization. © GHD Inc. 2013
GHD Inc.
DAN REITER
8410431
G2010.0048 EVC MECHANICAL, ELECTRICAL,AND PLUMBING UPGRADE PROJECT (BIDPACKAGE #2)
1
SHEET GENERAL NOTES
1.
DEMOLITION NOTES
1.
KEYNOTES
1. CUT BACK ROOFING MEMBRANE ANDINSULATION TO EXPOSE METAL ROOFDECKING BELOW GENERATOR ANDINSTALL SKID PER
1 ROOF FRAMING PLAN0 16'8'4'
1/8"=1'-0"
4
S-501
1
M108
AS SHOWN
SS / PS CSH
BT DR
417 Montgomery Street Suite 700 San Francisco California 94104 USAT 1 415 283 4970 F 1 415 283 4980W www.ghd.com
Drawing No.
Drawing Revisions
Rev.
No. Revision
Title
Drawn Date
Client
Project
Note: * indicates signatures on original issue of drawing or last revision of drawing
Original Size
Ansi D
Date
CheckDrafting
Scale
Drawn
CheckDesign
Designer
This Drawing must not be used for Construction unless Signed and Sealed as Approved
(Project Director)Approved
JobManager
ProjectDirector
Plot Date: Cad File No:4 September 2013 - 9:49 AM P:\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436M108.dwgPlotted by: Chris Hanzel
Contract No.
Sht of
Reuse of DocumentsThis document and the ideas and designs incorporated herein, as an instrument of professional service, is theproperty of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s writtenauthorization. © GHD Inc. 2013
GHD Inc.
DAN REITER
8410431
G2010.0048 EVC MECHANICAL, ELECTRICAL,AND PLUMBING UPGRADE PROJECT (BIDPACKAGE #2)
1
SHEET GENERAL NOTES
DEMOLITION NOTES
1.
KEYNOTES
1. PROVIDE AND INSTALL NEW SHUT OFF VALVEFOR NATURAL GAS PIPING IN FLOORMOUNTED VAULT WITH ACCESS HATCH.
1 SEQUOIA LECTURE HALL FLOOR PLAN0 12'4' 8'
3/16"=1'-0"
1
11
1. CONTRACTOR SHALL VERIFY IN FIELD THELOCATION OF THE VERTICAL DROPS OFNATURAL GAS PIPING AS THE DRAWINGSPROVIDED AS BACKGROUNDS MAY DIFFERFROM THE ACTUAL INSTALLED CONDITIONS.
2. CONTRACTOR SHALL PATCH, PRIME, ANDPAINT THE ENTIRE WALL WHENEVER APENETRATION IS MADE TO LOCATE THE GASPIPING. DO NOT PAINT ONLY THE LOCALIZEDAREA OF DAMAGE.
3. PROVIDE LABELLING ON EACH GAS VALVEACCESS PANEL STATING WHICHROOM/PORTION OF A ROOM THE GAS VALVESHUTS OFF. IF MORE THAN ONE VALVE ISREQUIRED TO BE SHUT OFF IN ORDER TOCLOSE ALL GAS SERVICE TO THE ROOMSTATE WHICH NUMBER OF THE TOTALNUMBER OF VALVES IS IN THE ROOM. FOREXAMPLE, IF THERE ARE 5 VALVES IN A ROOMSTATE FOR EACH, "SHUT OFF VALVE 1 OF 5.ROOM #XXX."
E108
NONE
SMG SMG
BAT BNB
417 Montgomery Street Suite 700 San Francisco California 94104 USA
T 1 415 283 4970 F 1 415 283 4980
W www.ghd.com
Drawing No.
Drawing Revisions
Rev.
No. Revision
Title
Drawn Date
Client
Project
Note: * indicates signatures on original issue of drawing or last revision of drawing
Original Size
Ansi D
Date
Check
Drafting
Scale
Drawn
Check
Design
Designer
This Drawing must not be used for Construction unless Signed and Sealed as Approved
(Project Director)
Approved
Job
Manager
Project
Director
Plot Date: Cad File No:5 May 2014 - 4:44 PM N:\US\San Francisco\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436E108.dwg
Plotted by:
Steve Girard
Contract No.
Sht of
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the
property of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s written
authorization. © GHD Inc. 2013
GHD Inc.
DAN REITER
8410431
G2010.0048 EVC MECHANICAL, ELECTRICAL,
AND PLUMBING UPGRADE PROJECT (BID
PACKAGE #2)
3
AUTOMATIC TRANSFER SWITCH 'ATS'
200A, 120/240V, 2-POLE, 3-WIRE,
SOLID NEUTRAL
GENERATOR MAIN
BREAKER
4
3
1-1/4" CONDUIT WITH (3) #6
AWG AND (1) #10 AWG GND
(E) 225A FEED FROM (E)
MAIN SWITCHBOARD 'MSB'
1-1/4" CONDUIT WITH (3) #6
AWG AND (1) #10 AWG GND
1
(E) PANEL 'AC1'
480Y/277V, 225A,
3PH, 4W
1
NATURAL GAS GENERATOR
9KW, 120/240V, 1PH, 3W
2
1
SEQUOIA - PARTIAL SINGLE LINE DIAGRAM
KEYNOTES
1. PROVIDE FEEDER AS INDICATED.
2. PROVIDE NATURAL GAS GENERATOR RATED AT
9kW, 120/240-VOLTS, 1-PHASE, 3-WIRE, GENERAC
GUARDIAN MODEL #006051-1 OR APPROVED
EQUAL.
3. PROVIDE GENERATOR MANUFACTURER'S
AUTOMATIC TRANSFER SWITCH 'ATS' IN NEMA 3R
ENCLOSURE SUITABLE FOR 200A, 120/240V,
1-PHASE, 3-WIRE WITH SOLID NEUTRAL, GENERAC
NEXUS MODEL #RTSX200A3 OR APPROVED
EQUAL.
4. PROVIDE 12-CIRCUIT ELECTRICAL PANEL,
FLUSH-MOUNTED, SUITABLE FOR 100A, 120/240V,
1-PHASE, 3-WIRE. SEE PANEL SCHEDULE ON
SHEET E110.
5. PROVIDE WALL-MOUNT DRY-TYPE TRANSFORMER
RATED FOR 10kVA, 240/120V, 1-PHASE, 3-WIRE IN
2ND FLOOR ELECTRICAL ROOM 210. SEE DETAIL
4/E111.
6. PROVIDE CIRCUIT BREAKER DISCONNECT IN
NEMA 1 ENCLOSURE RATED FOR 50A, 240V,
2-POLE WITH LOCKABLE HANDLE.
7. PROVIDE 30A, 2-POLE BREAKER IN (E) PANEL 'AC1'.
GENERATOR FRAME
GROUND ONLY
SEQUOIA GENERATOR - RELATED SHEETS:
S101 STRUCTURAL ROOF PLAN - SEQUOIA
M107 SEQUOIA 1ST CEILING PLAN - EAST
E102 ELECTRICAL ROOF PLAN - SEQUOIA
E104 ENLARGED PLANS - SEQUOIA
E108 SINGLE LINE DIAGRAM - SEQUOIA
E110 SCHEDULES - SEQUOIA
E111 ELECTRICAL DETAILS (DETAILS NO. 1 & 3)
#6 GROUND WIRE WITH COMPRESSION
LUG BOLTED TO (E) BUILDING COLUMN
(E) 2" CONDUIT WITH
(3) #4/0 AWG & #4 GND
3/4" CONDUIT WITH
(2) #10 AWG & #10 GND
1
1-1/4" CONDUIT WITH (3) #6
AWG AND (1) #10 AWG GND
1
ENCLOSED CIRCUIT BREAKER
'ECB-1EM'
6
TRANSFORMER 'T1EM'
10kVA, 480-240/120V,
1PH, 3W
#6 GROUND WIRE WITH COMPRESSION
LUG BOLTED TO (E) BUILDING COLUMN
PANEL '1EM'
240/120V, 100A,
1PH, 3W
7
(2) #12 AWG & #12 GND FOR GENERATOR
BATTERY CHARGER CIRCUIT
3
3
AUTOMATIC TRANSFER SWITCH
'ATS', MOUNT TOP AT +60" AFF
UNISTRUT SUPPORTS (HORIZONTAL)
ROOF
(1) 1-1/4" CONDUIT WITH (3) #6 AWG AND
(1) #8 AWG GND FROM (E) PANEL '2PA' IN
2ND FLOOR ELECTRICAL ROOM AND
(1) 1-1/4" CONDUIT WITH (3) #6 AWG AND
(1) #8 AWG GND TO PANEL '1EM' IN
CADAVER DEMO ROOM 114
1" LFMC WITH (3) #6 AWG
AND (1) #8 AWG GND
NATURAL GAS GENERATOR
(NOTE 1)
EQUIPMENT CURB
SEE STRUCTURAL
DRAWINGS
PROVIDE UNISTRUT SUPPORT ON
EACH SIDE OF GENERATOR SKID
(E) BUILDING COLUMN
NOTES:
1. GENERATOR WEIGHT IS 387 LBS. SEE
STRUCTURAL DRAWINGS FOR MOUNTING.
NOTES:
1. EQUIPMENT WEIGHT NOT TO EXCEED 100 LBS.
2. FOR EQUIPMENT EXCEEDING 42" IN HEIGHT
PROVIDE ADDITIONAL BLOCKING SUPPORT AT
MIDDLE OF PANEL.
3. FOR FLUSH-MOUNTED PANELS AND EQUIPMENT,
PROVIDE ADDITIONAL GYPSUM BOARD AT BACK
AND SIDES OF EQUIPMENT AS REQUIRED TO
MAINTAIN WALL FIRE RATING.
SET TOP OF
EQUIPMENT AT
6' AFF±, UON
PROVIDE CADDY ADJUSTABLE MOUNTING
BRACKET (MODEL #TSGB16) BETWEEN STUDS
AT TOP AND BOTTOM OF EQUIPMENT, FASTEN
EACH END WITH (4) #12 SHEET METAL SCREWS
(NOTE 2)
FASTEN EACH CORNER TO CADDY BRACKET
WITH 1/4" BOLTS, NUTS AND WASHERS
FLUSH-MOUNTED ELECTRICAL PANEL OR
EQUIPMENT AS INDICATED ON PLANS
(NOTE 1,3)
WALL FRAMING SHEET METAL STUDS AT 16" OC (TYP)
DEDICATED RECEPTACLE, SEE PLANS FOR
CIRCUIT, WIRING AND CONDUIT (TYP OF 2)
NOTES:
1. EQUIPMENT WEIGHT NOT TO EXCEED 200 LBS.
2. ADJUST EXACT MOUNTING HARDWARE SIZES,
LOCATIONS AND QUANTITIES WITH EQUIPMENT
MANUFACTURER
3. PRE-DRILL PLYWOOD FOR SHEET METAL
SCREWS.
SET TOP OF
EQUIPMENT AT
6' AFF±, UON
ATTACHED BOTTOM OF TRANSFORMER TO
UNISTRUT WITH (2) 1/4" CHANNEL BOLTS,
NUTS AND WASHERS (NOTE 2)
PROVIDE UNISTRUT ON PLYWOOD BACKING
AT TOP AND BOTTOM WITH #10x1" WOOD
SCREWS AT 4" OC (MINIMUM 4 EACH)
WALL-MOUNTED TRANSFORMER AS
INDICATED ON PLANS (NOTE 1)
WALL FRAMING SHEET METAL STUDS AT 16" OC (TYP)
24"x24"x3/4" PLYWOOD BACKING WITH (6) #10x1"
SHEET METAL SCREWS ON EACH SIDE
SPAN 2 STUDS MINIMUM (NOTE 3)
ATTACHED TOP OF TRANSFORMER TO
UNISTRUT WITH (1) 1/2" CHANNEL BOLT,
NUT AND WASHER (NOTE 2)
E111
AS SHOWN
SMG SMG
BAT BNB
417 Montgomery Street Suite 700 San Francisco California 94104 USA
T 1 415 283 4970 F 1 415 283 4980
W www.ghd.com
Drawing No.
Drawing Revisions
Rev.
No. Revision
Title
Drawn Date
Client
Project
Note: * indicates signatures on original issue of drawing or last revision of drawing
Original Size
Ansi D
Date
Check
Drafting
Scale
Drawn
Check
Design
Designer
This Drawing must not be used for Construction unless Signed and Sealed as Approved
(Project Director)
Approved
Job
Manager
Project
Director
Plot Date: Cad File No:5 May 2014 - 3:44 PM N:\US\San Francisco\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436E111.dwg
Plotted by:
Steve Girard
Contract No.
Sht of
Reuse of Documents
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the
property of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s written
authorization. © GHD Inc. 2013
GHD Inc.
DAN REITER
8410431
G2010.0048 EVC MECHANICAL, ELECTRICAL,
AND PLUMBING UPGRADE PROJECT (BID
PACKAGE #2)
3
1 SEQUOIA - ROOFTOP GENERATOR AND AUTOMATIC TRANSFER SWITCH
NOT TO SCALE
2 (NOT USED)
NOT TO SCALE
3 SEQUOIA - ELECTRICAL PANEL MOUNTING
NOT TO SCALE
SEQUOIA GENERATOR - RELATED SHEETS:
S101 STRUCTURAL ROOF PLAN - SEQUOIA
M107 SEQUOIA 1ST CEILING PLAN - EAST
E102 ELECTRICAL ROOF PLAN - SEQUOIA
E104 ENLARGED PLANS - SEQUOIA
E108 SINGLE LINE DIAGRAM - SEQUOIA
E110 SCHEDULES - SEQUOIA
E111 ELECTRICAL DETAILS (DETAILS NO. 1 & 3)
GULLO CAFE - RELATED SHEETS:
E101 SITE PLAN - GULLO CAFE
E103 ENLARGED PLANS - GULLO CAFE
E105 ENLARGED PLANS - GULLO CAFE
E107 SINGLE LINE DIAGRAM - GULLO CAFE
E109 SCHEDULES - GULLO CAFE
E111 ELECTRICAL DETAILS (DETAIL #2)
4 SEQUOIA - TRANSFORMER MOUNTING