M104 AS SHOWN SS / PS CSH BT DR 417 Montgomery Street Suite 700 San Francisco California 94104 USA T 1 415 283 4970 F 1 415 283 4980 W www.ghd.com Drawing No. Drawing Revisions Rev. No. Revision Title Drawn Date Client Project Note: * indicates signatures on original issue of drawing or last revision of drawing Original Size Ansi D Date Check Drafting Scale Drawn Check Design Designer This Drawing must not be used for Construction unless Signed and Sealed as Approved (Project Director) Approved Job Manager Project Director Plot Date: Cad File No: 4 September 2013 - 10:31 AM P:\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436M104.dwg Plotted by: Chris Hanzel Contract No. Sht of Reuse of Documents This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s written authorization. © GHD Inc. 2013 GHD Inc. DAN REITER 8410431 G2010.0048 EVC MECHANICAL, ELECTRICAL, AND PLUMBING UPGRADE PROJECT (BID PACKAGE #2) 1 SHEET GENERAL NOTES 1. CONTRACTOR SHALL VERIFY IN FIELD THE LOCATION OF THE VERTICAL DROPS OF NATURAL GAS PIPING AS THE DRAWINGS PROVIDED AS BACKGROUNDS MAY DIFFER FROM THE ACTUAL INSTALLED CONDITIONS. MOUNT NEW SHUT OFF VALVES 48" AFF. 2. CONTRACTOR SHALL PATCH, PRIME, AND PAINT THE ENTIRE WALL WHENEVER A PENETRATION IS MADE TO LOCATE THE GAS PIPING. DO NOT PAINT ONLY THE LOCALIZED AREA OF DAMAGE. 3. PROVIDE LABELLING ON EACH GAS VALVE ACCESS PANEL STATING WHICH ROOM/PORTION OF A ROOM THE GAS VALVE SHUTS OFF. IF MORE THAN ONE VALVE IS REQUIRED TO BE SHUT OFF IN ORDER TO CLOSE ALL GAS SERVICE TO THE ROOM STATE WHICH NUMBER OF THE TOTAL NUMBER OF VALVES IS IN THE ROOM. FOR EXAMPLE, IF THERE ARE 5 VALVES IN A ROOM STATE FOR EACH, "SHUT OFF VALVE 1 OF 5. ROOM #XXX." DEMOLITION NOTES 1. KEYNOTES 1. INSTALL NEW SHUT OFF VALVE IN VERTICAL SECTION OF NATURAL GAS PIPING. PROVIDE ACCESS PANEL IN WALL TO ACCESS THE VALVE AND SHUT OFF FROM ROOM 107. 2. INSTALL NEW SHUT OFF VALVE IN VERTICAL SECTION OF NATURAL GAS PIPING. PROVIDE ACCESS PANEL IN WALL TO ACCESS THE VALVE AND SHUT OFF FROM ROOM 107. ACCESS TO THIS VALVE SHUTS OFF NATURAL GAS TO BOTH ROOMS 107 AND 106. 3. INSTALL NEW SHUT OFF VALVE IN VERTICAL SECTION OF NATURAL GAS PIPING. PROVIDE ACCESS PANEL IN WALL TO ACCESS THE VALVE AND SHUT OFF FROM ROOM 106. 4. INSTALL NEW SHUT OFF VALVE IN VERTICAL SECTION OF NATURAL GAS PIPING. PROVIDE ACCESS PANEL IN WALL TO ACCESS THE VALVE AND SHUT OFF FROM ROOM 115. 1 SEQUOIA 1ST FLOOR PLAN - WEST 0 8' 4' 2' 1/4"=1'-0" 1 4 4 4 3 2 3 1 115 - PRESERVED MATERIALS 106 - ENVIRONMENTAL SCIENCE LAB 107- - PHYSIOLOGY LAB - ****(3) THREE ROOMS WITH WORK TO BE PERFORMED**** ROOM 129 ROOM 127 ROOM 126

Upload: others

Post on 30-Apr-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SHEET GENERAL NOTES - SJECCD 0048 EVC MEP... · 2014. 5. 12. · sheet general notes 1. contractor shall verify in field the location of the vertical drops of natural gas piping as

M104

AS SHOWN

SS / PS CSH

BT DR

417 Montgomery Street Suite 700 San Francisco California 94104 USA

T 1 415 283 4970 F 1 415 283 4980

W www.ghd.com

Drawing No.

Drawing Revisions

Rev.

No. Revision

Title

Drawn Date

Client

Project

Note: * indicates signatures on original issue of drawing or last revision of drawing

Original Size

Ansi D

Date

CheckDrafting

Scale

Drawn

CheckDesign

Designer

This Drawing must not be used for Construction unless Signed and Sealed as Approved

(Project Director)Approved

JobManager

ProjectDirector

Plot Date: Cad File No:4 September 2013 - 10:31 AM P:\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436M104.dwgPlotted by: Chris Hanzel

Contract No.

Sht of

Reuse of Documents

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the

property of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s written

authorization. © GHD Inc. 2013

GHD Inc.

DAN REITER

8410431

G2010.0048 EVC MECHANICAL, ELECTRICAL,

AND PLUMBING UPGRADE PROJECT (BID

PACKAGE #2)

1

SHEET GENERAL NOTES

1. CONTRACTOR SHALL VERIFY IN FIELD THE

LOCATION OF THE VERTICAL DROPS OF

NATURAL GAS PIPING AS THE DRAWINGS

PROVIDED AS BACKGROUNDS MAY DIFFER

FROM THE ACTUAL INSTALLED CONDITIONS.

MOUNT NEW SHUT OFF VALVES 48" AFF.

2. CONTRACTOR SHALL PATCH, PRIME, AND

PAINT THE ENTIRE WALL WHENEVER A

PENETRATION IS MADE TO LOCATE THE GAS

PIPING. DO NOT PAINT ONLY THE LOCALIZED

AREA OF DAMAGE.

3. PROVIDE LABELLING ON EACH GAS VALVE

ACCESS PANEL STATING WHICH

ROOM/PORTION OF A ROOM THE GAS VALVE

SHUTS OFF. IF MORE THAN ONE VALVE IS

REQUIRED TO BE SHUT OFF IN ORDER TO

CLOSE ALL GAS SERVICE TO THE ROOM

STATE WHICH NUMBER OF THE TOTAL

NUMBER OF VALVES IS IN THE ROOM. FOR

EXAMPLE, IF THERE ARE 5 VALVES IN A ROOM

STATE FOR EACH, "SHUT OFF VALVE 1 OF 5.

ROOM #XXX."

DEMOLITION NOTES

1.

KEYNOTES

1. INSTALL NEW SHUT OFF VALVE IN VERTICAL

SECTION OF NATURAL GAS PIPING. PROVIDE

ACCESS PANEL IN WALL TO ACCESS THE

VALVE AND SHUT OFF FROM ROOM 107.

2. INSTALL NEW SHUT OFF VALVE IN VERTICAL

SECTION OF NATURAL GAS PIPING. PROVIDE

ACCESS PANEL IN WALL TO ACCESS THE

VALVE AND SHUT OFF FROM ROOM 107.

ACCESS TO THIS VALVE SHUTS OFF NATURAL

GAS TO BOTH ROOMS 107 AND 106.

3. INSTALL NEW SHUT OFF VALVE IN VERTICAL

SECTION OF NATURAL GAS PIPING. PROVIDE

ACCESS PANEL IN WALL TO ACCESS THE

VALVE AND SHUT OFF FROM ROOM 106.

4. INSTALL NEW SHUT OFF VALVE IN VERTICAL

SECTION OF NATURAL GAS PIPING. PROVIDE

ACCESS PANEL IN WALL TO ACCESS THE

VALVE AND SHUT OFF FROM ROOM 115.

1SEQUOIA 1ST FLOOR PLAN - WEST

0 8'4'2'

1/4"=1'-0"

1

4

4

4

3

2

3

1

115 - PRESERVED MATERIALS

106 - ENVIRONMENTAL SCIENCE LAB

107- - PHYSIOLOGY LAB

- ****(3) THREE ROOMS WITH WORK TO BE PERFORMED****

ROOM 129

ROOM 127

ROOM 126

Page 2: SHEET GENERAL NOTES - SJECCD 0048 EVC MEP... · 2014. 5. 12. · sheet general notes 1. contractor shall verify in field the location of the vertical drops of natural gas piping as

M105

AS SHOWN

SS / PS CSH

BT DR

417 Montgomery Street Suite 700 San Francisco California 94104 USA

T 1 415 283 4970 F 1 415 283 4980

W www.ghd.com

Drawing No.

Drawing Revisions

Rev.

No. Revision

Title

Drawn Date

Client

Project

Note: * indicates signatures on original issue of drawing or last revision of drawing

Original Size

Ansi D

Date

CheckDrafting

Scale

Drawn

CheckDesign

Designer

This Drawing must not be used for Construction unless Signed and Sealed as Approved

(Project Director)Approved

JobManager

ProjectDirector

Plot Date: Cad File No:4 September 2013 - 10:26 AM P:\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436M105.dwgPlotted by: Chris Hanzel

Contract No.

Sht of

Reuse of Documents

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the

property of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s written

authorization. © GHD Inc. 2013

GHD Inc.

DAN REITER

8410431

G2010.0048 EVC MECHANICAL, ELECTRICAL,

AND PLUMBING UPGRADE PROJECT (BID

PACKAGE #2)

1

SHEET GENERAL NOTES

DEMOLITION NOTES

1.

KEYNOTES

1. INSTALL NEW SHUT OFF VALVE IN VERTICAL

SECTION OF NATURAL GAS PIPING. PROVIDE

ACCESS PANEL IN WALL AND SHUT OFF FROM

ROOM 128.

2. INSTALL NEW SHUT OFF VALVE IN VERTICAL

SECTION OF NATURAL GAS PIPING. PROVIDE

ACCESS PANEL IN WALL AND SHUT OFF FROM

ROOM 105.

3. INSTALL NEW SHUT OFF VALVE IN VERTICAL

SECTION OF NATURAL GAS PIPING. PROVIDE

ACCESS PANEL IN WALL AND SHUT OFF FROM

ROOM 118.

4. INSTALL NEW SHUT OFF VALVE IN VERTICAL

SECTION OF NATURAL GAS PIPING. PROVIDE

ACCESS PANEL IN WALL AND SHUT OFF FROM

ROOM 112.

5. INSTALL NEW SHUT OFF VALVE IN VERTICAL

SECTION OF NATURAL GAS PIPING. PROVIDE

ACCESS PANEL IN WALL AND SHUT OFF FROM

ROOM 103.

6. INSTALL NEW SHUT OFF VALVE IN VERTICAL

SECTION OF NATURAL GAS PIPING. PROVIDE

ACCESS PANEL IN WALL AND SHUT OFF FROM

ROOM 102.

7. INSTALL NEW SHUT OFF VALVE IN VERTICAL

SECTION OF NATURAL GAS PIPING. PROVIDE

ACCESS PANEL IN WALL TO ACCESS THE

VALVE AND SHUT OFF THE FUME HOODS IN

ROOMS 112 AND 113.

8. INSTALL NEW SHUT OFF VALVE IN VERTICAL

SECTION OF NATURAL GAS PIPING. PROVIDE

ACCESS PANEL IN WALL AND SHUT OFF FROM

ROOM 111.

9. INSTALL NEW SHUT OFF VALVE IN VERTICAL

SECTION OF NATURAL GAS PIPING. PROVIDE

ACCESS PANEL IN WALL TO ACCESS THE

VALVE AND SHUT OFF THE FUME HOOD IN

ROOM 109.

10. INSTALL NEW SHUT OFF VALVE IN VERTICAL

SECTION OF NATURAL GAS PIPING. PROVIDE

ACCESS PANEL IN WALL TO ACCESS THE

VALVE AND SHUT OFF THE FUME HOODS IN

ROOMS 108 AND 109.

1SEQUOIA 1ST FLOOR PLAN - EAST

0 12'4' 8'

3/16"=1'-0"

10

9

8

7

4

8

3

3

3

2

2

2

2

5

2

1

2

3

1. CONTRACTOR SHALL VERIFY IN FIELD THE

LOCATION OF THE VERTICAL DROPS OF

NATURAL GAS PIPING AS THE DRAWINGS

PROVIDED AS BACKGROUNDS MAY DIFFER

FROM THE ACTUAL INSTALLED CONDITIONS.

MOUNT NEW SHUT OFF VALVES 48" AFF.

2. CONTRACTOR SHALL PATCH, PRIME, AND

PAINT THE ENTIRE WALL WHENEVER A

PENETRATION IS MADE TO LOCATE THE GAS

PIPING. DO NOT PAINT ONLY THE LOCALIZED

AREA OF DAMAGE.

3. PROVIDE LABELLING ON EACH GAS VALVE

ACCESS PANEL STATING WHICH

ROOM/PORTION OF A ROOM THE GAS VALVE

SHUTS OFF. IF MORE THAN ONE VALVE IS

REQUIRED TO BE SHUT OFF IN ORDER TO

CLOSE ALL GAS SERVICE TO THE ROOM

STATE WHICH NUMBER OF THE TOTAL

NUMBER OF VALVES IS IN THE ROOM. FOR

EXAMPLE, IF THERE ARE 5 VALVES IN A ROOM

STATE FOR EACH, "SHUT OFF VALVE 1 OF 5.

ROOM #XXX."

128 - TELECOM CUSTODIAL ROOM

- ****(8) EIGHT ROOMS WITH WORK TO BE PERFORMED****

105 - ANIMAL BIOLOGY

118 - SPECIMENS & LIVING MATERIALS

103 - PLANT BIOLOGY LAB

111 - CLEAN ROOM

112 - INCUBATOR ROOM

109 - MICROBIOLOGY LAB

108 - ANATOMY LAB

ROOM 112

ROOM 124

ROOM 114

ROOM 135 ROOM 123ROOM 126

ROOM 119

ROOM 113

ROOM 114

ROOM 115

ROOM 110

ROOM 111.

Page 3: SHEET GENERAL NOTES - SJECCD 0048 EVC MEP... · 2014. 5. 12. · sheet general notes 1. contractor shall verify in field the location of the vertical drops of natural gas piping as

M107

AS SHOWN

SS / PS CSH

BT DR

417 Montgomery Street Suite 700 San Francisco California 94104 USAT 1 415 283 4970 F 1 415 283 4980W www.ghd.com

Drawing No.

Drawing Revisions

Rev.

No. Revision

Title

Drawn Date

Client

Project

Note: * indicates signatures on original issue of drawing or last revision of drawing

Original Size

Ansi D

Date

CheckDrafting

Scale

Drawn

CheckDesign

Designer

This Drawing must not be used for Construction unless Signed and Sealed as Approved

(Project Director)Approved

JobManager

ProjectDirector

Plot Date: Cad File No:4 September 2013 - 10:18 AM P:\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436M107.dwgPlotted by: Chris Hanzel

Contract No.

Sht of

Reuse of DocumentsThis document and the ideas and designs incorporated herein, as an instrument of professional service, is theproperty of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s writtenauthorization. © GHD Inc. 2013

GHD Inc.

DAN REITER

8410431

G2010.0048 EVC MECHANICAL, ELECTRICAL,AND PLUMBING UPGRADE PROJECT (BIDPACKAGE #2)

1

SHEET GENERAL NOTES

DEMOLITION NOTES

1.

KEYNOTES

1. EXISTING SHUT OFF VALVE ABOVE CEILINGTO REMAIN.

2. MAKE POINT OF CONNECTION FOR 1-1/4"NATURAL GAS BRANCH LINE TO NEW ROOFMOUNTED GENERATOR ABOVE THE CEILING.VERIFY IN FIELD THE ROUTE FROM ABOVETHE FIRST FLOOR CEILING THROUGH THESECOND FLOOR SO THAT PIPING IS NOTEXPOSED. ROUTE PIPING WITHIN THE WALLSTHROUGH THE SECOND FLOOR TO THE ROOF.REPAIR ANY DAMAGE TO WALLS, CEILING,AND FLOORS WHILE INVESTIGATING THEROUTE OF THE GAS PIPING. SEE SHEET E102FOR ADDITIONAL INFORMATION.

1 SEQUOIA 1ST CEILING PLAN - WEST0 12'4' 8'

3/16"=1'-0"

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

2

1. CONTRACTOR SHALL VERIFY IN FIELD THELOCATION OF THE VERTICAL DROPS OFNATURAL GAS PIPING AS THE DRAWINGSPROVIDED AS BACKGROUNDS MAY DIFFERFROM THE ACTUAL INSTALLED CONDITIONS.

2. CONTRACTOR SHALL PATCH, PRIME, ANDPAINT THE ENTIRE WALL WHENEVER APENETRATION IS MADE TO LOCATE THE GASPIPING. DO NOT PAINT ONLY THE LOCALIZEDAREA OF DAMAGE.

3. PROVIDE LABELLING ON EACH GAS VALVEACCESS PANEL STATING WHICHROOM/PORTION OF A ROOM THE GAS VALVESHUTS OFF. IF MORE THAN ONE VALVE ISREQUIRED TO BE SHUT OFF IN ORDER TOCLOSE ALL GAS SERVICE TO THE ROOMSTATE WHICH NUMBER OF THE TOTALNUMBER OF VALVES IS IN THE ROOM. FOREXAMPLE, IF THERE ARE 5 VALVES IN A ROOMSTATE FOR EACH, "SHUT OFF VALVE 1 OF 5.ROOM #XXX."

cshanzel
Line
cshanzel
Callout
--MAKE THE POINT OF CONNECTION INTO THE (E) 1-1/4" (OR LARGER SIZE) NATURAL GAS PIPING ABOVE THE CEILING IN THE FIRST FLOOR. ROUTE THE PIPING UP THROUGH THE WALL IN THE SECOND FLOOR TO ABOVE THE CEILING OF THE SECOND FLOOR.
Page 4: SHEET GENERAL NOTES - SJECCD 0048 EVC MEP... · 2014. 5. 12. · sheet general notes 1. contractor shall verify in field the location of the vertical drops of natural gas piping as
cshanzel
Text Box
THIS PLAN HAS BEEN PROVIDED TO SHOW THE APPROXIMATE LOCATION OF DUCTWORK TO AVOID AS THE NATURAL GAS PIPING IS ROUTED UP THROUGH THE SECOND FLOOR.
cshanzel
Line
Page 5: SHEET GENERAL NOTES - SJECCD 0048 EVC MEP... · 2014. 5. 12. · sheet general notes 1. contractor shall verify in field the location of the vertical drops of natural gas piping as
cshanzel
Rectangle
cshanzel
Polygonal Line
cshanzel
Callout
ROUTE THE PIPING UP TO THE UNIT FROM BELOW. KEEP PIPING ABOVE CEILING.
cshanzel
Callout
ROUTE THE PIPING UP IN THE WALL TO ABOVE THE CEILING. ROUTE OVER THE CORRIDOR INTO THE NURSING ROOM BEFORE ROUTING UP TO THE NEW GENERATOR.
Page 6: SHEET GENERAL NOTES - SJECCD 0048 EVC MEP... · 2014. 5. 12. · sheet general notes 1. contractor shall verify in field the location of the vertical drops of natural gas piping as
cshanzel
Rectangle
cshanzel
Callout
NEW GENERATOR LOCATION FOR REFERENCE
Page 7: SHEET GENERAL NOTES - SJECCD 0048 EVC MEP... · 2014. 5. 12. · sheet general notes 1. contractor shall verify in field the location of the vertical drops of natural gas piping as

GENERATOR SKID 1

2'-0"

S101

AS SHOWN

SS CC

BT

417 Montgomery Street Suite 700 San Francisco California 94104 USAT 1 415 283 4970 F 1 415 283 4980W www.ghd.com

Drawing No.

Drawing Revisions

Rev.

No. Revision

Title

Drawn Date

Client

Project

Note: * indicates signatures on original issue of drawing or last revision of drawing

Original Size

Ansi D

Date

CheckDrafting

Scale

Drawn

CheckDesign

Designer

This Drawing must not be used for Construction unless Signed and Sealed as Approved

(Project Director)Approved

JobManager

ProjectDirector

Plot Date: Cad File No:4 September 2013 - 9:25 AM P:\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436S101.dwgPlotted by: Chris Hanzel

Contract No.

Sht of

Reuse of DocumentsThis document and the ideas and designs incorporated herein, as an instrument of professional service, is theproperty of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s writtenauthorization. © GHD Inc. 2013

GHD Inc.

DAN REITER

8410431

G2010.0048 EVC MECHANICAL, ELECTRICAL,AND PLUMBING UPGRADE PROJECT (BIDPACKAGE #2)

1

SHEET GENERAL NOTES

1.

DEMOLITION NOTES

1.

KEYNOTES

1. CUT BACK ROOFING MEMBRANE ANDINSULATION TO EXPOSE METAL ROOFDECKING BELOW GENERATOR ANDINSTALL SKID PER

1 ROOF FRAMING PLAN0 16'8'4'

1/8"=1'-0"

4

S-501

1

cshanzel
Rectangle
Page 8: SHEET GENERAL NOTES - SJECCD 0048 EVC MEP... · 2014. 5. 12. · sheet general notes 1. contractor shall verify in field the location of the vertical drops of natural gas piping as

M108

AS SHOWN

SS / PS CSH

BT DR

417 Montgomery Street Suite 700 San Francisco California 94104 USAT 1 415 283 4970 F 1 415 283 4980W www.ghd.com

Drawing No.

Drawing Revisions

Rev.

No. Revision

Title

Drawn Date

Client

Project

Note: * indicates signatures on original issue of drawing or last revision of drawing

Original Size

Ansi D

Date

CheckDrafting

Scale

Drawn

CheckDesign

Designer

This Drawing must not be used for Construction unless Signed and Sealed as Approved

(Project Director)Approved

JobManager

ProjectDirector

Plot Date: Cad File No:4 September 2013 - 9:49 AM P:\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436M108.dwgPlotted by: Chris Hanzel

Contract No.

Sht of

Reuse of DocumentsThis document and the ideas and designs incorporated herein, as an instrument of professional service, is theproperty of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s writtenauthorization. © GHD Inc. 2013

GHD Inc.

DAN REITER

8410431

G2010.0048 EVC MECHANICAL, ELECTRICAL,AND PLUMBING UPGRADE PROJECT (BIDPACKAGE #2)

1

SHEET GENERAL NOTES

DEMOLITION NOTES

1.

KEYNOTES

1. PROVIDE AND INSTALL NEW SHUT OFF VALVEFOR NATURAL GAS PIPING IN FLOORMOUNTED VAULT WITH ACCESS HATCH.

1 SEQUOIA LECTURE HALL FLOOR PLAN0 12'4' 8'

3/16"=1'-0"

1

11

1. CONTRACTOR SHALL VERIFY IN FIELD THELOCATION OF THE VERTICAL DROPS OFNATURAL GAS PIPING AS THE DRAWINGSPROVIDED AS BACKGROUNDS MAY DIFFERFROM THE ACTUAL INSTALLED CONDITIONS.

2. CONTRACTOR SHALL PATCH, PRIME, ANDPAINT THE ENTIRE WALL WHENEVER APENETRATION IS MADE TO LOCATE THE GASPIPING. DO NOT PAINT ONLY THE LOCALIZEDAREA OF DAMAGE.

3. PROVIDE LABELLING ON EACH GAS VALVEACCESS PANEL STATING WHICHROOM/PORTION OF A ROOM THE GAS VALVESHUTS OFF. IF MORE THAN ONE VALVE ISREQUIRED TO BE SHUT OFF IN ORDER TOCLOSE ALL GAS SERVICE TO THE ROOMSTATE WHICH NUMBER OF THE TOTALNUMBER OF VALVES IS IN THE ROOM. FOREXAMPLE, IF THERE ARE 5 VALVES IN A ROOMSTATE FOR EACH, "SHUT OFF VALVE 1 OF 5.ROOM #XXX."

cshanzel
Callout
303 - LECTURE
cshanzel
Text Box
- ****(3) THREE ROOMS WITH WORK TO BE PERFORMED****
cshanzel
Polygonal Line
cshanzel
Polygonal Line
cshanzel
Polygonal Line
cshanzel
Callout
301 - LECTURE
cshanzel
Callout
302 - LECTURE
cshanzel
Text Box
ROOM 140
cshanzel
Text Box
ROOM 160
cshanzel
Text Box
ROOM 150
Page 9: SHEET GENERAL NOTES - SJECCD 0048 EVC MEP... · 2014. 5. 12. · sheet general notes 1. contractor shall verify in field the location of the vertical drops of natural gas piping as

E108

NONE

SMG SMG

BAT BNB

417 Montgomery Street Suite 700 San Francisco California 94104 USA

T 1 415 283 4970 F 1 415 283 4980

W www.ghd.com

Drawing No.

Drawing Revisions

Rev.

No. Revision

Title

Drawn Date

Client

Project

Note: * indicates signatures on original issue of drawing or last revision of drawing

Original Size

Ansi D

Date

Check

Drafting

Scale

Drawn

Check

Design

Designer

This Drawing must not be used for Construction unless Signed and Sealed as Approved

(Project Director)

Approved

Job

Manager

Project

Director

Plot Date: Cad File No:5 May 2014 - 4:44 PM N:\US\San Francisco\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436E108.dwg

Plotted by:

Steve Girard

Contract No.

Sht of

Reuse of Documents

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the

property of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s written

authorization. © GHD Inc. 2013

GHD Inc.

DAN REITER

8410431

G2010.0048 EVC MECHANICAL, ELECTRICAL,

AND PLUMBING UPGRADE PROJECT (BID

PACKAGE #2)

3

AUTOMATIC TRANSFER SWITCH 'ATS'

200A, 120/240V, 2-POLE, 3-WIRE,

SOLID NEUTRAL

GENERATOR MAIN

BREAKER

4

3

1-1/4" CONDUIT WITH (3) #6

AWG AND (1) #10 AWG GND

(E) 225A FEED FROM (E)

MAIN SWITCHBOARD 'MSB'

1-1/4" CONDUIT WITH (3) #6

AWG AND (1) #10 AWG GND

1

(E) PANEL 'AC1'

480Y/277V, 225A,

3PH, 4W

1

NATURAL GAS GENERATOR

9KW, 120/240V, 1PH, 3W

2

1

SEQUOIA - PARTIAL SINGLE LINE DIAGRAM

KEYNOTES

1. PROVIDE FEEDER AS INDICATED.

2. PROVIDE NATURAL GAS GENERATOR RATED AT

9kW, 120/240-VOLTS, 1-PHASE, 3-WIRE, GENERAC

GUARDIAN MODEL #006051-1 OR APPROVED

EQUAL.

3. PROVIDE GENERATOR MANUFACTURER'S

AUTOMATIC TRANSFER SWITCH 'ATS' IN NEMA 3R

ENCLOSURE SUITABLE FOR 200A, 120/240V,

1-PHASE, 3-WIRE WITH SOLID NEUTRAL, GENERAC

NEXUS MODEL #RTSX200A3 OR APPROVED

EQUAL.

4. PROVIDE 12-CIRCUIT ELECTRICAL PANEL,

FLUSH-MOUNTED, SUITABLE FOR 100A, 120/240V,

1-PHASE, 3-WIRE. SEE PANEL SCHEDULE ON

SHEET E110.

5. PROVIDE WALL-MOUNT DRY-TYPE TRANSFORMER

RATED FOR 10kVA, 240/120V, 1-PHASE, 3-WIRE IN

2ND FLOOR ELECTRICAL ROOM 210. SEE DETAIL

4/E111.

6. PROVIDE CIRCUIT BREAKER DISCONNECT IN

NEMA 1 ENCLOSURE RATED FOR 50A, 240V,

2-POLE WITH LOCKABLE HANDLE.

7. PROVIDE 30A, 2-POLE BREAKER IN (E) PANEL 'AC1'.

GENERATOR FRAME

GROUND ONLY

SEQUOIA GENERATOR - RELATED SHEETS:

S101 STRUCTURAL ROOF PLAN - SEQUOIA

M107 SEQUOIA 1ST CEILING PLAN - EAST

E102 ELECTRICAL ROOF PLAN - SEQUOIA

E104 ENLARGED PLANS - SEQUOIA

E108 SINGLE LINE DIAGRAM - SEQUOIA

E110 SCHEDULES - SEQUOIA

E111 ELECTRICAL DETAILS (DETAILS NO. 1 & 3)

#6 GROUND WIRE WITH COMPRESSION

LUG BOLTED TO (E) BUILDING COLUMN

(E) 2" CONDUIT WITH

(3) #4/0 AWG & #4 GND

3/4" CONDUIT WITH

(2) #10 AWG & #10 GND

1

1-1/4" CONDUIT WITH (3) #6

AWG AND (1) #10 AWG GND

1

ENCLOSED CIRCUIT BREAKER

'ECB-1EM'

6

TRANSFORMER 'T1EM'

10kVA, 480-240/120V,

1PH, 3W

#6 GROUND WIRE WITH COMPRESSION

LUG BOLTED TO (E) BUILDING COLUMN

PANEL '1EM'

240/120V, 100A,

1PH, 3W

7

(2) #12 AWG & #12 GND FOR GENERATOR

BATTERY CHARGER CIRCUIT

3

3

Page 10: SHEET GENERAL NOTES - SJECCD 0048 EVC MEP... · 2014. 5. 12. · sheet general notes 1. contractor shall verify in field the location of the vertical drops of natural gas piping as

AUTOMATIC TRANSFER SWITCH

'ATS', MOUNT TOP AT +60" AFF

UNISTRUT SUPPORTS (HORIZONTAL)

ROOF

(1) 1-1/4" CONDUIT WITH (3) #6 AWG AND

(1) #8 AWG GND FROM (E) PANEL '2PA' IN

2ND FLOOR ELECTRICAL ROOM AND

(1) 1-1/4" CONDUIT WITH (3) #6 AWG AND

(1) #8 AWG GND TO PANEL '1EM' IN

CADAVER DEMO ROOM 114

1" LFMC WITH (3) #6 AWG

AND (1) #8 AWG GND

NATURAL GAS GENERATOR

(NOTE 1)

EQUIPMENT CURB

SEE STRUCTURAL

DRAWINGS

PROVIDE UNISTRUT SUPPORT ON

EACH SIDE OF GENERATOR SKID

(E) BUILDING COLUMN

NOTES:

1. GENERATOR WEIGHT IS 387 LBS. SEE

STRUCTURAL DRAWINGS FOR MOUNTING.

NOTES:

1. EQUIPMENT WEIGHT NOT TO EXCEED 100 LBS.

2. FOR EQUIPMENT EXCEEDING 42" IN HEIGHT

PROVIDE ADDITIONAL BLOCKING SUPPORT AT

MIDDLE OF PANEL.

3. FOR FLUSH-MOUNTED PANELS AND EQUIPMENT,

PROVIDE ADDITIONAL GYPSUM BOARD AT BACK

AND SIDES OF EQUIPMENT AS REQUIRED TO

MAINTAIN WALL FIRE RATING.

SET TOP OF

EQUIPMENT AT

6' AFF±, UON

PROVIDE CADDY ADJUSTABLE MOUNTING

BRACKET (MODEL #TSGB16) BETWEEN STUDS

AT TOP AND BOTTOM OF EQUIPMENT, FASTEN

EACH END WITH (4) #12 SHEET METAL SCREWS

(NOTE 2)

FASTEN EACH CORNER TO CADDY BRACKET

WITH 1/4" BOLTS, NUTS AND WASHERS

FLUSH-MOUNTED ELECTRICAL PANEL OR

EQUIPMENT AS INDICATED ON PLANS

(NOTE 1,3)

WALL FRAMING SHEET METAL STUDS AT 16" OC (TYP)

DEDICATED RECEPTACLE, SEE PLANS FOR

CIRCUIT, WIRING AND CONDUIT (TYP OF 2)

NOTES:

1. EQUIPMENT WEIGHT NOT TO EXCEED 200 LBS.

2. ADJUST EXACT MOUNTING HARDWARE SIZES,

LOCATIONS AND QUANTITIES WITH EQUIPMENT

MANUFACTURER

3. PRE-DRILL PLYWOOD FOR SHEET METAL

SCREWS.

SET TOP OF

EQUIPMENT AT

6' AFF±, UON

ATTACHED BOTTOM OF TRANSFORMER TO

UNISTRUT WITH (2) 1/4" CHANNEL BOLTS,

NUTS AND WASHERS (NOTE 2)

PROVIDE UNISTRUT ON PLYWOOD BACKING

AT TOP AND BOTTOM WITH #10x1" WOOD

SCREWS AT 4" OC (MINIMUM 4 EACH)

WALL-MOUNTED TRANSFORMER AS

INDICATED ON PLANS (NOTE 1)

WALL FRAMING SHEET METAL STUDS AT 16" OC (TYP)

24"x24"x3/4" PLYWOOD BACKING WITH (6) #10x1"

SHEET METAL SCREWS ON EACH SIDE

SPAN 2 STUDS MINIMUM (NOTE 3)

ATTACHED TOP OF TRANSFORMER TO

UNISTRUT WITH (1) 1/2" CHANNEL BOLT,

NUT AND WASHER (NOTE 2)

E111

AS SHOWN

SMG SMG

BAT BNB

417 Montgomery Street Suite 700 San Francisco California 94104 USA

T 1 415 283 4970 F 1 415 283 4980

W www.ghd.com

Drawing No.

Drawing Revisions

Rev.

No. Revision

Title

Drawn Date

Client

Project

Note: * indicates signatures on original issue of drawing or last revision of drawing

Original Size

Ansi D

Date

Check

Drafting

Scale

Drawn

Check

Design

Designer

This Drawing must not be used for Construction unless Signed and Sealed as Approved

(Project Director)

Approved

Job

Manager

Project

Director

Plot Date: Cad File No:5 May 2014 - 3:44 PM N:\US\San Francisco\Projects\12616 Evergreen College CCD\8410431 EVC Phase I - MEP & FP\06-CAD\Sheets\Bid Package #2\8410436E111.dwg

Plotted by:

Steve Girard

Contract No.

Sht of

Reuse of Documents

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the

property of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s written

authorization. © GHD Inc. 2013

GHD Inc.

DAN REITER

8410431

G2010.0048 EVC MECHANICAL, ELECTRICAL,

AND PLUMBING UPGRADE PROJECT (BID

PACKAGE #2)

3

1 SEQUOIA - ROOFTOP GENERATOR AND AUTOMATIC TRANSFER SWITCH

NOT TO SCALE

2 (NOT USED)

NOT TO SCALE

3 SEQUOIA - ELECTRICAL PANEL MOUNTING

NOT TO SCALE

SEQUOIA GENERATOR - RELATED SHEETS:

S101 STRUCTURAL ROOF PLAN - SEQUOIA

M107 SEQUOIA 1ST CEILING PLAN - EAST

E102 ELECTRICAL ROOF PLAN - SEQUOIA

E104 ENLARGED PLANS - SEQUOIA

E108 SINGLE LINE DIAGRAM - SEQUOIA

E110 SCHEDULES - SEQUOIA

E111 ELECTRICAL DETAILS (DETAILS NO. 1 & 3)

GULLO CAFE - RELATED SHEETS:

E101 SITE PLAN - GULLO CAFE

E103 ENLARGED PLANS - GULLO CAFE

E105 ENLARGED PLANS - GULLO CAFE

E107 SINGLE LINE DIAGRAM - GULLO CAFE

E109 SCHEDULES - GULLO CAFE

E111 ELECTRICAL DETAILS (DETAIL #2)

4 SEQUOIA - TRANSFORMER MOUNTING

NOT TO SCALE

3

Page 11: SHEET GENERAL NOTES - SJECCD 0048 EVC MEP... · 2014. 5. 12. · sheet general notes 1. contractor shall verify in field the location of the vertical drops of natural gas piping as
cshanzel
Line
cshanzel
Line
cshanzel
Line
cshanzel
Line
cshanzel
Line
cshanzel
Polygonal Line
cshanzel
Polygonal Line
cshanzel
Polygonal Line
cshanzel
Polygonal Line
cshanzel
Polygonal Line
cshanzel
Polygonal Line
cshanzel
Polygonal Line
cshanzel
Polygonal Line
AThomas1
Text Box
LETC PHOTO LOCATIONS
Page 12: SHEET GENERAL NOTES - SJECCD 0048 EVC MEP... · 2014. 5. 12. · sheet general notes 1. contractor shall verify in field the location of the vertical drops of natural gas piping as
cshanzel
Polygon
FAN COIL 4 PHOTOS ABOVE THE T-BAR CEILING
AThomas1
Text Box
Page 13: SHEET GENERAL NOTES - SJECCD 0048 EVC MEP... · 2014. 5. 12. · sheet general notes 1. contractor shall verify in field the location of the vertical drops of natural gas piping as
cshanzel
Polygon
MAT ROOM PHOTOS ABOVE THE T-BAR CEILING AND OF THE ROOF ABOVE EXISTING FAN COIL UNITS IN SIDE ROOM.