Page 1: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 105/05/2011MTR Corporation 05/05/2011 Page 1MTR Corporation

Shatin to Central Link

4 May 2011

Transport Advisory Committee

Page 2: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 2

• One of the ten major infrastructure projects in 2007-2008 Policy Address

• Government invited MTRCL to continue with SCL planning and design in March 2008

• Design, site investigation works and public consultation of the SCL commenced in mid 2008 and are in progress

• The railway project was gazetted under the Railways Ordinance on 26 November 2010

• Funding for SCL Protection Works and Advance Works is being sought from Legislative Council

Background

Page 3: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 3

Tai Wai

Hin Keng

Diamond Hill

Kai Tak

To Kwa Wan

Ma Tau Wai

Tai Wai to Hung Hom Section

ExhibitionAdmiralty

Hung Hom to Admiralty Section

Interchange Stations

Alignment

Ho Man Tin

Hung Hom

Page 4: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 4

• Expansion of the railway network catchment in Hong Kong– 1.1 million passengers per day – Annual transport benefit: HK$4.4 billion

• Enhancement of accessibility within network: six interchange stations

• Improvement in transport– Relieve congestion in existing railway lines – Relieve reliance on road-based transport

• Community and economic development

• Environmental protection

Benefits

Page 5: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 5

Tuen Mun

Wu Kai Sha

Lo Wu

Tai Wai

Admiralty

Hung Hom

Lok Ma Chau

East West Corridor (8-car trains)

• Ma On Shan Line

• West Rail Line

• SCL (Tai Wai to Hung Hom Section)

North South Corridor(9-car trains)

• East Rail Line

• SCL (Hung Hom to Admiralty Section)

• Two strategic railway corridors will be formed, enhancing the whole network to cope with future demand

• East West Corridor – a new route between NT and Kowloon, relieving congestion of existing lines

• North South Corridor – a direct link between NT and HK Island with more frequent service

Page 6: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 6

Lok Ma Chau Lo Wu

Wu Kai Sha

Admiralty

New Territories

Kowloon

HK Island

Diamond Hill

YauTong

Hung Hom

East TST

Quarry Bay

Tsim Sha Tsui

Tai Wai

Kowloon Tong

East West Corridor• SCL (Tai Wai to Hung Hom Section)

connects Ma On Shan Line to West Rail Line via East Kowloon

• Increase the carrying capacity of the railway system from NT East to Kowloon through a new corridor

• Divert approx. 20% of the NT East southbound passengers, relieving the current overcrowded conditions of East Rail Line between Tai Wai and Kowloon Tong

Divert 20% southbound passengers

Ho Man Tin

Page 7: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 7

North South Corridor• SCL (Hung Hom to Admiralty

Section) extends East Rail Line across the harbour to HK Island

• New trains with new signallingsystems, enabling a higher train frequency

• Divert approx. 24% of the TsuenWan Line cross harbourpassengers, relieving the current overcrowded conditions between Tsim Sha Tsui and Admiralty

Lok Ma Chau Lo Wu

Wu Kai Sha

Admiralty

New Territories

Kowloon

HK Island

Diamond Hill

YauTong

Ho Man TinHung

Hom

East TST

Quarry Bay

Tsim Sha Tsui

Tai Wai

Kowloon Tong

Exhibition

Divert 24% cross harbour passengers

Page 8: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 8

SCL Protection Works and Advance Works

Scheduled for end 2011Will seek funding from LegCo in June

Causeway Bay Typhoon Shelter

Harcourt Garden

International Mail CentreScheduled for mid 2011

Funding approved by LegCoAdmiralty Station

Ho Man Tin Station

Commenced in mid 2010Wan Chai Reclamation

Works CommencementFunding SituationLocation

Page 9: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 9

Interchange stations

SCL / Tsuen Wan Line / Island Line / South Island Line (East)

Admiralty

SCL / North Island LineExhibition

East West Corridor / North South CorridorHung Hom

Kwun Tong Line Extension / SCLHo Man Tin

Kwun Tong Line / SCLDiamond Hill

East West Corridor / North South CorridorTai Wai

Railway LinesStation

Page 10: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 10

`

Fat Kwong Street

Fat Kwong Street

Valley Road

Valley Road

Ho Man Tin EstateHo Man Tin EstateN

Oi Man EstateOi Man Estate

Chung Yee StreetChung Yee Street

SheungSheung Lok Street

Lok Street

Chatham Road North

Chatham Road North

Ho Man Tin Station

SCL (East West Corridor)

Station/Railway Facilities

Station Entrance

Ventilation Shaft

Emergency Access

Passenger Lift

Pedestrian Subway

Footbridge/Covered walkway

Wuhu Street

Wuhu Street

Kwun Tong Line Extension

Chung

Chung HauHau

Street

Street

Page 11: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 11

Chatham Road NorthYan Fung Street

Chung Hau Street

SCL platforms KTE platforms Common station facilities (e.g. concourse)

Proposed footbridge

Ho Man Tin Station

Minimize disturbance to the public-

Shorten the construction period-

Reduce overall size of the station and cost-

Integrated station

Page 12: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 12

Kwun Tong Line Extension Platform

SCL Platform

Station Concourse

Station Entrance at Chung Hau Street

Station Concourse

Ho Man Tin Station

Page 13: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 13

Queensway

Gloucester Road

Harcourt Road

Cotton Tre

e Driv

e

Ars

enal

Str

eet

Hennessy Road

Harcourt GardenHarcourt Garden

Hong Kong ParkHong Kong Park

Admiralty Station

Existing station

Station extension

Tsuen Wan Line

Island Line

South Island Line (East)

Station/Railway Facilities

New Station Entrance

Ventilation Shaft

SCL (North South Corridor)

Overrun tunnel

Page 14: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 14

Admiralty Station

樂禮街

行人天橋 平台花園

Existing TWL/ISL Upper Platform

Rodney Street

Footbridge Landscape Deck

Existing TWL/ISL Lower Platform

Admiralty Station ExtensionExisting Admiralty Station

South Island Line (East)

SCLSCL

Minimize disturbance to the public-

Shorten the construction period-

Reduce overall size of the station and cost-

Integrated station

Page 15: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 15

Admiralty Station

South Island Line (East) Platform

SCL Platform

Existing Station Concourse

Existing Upper Platform

Existing Lower Platform

Interchanging Level

Page 16: Shatin to Central LinkPage 2 • One of the ten major infrastructure projects in 2007-2008 Policy Address • Government invited MTRCL to continue with SCL planning and design in March

Page 16

In progressDetailed Design / Site Investigation

2018

2020

Anticipated Completion Date:

• Tai Wai to Hung Hom Section

• Hung Hom to Admiralty Section

Gazette under Railways Ordinance 2010.11.26

Funding Application for Protection Works / Advance Works

2010 / 2011

Main Construction Commencement 2012

Programme