Page 1: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

SHARC-A-PALOOZA PRESENTATION – JUNE 2019

Page 2: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

EVERYONE WANTS TO GO GREEN…UNTIL IT COSTS AN EXTRA DOLLAR

Page 3: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

$3.0BTransaction Value

$1.3BAssets Under Management

$250MCommitted Capital

Page 4: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

SUBTERRAPROJECT HIGHLIGHTSubterra has signed a term sheet with Metropia, Capital Developments, and RioCan to design and assess the feasibility of a geothermal energy system for their preeminent 11 Yorkville Avenue development project (across from the Four Seasons Hotel). This would be the tallest building in Canada to use a geothermal heating and cooling system to date.

Total Stories: 62Total GFA: 563,967 ft2

# of Residential Units: 635

4

Page 5: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

5

PROJECTHIGHLIGHToneGRID Project Overview

Forum is acting as financing partner and co-developer with oneGRID Corp. (oneGRID) to advance the Empire State Connector project, a 1,000 MW high-voltage, direct current electric transmission line connecting Upstate New York to New York City. Cheap and reliable Upstate New York power will be collected at a converter station built near Utica, and then will be transported via transmission cables that use safe and proven technology. These cables will be located in existing waterways to minimize the project’s environmental impact and eliminate any visual impact. The southern terminus will be located in New York City.

The project will provide an opportunity for the New York Independent System Operator to provide new sources of energy to power the largest city in the United States.

Visit http://www.onegridcorp.com/ to learn more about oneGRIDand http://www.empirestateconnector.com/ to learn more about the Empire State Connector project.

Page 6: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

6

SELECTTRANSACTIONS

“The Quad” at York University Student Accommodation• Forum and Campus Suites are JV partners in the

design, build, finance, maintenance and operations of a mixed use student housing project at York University

• First Phase has 812 beds in 486 units

Surrey Pretrial Service Center Expansion• This 180-cell high security pretrial corrections

facility, located in Surrey, B.C., is a DBFM project with Forum and Brookfield Financial as co-developers

• Procured by Partnerships British Columbia on behalf of the Minister of Citizens Services, this project provides a 30-year concession that extends to 2043

Ontario Power Generation Headquarters• 20 year DBFM project for Ontario Power

Generation’s Pickering HQ• OPG took occupancy of the property upon its

completion in early 2002 and it currently houses over 450 employees in the 100,00 sq ft facility

Ontario Paramedic Services HQ• 30 year Design-Build-Finance-Maintain (“DBFM)

contract for a 100,000 sq ft facility that serves as the HQ for the Ottawa Paramedic Services

• Received CABA BiQ Gold Award Award for Excellence

TransAlta Headquarters

• TransAlta Corporation completed a $66MM sale-leaseback of its global headquarters located in Calgary, with Forum

• The complex spans a city block, contains 3 buildings and totals 335,000 sq ft

Billy Bishop Toronto City Airport Pedestrian Tunnel• The pedestrian tunnel features a mechanized

underground walkway and will be powered by 100% green energy supplied by Bullfrog Power

• Approximately 1,100 people per hour can travel through the tunnel which won the Tunneling Association of Canada’s Canadian Project of the Year Award

Page 7: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

7

FUNDING METHODS

BANKS

• Onerous Terms• Slow Deployment

• Grants• Rebates• Incentives• Utility Programs• Complicated and

limited availability• Rigid & slow capital

• Nimble & Fast Capital• Partnership Structure• Business Experience• Forward Thinking

PUBLIC SECTOR PRIVATE CAPITAL

Page 8: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

8

LOW-CARBONTECHNOLOGIES

Subterra uses multiple low-carbon technologies including:

• Geothermal Exchange• Wastewater / Sewage Heat Recovery• Solar• Thermal Energy Storage• Conventional HVAC (Hybrid Systems)

• Heat Pump Leasing• Fan Coil Leasing

Page 9: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

DEVELOPER CAPITAL AVOIDANCESubterra designs, installs, monitors, maintains and owns the geothermal system, reducing developer capital cost commitments and risk.

MEET STRINGENT GREEN BUILDING CODESIntegrating geothermal into the design of new buildings helps developers align with city planning goals and future building codes, expediting the building approval and development process.

INCREASE SALEABLE SPACEGeothermal systems allow developers to forego the installation of many conventional HVAC system components, freeing up extra saleable floor area.

ENERGY PRICE PROTECTION FOR RESIDENTSBuilding owners and residents pay one simple monthly rate for heating and cooling that’s locked in and only adjusted for inflation.

REDUCTION OF HARMFUL GHG EMISSIONSGeothermal heating and cooling systems are significantly more efficient than other conventional systems, capable of achieving energy savings between 60-80%.

THE SUBTERRASOLUTION

Building owners pay a fixed monthly fee to Subterra for heating, cooling, and hot water

Subterra’s System provides clean and renewable thermal energy to building owners

Developers contract Subterra to build, own, and operate a thermal energy system for their building

AIR CONDITIONING

SUBTERRA RENEWABLE

ENERGY

SPACE HEATING

DOMESTIC HOT WATER

DEVELOPER

$$$

9

Page 10: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

10

PROJECT STAKEHOLDERS

Developers

• Capital Savings• Incentives• Marketability• Increased saleable area• Ability to partner

• Ability to Partner• Ongoing work• Capital available to

help projects be completed

• Fixed Pricing• No Hidden Fees• Rates locked in• Environmental Benefits

• Provide Capital• Long Term Operations

and Maintenance• Business experience to

ensure projects get competed

• Partnership Opportunities

Engineers &Technology Providers Occupants Subterra

Page 11: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

11

CASESTUDY

Mixed Use – Residential, Office, Retail

Total GFA: 1,862,583 ft2

Site Size: 316,351 ft2

Residential Units: 2,098

Total Towers: 8

Total Combined Floors: 159

Renewables Used:

Geothermal Exchange• 306 boreholes to 650ft

Waste Water Heat Recovery• Domestic Hot Water

Page 12: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

ZEROCAPITAL COSTS

$16,726,468 DEVELOPER BENEFIT

72% HEATING & COOLINGENERGY SAVINGS

2,732 TonnesANNUAL GHG REDUCTION

NO IMPACTTO CRITICAL PATH

12

SAVINGSSUMMARY

Page 13: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

Electricity

Heat Pump Electricity

Natural Gas

Make-up Water

Maintenance

Capital Reserves

Renewable Energy Fee

$ 49.65 $ 48.19

Baseline Geothermal

13

Ex. Residential Monthly Heating and Cooling Bill for 800 ft2 Suite

HEATING & COOLINGOPERATING COSTS

5.9¢ / ft2MONTHLY RENEWABLE ENERGY FEE

*WHAT’S IN THE RENEWABLE ENERGY FEE?An all-inclusive fee covering the supply, operation and maintenance of the hybrid geothermal system. The fee includes the following:

• Operation, maintenance, commissioning and regular servicing of the geothermal field and related equipment.

• Operation, maintenance, commissioning and regular servicing of the hybrid components including cooling towers, boilers, circulating pumps, heat exchanger and others, as required by system design.

• Replacement and repairs of all geothermal equipment and hybrid components.

• All thermal energy (BTU’s) supplied by the field, uncapped and without surcharges.

• Building automation through state of the art controls that proactively manage the system and building temperature.

Both the HGE Fee and heat pump electrical costs can be sub-metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees.

Example reflects the marginal heating and cooling cost to the resident and is calculated by the building’s total operating cost divided by unit size.

Page 14: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

2,732 TONNESANNUAL REDUCTION IN GREENHOUSE GAS EMISSIONS

14

585

Passenger vehicles driven for one year

2,988,703

Pounds of Coal Burned

-or-

-or-

6,326 456

Barrels of Oil Consumed

Homes’ Energy Use for One Year

-or-

GREEN HOUSE GASREDUCTIONS

“Buildings generate nearly 40% of annual global GHG emissions.” – Architecture 2030

Be recognized as a thought leader in the industry, making a real impact on progress, climate change and community.

307,379

Gallons of Gasoline Consumed

Page 15: SHARC-A-PALOOZA PRESENTATION –JUNE 2019 · metered based on individual consumption. Additionally, Subterra does not charge initial connection or ongoing infrastructure fees. Example

Contact:

Jeff AddisonE: [email protected]: (604) 360-6551