SG3 (Optical Access and Transport) Progress Report 23-07-2015 Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3 Meeting Co-chair: Mr Gupteswar Majhi, Vice Chair SG3

Upload: arleen-french

Post on 13-Jan-2016

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: SG3 (Optical Access and Transport) Progress Report 23-07-2015 Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3 Meeting Co-chair: Mr Gupteswar Majhi, Vice

SG3 (Optical Access and Transport)Progress Report

23-07-2015

Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3Meeting Co-chair: Mr Gupteswar Majhi, Vice Chair SG3

Page 2: SG3 (Optical Access and Transport) Progress Report 23-07-2015 Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3 Meeting Co-chair: Mr Gupteswar Majhi, Vice

Agenda 23rd July 2015, Thursday (Room No: 308, IIIT-B, Electronic City,

Bangalore (Opp Infosys campus, Gate 1)) Session 1

◊ 9-9.30: Registration◊ 9.30-10.30:

o Approval of Agendao Introduction of SG3 Vice Chairo Approval of Minutes of previous meetings and work plano Any other item

◊ 10.30: 11.00: Tea Break

<Doc number> 2© TSDSI 2015

Page 3: SG3 (Optical Access and Transport) Progress Report 23-07-2015 Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3 Meeting Co-chair: Mr Gupteswar Majhi, Vice

Agenda Session 2

◊ 11.00-12.30:o Discussion on Terms of Reference (NIP 40)o Discussion on NIP for New work item on E- band point to point MW

(NIP7)o Discussion on Creation of framework document for CPRI-T (SWIP01)

◊ 12.30-14.00: Lunch Break◊ 14.00-16.30:

o Further discussion on NIP40 and SWIP01◊ 16.30-17.00: Tea Break◊ 17.00-17.30:

o Approval of ToRo Approval of draft Minutes of Meetingo Closing of SG3 meeting

<Doc number> 3© TSDSI 2015

Page 4: SG3 (Optical Access and Transport) Progress Report 23-07-2015 Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3 Meeting Co-chair: Mr Gupteswar Majhi, Vice

Welcome IIITB and Prof Dr. Debabrata Das, Dean - Academic and R&D,

Professor and Hewlett Packard Chair, I I I T – Bangalore for hosting the SG1 and SG3 F2F meeting.

Introduction of Mr Gupteswar Majhi, Vice Chair SG3 elected on July 13th 2015

Minutes of the Meeting:◊ Conference Call 01: On 22/04/2015◊ Conference Call 02: On 04/06/2015◊ Conference Call 03: On 09/07/2015

<Doc number> 4© TSDSI 2015

Page 5: SG3 (Optical Access and Transport) Progress Report 23-07-2015 Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3 Meeting Co-chair: Mr Gupteswar Majhi, Vice

Work Plan

<Doc number> 5© TSDSI 2015

Work Item No

Supporters/Contributors

Identification tag

Description

01 Ericsson, Huawei, Intel, Tejas

CPRI-T Fronthaul through transport of CPRI signal from RRH to the C-RAN baseband.

02 Huawei, Tejas SDN-T Specifying the southbound interface, controller and northbound interface for OTN, MPLS-TP, Carrier Ethernet, DWDM/ROADM, IP/MPLS equipment used in various backhaul layers

03 Airtel, Ericsson, Huawei

VBAND V-band point to point connection

04 Airtel, Tejas OTNINTROP OTN interoperation w.r.t. protection and OAM

05 Ericsson, TCIL EBAND E-band point to point connection

Page 6: SG3 (Optical Access and Transport) Progress Report 23-07-2015 Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3 Meeting Co-chair: Mr Gupteswar Majhi, Vice

Work Item and NIPs

<Doc number> 6© TSDSI 2015

Work Item No

NIP No Identification tag

Description

01 NIP 9 CPRI-OPT Fronthaul through optical transport of CPRI signal from RRH to the C-RAN baseband.

05 NIP 7 EBAND E-band point to point connection

06 NIP 8 CPRI-EBAND Front haul in E-band for connected through a CPRI interface between radio unit and the baseband.

NIP 8,9 combined as a single study item SI01

Page 7: SG3 (Optical Access and Transport) Progress Report 23-07-2015 Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3 Meeting Co-chair: Mr Gupteswar Majhi, Vice

Backhaul WG Plan FY15-16

<Doc number> © TSDSI 2015 7

Page 8: SG3 (Optical Access and Transport) Progress Report 23-07-2015 Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3 Meeting Co-chair: Mr Gupteswar Majhi, Vice

CN WG/SG Work flow

<Doc number>

8© TSDSI 2014

May Jun Jul Aug Sep Oct Nov Dec

Framework Document Concall

NIP Consolidation

doneConcall Concall

Concall& F2F

Meeting

Jan Feb Mar

Standard

F2F meeting

for finalization

Concall

2015

2016

Page 9: SG3 (Optical Access and Transport) Progress Report 23-07-2015 Meeting Chair: Mr Jishnu Aravindakshan, Chair SG3 Meeting Co-chair: Mr Gupteswar Majhi, Vice

THANK YOU