session plan_carpentry nc2
TRANSCRIPT
SESSION PLANSector : CONSTRUCTIONQualification Title : CARPENTRY NC IIUnit of Competency: STAKE-OUT BUILDING LINESModule Title : STAKING-OUT BUILDING LINESLearning Outcomes
LO1. Prepare materials for stake-out building linesLO2. Stake-out building linesLO3. Fix building lines
A. Introduction This module covers the knowledge, skills, and attitude for preparing stake-out materials and fixing stake-out building lines.
B. Learning Activities
LO 1. Prepare materials for stake-out building lines
Learning Content Method Presentation Practice Feedback Resources Date/ Time
1. Interpretation of Plans and Details
Modular Read Information Sheet No. 1.1-1 on Interpretation of Plans and Details
Answer Self-check no. 1.1-1
Compare to Answer Key No. 1.1-1
CBLM on Preparing materials for Staking-out Building Lines
Claw HammerMarking ToolsWater hose levelNylon StringPlumb BobSteel SquareCold chiselRipping/wrecking/ claw BarPull-push ruleTry-squareHand Saw
2. Material Specifications
Modular Read Information Sheet No. 1.1-2 on Material Specifications
Answer Self-check no. 1.1-2
Compare to Answer key No. 1.1-2
3. Board Foot Computations
Modular Read Information Sheet No. 1.1-3 on Board Foot Computations
Answer Self-check No. 1.1-3
Compare to Answer key No. 1.1-3
4. Tools, Materials and Equipment for Staking-out Building Lines
Modular Read Information Sheet No. 1.1-4 Tools, Materials and Equipment for Staking-out Building Lines
Answer Self-check No. 1.1-4
Compare to Answer Key No. 1.1-4
5. Company Rules Modular Read Information Sheet No. 1.1-5 Company Rules
Answer Self-check No. Compare to Answer
and Regulations and Regulations 1.1-5 Key No. 1.1-5 Chalk LineBoloSledge HammerPersonal Protective Equipment
Plan and working drawingsLumberNails
LO 2. Stake-out building lines
1. Setting Batter Boards
Modular/
Demonstration
Read Information Sheet No. 1.2-1 on Setting Batter Boards
Answer Self-check No. 1.2-1
Perform Job Sheet No. 1.2-1 on Installing Batter boards
Perform Operation Sheet No. 1.2-1a on Layout the (Rectangular) Site
Perform Operation Sheet No. 1.2-1b on Set and Stake Procedure
Perform Operation Sheet No. 1.2-1c on
Compare to Answer Key No. 1.2-1
Trainee evaluates output using Performance Criteria Checklist No. 1.2-1
Trainee evaluates output using Performance Criteria Checklist No. 1.2-1a
Trainee evaluates output using Performance Criteria Checklist No. 1.2-1b
Trainee evaluates output using
CBLM
Claw HammerPencil/marking penPull-push ruleNylon StringPlumb BobSteel SquareTry-squareHand SawChalk LinePersonal Protective Equipment
Plan and working drawingsLumberNails
Determining the Location of the Batter Boards and Construct Them
Performance Criteria Checklist No. 1.2-1c
LO 3. Fix building lines
1. Squaring Lines Modular
Demonstration
Read Information Sheet No. 1.3-1 on Squaring Lines
Answer Self-check No. 1.3-1
Perform Operation Sheet No. 1.3-1 on Extending and Squaring Lines
Compare to Answer Key No. 1.3-1
Trainee evaluates output using Performance Criteria Checklist No. 1.3-1
CBLM
Claw HammerPencil/marking penPull-push ruleSteel SquareTry-squarePersonal Protective Equipment
NailsPlywood
C. Assessment PlanWritten Test: Question on Tools, materials and equipment for staking-out building lines, material estimates, properties of wood, board foot computation, and concepts in setting batterboards
Performance Test: The performance will include the following:◦ Staking-out building lines◦ Setting batter boards◦ Squaring lines
Prepared by:GLENN F. SALANDANANJZGMSAT
SESSION PLANSector : CONSTRUCTIONQualification Title : CARPENTRY NC IIUnit of Competency : FABRICATE FORMWORKSModule Title : FABRICATING FORMWORKSLearning Outcomes:
LO 1. Prepare materials, tools and equipment for fabricating formworks according to job requirementsLO 2. Lay-out and cut to dimension of form sheating and stiffeners LO 3. Assemble form panels
A. Introduction This module covers the knowledge, skills and attitude in selecting and preparing materials, tools and equipment for fabricating formworks, laying-out, cutting to dimensions of form sheating and stiffeners and assembling form panels.
B. Learning Activities
LO 1. Prepare materials, tools and equipment for fabricating formworks according to job requirements
Learning Content Method Presentation Practice Feedback Resources Date/ Time
1. Tools , materials and equipment for fabricating formworks
Modular Read Information Sheet No. 2.1-1 on Tools , materials and equipment for fabricating formworks
Answer Self-check No. 2.1-1
Compare to Answer Key No. 2.1-1
CBLM
Claw HammerPencil/Marking penPull-Push RuleNylon StringSteel SquareTry-squareHand SawChalk LinePersonal Protective EquipmentPortable Circular saw
Plan and working
2. Material for fabricating formworks
Modular Read Information Sheet No. 2.1-2 on Material for fabricating formworks
Answer Self-check No. 2.1-2
Compare to Answer Key No. 2.1-2
3. Mechanical properties of lumber
Modular Read Information Sheet No. 2.1-3 on Mechanical properties of lumber
Answer Self-check No. 2.1-3
Compare to Answer Key No. 2.1-3
4. Economic use of materials
Modular Read Information Sheet No. 2.1-4 on Economic use of materials
Answer Self-check No. 2.1-4
Compare to Answer Key No. 2.1-4
drawingsLumberNails
LO 2. Lay-out and cut to dimension of form sheating and stiffeners
1. Form Design Modular Read Information Sheet No. 2.2-1 on Form Design
Answer Self-check No. 2.2-1
Compare to Answer Key No. 2.2-1
CBLM
Claw HammerPencil/Marking penPull-Push RuleSteel SquareTry-squareHand SawChalk LinePersonal Protective EquipmentPortable Circular saw
Plan and working drawingsLumberNails
2. Prefabrication of Formwork panels
Modular/
Demonstration
Read Information Sheet No. 2.2-2 on Prefabrication of Formwork panels
Perform Operation Sheet No. 2.2-2 on Prefabricate form panels and stiffeners
Trainee evaluates output using Performance Criteria Checklist No. 2.2-2
LO 3. Assemble form panels
1. Assembling form panels and stiffeners
Modular/
Demonstration
Read Information Sheet No. 2.3-1 on Assembling form panels and stiffeners
Perform Operation Sheet No. 2.3-1 on Assembling form panels and stiffeners
Trainee evaluates output using Performance Criteria Checklist No. 2.3-1
CBLM
HammerMarking ToolsMeasuring ToolsSteel SquareTry-square
Personal Protective Equipment
Plan and working drawingsLumberNails
C. Assessment Plan
Written Test: Question on tools and materials in fabricating formworks, mechanical properties of lumber, economic use of materials, and form design
Performance Test: The performance will include the following:◦ Prefabrication of formwork panels◦ Assemble form panels and stiffeners
Prepared by:
GLENN F. SALANDANANJZGMSAT
SESSION PLANSector : CONSTRUCTIONQualification Title : CARPENTRY NC IIUnit of Competency : INSTALL FORMWORK COMPONENTSModule Title : INSTALLING FORMWORK COMPONENTSLearning Outcomes:
LO 1. Select and prepare materials and tools for installing formworksLO 2. Lay-out/assemble scaffolds and bracesLO 3. Set/fix form panels of building components
A. IntroductionThis module covers the knowledge, skills and attitude in selecting and preparing materials and tools for installing formworks,
Laying-out/ assembling scaffolds and braces, setting/fixing form panels of building components.
B. Learning Activities
LO 1. Select and prepare materials and tools for installing formworks
Learning Content Method Presentation Practice Feedback Resources Date/ Time
1. Materials, power and hand tools and equipment uses and specifications
Modular Read Information Sheet No. 3.1-1 on Materials, power and hand tools and equipment uses and specifications
Answer Self-check No. 3.1-1
Compare to Answer Key No. 3.1-1
CBLM
Claw HammerPencil/marking penPull-push penNylon StringSteel SquareTry-squareHand SawChalk LinePersonal Protective EquipmentPortable Circular Saw
2. Properties of Wood
Modular Read Information Sheet No. 3.1-2 on Properties of Wood
Answer Self-check No. 3.1-2
Compare to Answer Key No. 3.1-2
3. Housekeeping Modular Read Information Sheet No. 3.1-3 on Housekeeping
Answer Self-check No. 3.1-3
Compare to Answer Key No. 3.1-3
Plan and working drawingsLumberNailsPlywood
LO 2. Lay-out/assemble scaffolds and braces
1. Types of scaffolds
Modular Read Information Sheet No. 3.2-1 on Types of scaffolds
Answer Self-check no. 3.2-1
Compare to Answer Key No. 3.2-1
CBLM
Scaffolds Locks and Connectors
Plan and working drawings
2. Different scaffold fittings and their uses
Modular Read Information Sheet No. 3.2-2 on Different scaffold fittings and their uses
Answer Self-check No. 3.2-2
Compare to Answer Key No. 3.2-2
3. Scaffolds safety rules
Modular Read Information Sheet No. 3.2-3 on Scaffolds safety rules
Answer Self-check No. 3.2-3
Compare to Answer Key No. 3.2-3
4. Assemble scaffolds
Modular/ Demonstration
Read Information Sheet No. 3.2-4 on Assemble scaffolds
Perform Operation Sheet No. 3.2-4 on Assembling scaffolds
Trainee evaluates output using Performance Criteria Checklist No. 3.2-4
LO 3. Set/fix form panels of building components
1. Formwork components assembly
Modular/
Demonstration
Read Information Sheet No. 3.3-1 on Formwork components assembly
Answer Self-check No. 3.3-1
Perform Operation Sheet No. 3.3-1a on Install column forms
Perform Operation
Compare to Answer Key No. 3.3-1
Trainee evaluates output using Performance Criteria Checklist No. 3.3-1a
Trainee evaluates
CBLM
Claw HammerWrecking barPencil/marking penPull-push ruleTry-squareHand SawPlumb bobSpirit level
Sheet No. 3.3-1b on Install beam forms
output using Performance Criteria Checklist No. 3.3-1b
Personal Protective EquipmentPortable Circular Saw
Plan and working drawingsLumberNailsPlywood
C. Assessment Plan
Written Test: Question on Materials, power and hand tools and equipment uses and specifications, properties of wood, types of scaffolds, different scaffold fittings and their uses, and scaffolds safety rules
Performance Test: The performance will include the following:◦ Assemble and disassemble scaffolding◦ Install column forms◦ Install beam forms
Prepared by:
GLENN F. SALANDANANJZGMSAT
SESSION PLANSector : CONSTRUCTIONQualification Title : CARPENTRY NC IIUnit of Competency : STRIP FORMWORKS COMPONENTSModule Title : STRIPPING FORMWORKS COMPONENTSLearning Outcomes:
LO 1. Prepare staging area, tools and equipment LO 2. Strip formworks of building componentsLO 3. Shore or/and re-shore and removal
A. IntroductionThis module covers the knowledge, skills and attitudes in stripping formworks components and accessories for concrete work. It
includes preparing tools, equipment and staging of materials and shoring and re-shoring operations.
B. Learning Activities
LO 1. Prepare staging area, tools and equipment
Learning Content Method Presentation Practice Feedback Resources Date/ Time
1. Company rules and regulations
Modular Read Information Sheet No. 4.1-1 on Company rules and regulations
Answer Self-check No. 4.1-1
Compare to Answer Key No. 4.1-1
CBLM on Select and prepare materials and tools for installing formworks
LO 2. Strip formworks of building components
1. Removing formworks
Modular Read Information Sheet No. 4.2-1 on Removing formworks
Answer Self-check No. 4.2-1
Compare to Answer Key No. 4.2-1
CBLM
Tools and EquipmentCrow barClaw HammerPliersWrenchShovelScaffoldingHard hat
2. Maintenance and storage of formworks
Modular/ Demonstration
Read Information Sheet No. 4.2-2 on Maintenance and storage of formworks
Answer Self-check No. 4.2-2
Perform Operation Sheet No. 4.2-1 on Stripping formwork
Compare to Answer Key No. 4.2-2
Trainee evaluates output using Performance Criteria Checklist No. 4.2-1
Perform Operation Sheet No. 4.2-2 on Maintaining and storing of forms
Trainee evaluates output using Performance Criteria Checklist No. 4.2-2
Safety shoesGogglesGlovesCircular SawBrooms
LO 3. Shore or/and re-shore and removal
1. Shore and reshore removal
Modular Read Information Sheet No. 4.3-1 on Shore and reshore removal
Answer Self-check No. 4.3-1
Compare to Answer Key No. 4.3-1
CBLM
Tools and EquipmentCrow barClaw HammerPliersWrenchShovelScaffoldingHard hatHard shoesGogglesGlovesCircular SawBrooms
C. Assessment Plan◦ Written Test: Question on company rules and regulations, removing formworks, maintenance and storage of formworks.◦ Performance Test: The performance will include the following:
• Stripping formwork
• Maintaining and storing of formsPrepared by:
GLENN F. SALANDANANJZGMSAT
SESSION PLANSector : CONSTRUCTIONQualification Title : CARPENTRY NC IIUnit of Competency : INSTALL FRAMING WORKSModule Title : INSTALLING FRAMING WORKS
Learning Outcomes:LO 1. Prepare appropriate materials, tools and equipment for installing framing worksLO 2. Lay-out/erect and assemble post and girt LO 3. Lay-out/install floor joists LO 4. Lay-out/install wall studsLO 5. Lay-out/fabricate/install roof framesLO 6. Lay-out/install ceiling joist
A. Introduction
This module covers the required competencies in preparing appropriate materials, tools and equipment for installing framing works, laying-out/erecting and assembling post and girt, laying-out/installing floor joists , laying-out/installing wall studs, laying-out/fabricating/installing roof frames, laying-out/installing ceiling joist.
B. Learning Activities
LO 1. Prepare appropriate materials, tools and equipment for installing framing works
Learning Content Method Presentation Practice Feedback Resources Date/ Time
1. Classification of Philippine lumber
Modular Read Information Sheet No. 5.1-1 on Classification of Philippine lumber
Answer Self-check No. 5.1-1
Compare to Answer Key No. 5.1-1
CBLM
Mock-up of a Framed House
2. Different materials, sizes, grades and uses
Modular Read Information Sheet No. 5.1-2 on Different materials, sizes, grades and uses
Answer Self-check No. 5.1-2
Compare to Answer Key No. 5.1-2
3. Parts of a framed house
Modular Read Information Sheet No. 5.1-3 on Parts of a framed house
Answer Self-check No. 5.1-3
Compare to Answer Key No. 5.1-3
LO 2. Lay-out/erect and assemble post and girt
1. Post Modular
Demonstration
Read Information Sheet No. 5.2-1 on Post
Answer Self-check No. 5.2-1
Perform Operation Sheet No. 5.2-1 on Erecting Post
Compare to Answer Key No. 5.2-1
Trainee evaluates output using Performance Criteria Checklist No. 5.2-1
CBLM
TOOLS AND EQUIPMENT
• Claw Hammer• Pencil/Markin
g pen• Pull-Push
Rule• Steel Square• Try-square• Hand Saw• Chalk Line• PPE• Portable
Circular Saw• Lumber• Nails
2. Girts and Girders
Modular Read Information Sheet No. 5.2-2 on Girts and Girders
Answer Self-check No. 5.2-2
Compare to Answer Key No. 5.2-2
3. Load Conditions and Structural System Response
Modular Read Information Sheet No. 5.2-3 on Load Conditions and Structural System Response
Answer Self-check No. 5.2-3
Compare to Answer Key No. 5.2-3
LO 3. Lay-out/install floor joists
1. Floor Joist Modular Read Information Sheet No. 5.3-1 on Floor Joist
Answer Self-check No. 5.3-1
Compare to Answer Key No. 5.3-1
CBLM
2. Standard Size of Floor Opening
Modular Read Information Sheet No. 5.3-2 on Standard Size of Floor Opening
Answer Self-check No. 5.3-2
Compare to Answer Key No. 5.3-2
LO 4. Lay-out/install wall studs
1. Components of Wall
Modular/ Read Information Sheet No. 5.4-1 on Components
Perform Operation Trainee evaluates CBLMTools, Materials and
Demonstration of Wall Sheet No. 5.4-1 on Layout Wall
output using Performance Criteria Checklist No. 5.4.1
Equipment
Claw HammerPencil/marking penPull-push ruleNylon StringTry-squareHand SawWater Hose LevelPlumb BobScaffoldingPlan and working drawingsNails
2. Measuring and Cutting Stud
Modular/
Demonstration
Read Information Sheet No. 5.4-2 on Measuring and cutting studs
Perform Operation Sheet No. 5.4-2a on Assemble Wall
Perform Operation Sheet No. 5.4-2b on Erecting Wall
Perform Operation Sheet No. 5.4-2c on Plumb and align a Wall
Trainee evaluates output using Performance Criteria Checklist No. 5.4.2a
Trainee evaluates output using Performance Criteria Checklist No. 5.4.2b
Trainee evaluates output using Performance Criteria Checklist No. 5.4.2c
CBLMTools Materials and Equipment
• circular saw• hand saw• hammer• wrecking bar• folding rule• try square• chalk line
LO 5. Lay-out/fabricate/install roof frames
1. Types of roof designs
Modular Read Information Sheet No. 5.5-1 on Types of roof
Answer Self-check No. 5.5-1
Compare to Answer CBLM
designs Key No. 5.5-1 TOOLS AND EQUIPMENT• Claw Hammer• Pencil/Marking pen• Pull-Push Rule• Nylon String• Steel Square• Try-square• Hand Saw• Chalk Line• PPE• Portable Circular Saw• Plan and working drawings• Lumber• Nails• Plywood
2. Roof Frames Modular Read Information Sheet No. 5.5-2 on Procedures in fabricating and installing roof frames
Answer Self-check No. 5.5-2
Compare to Answer Key No. 5.5-2
3. Parts of a roof Modular Read Information Sheet No. 5.5-3 on Parts of a roof
Answer Self-check No. 5.5-3
Perform Operation Sheet No. 5.5-3 on Laying out Truss
Compare to Answer Key No. 5.5-3
Trainee evaluates output using Performance Criteria Checklist No. 5.5-3
4. Tension and compression of parts
Modular Read Information Sheet No. 5.5-4 on Tension and compression of part
Answer Self-check No. 5.5-4
Compare to Answer Key No. 5.5-4
LO 6. Lay-out/install ceiling joist
1. Ceiling Joist Modular/
Demonstration
Read Information Sheet No. 5.6-1 on Types of Roof Design
Perform Operation Sheet No. 5.6-1 on Install Ceiling Joist
Trainee evaluates output using Performance Criteria Checklist No. 5.6-1
CBLM
TOOLS AND EQUIPMENT• Claw Hammer• Pencil/marking pen• Pull-push rule• Nylon String• Steel Square• Try-square• Hand Saw• Chalk Line• Water Hose Level
• Sledge Hammer• Plumb Bob• Hand Saw• Scaffolding• Personal Protective Equipment • Portable Circular Saw• Plan and working drawings• Lumber• Nails
C. Assessment Plan
Written Test: Question on Classification of Philippine lumber, different material sizes, grades and uses, parts of a framed house, different type of rood design, and parts of a roof
Performance Test: The performance will include the following:◦ Install floor joist◦ Install vertical and horizontal wall studs◦ Install ceiling joints
Prepared by:
GLENN F. SALANDANANJZGMSAT