Page 1: Session 3   gdas pmp study group presentation

© 2005 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice

GDAS PM Professions:PMP Study Group

Monique HowardSeptember 19, 2008

Session #3: Professional Responsibility & Integration Management

Page 2: Session 3   gdas pmp study group presentation

Agenda

• Summary of Focus − Professional Responsibility− Integration Management

• Open Forum: Participant Questions• Study Group Questions• Wrap Up

Page 3: Session 3   gdas pmp study group presentation

Professional Responsibility• Responsibility of the Profession

− Compliance with all organizational rules and policies

− Candidate/Certificant Professional Practice− Advancement of the Profession

• Responsibilities to Customers and the Public− Qualifications, experience and performance of

professional services− Conflict of interest situations and other

prohibited professional conduct

• Can be about 18 questions

Page 4: Session 3   gdas pmp study group presentation

Integration Management• Key concepts to understand:

− Seven Processes• Develop Project Charter• Develop Preliminary Project Scope Statement• Develop Project Management Plan• Direct and Manage Project Execution• Monitor and Control Project Work• Integrated Change Control• Close Project

− PMBOK • ITTO Matrix, Page Number: 70

• Expect up to 14 questions

Page 5: Session 3   gdas pmp study group presentation

Open Forum: Participant Questions

If you have a question, raise your hand

Page 6: Session 3   gdas pmp study group presentation

Study Group Questions

Delivery Format:

•Each Question will be displayed and read•Survey Box will be used to solicit answer•Based on responses, we will discuss options•Answer will be revealed

Page 7: Session 3   gdas pmp study group presentation

1. You are managing a contract which has outsourced software development for microprocessor design to a vendor. Since this field is rapidly evolving, you know that you should be able to manage changes to the contract. The paperwork, tracking systems, and approval levels for authorizing changes should be documented in:A. Contract Change Control System

B. Inspections and AuditsC. Performance ReportingD. Several systems including Records Management, Claims

Administration System, Performance Reporting System etc

Page 8: Session 3   gdas pmp study group presentation

1. You are managing a contract which has outsourced software development for microprocessor design to a vendor. Since this field is rapidly evolving, you know that you should be able to manage changes to the contract. The paperwork, tracking systems, and approval levels for authorizing changes should be documented in:A. Contract Change Control System

B. Inspections and AuditsC. Performance ReportingD. Several systems including Records Management, Claims

Administration System, Performance Reporting System etc

Answer:     AJustification:     A Contract Change Control System defines the processes by which the contract can be modified. It includes the paperwork, tracking systems, dispute resolution procedures, and approval levels necessary for authorizing changes.

Reference: PMBOK Third Edition, Page Number: 292

Page 9: Session 3   gdas pmp study group presentation

2. In your new company, you realize that some of the financial statements of the company do not follow US GAAP Accounting Standards and are hence inaccurate. In this case, what should you do first?

A. Inform the US government agencies of the inaccurate accounting practices in the company.

B. Talk to your finance managers about why you think that they may be violating the standard accounting standards.

C. Since you are new to the company, you assume that finance standards are different in the company - hence do not do anything about the issue.

D. Talk with the finance manager in your previous company to get expert opinion about accounting standards in the new company.

Page 10: Session 3   gdas pmp study group presentation

2. In your new company, you realize that some of the financial statements of the company do not follow US GAAP Accounting Standards and are hence inaccurate. In this case, what should you do first?

A. Inform the US government agencies of the inaccurate accounting practices in the company.

B. Talk to your finance managers about why you think that they may be violating the standard accounting standards.

C. Since you are new to the company, you assume that finance standards are different in the company - hence do not do anything about the issue.

D. Talk with the finance manager in your previous company to get expert opinion about accounting standards in the new company.

Answer:     B  Justification:     * Option 2 is the best answer, because it aims at trying to understand and resolve the problem* Option 1 is the last option - to be preferred after all other alternatives are exhausted, and you are convinced that your new company is involved in malpractice* Option 3 just avoids the issue* Option 4 i.e. talking with the finance manager in your previous company is not recommended because you may be compromising proprietary information

Reference: pmstudy.com notes as mentioned above

Page 11: Session 3   gdas pmp study group presentation

3. Your project is in the planning phase and you are paid every fortnight for the work to be done during the fortnight. You have been informed by the project sponsor that there has been a revaluation of projects within your company and your project will not be getting any additional funding. In this case, you should:

A. stop work immediately and release all resources.B. perform appropriate closure for the project.C. decrease team size.D. remove non-critical tasks to decrease cost.

Page 12: Session 3   gdas pmp study group presentation

3. Your project is in the planning phase and you are paid every fortnight for the work to be done during the fortnight. You have been informed by the project sponsor that there has been a revaluation of projects within your company and your project will not be getting any additional funding. In this case, you should:

A. stop work immediately and release all resources.B. perform appropriate closure for the project.C. decrease team size.D. remove non-critical tasks to decrease cost.

Correct Choice:     B Justification:     The project or phase, after either achieving its objectives or being terminated for other reasons, requires closure. Project Closure consists of documenting project results to formalize acceptance of the product of the project by the sponsor, or customer.

Reference: pmstudy.com notes as mentioned above

pmstudy.com comments:Option A: Without performing Administrative Closure, if resources are released, all the benefits of the project are lostOption C, Option D: They just postpone the problem and do not solve(resolve) the issue

Page 13: Session 3   gdas pmp study group presentation

4. Managing risks and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the:

A. Project PlanB. Project BaselineC. Risk Response PlanD. Risk Baseline

Page 14: Session 3   gdas pmp study group presentation

4. Managing risks and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the:

A. Project PlanB. Project BaselineC. Risk Response PlanD. Risk Baseline

Correct Choice:     AJustification:     The project plan includes the risk management plan. Risk Management Plan includes defining key risks, including constraints and assumptions, and planned responses and contingencies

Reference: PMBOK Third Edition, Page Number: 89

Page 15: Session 3   gdas pmp study group presentation

5. You had worked as a project manager in a firm specializing in making semiconductor chips. Now that you are working with a competitor,

A. you should not be using the knowledge gained in the first company to improve the competitor's product.

B. you can use the knowledge gained in the first company to improve the competitor's product.

C. before doing anything which may adversely impact prospects of the first company, you should get their approval.

D. you should do nothing which provides competition to or undermines the products of the first company.

Page 16: Session 3   gdas pmp study group presentation

5. You had worked as a project manager in a firm specializing in making semiconductor chips. Now that you are working with a competitor,

A. you should not be using the knowledge gained in the first company to improve the competitor's product.

B. you can use the knowledge gained in the first company to improve the competitor's product.

C. before doing anything which may adversely impact prospects of the first company, you should get their approval.

D. you should do nothing which provides competition to or undermines the products of the first company.

Correct Choice:     B  Justification:     Knowledge gained in one company is not proprietary information and can be used in subsequent jobs. Choice 1, Choice 3 and Choice 4 are inappropriate because you may have to work in projects for the competitor which will adversely impact products of the first company you worked for. This is acceptable so long as you do not unethically use any contacts or proprietary information from the first company.

Reference: pmstudy.com notes as mentioned above

Page 17: Session 3   gdas pmp study group presentation

6. The organization of the project is very important for successful implementation. Which factor does not have an impact on the design of the project organization?

1. Environmental Forces2. Schedule Limitations3. Strategic Choices4. Technological Factors

Page 18: Session 3   gdas pmp study group presentation

6. The organization of the project is very important for successful implementation. Which factor does not have an impact on the design of the project organization?

1. Environmental Forces2. Schedule Limitations3. Strategic Choices4. Technological Factors

Correct Choice:     B Justification:     Schedule limitations can shape the size of the project team but will not influence its organizational design.

Reference: Project Management - A Systems Approach to Planning, Scheduling and Controlling; Also Mentioned in "Organizing Projects for success"

Page 19: Session 3   gdas pmp study group presentation

7. You have been having a lot of heated discussions with your colleague about an issue, and this is resulting in a hostile environment. To "cool-off" this hostile situation, you agree with your colleague`s point of view. The conflict resolution mode that you are using is:A. Problem SolvingB. WithdrawalC. ForcingD. Confrontation

Page 20: Session 3   gdas pmp study group presentation

7. You have been having a lot of heated discussions with your colleague about an issue, and this is resulting in a hostile environment. To "cool-off" this hostile situation, you agree with your colleague`s point of view. The conflict resolution mode that you are using is:A. Problem SolvingB. WithdrawalC. ForcingD. Confrontation

Correct Choice:     BJustification:     

Reference: Project Management - A Systems Approach to Planning, Scheduling and Controlling, Page Number: 389

Page 21: Session 3   gdas pmp study group presentation

8. You are aware that an employee in your project may potentially get a promotion. However, there is a possibility that he may get transferred after his promotion, thus impacting your project. In this situation, you should: A. give a bad recommendation about the person so as to delay the

promotion of the person until the project is over.B. inform the employee about the potential promotion, and ask him to

transition his responsibilities to another person.C. after the employee gets the promotion and is told of the transfer, you

ask him to prepare a transition plan.D. hire another resource who can replace the person after he gets the

promotion.

Page 22: Session 3   gdas pmp study group presentation

8. You are aware that an employee in your project may potentially get a promotion. However, there is a possibility that he may get transferred after his promotion, thus impacting your project. In this situation, you should: A. give a bad recommendation about the person so as to delay the

promotion of the person until the project is over.B. inform the employee about the potential promotion, and ask him to

transition his responsibilities to another person.C. after the employee gets the promotion and is told of the transfer, you

ask him to prepare a transition plan.D. hire another resource who can replace the person after he gets the

promotion.

Correct Choice:     C Justification:     Option 3 is the best answer - you are not sure whether the resource will get a promotion or get transferred. So, after the promotion/transfer is confirmed, you should ask him to do a proper transition. Option 2 and Option 4 assume that the person will be getting a promotion and transfer - since this is not certain as of now, if you go ahead with this assumption and the promotion does not happen, it will cause problems from a human resource management perspective. Option 1 is unethical

Reference: pmstudy.com notes as mentioned above

Page 23: Session 3   gdas pmp study group presentation

9. While doing quality inspection, few defects were identified in the product. After rectifying the defects, the repaired items were reinspected and accepted. Subsequently, a notification was issued, which can also be referred to as:A. Validated Defect RepairB. Product AcceptanceC. Quality AuditD. Approved Change Request

Page 24: Session 3   gdas pmp study group presentation

9. While doing quality inspection, few defects were identified in the product. After rectifying the defects, the repaired items were reinspected and accepted. Subsequently, a notification was issued, which can also be referred to as:A. Validated Defect RepairB. Product AcceptanceC. Quality AuditD. Approved Change Request

Correct Choice:     A  Justification:     Validated Defect Repair: Notification that reinspected repaired items have either been accepted or rejected.

Reference: PMBOK Third Edition, Page Number: 93

Page 25: Session 3   gdas pmp study group presentation

10. You are doing some work under contract, when the buyer requests you to add some additional requirements which were not defined in the original contract. Since satisfying the buyer is of paramount interest, you go ahead and incorporate the requirements as part of the project. You are violating which Code of Professional Conduct:

A. Responsibility to maintain and satisfy the scope and objectivesB. Responsibility to ensure that a conflict of interest does not

compromise legitimate interestsC. Responsibility to provide accurate and truthful representationsD. No Code of Professional Conduct is violated

Page 26: Session 3   gdas pmp study group presentation

10. You are doing some work under contract, when the buyer requests you to add some additional requirements which were not defined in the original contract. Since satisfying the buyer is of paramount interest, you go ahead and incorporate the requirements as part of the project. You are violating which Code of Professional Conduct:

A. Responsibility to maintain and satisfy the scope and objectivesB. Responsibility to ensure that a conflict of interest does not

compromise legitimate interestsC. Responsibility to provide accurate and truthful representationsD. No Code of Professional Conduct is violated

Correct Choice:     A Justification:     

Reference: Project Management - Code of Professional Conduct (PMI)

Page 27: Session 3   gdas pmp study group presentation

11. In a recent job interview, you were asked to define the most important characteristic of a project manager. Which of the following will be your best answer?

A. Subject matter expertB. IntegratorC. Creative personD. Risk minimizer

Page 28: Session 3   gdas pmp study group presentation

11. In a recent job interview, you were asked to define the most important characteristic of a project manager. Which of the following will be your best answer?

A. Subject matter expertB. IntegratorC. Creative personD. Risk minimizer

Correct Choice:     B  Justification:     In project management context, integration includes characteristics of unification, consolidation, articulation, and integrative actions that are crucial to project completion, successfully meeting customer and other stakeholder requirements, and managing expectations.

Reference: PMBOK Third Edition Page 77

pmstudy.com notes: The most important characteristic of a project manager is being an Integrator who can manage all the different interfaces in the project. The project manager should also be a good Communicator because a project manager usually spends more than 50% of his time communicating with different project stakeholders.

Option 1: A project manager need not be a subject matter expert. There may be several subject matter experts for the project from whom the project manager can take advice when required.Option 3: Creativity is desirable but not the most important characteristic of a project manager. Option 4: A project manager should try to minimize risks in the project. However, this again is not the most important characteristic of a project manager.

Page 29: Session 3   gdas pmp study group presentation

12. As a PMP Certified project manager, you are responsible for all of the following EXCEPT:

A. Maintaining the confidentiality of sensitive information which you have access to

B. Managing conflict of interest situations in your projectC. Ensuring the integrity of your team-membersD. Refraining from offering and accepting inappropriate payments, gifts

and other forms of communication

Page 30: Session 3   gdas pmp study group presentation

12. As a PMP Certified project manager, you are responsible for all of the following EXCEPT:

A. Maintaining the confidentiality of sensitive information which you have access to

B. Managing conflict of interest situations in your projectC. Ensuring the integrity of your team-membersD. Refraining from offering and accepting inappropriate payments, gifts

and other forms of communication

Correct Choice:     C Justification:     You cannot be responsible for the integrity of your team-members; but you should definitely try to influence your team-members to perform all project activities in an ethical manner and with integrity.

All the remaining activities are mentioned in the PMP Code of Professional Conduct as responsibilities of a project manager

Reference: pmstudy.com notes as mentioned above

Page 31: Session 3   gdas pmp study group presentation

13. In your project, you want to monitor and control project processes associated with initiating, planning, executing and closing. This will help you take corrective or preventive action to control project performance. In this context, what should you do first?

A. Review all project forecastsB. Detail all the activities of project team members involved in executing

administrative closure for the projectC. Review the project management plan and work performance information

for your projectD. Manage Project Risks

Page 32: Session 3   gdas pmp study group presentation

13. In your project, you want to monitor and control project processes associated with initiating, planning, executing and closing. This will help you take corrective or preventive action to control project performance. In this context, what should you do first?

A. Review all project forecastsB. Detail all the activities of project team members involved in executing

administrative closure for the projectC. Review the project management plan and work performance information

for your projectD. Manage Project Risks

Correct Choice:     C  Justification:     Figure 4-7

Reference: PMBOK Third Edition, Page Number: 95

pmstudy.com notes: Monitor and control project processes associated with initiating, planning, executing and closing" refers to "Monitor and Control Project work" - this is done as part of Project Integration Management. PMBOK Page 94

Option 1: Project Forecasts are created as an output from Monitor and Control Project Work (PMBOK Page 95). Option 2: This is done as part of administrative closure that happens when we are in Close Project phase (PMBOK Page 100). Option 3: Reviewing the project management plan and work performance information for your project is the first thing that you should do. These are inputs to "Monitor and Control Project" (PMBOK Page 95). Option 4: Managing project risks is not done as part of the "Monitor and Control Project" process

Page 33: Session 3   gdas pmp study group presentation

14. In a project management context, all the following are Constructive Roles EXCEPT:

1. Information Seeker2. Recognition Seeker3. Consensus Taker4. Information Giver

Page 34: Session 3   gdas pmp study group presentation

14. In a project management context, all the following are Constructive Roles EXCEPT:

1. Information Seeker2. Recognition Seeker3. Consensus Taker4. Information Giver

Correct Choice:     BJustification:     

Reference: Project Management - A Systems Approach to Planning, Scheduling and Controlling, Page Number: 215-216

Page 35: Session 3   gdas pmp study group presentation

15. You have recently appointed a project manager to handle a critical project in your organization. You want to provide the project manager with authority to apply organizational resources to project activities. Which document should you use?

A. Resource Authorization DocumentB. Work Breakdown StructureC. Project CharterD. Project Scope Statement

Page 36: Session 3   gdas pmp study group presentation

15. You have recently appointed a project manager to handle a critical project in your organization. You want to provide the project manager with authority to apply organizational resources to project activities. Which document should you use?

A. Resource Authorization DocumentB. Work Breakdown StructureC. Project CharterD. Project Scope Statement

Correct Choice:     C Justification:     The project charter provides the project manager with the authority to apply organizational resources to project activities.

Reference: PMBOK Third Edition, Page Number: 81

Page 37: Session 3   gdas pmp study group presentation

16. Your previous project manager made most decisions by himself without consulting subordinates. So, he believed in a leadership style that was: A. Laissez FaireB. AssertiveC. AutocraticD. Coaching

Page 38: Session 3   gdas pmp study group presentation

16. Your previous project manager made most decisions by himself without consulting subordinates. So, he believed in a leadership style that was: A. Laissez FaireB. AssertiveC. AutocraticD. Coaching

Correct Choice:     C  Justification:     

Reference: pmstudy.com notes as mentioned above

Page 39: Session 3   gdas pmp study group presentation

17. In which document will you find the code of account identifier, statement of work, responsible organization, and a list of schedule milestones?

A. WBSB. WBS DictionaryC. PERT/CPM ChartsD. Roles and Responsibilities Matrix

Page 40: Session 3   gdas pmp study group presentation

17. In which document will you find the code of account identifier, statement of work, responsible organization, and a list of schedule milestones?

A. WBSB. WBS DictionaryC. PERT/CPM ChartsD. Roles and Responsibilities Matrix

Correct Choice:     B Justification:     WBS Dictionary : For each WBS component, the WBS dictionary includes a code of account identifier, a statement of work, responsible organization and a list of schedule milestones.

Reference: PMBOK Third Edition, Page Number: 117

Page 41: Session 3   gdas pmp study group presentation

18. You are working in the project office of your organization. What is your job responsibility?

A. Managing the operational activities in the companyB. Always managing Human Resource and Risk Management issues

for projectsC. Providing support functions to project managers in the form of

training, software, standardized policies etc.D. Providing Subject Matter Expertise in the functional areas of the

project

Page 42: Session 3   gdas pmp study group presentation

18. You are working in the project office of your organization. What is your job responsibility?

A. Managing the operational activities in the companyB. Always managing Human Resource and Risk Management issues

for projectsC. Providing support functions to project managers in the form of

training, software, standardized policies etc.D. Providing Subject Matter Expertise in the functional areas of the

project

Correct Choice:     C  Justification:     A Project Management Office (PMO) is an organizational unit to centralize and coordinate the management of projects under its domain. A PMO can also be referred to as ... "project office." PMOs can operate in a continuum from providing project management support functions in the form of training, software, standardized policies and procedures, to actual direct management and responsibility for achieving the project objectives.

Reference: PMBOK Third Edition, Page Number: 17

Page 43: Session 3   gdas pmp study group presentation

19. You are the project manager for a construction project and there are 121 people reporting to you. Your job requires that you sanction work to others and ensure that the work is done at the right time. The tool you use is:

A. Work Breakdown StructureB. Work Authorization SystemC. PERT/CPM/Network DiagramsD. WBS Dictionaries

Page 44: Session 3   gdas pmp study group presentation

19. You are the project manager for a construction project and there are 121 people reporting to you. Your job requires that you sanction work to others and ensure that the work is done at the right time. The tool you use is:

A. Work Breakdown StructureB. Work Authorization SystemC. PERT/CPM/Network DiagramsD. WBS Dictionaries

Correct Choice:     B Justification:     Work Authorization System: It includes the steps, documents, tracking system, and defined approval levels needed to issue work authorizations.

Reference: PMBOK Third Edition, Page Number: 379

Page 45: Session 3   gdas pmp study group presentation

20. A restriction (e.g. limited budget) that affects the performance of the project is also called a(an):

1. Constraint2. Assumption3. Kill point4. Risk

Page 46: Session 3   gdas pmp study group presentation

20. A restriction (e.g. limited budget) that affects the performance of the project is also called a(an):

1. Constraint2. Assumption3. Kill point4. Risk

Correct Choice:     A  Justification:     Project constraints: ... For example, a predefined budget or any imposed dates (schedule milestones) are included in constraints

Reference: PMBOK Third Edition, Page Number: 111

A constraint is an applicable restriction that will affect the performance of the project. For example, a predefined budget is a constraint that is highly likely to limit the options of the team regarding scope, staffing, and schedule.

Page 47: Session 3   gdas pmp study group presentation

21. You are the project manager of a civil construction company involved with building houses. In your project, you often use Work Breakdown Structures (WBS) from your previous projects as templates. A Work Breakdown Structure can be used for all of the following except:

A. Tracking project performance against cost and schedule

B. Creating a network diagram, with task dependenciesC. Creating a project scheduleD. Assigning resources to work on different work elements

Page 48: Session 3   gdas pmp study group presentation

21. You are the project manager of a civil construction company involved with building houses. In your project, you often use Work Breakdown Structures (WBS) from your previous projects as templates. A Work Breakdown Structure can be used for all of the following except:

A. Tracking project performance against cost and schedule

B. Creating a network diagram, with task dependenciesC. Creating a project scheduleD. Assigning resources to work on different work elements

Correct Choice:     B Justification:     Task dependencies are not evident in a WBS. WBS does not specify the time frame in which different tasks should be accomplished.

Reference: pmstudy.com notes as mentioned above; Also, please refer to PMBOK 3rd Edition, Page 113

Page 49: Session 3   gdas pmp study group presentation

22. You have scheduled a contractor conference after two days with potential contractors to discuss a procurement. Today, the senior management informed you that there is a very high probability of the project being canceled. You should

A. cancel the meetingB. go ahead with the meeting but inform the contractors that the

project may be canceledC. go ahead with the meeting as usualD. wait until the meeting, to see if there is a change in the status of the

project

Page 50: Session 3   gdas pmp study group presentation

22. You have scheduled a contractor conference after two days with potential contractors to discuss a procurement. Today, the senior management informed you that there is a very high probability of the project being canceled. You should

A. cancel the meetingB. go ahead with the meeting but inform the contractors that the

project may be canceledC. go ahead with the meeting as usualD. wait until the meeting, to see if there is a change in the status of the

project

Correct Choice:     A  Justification:     Option 1 is the best choice. There is no point in having the meeting and wasting time if there is a high probability of the project being canceled.

Reference: pmstudy.com notes as mentioned above

Page 51: Session 3   gdas pmp study group presentation

23. A customer informed you that it is preferable to change a certain aspect of the project. What should you do first?

A. Talk with team members to understand implications of the changeB. Communicate the change to the Management to get their inputsC. Open up a Change ControlD. Do sizing for the change and communicate to the customer

Page 52: Session 3   gdas pmp study group presentation

23. A customer informed you that it is preferable to change a certain aspect of the project. What should you do first?

A. Talk with team members to understand implications of the changeB. Communicate the change to the Management to get their inputsC. Open up a Change ControlD. Do sizing for the change and communicate to the customer

Correct Choice:     A  Justification:     Anytime there is a potential request for a change from a customer,

1. Understand what functionality was requested - Talk with team-members to assess the implication of the change2. Open up a Change Control if there is a formal Change Control Mechanism3. Communicate the change to the management, and inform the customer about the impact of the change (e.g. increase in sizing, schedule etc.)4. If change is accepted, go ahead and implement the changes

Reference: pmstudy.com notes as mentioned above

Page 53: Session 3   gdas pmp study group presentation

24. As a project manager, Project Plan Development is an important element of managing projects. Which phase of the project management life-cycle does Project Plan Development belong to?

A. Initiation ProcessB. Planning ProcessC. Execution ProcessD. Controlling Process

Page 54: Session 3   gdas pmp study group presentation

24. As a project manager, Project Plan Development is an important element of managing projects. Which phase of the project management life-cycle does Project Plan Development belong to?

A. Initiation ProcessB. Planning ProcessC. Execution ProcessD. Controlling Process

Correct Choice:     B  Justification:     Project Plan Development is done as part of the Planning Process.

Reference: pmstudy.com notes as mentioned above

Page 55: Session 3   gdas pmp study group presentation

25. If you would like to find out who will be approving changes in your project deliverables and documentation, you can refer to the:

A. Change Control SystemB. Project PlanC. Organization ChartD. Resource Assignment Matrix

Page 56: Session 3   gdas pmp study group presentation

25. If you would like to find out who will be approving changes in your project deliverables and documentation, you can refer to the:

A. Change Control SystemB. Project PlanC. Organization ChartD. Resource Assignment Matrix

Correct Choice:     AJustification:     Change control system: A collection of formal documented procedures that define how project deliverables and documentation will be controlled, changed, and approved

Reference: PMBOK Third Edition, Page Number: 353

A change control system is a collection of formal documented procedures that define how project performance will be monitored and evaluated, and includes the steps by which official project documents may be changed. It includes the paperwork, tracking systems, processes and approval levels necessary for authorizing changes.

Page 57: Session 3   gdas pmp study group presentation

Wrap Up

Conference Number: 547-941-6414 or 866-547-8978Passcode: Leader – 844306338, Participant – 370670831

4 Scope Management(PMBOK Chapters 5)

September 25

2:00pm EST

Presenter: https://www.rooms.hp.com/attend/default.aspx?key=EHYAWGDPHRParticipant: https://www.rooms.hp.com/attend/default.aspx?key=EPKQ5PM2NU