SESSION 12: MV UNDERGROUND CABLE
SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN
• Development of TNB MV Underground Cable
Specification
• TNB MV Underground Cable Installation Practice
• Development of TNB Underground Cable Maintenance
Practices
• Future Development in TNB MV Underground Cable
System
![Page 2: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/2.jpg)
Hosted by: Organized by:
2
Objective
• To enhance understanding on technical requirements
for TNB’s cables.
• To share TNB standard process & foster better
understanding.
• To inform public on TNB’s effort in developing high
reliability underground cable system
![Page 3: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/3.jpg)
Hosted by: Organized by:
3
Development of TNB MV Underground Cable
Specification
• Types of cables used in TNB
– Low Voltage Cables
• PILC (4 cores)
• PVC (1 core)
• XLPE (4 cores)
– Medium Voltage (11, 22&33kV)
• PILC (3 cores)
• Oil Filled (3 cores)
• XLPE (1 core & 3 cores)
![Page 4: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/4.jpg)
Hosted by: Organized by:
4
Development of TNB MV Underground Cable
Specification
• TNB uses two type of MVUG Cables
– PILCDSTA (PILC)
• Before mid 1980’s
• Ceased addition since 2007
– XLPE
• Starts mid 1980’s
• Now 100% new cables
![Page 5: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/5.jpg)
Hosted by: Organized by:
5
Typical Construction of PILC Cable
![Page 6: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/6.jpg)
Hosted by: Organized by:
6
Typical Construction of Single Core XLPE Cable
![Page 7: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/7.jpg)
Hosted by: Organized by:
7
Typical Construction of Three Cores XLPE Cable
![Page 8: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/8.jpg)
Hosted by: Organized by:
8
Specification Development Process
• Specification Development / Revision
– Major changes in reference standards
– New cable design is needed
• To keep up with technology advancement
• To introduce new requirements to enhance performance based on
feedback
– Diagnostic Test findings
– Failure investigation & analysis
![Page 9: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/9.jpg)
Hosted by: Organized by:
9
Characteristic of TNB Technical Specification
• Functional requirement
• Refers International / National Standards
• Specific requirements to suit local
environmental & operational condition.
![Page 10: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/10.jpg)
Hosted by: Organized by:
10
Functional Requirements
• System voltage
– Nominal voltage
– Maximum voltage
• System frequency
• Impulse withstand voltage level (BIL)
• Maximum continuous conductor operating
temperature
• 3 Phase Symmetrical Fault Level
![Page 11: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/11.jpg)
Hosted by: Organized by:
11
Reference Standards
1. IEC – International Electrotechnical Commission
2. BS – British Standard (UK)
3. IEEE – Institute of Electrical and Electronics Engineers
(USA)
4. ICEA – Insulated Cable Engineering Association (USA)
5. NEMA – National Electrical Manufacturers Association
(USA)
![Page 12: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/12.jpg)
Hosted by: Organized by:
12
Common Reference Standards
IEC 60502 -1 : Power cables with extruded insulation
and their accessories for rated voltage from 1kV
(Um = 1.2kV) up to 30kv (Um=36kV)
Part 1:
Cables for rated voltages of 1kV (Um = 1.2kV) and
3kV (Um = 3.6kV).
![Page 13: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/13.jpg)
Hosted by: Organized by:
13
Common Reference Standards
IEC 60502 -2 : Power cables with extruded insulation
and their accessories for rated voltage from 1kV
(Um = 1.2kV) up to 30kv (Um=36kV)
Part 2:
Cables for rated voltages of 6kV (Um = 7.2kV) and
30kV (Um = 36kV).
![Page 14: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/14.jpg)
Hosted by: Organized by:
14
Common Reference Standards
IEC 60228 : Conductors of insulated cables
BS 2627 : Wrought aluminum for electrical purposes.
![Page 15: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/15.jpg)
Hosted by: Organized by:
15
Specific TNB’s Requirements
• Conductor screen
– Minimum thickness
– Minimum volume resistivity
• Insulation screen
– Minimum thickness
– Minimum volume resistivity
– Bonded or Striptable
• XLPE Insulation Free from voids & impurities
![Page 16: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/16.jpg)
Hosted by: Organized by:
16
Specific TNB’s Requirements
• Triple extrusion (Method of application)
– Conductor screen
– Insulation
– Insulation screen
Metallic screen
– Type (tape / wire)
– Thickness
– Method of application
![Page 17: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/17.jpg)
Hosted by: Organized by:
17
Specific TNB’s Requirements
• XLPE curing method (Dry)
• Type & grade of sheathing material
– MDPE ST7
– PVC ST2 (ABC)
– UV resistance
– Termite repellant
– Graphite outer coating (single core)
![Page 18: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/18.jpg)
Hosted by: Organized by:
18
Specific TNB’s Requirements
• Filler material
– Non hydroscopic
• Moisture barrier
– Longitudinal
• Water swell-able tape
– Radial
• Lead sheath (PILC & Submarine)
• Laminated aluminum foil
![Page 19: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/19.jpg)
Hosted by: Organized by:
19
Quality Control Testing
• Type Test
– Design verification test
• Based on IEC Standard
• Tested by Independent Approved Laboratory
• Routine Test
– Manufacturing quality control test
• Based on IEC Standard
• 100% finished product
![Page 20: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/20.jpg)
Hosted by: Organized by:
20
Quality Control Testing
• Sample Test
– Based on IEC Standard
– Every 10kM produced
– Commencement of contract & before Factory Acceptance
Test (FAT)
• Factory Acceptance Test
– Based on IEC Standard (Routine Test)
– 10% sample
![Page 21: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/21.jpg)
Hosted by: Organized by:
21
Request for New Tech Spec
Prepare Draft
Get Feedback
Feedback Prepare Final Draft
Technical Working
Committee
Comments
Distribution Technical
Committee Approve
Distribute to
End Users
Yes
Yes
No
No
END
Yes
No
![Page 22: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/22.jpg)
Hosted by: Organized by:
22
TNB UG Cable Installation Practice
• Direct buried
– Open trench
• Laid in Duct
– Busy & congested areas (HDPE / PVC pipes)
– Road / railway / stream / river crossing (HDD)
• Laid in Duct bank
– No dig policy
– Putrajaya
![Page 23: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/23.jpg)
Hosted by: Organized by:
23
TNB UG Cable Installation Practice
• Laid in dedicated precast concrete trench
– No Dig Policy
• Medini – Iskandar Malaysia
• Utility tunnel
– Laid on cable tray
– No Dig Policy
• Putrajaya
![Page 24: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/24.jpg)
Hosted by: Organized by:
24
Direct Buried (Before 2008)
![Page 25: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/25.jpg)
Hosted by: Organized by:
25
Direct Buried (After 2008)
![Page 26: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/26.jpg)
Hosted by: Organized by:
26
Direct Buried (After 2008)
![Page 27: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/27.jpg)
Hosted by: Organized by:
27
Direct Buried
![Page 28: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/28.jpg)
Hosted by: Organized by:
28
Cross-section of direct buried LV, 11, 22kV Cables
![Page 29: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/29.jpg)
Hosted by: Organized by:
29
uPVC Cable Protection Slab
![Page 30: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/30.jpg)
Hosted by: Organized by:
30
Mechanical Protection for Cables
11& 22kV Cables 33kV Cables
![Page 31: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/31.jpg)
Hosted by: Organized by:
31
Mechanical Protection for Cables
![Page 32: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/32.jpg)
Hosted by: Organized by:
32
River Crossing – Cable Bridge
![Page 33: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/33.jpg)
Hosted by: Organized by:
33
Class B PVC Ducts
![Page 34: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/34.jpg)
Hosted by: Organized by:
34
Exposed Duct : PE Vs PVC
Source : BICC Electric Cables Handbook, 3rd edition, Pg 95
![Page 35: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/35.jpg)
Hosted by: Organized by:
35
HDD – Road, Railway, Small river crossing
![Page 36: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/36.jpg)
Hosted by: Organized by:
36
HDPE Grade PN10 Ducts
![Page 37: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/37.jpg)
Hosted by: Organized by:
37
Cable Laying (MEDINI – Iskandar Malaysia)
No Dig Policy
![Page 38: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/38.jpg)
Hosted by: Organized by:
38
Pre-Cast Concrete Trench Turf
![Page 39: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/39.jpg)
Hosted by: Organized by:
39
Cable Laying (Putrajaya)
No Dig Policy
![Page 40: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/40.jpg)
Hosted by: Organized by:
40
• Single core cable installation
– LV cable
• Limitation on length allowed
• Safety / Fault current return path
– MV cable
• Single point bonding
• Both end bonding
• Cross bonding
![Page 41: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/41.jpg)
Hosted by: Organized by:
41
• Single core cable installation
– MV cable
• Single point bonding
– Sheath induce voltage - <50V
– Fault current return path
• Both end bonding
– Sheath circulation current
– De-rating of cable current carrying capacity
• Cross bonding
– Link box maintenance
– Sheath voltage management
– Sheath current monitoring
![Page 42: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/42.jpg)
Hosted by: Organized by:
42
Sheath voltage α Load Current & Length of Cable
![Page 43: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/43.jpg)
Hosted by: Organized by:
43
Single core cable sheath Bonding
Cross Bonding System
![Page 44: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/44.jpg)
Hosted by: Organized by:
44
Effect of Bonding Types Cable Laid in Trefoil Formation
Trefoil Direct buried in backfill (native soil = 1.5, backfill=1.2), cable depth = 3.5 ft, trench width = 1.64 ft
No Cable Bonding typeAmpacity
(A)
Induced
sheath
current
(A)
Induced
sheath
voltage (V/km)
Both end 485 28.4 -
Single end 493 - 28.6
Both end 488 278.6 -
Single end 570 - 32.6
Perfect cross bond 570 - 0
11 kV 1C 500
33 kV 1C 630
1
2
![Page 45: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/45.jpg)
Hosted by: Organized by:
45
Laying of Single Core Cables
Flat Formation Trefoil Formation
•Higher Ampacity (Flat non
touching)
•Voltage unbalance must kept
<2%
•Need to transpose core at each
cross bonding joint
•Lower Ampacity
•No voltage unbalance
•No need for core transpose at
cross bonding joint
•Simple and easy to manage
•No confusion during fault
location
![Page 46: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/46.jpg)
Hosted by: Organized by:
46
Do not lay single core cable in GI pipe !
![Page 47: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/47.jpg)
Hosted by: Organized by:
47
Flat formation with Core Transposition & Cross
Bonding
![Page 48: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/48.jpg)
Hosted by: Organized by:
48
Trefoil formation with cross bonding
![Page 49: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/49.jpg)
Hosted by: Organized by:
49
Cross Bonding Joint & Link Box
![Page 50: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/50.jpg)
Hosted by: Organized by:
50
Link Box
33kV Link Box
![Page 51: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/51.jpg)
Hosted by: Organized by:
51
Link Box
11&22kV Link Box
![Page 52: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/52.jpg)
Hosted by: Organized by:
52
Single Core Cable Maintenance Test
Sheath Voltage & Current Measurment
![Page 53: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/53.jpg)
Hosted by: Organized by:
53
TNB’s MV System Breakdown Statistic
1613, 12%
3880, 29% 7935, 59%
Overhead Substation Underground
MV INTERRUPTIONS BY COMPONENTS FOR FY 0910
Underground System contributes 59% of MV Interruptions
![Page 54: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/54.jpg)
Hosted by: Organized by:
54
MVUG Cable Failure FY2010/2011
3299, 42%
2868, 36%
787, 10%
980, 12%
Cable Joint Termination Third Party
![Page 55: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/55.jpg)
Hosted by: Organized by:
55
![Page 56: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/56.jpg)
Hosted by: Organized by:
56
TNB MVUG Cable Maintenance Practices
• Maintenance required for MVUG cable?
– 3 cores cable
– 1 core cable
• What maintenance do you do for MVUG cable
system?
![Page 57: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/57.jpg)
Hosted by: Organized by:
57
TNB MVUG Cable Maintenance Practices
• Insulation integrity
• Sheath Integrity
• Connection Integrity
• Tier 1 (common test)
• Tier 2 (Special test)
![Page 58: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/58.jpg)
Hosted by: Organized by:
58
TNB MVUG Cable Maintenance Practices
• Insulation Integrity
– IR, PI , DAR – Tier 1
– Tan Delta – Tier 2
– PD Mapping –Tier 2
– Dielectric Spectroscopy – Tier 2
– HVDC* - Tier 1 (PILC)
![Page 59: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/59.jpg)
Hosted by: Organized by:
59
TNB MVUG Cable Maintenance Practices
• Sheath Integrity
– Sheath test – Tier 1
• Commissioning
• Maintenance (In service)
• After repair
• Connection Integrity
– Contact resistance – Tier 1
• New & after repair (connector)
• Thermography (Bad contact)
![Page 60: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/60.jpg)
Hosted by: Organized by:
60
Condition Monitoring
Technologies XLPE PILC LV
Purpose Technologies 1Commissio
ning
2In-
Service
3After
Repair
Commission
ing
In-
Service
After
Repair
Commission
ing
In-
Service
After
Repair
Insulation
Integrity
Insulation
Resistance
PI test
DAR test
Tan-delta
Partial
Discharge
Mapping
Dielectric
Spectroscopy
HVDC 4
![Page 61: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/61.jpg)
Hosted by: Organized by:
61
Condition Monitoring
Technologies XLPE PILC LV
Purpose Technologies 1Commi
ssioning
2In-
Service
3After
Repair
Commi
ssioning
In-
Service
After
Repair
Commis
sioning
In-
Service
After
Repair
Sheath
Integrity5
HVDC Sheath
Test 6
Integrity of
Connections
Contact
Resistance Test
Metallic Sheath
Continuity
Thermography
![Page 62: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/62.jpg)
Hosted by: Organized by:
62
Insulation Resistance Test (IR)
This test is done on cables at regular interval of 24
months for MV cables and 60 months for LV cables
under normal condition. This test results are considered
for condition assessment while the cable is in service.
![Page 63: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/63.jpg)
Hosted by: Organized by:
63
Insulation Resistance Test (IR)
• Insulation Resistance Test
is the specific resistivity of the cable insulation
(Ωm)
is the length of cable (m)
is the external radii of insulation
is the internal radii of insulation
•Insulation resistance is temperature sensitive
•Long test time is needed to allow for charging current to ceased
•Reading is length dependent
•Difficult to make decision
![Page 64: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/64.jpg)
Hosted by: Organized by:
64
Insulation Resistance Test (IR)
![Page 65: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/65.jpg)
Hosted by: Organized by:
65
Insulation Resistance Test (IR)
PI = Polarization Index = R10 / R1
Insulation resistance measurement values are recorded at 1
minute and 10 minutes of voltage application.
The ratio at 10 minutes to 1 minute will determine the
polarization index value.
![Page 66: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/66.jpg)
Hosted by: Organized by:
66
Results Classification Action
PI value ≥ 3.0
Excellent
Normal. The monitoring periodicity of 24
months for MV cables and 60 months for
LV cables can be maintained.
1.5< PI value < 3.0
Good
The monitoring periodicity should be
revised to 6 months for MV cables and 24
months for LV cables.
1.0< PI value < 1.5
Moderate
The monitoring periodicity should be
revised to 3 months for MV cables and 12
months for LV cables.
PI value < 1.0
Bad / Dangerous
Remove the Cable from service and
perform Tier 2 tests (if applicable)
immediately for MV cable. Replace LV
cables.
![Page 67: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/67.jpg)
Hosted by: Organized by:
67
Insulation Resistance Test (IR)
DAR = Dielectric Absorption Ratio = R60 / R30
Insulation resistance measurement values are recorded at 30
second and 60 second of voltage application.
The ratio at 60 Second to 30 second will determine the
Dielectric Absorption Ratio value.
![Page 68: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/68.jpg)
Hosted by: Organized by:
68
Results Classification Action
DAR value ≥ 1.6
Excellent
Normal. The monitoring periodicity
of 24 months for MV cables and 60
months for LV cables can be
maintained.
1.< DAR value <
1.5
Good
The monitoring periodicity should
be revised to 6 months for MV
cables and 24 months for LV cables.
1.0 < DAR value <
1.1
Moderate
The monitoring periodicity should
be revised to 3 months for MV
cables and 12 months for LV cables.
DAR value < 1.0
Bad / Dangerous
Remove the Cable from service and
perform Tier 2 tests (if applicable)
immediately for MV cable. Replace
LV cables.
![Page 69: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/69.jpg)
Hosted by: Organized by:
69
Tangent Delta (Tan ∂) Test
This test is done on cables at regular interval of 24 months
under normal condition. This test results are considered for
condition assessment while the cable is in service.
![Page 70: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/70.jpg)
Hosted by: Organized by:
70
Results Action
XLPE:
tan δ (2 U0) < 1.2 E-3 and
[tan δ (2 U0) - tan δ (U0)] < 0.6 E-3
PILC:
tan δ (50Hz) < 2.3 E-3
Normal. The monitoring periodicity of all Tier 1 tests
can be maintained at 24 months. Practice Tan delta
test if necessary.
XLPE:
1.2 E-3 ≥ tan δ (2 U0) < 2.2 E-3 and
0.6 E-3 ≥ [tan δ (2 U0) - tan δ (U0)] < 1.0 E-3
PILC:
2.3 E-3 < tan δ (50Hz) < 3.0 E-3
Retest the cable for Tan delta test after 6 months.
The monitoring periodicity of all Tier 1 tests should
be revised to 6 months.
XLPE:
2.2 E-3 ≥ tan δ (2 U0) < 2.8 E-3 and
1.0 E-3 ≥ [tan δ (2 U0) - tan δ (U0)] < 1.5 E-3
PILC:
3.0 E-3 < tan δ (50Hz) < 3.5 E-3
Retest the cable for Tan delta test after 3 months.
Arrange for replacement of defective section(s).
XLPE:
tan δ (2 U0) ≥ 2.8 E-3 or
[tan δ (2 U0) - tan δ (U0)] ≥ 1.5 E-3
PILC:
tan δ (50Hz) ≥ 3.5 E-3
Indicates serious problem requiring immediate
evaluation, additional testing and consultation with
experts. Recommendation is to remove from service
immediately and replace the cable..
![Page 71: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/71.jpg)
Hosted by: Organized by:
71
Tan ∂ Measurement
![Page 72: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/72.jpg)
Hosted by: Organized by:
72
PD Mapping
High Voltage Part Operator Desk
![Page 73: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/73.jpg)
Hosted by: Organized by:
73
![Page 74: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/74.jpg)
Hosted by: Organized by:
74
Joint
![Page 75: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/75.jpg)
Hosted by: Organized by:
75
PD Mapping
Results Action
Severity Index < 2 Normal. The monitoring periodicity of all Tier 1 tests can be maintained
at 24 months. Practice partial discharge test if necessary.
2 < Severity Index < 5 Retest the cable for partial discharge after 6 months. The monitoring
periodicity of all Tier 1 tests should be revised to 6 months.
5 < Severity Index < 7 Retest the cable for partial discharge after 3 months. Arrange for
replacement of defective section(s).
Severity Index > 7 Indicates serious problem requiring immediate evaluation, additional
testing and consultation with experts. Recommendation is to remove from
service immediately and replace the cable.
![Page 76: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/76.jpg)
Hosted by: Organized by:
76
Sheath Integrity Test
![Page 77: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/77.jpg)
Hosted by: Organized by:
77
VLF Withstand Test
• Replacement test system for HV DC for XLPE cables
• Destructive test
• To proactively flush out weak spot in cable system
• Also used as High Voltage Source for PD Mapping
![Page 78: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/78.jpg)
Hosted by: Organized by:
78
VLF Withstand Test
Before 2007
• Commissioning Test &
• Routine Maintenance Test
– Test Voltage 3Uo
– Test Duration 60 min
– Test Frequency 0.1Hz, 0.05Hz, 0.02Hz
![Page 79: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/79.jpg)
Hosted by: Organized by:
79
VLF Withstand Test
Since 2007/8
• Commissioning Test
– New cables
• Test voltage 2.0Uo
• Test duration 30min
• Test Frequency 0.1Hz
– After fault repaired
• Test voltage 1.6Uo
• Test duration 15min
• Test Frequency 0.1Hz
Alternative to VLF Withstand
Test – 24 hour system voltage
SOAK Test
![Page 80: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/80.jpg)
Hosted by: Organized by:
80
![Page 81: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/81.jpg)
Hosted by: Organized by:
81
![Page 82: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/82.jpg)
Hosted by: Organized by:
82
TNB’s Experience
Duration
(Minutes)
Nos. of failure %
0-12 1472 67.62
13-30 496 21.54
31-45 129 5.93
46-60 107 4.92
![Page 83: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/83.jpg)
Hosted by: Organized by:
83
IEEE Std 400.2–2004
IEEE Guide for Field Testing of Shielded Power Cable Systems Using
Very Low Frequency (VLF)
• The results of field tests on over 15000 XLPE cable circuits
tested showed that ~68% of the recorded failures occurred
within 12 minutes, ~89% within 30 minutes, ~95% after 45
minutes, and 100% after 60 minutes (Moh [B17]).
• The recommended testing time varies between 15 and 60
minutes, although the data in Moh [B17] suggest a testing
time of 30 minutes.
![Page 84: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/84.jpg)
Hosted by: Organized by:
84
Future Development
• Cable Design & Construction
– Tree Retardant (TR-XLPE)
– Stringent requirement on insulation compound cleanliness
– Strict requirement on eccentricity of cable core
– Fully bonded insulation screen
– Water tight cable construction
![Page 85: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/85.jpg)
Hosted by: Organized by:
85
Future Development
• Cable Operation & Maintenance
– Sheath Integrity test for 3 core cables
– Advance CBM diagnostic test
• On-line PD Detection & Location
– Monitoring of Water Tree in MVUG Cables
• Dielectric Spectroscopy test
• Polarization & Depolarization Current Measurement
![Page 86: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/86.jpg)
Hosted by: Organized by:
86
Dielectric Spectroscopy
![Page 87: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/87.jpg)
Hosted by: Organized by:
87
Dielectric Spectroscopy (DS) Test
![Page 88: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/88.jpg)
Hosted by: Organized by:
88
Conclusion
• TNB continuously seek to improve its MVUG cable system performance via
– Improve quality of cable and its accessories
– Adopt new Accessories technology
– Adopt new methodology for
• Installation method
• Condition based maintenance practice
• New diagnostic tools
![Page 89: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of](https://reader034.vdocuments.us/reader034/viewer/2022050615/5ac06e737f8b9ad73f8bbb16/html5/thumbnails/89.jpg)
Hosted by: Organized by:
89