westernwindow systemswesternwindowsystems.com
bifold
installation instructions
series 9500 f loor load
westernwindow systemswesternwindowsystems.com
Head De�ection (+0.12” / -0.00”)
Head
Left Jamb
Right Jamb
Note: This is a bottom hung product. Provide adequate structure at threshold. Continuous threshold support is required.
Lay bed of sealant at threshold and under both jambs – ½” to exterior of inside frame point.
Center and set frame in opening with temporary shims.
Shim and level threshold as needed
Threshold must be level – continuous shim required.
Anchor threshold with #10 x 2-1/2 pph anchors.
Anchor head with #10 x 2-1/2 pph anchors.
Pump Sealant into holes prior to inserting screws to ensure penetration is sealed completely.
Mounting At Jambs:
Plumb and square jambs using shims – as necessary.
Pump sealant into jamb mounting holes to ensure penetration is sealed completely.
Threshold Sill
Butter all joints with appropriate sealant
bifold
installation instructionsinstallation
12/04/2013 pg1
series 9500 f loor load
westernwindow systemswesternwindowsystems.com
bifold
installation instructionsinstallation
series 9500 f loor load
Anchor jambs with #10 x 2-1/2 pfh anchors
Apply a full bead of quality sealant where jamb and threshold meet – from exterior to interior.
Secure with appropriate anchor screws.
Note: Rough openings should be �ashed with an appropriate moisture barrier in accordance with industry standards and/or building codes.
Perimeter caulk door frame to moisture barrier after installation. Use sealant that is recommended by moisture barrier manufacturer.
To begin:
Check rough opening to verify that it is plumb, level and approximately ½” wider and ½” taller than the net frame size.
Check �ashing.
Assemble frame and butter all joints with appropriate sealant to ensure the seal is complete.
Check main frame as necessary – to �t required opening.
12/04/2013 pg2
installation instructionsinstallation
westernwindow systemswesternwindowsystems.com
series 9500 f loor load
12/04/2013 pg3
Bottom End Carrier
Top End Carrier
Insert all hardware in correct order
Prepare all end carrier hardware
Check hardware orientation and positioning
Insert carrier hardware in head and t-hold (through cutouts at pivot)
Note: Plastic adjustment tool supplied. Tip to be removed after�nal adjustment.
Top End Carrier At Head
Bottom End Carrier At T-Hold
bifold
westernwindow systemswesternwindowsystems.com
bifold
installation instructionsinstallation
Bottom End Carrier
Top End Carrier
Insert all hardware in correct order
Prepare all end carrier hardware
Check hardware orientation and positioning
Insert carrier hardware in head and t-hold (through cutouts at pivot)
Note: Plastic adjustment tool supplied. Tip to be removed after�nal adjustment.
Top Intermediate Carrier At Head
Bottom Intermediate Carrier At T-Hold
12/04/2013 pg4
series 9500 f loor load
westernwindow systemswesternwindowsystems.com
bifold
installation instructionsinstallation
Top Pivot JambHorizontal adjustment screw faces away from jamb
Bottom Pivot JambHorizontal adjustment screw faces away from jamb
Insert all hardware in correct order
Prepare all pivot hardware
Check hardware orientation and positioning
Insert carrier hardware in head and t-hold (through cutouts at pivot)
Note: Plastic adjustment tool supplied. Tip to be removed after�nal adjustment.
Top Pivot Cap
Bottom Pivot Cap
Top Pivot Head position
Bottom Pivot T-Hold Position
12/04/2013 pg5
series 9500 f loor load
westernwindow systemswesternwindowsystems.com
Wall Pivot (Mid-Pivot) jamb
bifold
installation instructionsinstallation
Wall Pivot (Mid-Pivot)
Insert all hardware in correct order
Prepare all end carrier hardware
Check hardware orientation and positioning
Insert carrier hardware in head and t-hold (through cutouts at pivot)
westernwindow systemswesternwindowsystems.com
Wall Pivot (Mid-Pivot) jamb
bifold
installation instructionsinstallation
Wall Pivot (Mid-Pivot)
Insert all hardware in correct order
Prepare all end carrier hardware
Check hardware orientation and positioning
Insert carrier hardware in head and t-hold (through cutouts at pivot)
12/04/2013 pg6
series 9500 f loor load
westernwindow systemswesternwindowsystems.com
bifold
installation instructionsinstallation
12/04/2013 pg7
westernwindow systemswesternwindowsystems.com
bifold
installation instructionsinstallation
Gather Door Panels.
Check for orientation and swing direction.
Check for panel positioning.
Dry �t panels in frame for alignment.
Thoroughly clean and lubricate frame head and t-hold.
Separate door panels into appropriate pairs.
Insert and hold open door panels at 90 degrees in main frame.
Support panel weight with �at wedge or similar tool.
Fit all pivots, �oor guides, carriers, and butt hinges to panel stiles.
Check hardware orientation and positioning.
Panels are labeled alphabetically – from left to right.
Install panels from left to right.
Passive Panel With Inactive Flush Bolt/Lock
Active Panel With Active lock and Handle
Panel “A”
Panel “B”
Panel “C”
Panel “D”
Door panels are labeled alphabetically from left to rightAstragal At Passive Panel
series 9500 f loor load
westernwindow systemswesternwindowsystems.com
bifold
installation instructionsinstallation
12/04/2013 pg8
westernwindow systemswesternwindowsystems.com
bifold
installation instructionsinstallation
Install Panels from left to right.
Attach all panels to hardware and close panels. Position and adjust panels from top to bottom between head and t-hold for even split.
Re-align and re-adjust panels as necessary – for plumb.
Panel “A”
Panel “B”
Panel “C”
Panel “D”
Door panels are labeled alphabetically from left to right
Left Panel Jamb: 3/8” gap between panel and jamb.
Passive
Active
Intermediate Carriers
Inactive Lock
Active Lock
Inactive Lock
Mid-Pivot Mid-Pivot
Pivot
AstragalMagnetic Door HoldO�set
Butt Hinges
O�set Butt Hinge
With Handle
Pivot
series 9500 f loor load
westernwindow systemswesternwindowsystems.com
bifold
installation instructionsinstallation
12/04/2013 pg9
westernwindow systemswesternwindowsystems.com
bifold
installation instructionsinstallation
Open door panels and adjust pivots and carrier hardware as necessary.
Test operate all door panels. For uneven gaps, adjust door panels as necessary.
Fine tune and adjust until doors operate smoothly, and gaps are even and acceptable.
Apply magnetic door holds to appropriate panels as required.
Screw apply pivot caps into place, Refer back to page 5 to identify the pivot cap for both top and bottom locations.
Magnetic Door Hold
Final Adjustment At Carriers
Note: Plastic adjustment tool supplied. Tip to be removed after�nal adjustment.
Panel “A” Panel “B” Panel “C”Panel “D”
series 9500 f loor load