sergio martins - operations and passengers workshop - panel 2
TRANSCRIPT
A-cdmthree Steps towards
cost ×avings
SergioMartins
Director,AirTraffic Management- Latin America
RiodeJaneiro,March 31st,2017
Why a-cdm ?
https://www.eurocontrol.int/sites/default/files/content/documents/nm/airports/acdm-cba.pdf
• $9,00savings.......foreach $1,00invested
Why a-cdm ?
https://www.eurocontrol.int/sites/default/files/content/documents/nm/airports/acdm-cba.pdf
• $9,00savings.......foreach $1,00invested
• Shortpayback period• ATC/Airlines/Ground Handlers
...below 12months• AirportOperators
...below 24months• Overall
...below 12months
Why a-cdm ?
https://www.eurocontrol.int/sites/default/files/content/documents/nm/airports/acdm-cba.pdf
• $9,00savings.......foreach $1,00invested
• Shortpayback period• ATC/Airlines/Ground Handlers
...below 12months• AirportOperators
...below 24months• Overall
...below 12months
• Impressive Fuel Savings records
What is a-cdm all about ?
• Reducing taxifuel consumption
• Maximizing useof airport infraestructure
• Minimizing surface congestion
• Rationalizing turn-around process
• Improving predictability
• Increasing airport capacity
• Integrating airport operation into ATFM
optimization efforts
a-cdm, the three steps !
1. Information Sharing
ü Newculture based upon stakeholders´ collaboration
formaximum Situation Awareness
a-cdm, the three steps !
1. Information Sharing
ü Newculture based upon stakeholders´ collaboration
formaximum Situation Awareness
2. Milestone Approach
ü Linkof Arrival &Departure flight information,
introducing event tracking capability (milestones)
• Pre-Departure Sequencing
ü ATCassignment of optimum Engine Startand
Departure Sequence
a-cdm, the three steps !
1. Information Sharing
ü Newculture based upon stakeholders´ collaboration for
maximum Situation Awareness
2. Milestone Approach
ü Linkof Arrival &Departure flight information,introducing
event tracking capability (milestones)
3. Pre-Departure Sequencing
ü ATCassignment of optimum Engine Start/Pushback and
Takeoff Sequence
Step 1 - information sharingAirportCDMInformation Sharing Platform(ACISP)
Datagrouped by Aircraft Registration
AirportSystems(AODB,FIDS,CUTE,etc.)
Airlines´ andGroundHandlers´ Systems
MeteorologicalInformation
SurfaceSurveillance
Step 1 - information sharing
MapDisplays,Countersandrelevantflights/KPIs
Configuredtohighlightcriticalalerts
Statisticalinformationand
Forecasts
Common-UseSurfaceSurveillance Platform
Step 1 - information sharing
CustomizedWorkSpaces
ColorCodebasedsegregationandfilters
MixofMapDisplays,showingdifferentAirport/Airspace
sectors
IntegrationwithATCVoicechanels
Common-UseSurfaceSurveillance Platform
EOBT ETOTTTOTATOT
ARRFlightSchedule
Step 2 - milestone approach
En-route
TURNAROUND OUTBOUNDINBOUND
Taxiing Gate Taxiing
Take-off
Taxiing ApronApronTake-off Landing
ANSP Airline GHAirport RAMP
TOBTTSAT
EIBTELDT
AOBT
ATOTALDT
Milestones1 2 3 4 5 6 7/8
910 14
1112
1315 16
DEPFlightScheduleAircraft,Gate
i
iii
i ii
i
i
i
i iii ii iiiii i i
i i i i
AIBT
i i i i ii i
Linkbetween Arrival and Departure MovementsActualTargetEstimate
AirportCDMInformation Sharing Platform(ACISP)
STEP 2 - MILESTONE APPROACH
5
AlertsCounters
FlightList
FlightDetails
MilestoneProgress
Step 3 - pre-departuresequencing
RWYConfiguration
Tool
FlightList withAssigned TSATs
SlotManagementTool
Departure Manager(DMAN)
A-CDM BEST PRACTICES
Não é possível exibir esta imagem no momento.
Objectives & PerformanceProcedures/Process
ApplicationsData Integration
Não é possível exibir esta imagem no momento.
Não é possível exibir esta imagem no momento.
A-CDM BEST PRACTICES
A-CDM MANUAL
LOCAL RULES, PROCESSES & PROCEDURES
APPLICATIONS
A-CDMProgram
Airport AOC ANSPGHCrewRAMP
A-CDM BEST PRACTICES
Não é possível exibir esta imagem no momento.
Common Vocabulary
Não é possível exibir esta imagem no momento.
Procedures
Performance