senior program manager - mirza abdic’ distribution - r&d ... · distribution - r&d team...

8
Senior Program Manager - Mirza Abdic’ Distribution - R&D team Copenhagen.

Upload: others

Post on 07-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Senior Program Manager - Mirza Abdic’ Distribution - R&D ... · Distribution - R&D team Copenhagen. Format: 1 hour Skype call Attendees: Key Stakeholders from customer and partner

Senior Program Manager - Mirza Abdic’ Distribution - R&D team Copenhagen.

Page 2: Senior Program Manager - Mirza Abdic’ Distribution - R&D ... · Distribution - R&D team Copenhagen. Format: 1 hour Skype call Attendees: Key Stakeholders from customer and partner

Format: 1 hour Skype call

Attendees: Key Stakeholders from customer and partner teams.

AGENDA

Demand Replenishment for Raw Material Picking

• About Demand Replenishment for Raw Material Picking.

• Where it applies.

• Today’s extra goodie

• How all is set up.

Page 3: Senior Program Manager - Mirza Abdic’ Distribution - R&D ... · Distribution - R&D team Copenhagen. Format: 1 hour Skype call Attendees: Key Stakeholders from customer and partner

• About demand replenishment for raw material picking

Challenge

A wave template can not be constructed for raw material picking and a demand replenishment method can be

added for production orders and Kanban's. The capabilities correspond to the capabilities for sales order

picking and transfer order picking. Lack of capabilities have resulted in production raw material shortage, and

disruption in production processes. When raw materials have not been able to be moved from the warehouse

to input locations of the production facility, there was no any mechanism to ensure that picking locations get

replenished. This has often resulted in shortage of the raw materials and only way was to manually move the

materials to picking locations and re-wave the lines. This was very time consuming and manual process.

Solution

A wave template can now be constructed for raw material picking and a demand replenishment method can

be added for production orders and Kanban's. The capabilities correspond to the capabilities for sales order

picking and transfer order picking. Demand replenishment is now fully supported for all outbound and raw

material operations.

Page 4: Senior Program Manager - Mirza Abdic’ Distribution - R&D ... · Distribution - R&D team Copenhagen. Format: 1 hour Skype call Attendees: Key Stakeholders from customer and partner

• Where it applies

A wave template can now be created for raw material picking and a demand replenishment, method can be

added for production orders and Kanban's. The capabilities fully correspond to the capabilities for sales order

picking and transfer order picking.

Applies for both production orders and Kanban's.

Page 5: Senior Program Manager - Mirza Abdic’ Distribution - R&D ... · Distribution - R&D team Copenhagen. Format: 1 hour Skype call Attendees: Key Stakeholders from customer and partner

• How it is set up

- Wave template for raw material replenishment or Kanbans can be configured

- Method for replenishment can now be added to these wave template types.

- Note: It works exactly as sales demand replenishment

Page 6: Senior Program Manager - Mirza Abdic’ Distribution - R&D ... · Distribution - R&D team Copenhagen. Format: 1 hour Skype call Attendees: Key Stakeholders from customer and partner

• Today’s extra goodie

Immediate replenishment

- Immediate replenishment respecting restrict by unit (Release in 7.3 fall release 2017 and as Hotfix and KB for

2012 R3)

Overview of Immediate Replenishment

Immediate replenishment allows you to replenish inventory right after a location directive line fails, instead of

summing all demand at the end of allocation and replenishing it based on the summed quantity. This allows

you to set up replenishment to be restricted by specific units and quantity to go to specific locations.

Where it applies

Immediate replenishment is used during wave execution if allocation fails for a location directive line that has a

replenishment template set.

How it is setup

On location directive setup, a replenishment template that is type wave demand, can be selected on the

location directive line. This will be the replenishment template that runs if the location directive line fails to

allocate.

Page 7: Senior Program Manager - Mirza Abdic’ Distribution - R&D ... · Distribution - R&D team Copenhagen. Format: 1 hour Skype call Attendees: Key Stakeholders from customer and partner

https://roadmap.dynamics.com/

https://ideas.dynamics.com/ideas/

https://blogs.msdn.microsoft.com/dynamicsaxscm/

Page 8: Senior Program Manager - Mirza Abdic’ Distribution - R&D ... · Distribution - R&D team Copenhagen. Format: 1 hour Skype call Attendees: Key Stakeholders from customer and partner