Robbins is basically underground excavation company and have its headquarter at SOLON ,OHIO , USA , Currently its Working on chennai metro , India , Parbati hydroelectric project , Himanchal pardesh , India , SLBC Tunnel , Hyderabad , Katni project Madhya Pardesh

TRANSCRIPT

Page 1: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

SEMINAR PRESENTATION OF INDUSTRIAL TRAINING

AT

PRESENTED BY : ABHIMANYU KUMAR

BRANCH : EEE , 4TH YEAR

Page 2: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

About the“ THE ROBBINS COMPANY “ History Current projects Projects in INDIA Tunneling methods Types of Tunnel Boring machine Working of Tunnel boring machine (TBM -

317)

CONTENTS

Page 3: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

WORLD FIRST COMPANY TO MAKE TUNNEL BORING MACHINE IN 1951.

BORED OVER 3,500 KM OF TUNNEL

WORKED OVER MORE THAN 700 PROJECTS TILL DATE .

ABOUT THE ROBBINS COMPANY

Page 4: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

HAVE BOTH MANUFACTURING AND PRODUCTION COMPANY .

HEADQUATERS IS AT SOLON , OHIO ,

USA. HAVING MORE THAN

2.5 LAKH EMPLOYER AT TOTAL 35 OFFICES ALL OVER THE WORLD.

Page 5: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

JAMES ROBBINS FOUNDED THE ROBBINS COMPANY IN 1951 .

JAMES ROBBINS WAS THE TUNNEL MECHANIC.

ROBBINS BUILT THE FIRST TBM MITRY CONSTRUCTOR , WHO WERE WORKING FOR OHAE DAM SOUTH DAKOTA , USA .

HISTORY

Page 6: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

LOCATION ROBBINS OFFICES WORLDWIDE

Page 7: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

SEWER C PROJECT , USA NANJING METRO LINE , CHINA ENERGY PLANT PROJECT , USA MOSCOW METRO SYSTEM , RUSSIA SINGAPORE DOWN TOWN LINE ,

SINGAPORE

FEW ROBBINS CURRENT PROJECTS

Page 8: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

AMR-1/AMR-2 ( S.LB.C TUNNEL SCEME ) at Nalgonda district , Hyderabad ( A.P).

Parbati tunnel project for NHPC , Kullu , (H.P).

Chennai metro project , Chennai ,(T.N).

Katni tunnel project , katni (M.P)

PROJECTS IN INDIA

Page 9: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

LOCATION ON ROBBINS IN INDIA

Page 10: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

TRADITIONAL DRILL BLAST METHOD

ADVANTAGE : LOW COST DISADVANTAGE : UNSAFE

TUNNELING METHODS

Page 11: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

USING TUNNEL BORING MACHINE

ADVANTAGE : SAFE DISADVANTAGE : COSTLY

Page 12: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

MAIN BEAM TEAM

TYPES OF TUNNEL BORING MACHINE

Page 13: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

SINGLE SHIELD TBM

Page 14: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

DOUBLE SHIELD TBM

Page 15: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

DOUBLE SHIELDED TBM PARTS

Page 16: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

WORKING OF DOUBLE SHIELDED TBM

Page 17: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar

THE ROBBINS COMPANY OFFICIAL DOCUMENTRY ,

SOLON , OHIO, UNITED STATES OF

AMERICA

PREFERENCE

Page 18: Seminar presentation of industrial training At ROBBINS by Abhimanyu Kumar