seminar presentation of industrial training at robbins by abhimanyu kumar
DESCRIPTION
Robbins is basically underground excavation company and have its headquarter at SOLON ,OHIO , USA , Currently its Working on chennai metro , India , Parbati hydroelectric project , Himanchal pardesh , India , SLBC Tunnel , Hyderabad , Katni project Madhya PardeshTRANSCRIPT
SEMINAR PRESENTATION OF INDUSTRIAL TRAINING
AT
PRESENTED BY : ABHIMANYU KUMAR
BRANCH : EEE , 4TH YEAR
About the“ THE ROBBINS COMPANY “ History Current projects Projects in INDIA Tunneling methods Types of Tunnel Boring machine Working of Tunnel boring machine (TBM -
317)
CONTENTS
WORLD FIRST COMPANY TO MAKE TUNNEL BORING MACHINE IN 1951.
BORED OVER 3,500 KM OF TUNNEL
WORKED OVER MORE THAN 700 PROJECTS TILL DATE .
ABOUT THE ROBBINS COMPANY
HAVE BOTH MANUFACTURING AND PRODUCTION COMPANY .
HEADQUATERS IS AT SOLON , OHIO ,
USA. HAVING MORE THAN
2.5 LAKH EMPLOYER AT TOTAL 35 OFFICES ALL OVER THE WORLD.
JAMES ROBBINS FOUNDED THE ROBBINS COMPANY IN 1951 .
JAMES ROBBINS WAS THE TUNNEL MECHANIC.
ROBBINS BUILT THE FIRST TBM MITRY CONSTRUCTOR , WHO WERE WORKING FOR OHAE DAM SOUTH DAKOTA , USA .
HISTORY
LOCATION ROBBINS OFFICES WORLDWIDE
SEWER C PROJECT , USA NANJING METRO LINE , CHINA ENERGY PLANT PROJECT , USA MOSCOW METRO SYSTEM , RUSSIA SINGAPORE DOWN TOWN LINE ,
SINGAPORE
FEW ROBBINS CURRENT PROJECTS
AMR-1/AMR-2 ( S.LB.C TUNNEL SCEME ) at Nalgonda district , Hyderabad ( A.P).
Parbati tunnel project for NHPC , Kullu , (H.P).
Chennai metro project , Chennai ,(T.N).
Katni tunnel project , katni (M.P)
PROJECTS IN INDIA
LOCATION ON ROBBINS IN INDIA
TRADITIONAL DRILL BLAST METHOD
ADVANTAGE : LOW COST DISADVANTAGE : UNSAFE
TUNNELING METHODS
USING TUNNEL BORING MACHINE
ADVANTAGE : SAFE DISADVANTAGE : COSTLY
MAIN BEAM TEAM
TYPES OF TUNNEL BORING MACHINE
SINGLE SHIELD TBM
DOUBLE SHIELD TBM
DOUBLE SHIELDED TBM PARTS
WORKING OF DOUBLE SHIELDED TBM
THE ROBBINS COMPANY OFFICIAL DOCUMENTRY ,
SOLON , OHIO, UNITED STATES OF
AMERICA
PREFERENCE