Seminar on“Hong Kong Electricity Market:
Post-2008”
Reliability, Security, Best Price : A Consumer’s View
Presentation by KCRC
12 April 2005
![Page 2: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/2.jpg)
Content
KCRC Electricity Consumption Profile
KCRC Traction Supply Networks
Potential Energy Cost Saving Measures
Energy Demand for Future Extensions
View on Post 2008 Electricity Market
Q & A
![Page 3: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/3.jpg)
KCRC NetworkTotal length > 150 km
Annual electricity consumption HK$ 450 million in 2004
![Page 4: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/4.jpg)
Daily Patronage
Average daily patronage 1.5 million
![Page 5: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/5.jpg)
KCRC Operating ExpensesElectricity and
fuel16%
Staff cost
Electricity and fuel
Repair and maintenance
Material cost
Store and spares consumed
Property ownership andmanagement expensesOthers
Cost of services acquired
Government rent and rates
![Page 6: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/6.jpg)
Breakdown of Energy Cost
Depots andother KCRC
BuildingFacilities
5%
Traction Energy65%
StationOperations
30%
![Page 7: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/7.jpg)
KCRC Traction Supply Networks
System Voltage Infeed Points
East Rail AC 25kV Ho Man Tin, Tai Wai & Fanling CLP 132kV/25kV substation
West Rail AC 25kV Kwai Fong & Tin Shui Wai CLP 132kV/25kV substation
MOS Rail AC 25kV Tai Wai & Wu Kai Sha CLP 132kV/25kV substation
Light Rail DC 750V Tuen Mun, Yuen Long, Tin Shui Wai CLP 132kV/11kV substation
![Page 8: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/8.jpg)
FANTPK
YR
H1
YB
H2
BR
H3
TAW’A’
BR
YBBR
H2H3
YR
H1
YB
H2
RY
H1
HMT
LOW
ETS
EAST RAIL
WKN
CLPP FLK 132kV S/S
CIO
H1
WKS
MA ON SHAN RAIL
CLPP MOB 132kV S/S
CLPP TWK 132kV S/SCLPP TST 132kV S/S (2003)
TAW’B’
KWT / ATJ
AbbreviationsATJ – Au Tau JunctionCIO – City OneETS – East Tsim Sha TsuiFAN - FanlingHMT – Ho Man TinKWT – Kwu TungWKS – Wu Kai ShaLMC – Lok Ma ChauLOW – Lo WuTPK – Tai Po KauTAW’A’ – Tai Wai ‘A’TAW’B’ – Tai Wai ‘B’WKN – West Kowloon
LMC
East Rail Supply Networks
![Page 9: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/9.jpg)
West Rail Supply Networks
TUMTIS
BRRY
KWF HPWKN
ETS/HMT
CLPP KFW 132kV S/SYBBR
CLPP TIW 132kV S/S
H3H2H1H3H2H1
NAC
KWT / LMC
ATJ
WEST RAIL
AbbreviationsATJ – Au Tau JunctionETS – East Tsim Sha TsuiKWF – Kwai FongKWT – Kwu TungLMC – Lok Ma ChauNAC – Nam CheongHP – Ho PuiTIS – Tin Shui WaiTUM – Tuen MunWKN – West Kowloon
CLPP 132kV S/S
![Page 10: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/10.jpg)
CLP Tariff
• Traction energy -- Large Power Tariff Scheme
• Station energy -- Bulk Power Tariff Scheme
• Keep on negotiating for a better rate
![Page 11: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/11.jpg)
Trend of Traction EnergyEast Rail Traction Energy
2.40
2.45
2.50
2.55
2.60
1999 2000 2001 2002 2003 2004
Year
kWh
/ car
-km
![Page 12: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/12.jpg)
Energy ManagementIntroduction of Regenerative Braking
Phase III LRVSP-1900 / SP-1950 New EMU
![Page 13: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/13.jpg)
Energy ManagementTraction Coasting Control
Hard Driving Profile Coasting Profile
Spee
d
DistanceStation
AStation
BSp
eed
DistanceStation
AStation
B
High Potential of Traction Energy SavingHigh Potential of Traction Energy Saving
motoringmotoring braking coasting braking
![Page 14: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/14.jpg)
Energy ManagementReplacement of Motor Alternator with
Power Electronic Converter
Traditional Motor-Alternator Set
State-of-the-art Power Electronic Converter
On-going energy saving approx. HK$ 6 million annuallyOn-going energy saving approx. HK$ 6 million annually
![Page 15: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/15.jpg)
KCRC Network Extensionby 30% in future
Lok Ma ChauSpur Line
KowloonSouthern Link
Northern Link
ShatinCentral Link
RegionalExpress Line
![Page 16: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/16.jpg)
Energy Demand Projection
500,000
600,000
700,000
800,000
2003 2005 2007 2009 2011 2013 2015 2017
Ener
gy (M
Whr
)
MOS
LMCKSL
NOL/SCL/REL
![Page 17: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/17.jpg)
Potential connectivity for better security
• Linking with HEC due to SCL• Better assurance on the supply security
due to two sources of supply
![Page 18: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/18.jpg)
Opening of electricity market will have impacts on
• Price structure• Security • Reliability• Choice of optimal supplier
![Page 19: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/19.jpg)
Opinion
Being a mass transit service provider and probably one of the largest electricity consumer in HK, KCRC is closely observing the development of the electricity market reform with an open-minded.
![Page 20: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/20.jpg)
Bottom Lines
To obtain electricity power withGood security
High reliability
Best price
for enabling KCRC to provide good service to passenger
![Page 21: Seminar on “Hong Kong Electricity Market: Post-2008”aesc.hkbu.edu.hk/workshop/leetony.pdfCLPP TST 132kV S/S (2003) CLPP TWK 132kV S/S TAW’B’ KWT / ATJ Abbreviations ATJ –](https://reader036.vdocuments.us/reader036/viewer/2022081410/609b7ae5c30804454049d28a/html5/thumbnails/21.jpg)
End of Presentation